- Let date
- Friday, February 27, 2026
- Contract
- 68F91 · job page
- District
- District 4
- County
- Fulton, Mcdonough
- Highway
- Limits
- 6.24 miles of resurfacing from SCL of Avon to IL 9 in Fulton and McDonough Counties.
- Classification
- ·
- Project number
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Gunther Construction, a div of UCM, Inc. Low bidder | $11,748,219 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Gunther Constru… |
|---|---|---|---|---|---|---|
| 1 | XZ013798 | CONSTR STA LAYOUT | 1 | L SUM | $9,046.36 | |
| 2 | X1700112 | BRICK PAVER REMOVAL | 395 | SQ FT | $8.80 | |
| 3 | X2020060 | EXC & GR EX SHLD SPL | 637 | UNIT | $1,055.09 | |
| 4 | X2020114 | GRAD & SHAP DITCH SPL | 21,550 | FOOT | $22.28 | |
| 5 | X4400196 | HMA SURF REM SPL | 1,843 | SQ YD | $61.66 | |
| 6 | X4421000 | PARTIAL DEPTH PATCH | 224 | TON | $810.53 | |
| 7 | X4421002 | PART DEPTH PATCH SPL | 2,000 | SQ YD | $65.42 | |
| 8 | X5012652 | HEADWALL REMOVAL | 5 | EACH | $1,342.00 | |
| 9 | X5427602 | REMOV EX FLAR END SEC | 2 | EACH | $1,120.90 | |
| 10 | X5430212 | CUR-IN-PL PIPE LNR 12 | 94 | FOOT | $463.84 | |
| 11 | X5504010 | SS DI T1 10 | 144 | FOOT | $192.50 | |
| 12 | X5504013 | SS D I T1 12 | 37 | FOOT | $264.00 | |
| 13 | X6026053 | SAN MAN FR & COVER | 2 | EACH | $935.00 | |
| 14 | X6060097 | CLASS SI CONC OUT SPL | 105 | CU YD | $1,264.48 | |
| 15 | X6062700 | CONC GUTTER TA SPL | 3,919 | FOOT | $86.06 | |
| 16 | X6350204 | LINEAR DELIN PANELS 4 | 15 | EACH | $96.80 | |
| 17 | X6420108 | RUMBLE STRIP | 825 | SQ FT | $37.37 | |
| 18 | Z0001002 | GDRL AGG EROS CONT | 40 | TON | $16.50 | |
| 19 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $127,301.10 | |
| 20 | Z0056644 | SS 1 WAT MN 8 | 68 | FOOT | $206.80 | |
| 21 | Z0076600 | TRAINEES | 5,000 | HOUR | $0.8000 | |
| 22 | Z0076604 | TRAINEES TPG | 5,000 | HOUR | $15.00 | |
| 23 | 20200100 | EARTH EXCAVATION | 1,525 | CU YD | $49.50 | |
| 24 | 20800150 | TRENCH BACKFILL | 66 | CU YD | $104.50 | |
| 25 | 21101615 | TOPSOIL F & P 4 | 5,967 | SQ YD | $7.15 | |
| 26 | 21301048 | EXPLOR TRENCH 48 | 500 | FOOT | $19.80 | |
| 27 | 25000210 | SEEDING CL 2A | 5.25 | ACRE | $1,650.00 | |
| 28 | 25000400 | NITROGEN FERT NUTR | 453 | POUND | $2.20 | |
| 29 | 25000500 | PHOSPHORUS FERT NUTR | 453 | POUND | $2.20 | |
| 30 | 25000600 | POTASSIUM FERT NUTR | 453 | POUND | $2.20 | |
| 31 | 25000750 | MOWING | 5.25 | ACRE | $550.00 | |
| 32 | 25100630 | EROSION CONTR BLANKET | 24,315 | SQ YD | $1.72 | |
| 33 | 28000305 | TEMP DITCH CHECKS | 5,624 | FOOT | $45.93 | |
| 34 | 28000400 | PERIMETER EROS BAR | 14,098 | FOOT | $5.79 | |
| 35 | 28000500 | INLET & PIPE PROTECT | 2 | EACH | $1,112.96 | |
| 36 | 28000510 | INLET FILTERS | 4 | EACH | $551.38 | |
| 37 | 28100225 | STONE RIPRAP CL B3 | 359 | TON | $124.30 | |
| 38 | 40200800 | AGG SURF COURSE TY B | 117 | TON | $101.20 | |
| 39 | 40600295 | P BIT MATLS TACK CT | 152,936 | POUND | $0.9000 | |
| 40 | 40600405 | MATL TRANSFER DEVICE | 21,787 | TON | $4.67 | |
| 41 | 40600982 | HMA SURF REM BUTT JT | 3,012 | SQ YD | $59.22 | |
| 42 | 40600990 | TEMPORARY RAMP | 428 | SQ YD | $23.41 | |
| 43 | 40603205 | P HMA BC IL-9.5 N50 | 9,757 | TON | $177.65 | |
| 44 | 40604160 | P HMA SC IL-9.5 D N50 | 12,030 | TON | $181.84 | |
| 45 | 40800050 | INCIDENTAL HMA SURF | 397 | TON | $700.45 | |
| 46 | 42300400 | PCC DRIVEWAY PAVT 8 | 85 | SQ YD | $227.70 | |
| 47 | 42400100 | PC CONC SIDEWALK 4 | 1,052 | SQ FT | $27.50 | |
| 48 | 42400800 | DETECTABLE WARNINGS | 175 | SQ FT | $49.50 | |
| 49 | 44000153 | HMA SURF REM 1 | 76,348 | SQ YD | $4.38 | |
| 50 | 44000157 | HMA SURF REM 2 | 14,834 | SQ YD | $4.70 | |
| 51 | 44000200 | DRIVE PAVEMENT REM | 331 | SQ YD | $30.80 | |
| 52 | 44000400 | GUTTER REM | 589 | FOOT | $27.50 | |
| 53 | 44000500 | COMB CURB GUTTER REM | 130 | FOOT | $58.30 | |
| 54 | 44000600 | SIDEWALK REM | 1,086 | SQ FT | $8.80 | |
| 55 | 44201789 | CL D PATCH T2 12 | 253 | SQ YD | $349.05 | |
| 56 | 44201794 | CL D PATCH T3 12 | 44 | SQ YD | $327.05 | |
| 57 | 44201796 | CL D PATCH T4 12 | 1,586 | SQ YD | $305.05 | |
| 58 | 48102100 | AGG WEDGE SHLD TYPE B | 673 | TON | $101.81 | |
| 59 | 48203013 | HMA SHOULDERS 4 | 842 | SQ YD | $141.10 | |
| 60 | 48203014 | HMA SHOULDERS 4 1/4 | 21,117 | SQ YD | $60.07 | |
| 61 | 48203021 | HMA SHOULDERS 6 | 588 | SQ YD | $150.70 | |
| 62 | 50105220 | PIPE CULVERT REMOV | 265 | FOOT | $60.50 | |
| 63 | 542A0217 | P CUL CL A 1 12 | 78 | FOOT | $191.40 | |
| 64 | 542A0220 | P CUL CL A 1 15 | 28 | FOOT | $247.50 | |
| 65 | 542A5479 | P CUL CL A 1 EQRS 24 | 67 | FOOT | $347.60 | |
| 66 | 542C0217 | P CUL CL C 1 12 | 132 | FOOT | $157.30 | |
| 67 | 54213657 | PRC FLAR END SEC 12 | 2 | EACH | $2,559.70 | |
| 68 | 54213660 | PRC FLAR END SEC 15 | 2 | EACH | $2,780.80 | |
| 69 | 54213666 | PRC FLAR END SEC 21 | 1 | EACH | $3,245.00 | |
| 70 | 54214719 | PRCF END S EL EQRS 24 | 4 | EACH | $3,850.00 | |
| 71 | 54262710 | METAL FL END SEC 10" | 1 | EACH | $770.00 | |
| 72 | 54262712 | METAL FL END SEC 12" | 5 | EACH | $781.00 | |
| 73 | 550A0400 | STORM SEW CL A 2 21 | 8 | FOOT | $360.80 | |
| 74 | 55100300 | STORM SEWER REM 8 | 56 | FOOT | $44.00 | |
| 75 | 55101100 | STORM SEWER REM 21 | 4 | FOOT | $88.00 | |
| 76 | 60218400 | MAN TA 4 DIA T1F CL | 1 | EACH | $7,480.00 | |
| 77 | 60236200 | INLETS TA T8G | 2 | EACH | $3,630.00 | |
| 78 | 60237470 | INLETS TA T24F&G | 2 | EACH | $3,872.00 | |
| 79 | 60500060 | REMOV INLETS | 2 | EACH | $605.00 | |
| 80 | 60603800 | COMB CC&G TB6.12 | 163 | FOOT | $122.10 | |
| 81 | 60920010 | PIPE CULV CLEANED 10 | 129 | FOOT | $51.70 | |
| 82 | 60920012 | PIPE CULV CLEANED 12 | 217 | FOOT | $38.50 | |
| 83 | 60920015 | PIPE CULV CLEANED 15 | 189 | FOOT | $41.80 | |
| 84 | 60920018 | PIPE CULV CLEANED 18 | 31 | FOOT | $67.10 | |
| 85 | 63000001 | SPBGR TY A 6FT POSTS | 250 | FOOT | $53.90 | |
| 86 | 63000003 | SPBGR TY A 9FT POSTS | 150 | FOOT | $53.90 | |
| 87 | 63000350 | LSG OV CUL 12'6" SPAN | 100 | FOOT | $57.20 | |
| 88 | 63100167 | TR BAR TRM T1 SPL TAN | 6 | EACH | $4,620.00 | |
| 89 | 63200310 | GUARDRAIL REMOV | 601 | FOOT | $14.87 | |
| 90 | 64200108 | SHOULDER RUM STRIP 8 | 37,589 | FOOT | $0.6000 | |
| 91 | 64200214 | SINUSOIDAL RUM STP 14 | 22,955 | FOOT | $0.6500 | |
| 92 | 67000400 | ENGR FIELD OFFICE A | 12 | CAL MO | $3,918.66 | |
| 93 | 67100100 | MOBILIZATION | 1 | L SUM | $612,115.00 | |
| 94 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $57,452.00 | |
| 95 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $53,718.00 | |
| 96 | 70100500 | TRAF CONT-PROT 701326 | 1 | L SUM | $93,267.00 | |
| 97 | 70100600 | TRAF CONT-PROT 701336 | 1 | L SUM | $57,052.00 | |
| 98 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $15,784.61 | |
| 99 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $6,155.43 | |
| 100 | 70103815 | TR CONT SURVEILLANCE | 5 | CAL DA | $2,098.80 | |
| 101 | 70107025 | CHANGEABLE MESSAGE SN | 21 | CAL DA | $176.00 | |
| 102 | 70300100 | SHORT TERM PAVT MKING | 14,434 | FOOT | $3.25 | |
| 103 | 70300150 | SHRT TRM PAVT MK REM | 4,812 | SQ FT | $0.0100 | |
| 104 | 72000100 | SIGN PANEL T1 | 45 | SQ FT | $65.05 | |
| 105 | 72501000 | TERMINAL MARKER - DA | 6 | EACH | $16.50 | |
| 106 | 72800100 | TELES STL SIN SUPPORT | 74 | FOOT | $34.88 | |
| 107 | 73100100 | BASE TEL STL SIN SUPP | 4 | EACH | $1,039.54 | |
| 108 | 78009000 | MOD URETH PM LTR-SYM | 73 | SQ FT | $8.80 | |
| 109 | 78009004 | MOD URETH PM LINE 4 | 37,606 | FOOT | $0.6600 | |
| 110 | 78009006 | MOD URETH PM LINE 6 | 66,524 | FOOT | $0.7700 | |
| 111 | 78009008 | MOD URETH PM LINE 8 | 282 | FOOT | $1.98 | |
| 112 | 78009012 | MOD URETH PM LINE 12 | 624 | FOOT | $4.35 | |
| 113 | 78009024 | MOD URETH PM LINE 24 | 151 | FOOT | $7.59 | |
| 114 | 78011000 | GRV RCSD PM LTR & SYM | 73 | SQ FT | $3.30 | |
| 115 | 78011025 | GRV RCSD PVT MRKG 5 | 37,606 | FOOT | $0.6100 | |
| 116 | 78011035 | GRV RCSD PVT MRKG 7 | 66,524 | FOOT | $0.7200 | |
| 117 | 78011045 | GRV RCSD PVT MRKG 9 | 249 | FOOT | $1.49 | |
| 118 | 78011065 | GRV RCSD PVT MRKG 13 | 624 | FOOT | $2.09 | |
| 119 | 78011125 | GRV RCSD PVT MRKG 25 | 55 | FOOT | $3.69 | |
| 120 | 78100100 | RAISED REFL PAVT MKR | 500 | EACH | $49.50 | |
| 121 | 78300200 | RAISED REF PVT MK REM | 40 | EACH | $95.40 |