| Sep 18, 2026 | 78B55 |
JacksonDistrict 9 | 35 CU YD |
$57.00 | Samron Midwest Contracting, Inc. |
| Sep 18, 2026 | 97892 |
St. ClairDistrict 8 | 588 CU YD |
$60.00 | Plocher Construction Company, Inc. |
| Sep 18, 2026 | 68E86 |
PeoriaDistrict 4 | 14 CU YD |
$55.00 | Stark Excavating, Inc. |
| Sep 18, 2026 | 72E88 |
SchuylerDistrict 6 | 97 CU YD |
$42.00 | Rees Construction Company of Quincy |
| Sep 18, 2026 | 68H60 |
TazewellDistrict 4 | 15 CU YD |
$166.14 | Otto Baum Company, Inc. |
| Sep 18, 2026 | 62V90 |
CookDistrict 1 | 36 CU YD |
$20.00 | K-Five Construction Corporation |
| Sep 18, 2026 | 64V52 |
WinnebagoDistrict 2 | 1,075 CU YD |
$0.0100 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Jul 31, 2026 | 62J64 |
CookDistrict 1 | 59 CU YD |
$118.00 | Peter Baker & Son Co. |
| Jul 31, 2026 | 61K85 |
CookDistrict 1 | 92 CU YD |
$64.00 | Plote Construction, Inc. |
| Jul 31, 2026 | 92621 |
SangamonDistrict 6 | 2,275 CU YD |
$71.31 | Illinois Valley Paving, a div of UCM, Inc. |
| Jul 31, 2026 | 62T84 |
CookDistrict 1 | 37 CU YD |
$60.00 | D. Construction, Inc. |
| Jul 31, 2026 | 85781 |
Rock IslandDistrict 2 | 1,901 CU YD |
$38.00 | Miller Trucking & Excavating Company |
| Jul 31, 2026 | 97866 |
MonroeDistrict 8 | 208 CU YD |
$45.55 | Mayer Landscaping, Inc. |
| Jul 31, 2026 | 62W20 |
CookDistrict 1 | 64 CU YD |
$50.00 | D. Construction, Inc. |
| Jul 31, 2026 | 46949 |
ClintonDistrict 8 | 217 CU YD |
$64.50 | McCarthy Improvement Company |
| Jul 31, 2026 | 70G29 |
ChampaignDistrict 5 | 300 CU YD |
$74.00 | Stark Excavating, Inc. |
| Jul 31, 2026 | 46951 |
VermilionDistrict 5 | 409 CU YD |
$28.00 | Feutz Contractors, Inc. |
| Jul 31, 2026 | 72J44 |
Brown, PikeDistrict 6 | 107 CU YD |
$81.76 | Illinois Valley Paving, a div of UCM, Inc. |
| Jul 31, 2026 | 61M13 |
KaneDistrict 1 | 2,353 CU YD |
$33.65 | Dunnet Bay Construction Company |
| Jul 31, 2026 | 61K19 |
CookDistrict 1 | 65 CU YD |
$23.00 | R. W. Dunteman Company |
| Jul 31, 2026 | 74829 |
MoultrieDistrict 7 | 163 CU YD |
$63.00 | Howell Paving, Inc. |
| Jun 12, 2026 | 66M84 |
LasalleDistrict 3 | 56 CU YD |
$60.00 | D. Construction, Inc. |
| Jun 12, 2026 | 95997 |
FayetteDistrict 7 | 5 CU YD |
$106.00 | McCarthy Improvement Company |
| Jun 12, 2026 | 62U72 |
MchenryDistrict 1 | 21,092 CU YD |
$45.25 | Martam Construction Incorporated |
| Jun 12, 2026 | 46952 |
CookDistrict 1 | 63 CU YD |
$84.00 | K-Five Construction Corporation |
| Jun 12, 2026 | 68J15 |
TazewellDistrict 4 | 11 CU YD |
$188.39 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Jun 12, 2026 | 97899 |
St. ClairDistrict 8 | 18.8 CU YD |
$53.00 | Hank's Excavating & Landscaping, Inc. |
| Jun 12, 2026 | 62V08 |
Cook, Dupage, KaneDistrict 1 | 10 CU YD |
$100.00 | D. Construction, Inc. |
| Jun 12, 2026 | 72491 |
SangamonDistrict 6 | 4 CU YD |
$167.67 | Illinois Valley Paving, a div of UCM, Inc. |
| Jun 12, 2026 | 68J70 |
WoodfordDistrict 4 | 51 CU YD |
$89.00 | Advanced Asphalt Company |
| Jun 12, 2026 | 64L94 |
HenryDistrict 2 | 6,142 CU YD |
$65.00 | Valley Construction Co. |
| Jun 12, 2026 | 74705 |
MaconDistrict 7 | 1,573 CU YD |
$130.00 | William Charles Construction Company, LLC |
| Jun 12, 2026 | 62L30 |
CookDistrict 1 | 1,114 CU YD |
$50.00 | D. Construction, Inc. |
| Jun 12, 2026 | 80B22 |
CookDistrict 1 | 32 CU YD |
$23.00 | K-Five Construction Corporation |
| Jun 12, 2026 | 64V40 |
Rock IslandDistrict 2 | 1,207 CU YD |
$90.00 | Valley Construction Co. |
| Jun 12, 2026 | 85791 |
WinnebagoDistrict 2 | 165 CU YD |
$35.00 | N-Trak Group LLC |
| Jun 12, 2026 | 62M71 |
Kane, KendallDistrict 1 | 3,049 CU YD |
$40.00 | D. Construction, Inc. |
| Jun 12, 2026 | 80D00 |
CookDistrict 1 | 8 CU YD |
$104.00 | Plote Construction, Inc. |
| Jun 12, 2026 | 66K39 |
FordDistrict 3 | 19 CU YD |
$170.00 | Stark Excavating, Inc. |
| Jun 12, 2026 | 93854 |
ChristianDistrict 6 | 68 CU YD |
$90.00 | Phoenix Corporation of the Quad Cities |
| Jun 12, 2026 | 62R61 |
CookDistrict 1 | 205 CU YD |
$48.60 | OHLA Central, Inc. |
| Jun 12, 2026 | 46918 |
Marshall, WoodfordDistrict 4 | 5 CU YD |
$126.00 | Phoenix Corporation of the Quad Cities |
| Apr 24, 2026 | 70F20 |
McleanDistrict 5 | 100 CU YD |
$35.00 | Stark Excavating, Inc. |
| Apr 24, 2026 | 62P51 |
CookDistrict 1 | 1,271 CU YD |
$53.00 | Martam Construction Incorporated |
| Apr 24, 2026 | 61M41 |
LakeDistrict 1 | 15 CU YD |
$200.00 | Alliance Contractors, Inc. |
| Apr 24, 2026 | 61L48 |
Kane, MchenryDistrict 1 | 1,651 CU YD |
$0.0100 | William Charles Construction Company, LLC |
| Apr 24, 2026 | 80B21 |
CookDistrict 1 | 744 CU YD |
$40.00 | K-Five Construction Corporation |
| Apr 24, 2026 | 61L54 |
CookDistrict 1 | 1,274 CU YD |
$83.40 | Martam Construction Incorporated |
| Apr 24, 2026 | 72741 |
SangamonDistrict 6 | 50 CU YD |
$92.10 | P. H. Broughton & Sons, Inc. |
| Apr 24, 2026 | 62V71 |
WillDistrict 1 | 65 CU YD |
$60.00 | D. Construction, Inc. |
| Apr 24, 2026 | 93783 |
MorganDistrict 6 | 1,155 CU YD |
$58.00 | K. E. Vas Company |
| Apr 24, 2026 | 61L86 |
MchenryDistrict 1 | 44 CU YD |
$77.00 | Dunnet Bay Construction Company |
| Apr 24, 2026 | 80B76 |
WillDistrict 1 | 23 CU YD |
$60.00 | D. Construction, Inc. |
| Apr 24, 2026 | 61M15 |
CookDistrict 1 | 90 CU YD |
$98.00 | Dunnet Bay Construction Company |
| Apr 24, 2026 | 80B09 |
CookDistrict 1 | 16 CU YD |
$59.00 | Builders Paving, LLC |
| Apr 24, 2026 | 66M55 |
LasalleDistrict 3 | 390 CU YD |
$50.00 | D. Construction, Inc. |
| Apr 24, 2026 | 97887 |
St. ClairDistrict 8 | 20 CU YD |
$45.00 | KRB Excavating, Inc. |
| Apr 24, 2026 | 61M36 |
DupageDistrict 1 | 218 CU YD |
$97.00 | Builders Paving, LLC |
| Apr 24, 2026 | 46948 |
MaconDistrict 7 | 46 CU YD |
$149.60 | Illinois Valley Paving, a div of UCM, Inc. |
| Apr 24, 2026 | 80C85 |
MchenryDistrict 1 | 10,186 CU YD |
$38.00 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. |
| Apr 24, 2026 | 61M17 |
KaneDistrict 1 | 363 CU YD |
$64.00 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. |
| Apr 24, 2026 | 80B26 |
CookDistrict 1 | 70 CU YD |
$52.00 | Gallagher Asphalt Corporation |
| Apr 24, 2026 | 66P86 |
BureauDistrict 3 | 83 CU YD |
$168.00 | Advanced Asphalt Company |
| Apr 24, 2026 | 99761 |
WilliamsonDistrict 9 | 93 CU YD |
$44.00 | Samron Midwest Contracting, Inc. |
| Apr 24, 2026 | 66P68 |
IroquoisDistrict 3 | 5 CU YD |
$100.00 | Iroquois Paving Corporation |
| Apr 24, 2026 | 61L84 |
DupageDistrict 1 | 74 CU YD |
$42.00 | K-Five Construction Corporation |
| Apr 24, 2026 | 87893 |
GrundyDistrict 3 | 19 CU YD |
$50.00 | D. Construction, Inc. |
| Apr 24, 2026 | 61M35 |
MchenryDistrict 1 | 30 CU YD |
$60.00 | Landmark Contractors, Inc. |
| Apr 24, 2026 | 93850 |
MontgomeryDistrict 6 | 1 CU YD |
$75.00 | KRB Excavating, Inc. |
| Apr 24, 2026 | 68K20 |
StarkDistrict 4 | 34 CU YD |
$95.00 | Advanced Asphalt Company |
| Apr 24, 2026 | 66R50 |
IroquoisDistrict 3 | 89.2 CU YD |
$75.00 | Iroquois Paving Corporation |
| Apr 24, 2026 | 62K33 |
CookDistrict 1 | 902 CU YD |
$31.00 | Plote Construction, Inc. |
| Apr 24, 2026 | 61M37 |
DupageDistrict 1 | 68 CU YD |
$110.00 | R. W. Dunteman Company |
| Apr 24, 2026 | 87899 |
KendallDistrict 3 | 1,354 CU YD |
$45.00 | Austin Tyler Construction, Inc. |
| Apr 24, 2026 | 72503 |
SangamonDistrict 6 | 40 CU YD |
$50.00 | Phoenix Corporation of the Quad Cities |
| Apr 24, 2026 | 97840 |
MadisonDistrict 8 | 21 CU YD |
$170.00 | Christ Bros. Asphalt, Inc. |
| Feb 27, 2026 | 97872 |
St. ClairDistrict 8 | 1,699 CU YD |
$45.00 | DMS Contracting, Inc. |
| Feb 27, 2026 | 61L93 |
CookDistrict 1 | 14 CU YD |
$75.00 | K-Five Construction Corporation |
| Feb 27, 2026 | 87886 |
BureauDistrict 3 | 10 CU YD |
$100.00 | Universal Asphalt & Excavating, Inc. |
| Feb 27, 2026 | 64J38 |
WhitesideDistrict 2 | 69 CU YD |
$17.00 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Feb 27, 2026 | 97882 |
MadisonDistrict 8 | 66 CU YD |
$60.00 | Stutz Excavating, Inc. |
| Feb 27, 2026 | 61M16 |
CookDistrict 1 | 5 CU YD |
$200.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 99757 |
WilliamsonDistrict 9 | 16 CU YD |
$150.00 | Samron Midwest Contracting, Inc. |
| Feb 27, 2026 | 64R72 |
WinnebagoDistrict 2 | 1,489 CU YD |
$0.0100 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Feb 27, 2026 | 61M32 |
CookDistrict 1 | 105 CU YD |
$65.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 61M26 |
CookDistrict 1 | 6,074 CU YD |
$1.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 62V09 |
CookDistrict 1 | 14 CU YD |
$88.00 | Plote Construction, Inc. |
| Feb 27, 2026 | 66N22 |
KendallDistrict 3 | 11 CU YD |
$65.00 | D. Construction, Inc. |
| Feb 27, 2026 | 61M27 |
CookDistrict 1 | 1,867 CU YD |
$1.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 61L87 |
CookDistrict 1 | 6 CU YD |
$90.00 | Gallagher Asphalt Corporation |
| Feb 27, 2026 | 68F91 |
Fulton, McdonoughDistrict 4 | 66 CU YD |
$104.50 | Gunther Construction, a div of UCM, Inc. |
| Feb 27, 2026 | 61M28 |
CookDistrict 1 | 1,623 CU YD |
$1.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 62T82 |
LakeDistrict 1 | 50 CU YD |
$82.69 | Martam Construction Incorporated |
| Feb 27, 2026 | 61L39 |
KaneDistrict 1 | 47 CU YD |
$23.00 | Geneva Construction Company LLC. |
| Feb 27, 2026 | 80B25 |
DupageDistrict 1 | 5 CU YD |
$175.00 | R. W. Dunteman Company |
| Feb 27, 2026 | 62R23 |
WillDistrict 1 | 10,097 CU YD |
$38.00 | D. Construction, Inc. & Kraemer North America, LLC JV |
| Jan 16, 2026 | 99678 |
PulaskiDistrict 9 | 26 CU YD |
$38.00 | Samron Midwest Contracting, Inc. |
| Jan 16, 2026 | 62F94 |
WillDistrict 1 | 9,667 CU YD |
$40.00 | D. Construction, Inc. |
| Jan 16, 2026 | 97880 |
MonroeDistrict 8 | 49 CU YD |
$59.50 | DMS Contracting, Inc. |
| Jan 16, 2026 | 61L75 |
CookDistrict 1 | 60 CU YD |
$66.00 | A Lamp Concrete Contractors, Inc. |
| Jan 16, 2026 | 66N78 |
BureauDistrict 3 | 218 CU YD |
$39.00 | Advanced Asphalt Company |
| Jan 16, 2026 | 61M07 |
MchenryDistrict 1 | 18 CU YD |
$100.00 | Curran Contracting Company |
| Jan 16, 2026 | 61L36 |
DupageDistrict 1 | 101 CU YD |
$80.00 | Acura Inc. |
| Jan 16, 2026 | 62K62 |
CookDistrict 1 | 120 CU YD |
$90.00 | F. H. Paschen, S.N. Nielsen & Associates LLC |
| Jan 16, 2026 | 97883 |
MadisonDistrict 8 | 53 CU YD |
$96.00 | Stutz Excavating, Inc. |
| Jan 16, 2026 | 61M01 |
WillDistrict 1 | 3,270 CU YD |
$65.00 | Austin Tyler Construction, Inc. |
| Jan 16, 2026 | 76N65 |
St.clairDistrict 8 | 15 CU YD |
$100.00 | Plocher Construction Company, Inc. |
| Jan 16, 2026 | 62W33 |
CookDistrict 1 | 3,413 CU YD |
$60.00 | Iroquois Paving Corporation |
| Jan 16, 2026 | 61K16 |
CookDistrict 1 | 930 CU YD |
$53.00 | Alliance Contractors, Inc. |
| Jan 16, 2026 | 62K64 |
CookDistrict 1 | 92 CU YD |
$90.00 | F. H. Paschen, S.N. Nielsen & Associates LLC |
| Jan 16, 2026 | 85763 |
Rock IslandDistrict 2 | 468 CU YD |
$20.00 | Valley Construction Co. |
| Jan 16, 2026 | 61M08 |
LakeDistrict 1 | 1,362 CU YD |
$70.00 | Campanella and Sons, Inc. |
| Jan 16, 2026 | 78A09 |
FranklinDistrict 9 | 35 CU YD |
$60.00 | Samron Midwest Contracting, Inc. |
| Jan 16, 2026 | 64L27 |
StephensonDistrict 2 | 69 CU YD |
$38.00 | Martin & Company Excavating |
| Jan 16, 2026 | 99758 |
UnionDistrict 9 | 29 CU YD |
$135.45 | E. T. Simonds Construction Company |
| Jan 16, 2026 | 61L89 |
CookDistrict 1 | 300 CU YD |
$55.00 | Builders Paving, LLC |
| Jan 16, 2026 | 62K65 |
CookDistrict 1 | 71 CU YD |
$110.00 | F. H. Paschen, S.N. Nielsen & Associates LLC |
| Jan 16, 2026 | 89834 |
KnoxDistrict 4 | 27 CU YD |
$135.00 | Phoenix Corporation of the Quad Cities |
| Jan 16, 2026 | 61M09 |
CookDistrict 1 | 5,522 CU YD |
$68.00 | Martam Construction Incorporated |
| Jan 16, 2026 | 85786 |
WhitesideDistrict 2 | 60 CU YD |
$42.00 | Martin & Company Excavating |
| Jan 16, 2026 | 72G90 |
ChristianDistrict 6 | 1,276 CU YD |
$90.20 | Illinois Valley Paving, a div of UCM, Inc. |
| Jan 16, 2026 | 62U12 |
CookDistrict 1 | 65 CU YD |
$100.00 | F. H. Paschen, S.N. Nielsen & Associates LLC |
| Jan 16, 2026 | 61J01 |
DupageDistrict 1 | 558 CU YD |
$68.75 | R. W. Dunteman Company |
| Jan 16, 2026 | 97876 |
MadisonDistrict 8 | 41 CU YD |
$55.06 | Hank's Excavating & Landscaping, Inc. |
| Jan 16, 2026 | 62D34 |
CookDistrict 1 | 427.8 CU YD |
$95.00 | Lorig Construction Company |
| Jan 16, 2026 | 95990 |
LawrenceDistrict 7 | 8 CU YD |
$81.00 | C-Hill Civil Contractors, Inc. |
| Jan 16, 2026 | 60R94 |
CookDistrict 1 | 4,551 CU YD |
$25.00 | OHLA Central, Inc. |
| Jan 16, 2026 | 66D52 |
LivingstonDistrict 3 | 7 CU YD |
$82.00 | Kankakee Valley Construction Company, Inc. |
| Jan 16, 2026 | 61L42 |
LakeDistrict 1 | 134 CU YD |
$45.00 | D'Land Construction, LLC |
| Nov 7, 2025 | 85785 |
Rock IslandDistrict 2 | 168 CU YD |
$30.00 | Gensini Excavating, Inc. |
| Nov 7, 2025 | 61L43 |
CookDistrict 1 | 400 CU YD |
$23.00 | K-Five Construction Corporation |
| Nov 7, 2025 | 62R63 |
CookDistrict 1 | 464 CU YD |
$81.90 | Dunnet Bay Construction Company |
| Nov 7, 2025 | 61K01 |
DupageDistrict 1 | 20 CU YD |
$68.53 | Martam Construction Incorporated |
| Nov 7, 2025 | 68B60 |
WarrenDistrict 4 | 768 CU YD |
$74.80 | Gunther Construction, a div of UCM, Inc. |
| Nov 7, 2025 | 62U41 |
CookDistrict 1 | 23 CU YD |
$100.00 | Lorig Construction Company |
| Nov 7, 2025 | 61L82 |
CookDistrict 1 | 24 CU YD |
$124.00 | Dunnet Bay Construction Company |
| Nov 7, 2025 | 70F19 |
McleanDistrict 5 | 134.3 CU YD |
$136.22 | Rowe Construction, a div of UCM, Inc. |
| Nov 7, 2025 | 68F45 |
WoodfordDistrict 4 | 433 CU YD |
$48.76 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Nov 7, 2025 | 61L98 |
CookDistrict 1 | 36 CU YD |
$83.00 | PirTano Construction Co., LLC |
| Nov 7, 2025 | 78994 |
FranklinDistrict 9 | 5 CU YD |
$80.00 | Samron Midwest Contracting, Inc. |
| Nov 7, 2025 | 46944 |
WhitesideDistrict 2 | 18 CU YD |
$42.00 | Martin & Company Excavating |
| Nov 7, 2025 | 61J54 |
DupageDistrict 1 | 100 CU YD |
$50.00 | Lorig Construction Company |
| Nov 7, 2025 | 93847 |
PikeDistrict 6 | 625 CU YD |
$88.00 | Rees Construction Company of Quincy |
| Nov 7, 2025 | 78B23 |
FranklinDistrict 9 | 4 CU YD |
$55.00 | Samron Midwest Contracting, Inc. |
| Nov 7, 2025 | 85779 |
WhitesideDistrict 2 | 34 CU YD |
$48.00 | Martin & Company Excavating |
| Nov 7, 2025 | 61L76 |
CookDistrict 1 | 50 CU YD |
$23.00 | Davis Concrete Construction Co. |
| Nov 7, 2025 | 61L88 |
MchenryDistrict 1 | 71 CU YD |
$55.00 | Dunnet Bay Construction Company |
| Sep 19, 2025 | 64P02 |
OgleDistrict 2 | 10 CU YD |
$65.50 | Stenstrom Excavation & Blacktop, Inc. |
| Sep 19, 2025 | 97833 |
MadisonDistrict 8 | 732 CU YD |
$51.45 | Keller Construction, Inc. |
| Sep 19, 2025 | 72976 |
CassDistrict 6 | 37 CU YD |
$61.00 | CSD Environmental Services, Inc. |