$188.71Avg low bid / EACH
$185.42Avg of all bids
—Avg engineer's estimate
265Jobs · 12,782 EACH
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2026 | 106 | 5,323 | $200.13 | $188.27 |
| 2025 | 157 | 7,430 | $180.29 | $183.14 |
| 2024 | 2 | 29 | $247.59 | $248.38 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Sep 18, 2026 | 64V52 | WinnebagoDistrict 2 | 25 EACH | $236.00 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Sep 18, 2026 | 61M68 | KaneDistrict 1 | 80 EACH | $258.50 | D. Construction, Inc. |
| Sep 18, 2026 | 62V85 | CookDistrict 1 | 12 EACH | $200.00 | Builders Paving, LLC |
| Sep 18, 2026 | 80D33 | CookDistrict 1 | 28 EACH | $200.00 | K-Five Construction Corporation |
| Sep 18, 2026 | 80B49 | DupageDistrict 1 | 4 EACH | $250.00 | Martam Construction Incorporated |
| Sep 18, 2026 | 61M10 | Kane, DupageDistrict 1 | 62 EACH | $200.00 | K-Five Construction Corporation |
| Sep 18, 2026 | 62V90 | CookDistrict 1 | 15 EACH | $166.00 | K-Five Construction Corporation |
| Jul 31, 2026 | 92621 | SangamonDistrict 6 | 1 EACH | $575.44 | Illinois Valley Paving, a div of UCM, Inc. |
| Jul 31, 2026 | 61K85 | CookDistrict 1 | 48 EACH | $235.00 | Plote Construction, Inc. |
| Jul 31, 2026 | 61M13 | KaneDistrict 1 | 11 EACH | $200.00 | Dunnet Bay Construction Company |
| Jul 31, 2026 | 62W20 | CookDistrict 1 | 13 EACH | $256.30 | D. Construction, Inc. |
| Jul 31, 2026 | 62Y20 | CookDistrict 1 | 27 EACH | $350.00 | Martam Construction Incorporated |
| Jul 31, 2026 | 61M40 | DupageDistrict 1 | 10 EACH | $220.00 | Home Towne Electric, Inc. |
| Jul 31, 2026 | 70G29 | ChampaignDistrict 5 | 7 EACH | $250.00 | Stark Excavating, Inc. |
| Jul 31, 2026 | 61K19 | CookDistrict 1 | 44 EACH | $235.00 | R. W. Dunteman Company |
| Jun 12, 2026 | 80B28 | CookDistrict 1 | 104 EACH | $165.00 | K-Five Construction Corporation |
| Jun 12, 2026 | 64U86 | WinnebagoDistrict 2 | 20 EACH | $25.00 | Alliance Contractors, Inc. |
| Jun 12, 2026 | 62L30 | CookDistrict 1 | 102 EACH | $154.00 | D. Construction, Inc. |
| Jun 12, 2026 | 80C48 | LakeDistrict 1 | 4 EACH | $250.00 | Peter Baker & Son Co. |
| Jun 12, 2026 | 61M43 | KaneDistrict 1 | 2 EACH | $300.00 | D. Construction, Inc. |
| Jun 12, 2026 | 64V40 | Rock IslandDistrict 2 | 30 EACH | $350.00 | Valley Construction Co. |
| Jun 12, 2026 | 62M71 | Kane, KendallDistrict 1 | 164 EACH | $209.00 | D. Construction, Inc. |
| Jun 12, 2026 | 85794 | Rock IslandDistrict 2 | 30 EACH | $115.00 | Centennial Contractors of the Quad Cities, Inc. |
| Jun 12, 2026 | 61M44 | KaneDistrict 1 | 19 EACH | $220.00 | Geske and Sons, Inc. |
| Jun 12, 2026 | 70F48 | McleanDistrict 5 | 5 EACH | $90.00 | H. J. Eppel & Co. |
| Jun 12, 2026 | 62R61 | CookDistrict 1 | 57 EACH | $280.00 | OHLA Central, Inc. |
| Jun 12, 2026 | 61M49 | CookDistrict 1 | 40 EACH | $218.61 | Sjostrom & Sons, Inc. |
| Jun 12, 2026 | 76U76 | St.clairDistrict 8 | 3 EACH | $297.80 | Keeley & Sons, Inc. |
| Jun 12, 2026 | 62U72 | MchenryDistrict 1 | 342 EACH | $228.00 | Martam Construction Incorporated |
| Jun 12, 2026 | 61M51 | CookDistrict 1 | 6 EACH | $265.10 | Martam Construction Incorporated |
| Jun 12, 2026 | 80B22 | CookDistrict 1 | 382 EACH | $165.00 | K-Five Construction Corporation |
| Jun 12, 2026 | 62V08 | Cook, Dupage, KaneDistrict 1 | 2 EACH | $250.00 | D. Construction, Inc. |
| Jun 12, 2026 | 61M53 | CookDistrict 1 | 34 EACH | $200.00 | Builders Paving, LLC |
| Apr 24, 2026 | 61L86 | MchenryDistrict 1 | 3 EACH | $250.00 | Dunnet Bay Construction Company |
| Apr 24, 2026 | 80B62 | CookDistrict 1 | 4 EACH | $250.00 | Martam Construction Incorporated |
| Apr 24, 2026 | 61M15 | CookDistrict 1 | 2 EACH | $300.00 | Dunnet Bay Construction Company |
| Apr 24, 2026 | 62Y30 | CookDistrict 1 | 11 EACH | $250.00 | Martam Construction Incorporated |
| Apr 24, 2026 | 61M36 | DupageDistrict 1 | 18 EACH | $160.00 | Builders Paving, LLC |
| Apr 24, 2026 | 80B68 | DupageDistrict 1 | 237 EACH | $275.00 | D. Construction, Inc. |
| Apr 24, 2026 | 61M17 | KaneDistrict 1 | 27 EACH | $150.00 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. |
| Apr 24, 2026 | 66P86 | BureauDistrict 3 | 15 EACH | $330.00 | Advanced Asphalt Company |
| Apr 24, 2026 | 70F20 | McleanDistrict 5 | 58 EACH | $475.00 | Stark Excavating, Inc. |
| Apr 24, 2026 | 80C85 | MchenryDistrict 1 | 374 EACH | $150.00 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. |
| Apr 24, 2026 | 61M41 | LakeDistrict 1 | 13 EACH | $250.00 | Alliance Contractors, Inc. |
| Apr 24, 2026 | 80B12 | MchenryDistrict 1 | 3 EACH | $100.00 | Alliance Contractors, Inc. |
| Apr 24, 2026 | 80B07 | DupageDistrict 1 | 25 EACH | $200.00 | Builders Paving, LLC |
| Apr 24, 2026 | 61L84 | DupageDistrict 1 | 47 EACH | $70.00 | K-Five Construction Corporation |
| Apr 24, 2026 | 87899 | KendallDistrict 3 | 61 EACH | $250.00 | Austin Tyler Construction, Inc. |
| Apr 24, 2026 | 80B21 | CookDistrict 1 | 7 EACH | $250.00 | K-Five Construction Corporation |
| Apr 24, 2026 | 87907 | GrundyDistrict 3 | 11 EACH | $300.00 | D. Construction, Inc. |
| Apr 24, 2026 | 62K33 | CookDistrict 1 | 153 EACH | $150.00 | Plote Construction, Inc. |
| Apr 24, 2026 | 61L48 | Kane, MchenryDistrict 1 | 124 EACH | $162.83 | William Charles Construction Company, LLC |
| Apr 24, 2026 | 80B48 | CookDistrict 1 | 4 EACH | $250.00 | Martam Construction Incorporated |
| Apr 24, 2026 | 61L54 | CookDistrict 1 | 114 EACH | $250.80 | Martam Construction Incorporated |
| Apr 24, 2026 | 62P51 | CookDistrict 1 | 53 EACH | $237.12 | Martam Construction Incorporated |
| Feb 27, 2026 | 61M31 | CookDistrict 1 | 20 EACH | $15.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 61M32 | CookDistrict 1 | 19 EACH | $15.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 61M05 | CookDistrict 1 | 4 EACH | $350.00 | K-Five Construction Corporation |
| Feb 27, 2026 | 68F91 | Fulton, McdonoughDistrict 4 | 4 EACH | $551.38 | Gunther Construction, a div of UCM, Inc. |
| Feb 27, 2026 | 62R19 | Grundy, Kendall, WillDistrict 1 | 30 EACH | $302.50 | Meade Inc. |
| Feb 27, 2026 | 61M16 | CookDistrict 1 | 14 EACH | $15.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 62V09 | CookDistrict 1 | 10 EACH | $200.00 | Plote Construction, Inc. |
| Feb 27, 2026 | 62R23 | WillDistrict 1 | 125 EACH | $150.00 | D. Construction, Inc. & Kraemer North America, LLC JV |
| Feb 27, 2026 | 61M26 | CookDistrict 1 | 109 EACH | $15.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 61L87 | CookDistrict 1 | 25 EACH | $150.00 | Gallagher Asphalt Corporation |
| Feb 27, 2026 | 62Y26 | WillDistrict 1 | 2 EACH | $0.0100 | Iroquois Paving Corporation |
| Feb 27, 2026 | 61M27 | CookDistrict 1 | 29 EACH | $15.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 61M18 | CookDistrict 1 | 30 EACH | $120.00 | Gallagher Asphalt Corporation |
| Feb 27, 2026 | 61L39 | KaneDistrict 1 | 105 EACH | $100.00 | Geneva Construction Company LLC. |
| Feb 27, 2026 | 64R72 | WinnebagoDistrict 2 | 39 EACH | $200.00 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Feb 27, 2026 | 61M28 | CookDistrict 1 | 48 EACH | $150.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 62T82 | LakeDistrict 1 | 1 EACH | $286.00 | Martam Construction Incorporated |
| Feb 27, 2026 | 61L93 | CookDistrict 1 | 200 EACH | $150.00 | K-Five Construction Corporation |
| Feb 27, 2026 | 68E33 | MarshallDistrict 4 | 4 EACH | $200.00 | Gillan Construction LLC |
| Jan 16, 2026 | 62U12 | CookDistrict 1 | 11 EACH | $315.00 | F. H. Paschen, S.N. Nielsen & Associates LLC |
| Jan 16, 2026 | 61M07 | MchenryDistrict 1 | 2 EACH | $250.00 | Curran Contracting Company |
| Jan 16, 2026 | 62D34 | CookDistrict 1 | 20 EACH | $260.00 | Lorig Construction Company |
| Jan 16, 2026 | 61L89 | CookDistrict 1 | 80 EACH | $185.00 | Builders Paving, LLC |
| Jan 16, 2026 | 93826 | LoganDistrict 6 | 61 EACH | $225.00 | Kinney Contractors, Inc. |
| Jan 16, 2026 | 61L81 | WillDistrict 1 | 37 EACH | $200.00 | K-Five Construction Corporation |
| Jan 16, 2026 | 62W47 | CookDistrict 1 | 37 EACH | $275.00 | D. Construction, Inc. |
| Jan 16, 2026 | 62W33 | CookDistrict 1 | 30 EACH | $215.00 | Iroquois Paving Corporation |
| Jan 16, 2026 | 62F94 | WillDistrict 1 | 259 EACH | $200.00 | D. Construction, Inc. |
| Jan 16, 2026 | 61J01 | DupageDistrict 1 | 109 EACH | $341.60 | R. W. Dunteman Company |
| Jan 16, 2026 | 97883 | MadisonDistrict 8 | 6 EACH | $390.00 | Stutz Excavating, Inc. |
| Jan 16, 2026 | 61L99 | Will, CookDistrict 1 | 4 EACH | $137.75 | Iroquois Paving Corporation |
| Jan 16, 2026 | 76E84 | Madison, St.clairDistrict 8 | 48 EACH | $375.00 | The Kilian Corporation & Christ Brothers Asphalt & Keeley & Sons, Inc. tri-venture |
| Jan 16, 2026 | 76A46 | MadisonDistrict 8 | 24 EACH | $280.00 | Keller Construction, Inc. |
| Jan 16, 2026 | 62K62 | CookDistrict 1 | 38 EACH | $300.00 | F. H. Paschen, S.N. Nielsen & Associates LLC |
| Jan 16, 2026 | 61L19 | LakeDistrict 1 | 3 EACH | $295.00 | Dunnet Bay Construction Company |
| Jan 16, 2026 | 61L36 | DupageDistrict 1 | 12 EACH | $250.00 | Acura Inc. |
| Jan 16, 2026 | 61M01 | WillDistrict 1 | 75 EACH | $140.00 | Austin Tyler Construction, Inc. |
| Jan 16, 2026 | 76N65 | St.clairDistrict 8 | 40 EACH | $600.00 | Plocher Construction Company, Inc. |
| Jan 16, 2026 | 80B11 | WillDistrict 1 | 10 EACH | $250.00 | Iroquois Paving Corporation |
| Jan 16, 2026 | 62K64 | CookDistrict 1 | 36 EACH | $130.00 | F. H. Paschen, S.N. Nielsen & Associates LLC |
| Jan 16, 2026 | 61L42 | LakeDistrict 1 | 36 EACH | $225.00 | D'Land Construction, LLC |
| Jan 16, 2026 | 61K16 | CookDistrict 1 | 18 EACH | $50.00 | Alliance Contractors, Inc. |
| Jan 16, 2026 | 61M08 | LakeDistrict 1 | 39 EACH | $225.00 | Campanella and Sons, Inc. |
| Jan 16, 2026 | 78A09 | FranklinDistrict 9 | 9 EACH | $200.00 | Samron Midwest Contracting, Inc. |
| Jan 16, 2026 | 60R94 | CookDistrict 1 | 24 EACH | $200.00 | OHLA Central, Inc. |
| Jan 16, 2026 | 62K65 | CookDistrict 1 | 42 EACH | $250.00 | F. H. Paschen, S.N. Nielsen & Associates LLC |
| Jan 16, 2026 | 61L94 | MchenryDistrict 1 | 15 EACH | $147.00 | Geske and Sons, Inc. |
| Jan 16, 2026 | 61L44 | DupageDistrict 1 | 51 EACH | $185.00 | Builders Paving, LLC |
| Jan 16, 2026 | 61M09 | CookDistrict 1 | 111 EACH | $250.00 | Martam Construction Incorporated |
| Jan 16, 2026 | 91642 | ChampaignDistrict 5 | 103 EACH | $165.50 | William Charles Construction Company, LLC |
| Jan 16, 2026 | 61L75 | CookDistrict 1 | 18 EACH | $15.00 | A Lamp Concrete Contractors, Inc. |
| Nov 7, 2025 | 61L79 | DupageDistrict 1 | 50 EACH | $162.22 | K-Five Construction Corporation |
| Nov 7, 2025 | 61L92 | CookDistrict 1 | 51 EACH | $150.00 | Capitol Cement Co., Inc. |
| Nov 7, 2025 | 61L82 | CookDistrict 1 | 3 EACH | $360.00 | Dunnet Bay Construction Company |
| Nov 7, 2025 | 61L43 | CookDistrict 1 | 63 EACH | $200.00 | K-Five Construction Corporation |
| Nov 7, 2025 | 61L80 | DupageDistrict 1 | 32 EACH | $218.50 | Schroeder Asphalt Services, Inc. |
| Nov 7, 2025 | 89872 | PeoriaDistrict 4 | 49 EACH | $297.92 | Otto Baum Company, Inc. |
| Nov 7, 2025 | 61L98 | CookDistrict 1 | 27 EACH | $225.00 | PirTano Construction Co., LLC |
| Nov 7, 2025 | 61J94 | CookDistrict 1 | 37 EACH | $15.00 | A Lamp Concrete Contractors, Inc. |
| Nov 7, 2025 | 61L77 | CookDistrict 1 | 27 EACH | $150.00 | Triggi Construction, Inc. |
| Nov 7, 2025 | 62R63 | CookDistrict 1 | 51 EACH | $200.00 | Dunnet Bay Construction Company |
| Nov 7, 2025 | 61L21 | CookDistrict 1 | 12 EACH | $504.61 | H & H Electric Co. |
| Nov 7, 2025 | 62R51 | WillDistrict 1 | 11 EACH | $300.00 | Iroquois Paving Corporation |
| Nov 7, 2025 | 61L57 | DupageDistrict 1 | 66 EACH | $200.00 | K-Five Construction Corporation |
| Nov 7, 2025 | 70F19 | McleanDistrict 5 | 52 EACH | $318.56 | Rowe Construction, a div of UCM, Inc. |
| Nov 7, 2025 | 62U41 | CookDistrict 1 | 36 EACH | $190.00 | Lorig Construction Company |
| Nov 7, 2025 | 61L76 | CookDistrict 1 | 14 EACH | $25.00 | Davis Concrete Construction Co. |
| Nov 7, 2025 | 61J54 | DupageDistrict 1 | 4 EACH | $250.00 | Lorig Construction Company |
| Nov 7, 2025 | 61L73 | WillDistrict 1 | 2 EACH | $275.00 | D. Construction, Inc. |
| Nov 7, 2025 | 74595 | CumberlandDistrict 7 | 1 EACH | $0.0100 | Samron Midwest Contracting, Inc. |
| Nov 7, 2025 | 46944 | WhitesideDistrict 2 | 4 EACH | $125.00 | Martin & Company Excavating |
| Nov 7, 2025 | 61L97 | KaneDistrict 1 | 33 EACH | $160.00 | Everlast Blacktop Inc. |
| Nov 7, 2025 | 61L83 | LakeDistrict 1 | 9 EACH | $225.00 | Peter Baker & Son Co. |
| Nov 7, 2025 | 61L78 | DupageDistrict 1 | 27 EACH | $15.00 | A Lamp Concrete Contractors, Inc. |
| Nov 7, 2025 | 61K01 | DupageDistrict 1 | 11 EACH | $237.12 | Martam Construction Incorporated |
| Nov 7, 2025 | 87884 | LivingstonDistrict 3 | 18 EACH | $275.00 | D. Construction, Inc. |
| Sep 19, 2025 | 61L35 | CookDistrict 1 | 29 EACH | $15.00 | A Lamp Concrete Contractors, Inc. |
| Sep 19, 2025 | 62Y13 | CookDistrict 1 | 4 EACH | $250.00 | Martam Construction Incorporated |
| Sep 19, 2025 | 61L72 | CookDistrict 1 | 32 EACH | $0.0100 | P. T. Ferro Construction Co. |
| Sep 19, 2025 | 61L69 | DupageDistrict 1 | 2 EACH | $275.00 | D. Construction, Inc. |
| Sep 19, 2025 | 93841 | ChristianDistrict 6 | 36 EACH | $224.70 | Illinois Valley Paving, a div of UCM, Inc. |
| Sep 19, 2025 | 70D66 | VermilionDistrict 5 | 5 EACH | $300.00 | Stark Excavating, Inc. |
| Sep 19, 2025 | 62B64 | CookDistrict 1 | 16 EACH | $200.00 | R. W. Dunteman Company |
| Sep 19, 2025 | 61K93 | CookDistrict 1 | 96 EACH | $205.20 | Lima Contractors |
| Sep 19, 2025 | 95980 | MoultrieDistrict 7 | 15 EACH | $162.74 | A & R Mechanical Service, Inc. |
| Sep 19, 2025 | 70F21 | McleanDistrict 5 | 98 EACH | $317.37 | Rowe Construction, a div of UCM, Inc. |
| Sep 19, 2025 | 62J29 | LakeDistrict 1 | 3 EACH | $290.00 | Clean Cut Tree Service, Inc. |
| Sep 19, 2025 | 61L71 | CookDistrict 1 | 112 EACH | $200.00 | Builders Paving, LLC |
| Sep 19, 2025 | 61L70 | CookDistrict 1 | 11 EACH | $225.00 | Triggi Construction, Inc. |
| Sep 19, 2025 | 87846 | KendallDistrict 3 | 122 EACH | $275.00 | D. Construction, Inc. |
| Sep 19, 2025 | 62R22 | WillDistrict 1 | 284 EACH | $238.70 | D. Construction, Inc. |
| Sep 19, 2025 | 61L74 | KaneDistrict 1 | 4 EACH | $150.00 | Triggi Construction, Inc. |
| Sep 19, 2025 | 61K52 | LakeDistrict 1 | 7 EACH | $217.00 | Dunnet Bay Construction Company |
| Sep 19, 2025 | 62X00 | LakeDistrict 1 | 6 EACH | $300.00 | Clean Cut Tree Service, Inc. |
| Sep 19, 2025 | 61L28 | KaneDistrict 1 | 125 EACH | $225.78 | Martam Construction Incorporated |