(CIP-617) BDR,BJR 25
- Let date
- Friday, September 18, 2026
- Contract
- 80B49 · job page
- District
- District 1
- County
- Dupage
- Highway
- Limits
- (3,716-Ft) Bridge Repairs (S.N. 022-0161) includes bridge deck scarification, latex concrete overlay, joint reconstruction, and patching, butt joints, HMA overlay of the approach pavement, concrete curb and gutter replacement, concrete median replacement, drainage structure adjustments, and pavement marking replacement. The project is located along IL Route 38 (Roosevelt Road) over the East Branch DuPage River in the Village of Glen Ellyn in DuPage County, Illinois.
- Classification
- ·
- Project number
Bidders 6
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Martam Construction Incorporated Low bidder | $759,267 | ||
| 2 | D. Construction, Inc. | $830,067 | +9.3% | |
| 3 | Alliance Contractors, Inc. | $970,005 | +27.8% | |
| 4 | Areatha Construction Co., Inc. | $976,446 | +28.6% | |
| 5 | Lorig Construction Company | $996,005 | +31.2% | |
| 6 | MYS, Incorporated | $1,081,010 | +42.4% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Martam Construc… | #2 D. Construction… | #3 Alliance Contra… | #4 Areatha Constru… | #5 Lorig Construct… | #6 MYS, Incorporat… |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | X0327638 | STREAM GAUGE | 1 | EACH | $1,500.00 | $1,500.00 | $2,000.00 | $3,881.65 | $2,600.00 | $3,908.21 | |
| 2 | X2503000 | MAINTENANCE MOWING | 3 | ACRE | $750.00 | $550.00 | $1,500.00 | $1,500.00 | $100.00 | $1,848.39 | |
| 3 | X2503112 | MOWING SPL | 1,200 | SQ YD | $5.00 | $11.83 | $4.00 | $4.00 | $0.5000 | $3.66 | |
| 4 | X5030250 | BR DECK GROOVING LONG | 297 | SQ YD | $23.00 | $26.64 | $39.63 | $39.65 | $40.00 | $43.95 | |
| 5 | X5030539 | FLOOR DRAINS CLEANED | 4 | EACH | $500.00 | $500.00 | $1.00 | $564.15 | $350.00 | $831.73 | |
| 6 | X5091732 | REPAIR BRIDGE RAIL | 9 | FOOT | $1,100.00 | $1,030.57 | $936.88 | $936.90 | $1,000.00 | $1,038.98 | |
| 7 | X6700407 | ENGRS FLD OFC TY A D1 | 12 | CAL MO | $3,600.00 | $5,000.00 | $500.00 | $3,000.00 | $3,500.00 | $3,169.84 | |
| 8 | X7010005 | MAINT TRAFF ILL TLWY | 1 | L SUM | $4,000.00 | $0.0100 | $2,800.00 | $2,000.00 | $100.00 | $55,448.93 | |
| 9 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $103,300.00 | $31,500.00 | $38,000.00 | $23,225.00 | $140,000.00 | $65,429.74 | |
| 10 | X7200061 | TEMP INFO SIGNING | 79 | SQ FT | $20.00 | $30.00 | $18.00 | $25.00 | $17.00 | $17.74 | |
| 11 | X7830050 | RRPM REFLECTOR REMOVL | 170 | EACH | $10.00 | $10.00 | $5.00 | $5.00 | $10.00 | $8.32 | |
| 12 | X7830052 | RRPM REFLECTOR REPLAC | 170 | EACH | $12.00 | $15.00 | $25.00 | $25.00 | $12.00 | $27.72 | |
| 13 | X8900104 | TEMP TR SIGNAL TIMING | 3 | EACH | $700.00 | $715.00 | $650.00 | $650.00 | $700.00 | $720.84 | |
| 14 | Z0001700 | APPR SLAB REPAIR (FD) | 12 | SQ YD | $1,450.00 | $1,500.00 | $1,896.00 | $1,748.50 | $1,400.00 | $1,258.45 | |
| 15 | Z0001800 | APPR SLAB REPAIR (PD) | 10 | SQ YD | $850.00 | $800.00 | $1,855.00 | $1,174.85 | $1,300.00 | $743.09 | |
| 16 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $5,000.00 | $10,000.00 | $5,000.00 | $7,500.00 | $6,000.00 | $7,762.85 | |
| 17 | Z0041895 | POLYMER CONCRETE | 10 | CU FT | $1,150.00 | $1,500.00 | $2,600.00 | $1,693.70 | $1,400.00 | $1,253.34 | |
| 18 | 21101615 | TOPSOIL F & P 4 | 164 | SQ YD | $15.00 | $27.50 | $34.00 | $34.00 | $25.00 | $13.03 | |
| 19 | 25200110 | SODDING SALT TOLERANT | 164 | SQ YD | $26.00 | $44.00 | $57.00 | $57.00 | $25.00 | $16.34 | |
| 20 | 25200200 | SUPPLE WATERING | 23 | UNIT | $1.00 | $1.10 | $60.00 | $60.00 | $5.00 | $1.11 | |
| 21 | 28000510 | INLET FILTERS | 4 | EACH | $250.00 | $220.00 | $25.00 | $300.00 | $350.00 | $166.35 | |
| 22 | 31101200 | SUB GRAN MAT B 4 | 378 | SQ YD | $9.00 | $9.00 | $8.00 | $29.00 | $22.00 | $17.50 | |
| 23 | 40600290 | BIT MATLS TACK CT | 1,194 | POUND | $0.0100 | $0.0100 | $0.0100 | $0.0100 | $0.0100 | $0.0100 | |
| 24 | 40600370 | LONG JOINT SEALANT | 918 | FOOT | $3.00 | $12.24 | $2.50 | $2.50 | $3.00 | $3.28 | |
| 25 | 40600982 | HMA SURF REM BUTT JT | 405 | SQ YD | $20.00 | $20.00 | $19.19 | $19.20 | $22.00 | $25.17 | |
| 26 | 40605026 | P HMA SC SMA 9.5 F N80 | 198 | TON | $270.00 | $181.00 | $252.85 | $252.85 | $260.00 | $331.69 | |
| 27 | 42000060 | WELDED WIRE REINF | 389 | SQ YD | $18.00 | $25.00 | $6.50 | $14.90 | $17.00 | $14.09 | |
| 28 | 42001300 | PROTECTIVE COAT | 333 | SQ YD | $2.00 | $1.00 | $0.0100 | $4.40 | $2.00 | $5.12 | |
| 29 | 44000500 | COMB CURB GUTTER REM | 1,124 | FOOT | $6.00 | $12.00 | $15.00 | $16.75 | $22.00 | $15.28 | |
| 30 | 44003100 | MEDIAN REMOVAL | 3,385 | SQ FT | $3.00 | $5.00 | $5.00 | $2.20 | $2.00 | $3.90 | |
| 31 | 44200986 | CL B PATCH T3 11 | 67 | SQ YD | $187.00 | $235.00 | $316.75 | $274.75 | $300.00 | $204.78 | |
| 32 | 44200988 | CL B PATCH T4 11 | 321 | SQ YD | $165.00 | $235.00 | $316.75 | $277.75 | $225.00 | $215.10 | |
| 33 | 44201294 | CL B PATCH EXPAN JT | 138 | FOOT | $125.00 | $55.00 | $177.50 | $108.30 | $73.00 | $328.72 | |
| 34 | 44201296 | DEFORMED BARS EXP JT | 134 | EACH | $16.00 | $30.00 | $10.00 | $90.15 | $47.00 | $42.78 | |
| 35 | 44201299 | DOWEL BARS 1 1/2 | 234 | EACH | $27.00 | $20.00 | $26.50 | $42.50 | $45.00 | $34.72 | |
| 36 | 44213200 | SAW CUTS | 483 | FOOT | $8.00 | $8.00 | $6.00 | $6.20 | $8.00 | $4.89 | |
| 37 | 44213204 | TIE BARS 3/4 | 14 | EACH | $23.00 | $20.00 | $18.25 | $35.05 | $36.00 | $20.29 | |
| 38 | 53016002 | DECK SLAB REP (FD-T2) | 1 | SQ YD | $4,500.00 | $3,500.00 | $1,900.00 | $7,722.75 | $3,000.00 | $4,133.51 | |
| 39 | 53101002 | BR DECK SCAR 3/4 | 333 | SQ YD | $63.00 | $100.00 | $250.00 | $249.90 | $210.00 | $187.33 | |
| 40 | 53101410 | BR DK LTX C OLY 2 3/4 | 333 | SQ YD | $145.00 | $210.00 | $337.00 | $357.70 | $250.00 | $330.64 | |
| 41 | 53212754 | STR REP CON DP = < 5 | 77 | SQ FT | $200.00 | $200.00 | $350.00 | $190.05 | $300.00 | $454.27 | |
| 42 | 53212755 | STR REP CON DP OVER 5 | 6 | SQ FT | $250.00 | $500.00 | $400.00 | $197.25 | $750.00 | $519.16 | |
| 43 | 60300105 | FR & GRATES ADJUST | 4 | EACH | $60.00 | $600.00 | $250.00 | $500.00 | $900.00 | $874.16 | |
| 44 | 60300305 | FR & LIDS ADJUST | 1 | EACH | $60.00 | $600.00 | $250.00 | $550.00 | $2,300.00 | $953.05 | |
| 45 | 60603800 | COMB CC&G TB6.12 | 562 | FOOT | $35.00 | $40.00 | $61.50 | $64.65 | $82.00 | $76.82 | |
| 46 | 60605000 | COMB CC&G TY B-6.24 | 562 | FOOT | $44.00 | $45.00 | $68.50 | $72.15 | $90.00 | $102.97 | |
| 47 | 60618300 | CONC MEDIAN SURF 4 | 3,399 | SQ FT | $9.00 | $7.50 | $8.45 | $6.25 | $10.00 | $10.69 | |
| 48 | 67100100 | MOBILIZATION | 1 | L SUM | $42,000.00 | $49,815.22 | $57,000.00 | $58,500.00 | $50,000.00 | $39,224.90 | |
| 49 | 70107025 | CHANGEABLE MESSAGE SN | 168 | CAL DA | $38.00 | $50.00 | $28.00 | $40.00 | $35.00 | $38.81 | |
| 50 | 70300150 | SHRT TRM PAVT MK REM | 5,108 | SQ FT | $0.4000 | $2.20 | $0.4000 | $0.9000 | $0.3500 | $0.5500 | |
| 51 | 70307100 | TEMP PVT MK LTR & SYM T4 TAPE | 174 | SQ FT | $6.00 | $22.00 | $10.00 | $3.90 | $5.00 | $4.16 | |
| 52 | 70307120 | TEMP PVT MK L4 T4 TAPE | 6,478 | FOOT | $1.50 | $2.50 | $1.20 | $1.35 | $1.50 | $1.33 | |
| 53 | 70307130 | TEMP PVT MK L6 T4 TAPE | 3,114 | FOOT | $1.90 | $5.00 | $1.60 | $1.90 | $2.00 | $2.00 | |
| 54 | 70400100 | TEMP CONC BARRIER | 1,000 | FOOT | $25.00 | $30.00 | $25.10 | $33.35 | $28.00 | $53.23 | |
| 55 | 70400125 | PIN TEMP CONC BARRIER | 72 | EACH | $20.00 | $20.00 | $50.00 | $21.75 | $27.00 | $22.18 | |
| 56 | 70400200 | REL TEMP CONC BARRIER | 963 | FOOT | $8.00 | $15.00 | $8.00 | $8.15 | $5.00 | $9.98 | |
| 57 | 70600260 | IMP ATTN TEMP FRN TL3 | 2 | EACH | $4,800.00 | $6,500.00 | $4,689.00 | $4,869.00 | $5,500.00 | $5,200.00 | |
| 58 | 70600332 | IMP ATTN REL FRN TL3 | 2 | EACH | $2,800.00 | $2,000.00 | $2,690.00 | $2,690.00 | $3,000.00 | $2,983.15 | |
| 59 | 78000400 | THPL PVT MK LINE 6 | 989 | FOOT | $6.00 | $5.50 | $5.11 | $5.10 | $5.00 | $5.67 | |
| 60 | 78000500 | THPL PVT MK LINE 8 | 185 | FOOT | $9.00 | $8.80 | $6.82 | $6.80 | $8.00 | $7.56 | |
| 61 | 78000600 | THPL PVT MK LINE 12 | 15 | FOOT | $12.00 | $11.00 | $10.23 | $10.25 | $10.00 | $11.34 | |
| 62 | 78004635 | PREF PL PM TD STD L 7 | 1,510 | FOOT | $8.00 | $8.25 | $8.68 | $8.70 | $7.50 | $9.63 | |
| 63 | 78009004 | MOD URETH PM LINE 4 | 639 | FOOT | $9.00 | $8.80 | $11.00 | $11.00 | $8.00 | $12.20 | |
| 64 | 78011040 | GRV RCSD PVT MRKG 8 | 1,510 | FOOT | $1.60 | $1.65 | $1.40 | $1.40 | $1.50 | $1.55 | |
| 65 | 78100100 | RAISED REFL PAVT MKR | 56 | EACH | $90.00 | $93.50 | $75.00 | $75.00 | $85.00 | $83.17 | |
| 66 | 78300202 | PVT MKG REM WTR BLAST | 1,394 | SQ FT | $6.00 | $3.30 | $6.00 | $3.00 | $5.00 | $5.54 | |
| 67 | 89502376 | REBUILD EX HANDHOLE | 4 | EACH | $2,800.00 | $3,000.00 | $9,127.00 | $9,127.00 | $1,000.00 | $2,772.45 |