(35)N-2
- Let date
- Friday, September 18, 2026
- Contract
- 68H60 · job page
- District
- District 4
- County
- Tazewell
- Highway
- Limits
- Converting the existing two-way stop controlled condition to all-way stop control with red-flashing beacons, stop ahead signs with dual flashing beacons, lighting upgrades, widening the radii at the intersection, construction of 4-foot wide Hot-Mix Asphalt shoulder along the curve radii with 2-foot aggregate wedge shoulders, new pavement marking, removing and replacing an 18-inch pipe culvert and related collateral work necessary to complete the project. This project is located at the intersecti
- Classification
- ·
- Project number
Bidders 4
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Otto Baum Company, Inc. Low bidder | $649,800 | ||
| 2 | R. A. Cullinan and Son, a div of UCM, Inc. | $736,180 | +13.3% | |
| 3 | Knapp Concrete Contractors, Inc. | $801,370 | +23.3% | |
| 4 | Illinois Civil Contractors, Inc. | $822,460 | +26.6% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Otto Baum Compa… | #2 R. A. Cullinan … | #3 Knapp Concrete … | #4 Illinois Civil … |
|---|---|---|---|---|---|---|---|---|---|
| 1 | X0326899 | SOLAR-POWER FB AS CMP | 4 | EACH | $6,425.53 | $6,393.18 | $6,527.00 | $6,791.20 | |
| 2 | X1400175 | SLR-PWR FB AS CMP DA | 4 | EACH | $7,496.45 | $7,615.46 | $7,768.20 | $8,089.59 | |
| 3 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $21,760.55 | $18,665.67 | $18,725.00 | $15,224.82 | |
| 4 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $7,394.22 | $5,542.77 | $15,622.00 | $16,284.42 | |
| 5 | 20200100 | EARTH EXCAVATION | 1,288 | CU YD | $36.65 | $55.17 | $57.50 | $74.84 | |
| 6 | 20800150 | TRENCH BACKFILL | 15 | CU YD | $166.14 | $48.82 | $125.05 | $50.57 | |
| 7 | 21101615 | TOPSOIL F & P 4 | 1,106 | SQ YD | $13.14 | $10.37 | $11.17 | $18.48 | |
| 8 | 25000750 | MOWING | 4 | ACRE | $197.99 | $393.75 | $535.00 | $2,133.28 | |
| 9 | 25100630 | EROSION CONTR BLANKET | 1,106 | SQ YD | $4.23 | $5.25 | $2.20 | $2.81 | |
| 10 | 28000250 | TEMP EROS CONTR SEED | 23 | POUND | $7.48 | $15.20 | $18.32 | $7.09 | |
| 11 | 28000305 | TEMP DITCH CHECKS | 40 | FOOT | $21.50 | $33.68 | $21.53 | $11.22 | |
| 12 | 28000400 | PERIMETER EROS BAR | 747 | FOOT | $3.13 | $9.09 | $4.54 | $7.93 | |
| 13 | 28000500 | INLET & PIPE PROTECT | 3 | EACH | $140.28 | $300.04 | $386.50 | $301.09 | |
| 14 | 28100205 | STONE RIPRAP CL A3 | 15 | TON | $141.57 | $382.30 | $93.35 | $153.98 | |
| 15 | 30300112 | AGG SUBGRADE IMPR 12 | 935 | SQ YD | $39.10 | $52.26 | $33.65 | $40.31 | |
| 16 | 31102150 | SUB GRAN MAT C 4 1/2 | 309 | SQ YD | $16.91 | $37.89 | $14.77 | $15.08 | |
| 17 | 35600712 | HMA BC WID 9 | 626 | SQ YD | $111.24 | $122.34 | $111.28 | $115.85 | |
| 18 | 40200800 | AGG SURF COURSE TY B | 49 | TON | $59.66 | $122.92 | $57.99 | $87.50 | |
| 19 | 40600275 | BIT MATLS PR CT | 2,312 | POUND | $1.29 | $0.7100 | $1.28 | $1.34 | |
| 20 | 40600295 | P BIT MATLS TACK CT | 1,714 | POUND | $1.29 | $2.50 | $1.28 | $1.34 | |
| 21 | 40603205 | P HMA BC IL-9.5 N50 | 70 | TON | $283.79 | $282.24 | $283.55 | $295.57 | |
| 22 | 40603535 | P HMA SC "D" N50 | 53 | TON | $283.79 | $324.24 | $283.55 | $295.57 | |
| 23 | 40800050 | INCIDENTAL HMA SURF | 20 | TON | $283.79 | $380.16 | $283.55 | $295.57 | |
| 24 | 44000100 | PAVEMENT REM | 20 | SQ YD | $138.96 | $114.15 | $46.00 | $91.63 | |
| 25 | 44000200 | DRIVE PAVEMENT REM | 11 | SQ YD | $128.08 | $121.06 | $57.50 | $142.26 | |
| 26 | 44004250 | PAVED SHLD REMOVAL | 171 | SQ YD | $51.65 | $67.82 | $57.50 | $52.95 | |
| 27 | 44201759 | CL D PATCH T4 9 | 42 | SQ YD | $390.64 | $297.56 | $343.59 | $418.20 | |
| 28 | 48102100 | AGG WEDGE SHLD TYPE B | 46 | TON | $80.92 | $129.37 | $68.34 | $101.70 | |
| 29 | 48203029 | HMA SHOULDERS 8 | 275 | SQ YD | $107.09 | $139.79 | $170.25 | $111.54 | |
| 30 | 50105220 | PIPE CULVERT REMOV | 100 | FOOT | $25.91 | $38.89 | $40.25 | $41.62 | |
| 31 | 542A5470 | P CUL CL A 1 EQRS 15 | 140 | FOOT | $161.45 | $139.11 | $144.70 | $163.55 | |
| 32 | 542D5470 | P CUL CL D 1 EQRS 15 | 40 | FOOT | $61.09 | $152.21 | $112.60 | $137.66 | |
| 33 | 54214290 | END SEC EQV R-S 15 | 4 | EACH | $1,918.96 | $1,722.72 | $2,346.21 | $2,267.37 | |
| 34 | 54262815 | METAL FL ES EQ RS 15" | 2 | EACH | $884.13 | $862.60 | $579.05 | $2,269.40 | |
| 35 | 66600105 | FUR ERECT ROW MARKERS | 11 | EACH | $1,016.28 | $364.93 | $374.50 | $519.66 | |
| 36 | 67000500 | ENGR FIELD OFFICE B | 6 | CAL MO | $2,107.74 | $2,849.72 | $3,745.00 | $2,692.66 | |
| 37 | 67100100 | MOBILIZATION | 1 | L SUM | $39,876.09 | $65,081.16 | $21,744.00 | $41,123.01 | |
| 38 | 70100500 | TRAF CONT-PROT 701326 | 1 | L SUM | $1,070.92 | $3,386.25 | $13,662.40 | $29,106.39 | |
| 39 | 70103815 | TR CONT SURVEILLANCE | 30 | CAL DA | $291.02 | $0.0100 | $2,300.00 | $569.03 | |
| 40 | 70106700 | TEMP RUMBLE STRIPS | 4 | EACH | $963.83 | $1,002.75 | $1,998.00 | $1,806.90 | |
| 41 | 70107025 | CHANGEABLE MESSAGE SN | 116 | CAL DA | $32.13 | $72.45 | $160.50 | $139.42 | |
| 42 | 70300100 | SHORT TERM PAVT MKING | 210 | FOOT | $3.15 | $0.0100 | $6.42 | $4.86 | |
| 43 | 70300150 | SHRT TRM PAVT MK REM | 66.1 | SQ FT | $4.66 | $0.0100 | $10.70 | $15.37 | |
| 44 | 70300221 | TEMP PVT MK LINE 4 - PAINT | 962 | FOOT | $1.23 | $0.0100 | $2.14 | $1.65 | |
| 45 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 1,065 | FOOT | $1.34 | $0.0100 | $3.21 | $2.48 | |
| 46 | 70300281 | TEMP PVT MK LINE 24 - PAINT | 92 | FOOT | $10.71 | $0.0100 | $10.70 | $10.04 | |
| 47 | 72000100 | SIGN PANEL T1 | 96 | SQ FT | $37.48 | $69.91 | $129.19 | $62.46 | |
| 48 | 72400200 | REMOV SIN PAN ASSY TB | 4 | EACH | $214.18 | $1,046.55 | $1,066.79 | $190.51 | |
| 49 | 73000100 | WOOD SIN SUPPORT | 224 | FOOT | $64.26 | $43.79 | $44.94 | $87.00 | |
| 50 | 78009004 | MOD URETH PM LINE 4 | 962 | FOOT | $3.43 | $3.36 | $4.28 | $5.00 | |
| 51 | 78009006 | MOD URETH PM LINE 6 | 1,065 | FOOT | $4.93 | $4.83 | $6.42 | $7.50 | |
| 52 | 78009024 | MOD URETH PM LINE 24 | 92 | FOOT | $16.71 | $16.38 | $32.10 | $30.12 | |
| 53 | 78011025 | GRV RCSD PVT MRKG 5 | 962 | FOOT | $1.07 | $1.05 | $5.35 | $4.74 | |
| 54 | 78011035 | GRV RCSD PVT MRKG 7 | 1,065 | FOOT | $1.71 | $1.68 | $7.49 | $7.12 | |
| 55 | 78011125 | GRV RCSD PVT MRKG 25 | 92 | FOOT | $4.18 | $4.10 | $32.10 | $13.38 | |
| 56 | 78300202 | PVT MKG REM WTR BLAST | 229 | SQ FT | $20.78 | $20.37 | $38.52 | $29.00 | |
| 57 | 80400100 | ELECT SERV INSTALL | 1 | EACH | $10,709.22 | $9,082.24 | $9,255.50 | $9,647.68 | |
| 58 | 81028190 | UNDRGRD C GALVS 1 1/2 | 30 | FOOT | $26.77 | $47.96 | $49.22 | $50.95 | |
| 59 | 81028390 | UNDRGRD C PVC 4 | 70 | FOOT | $85.67 | $85.19 | $87.74 | $90.49 | |
| 60 | 81028730 | UNDRGRD C CNC 1 1/4 | 100 | FOOT | $10.71 | $23.02 | $23.54 | $24.45 | |
| 61 | 81603096 | UD 4#8#8GXLPUSE 1 1/4 | 110 | FOOT | $16.06 | $23.91 | $24.61 | $25.40 | |
| 62 | 81702140 | EC C XLP USE 1C 4 | 300 | FOOT | $19.81 | $5.00 | $5.35 | $5.31 | |
| 63 | 82110008 | LUM LED RDWY H | 2 | EACH | $1,070.93 | $1,164.42 | $1,187.70 | $1,236.92 | |
| 64 | 82500310 | LT CONT PM 240V 60 | 1 | EACH | $10,173.76 | $11,214.54 | $11,427.60 | $11,912.73 | |
| 65 | 87301245 | ELCBL C SIGNAL 14 5C | 250 | FOOT | $3.21 | $3.66 | $3.75 | $3.89 | |
| 66 | 87703020 | STL COMB MAA&P 58 | 1 | EACH | $45,889.01 | $41,454.72 | $42,800.00 | $44,035.62 | |
| 67 | 87800420 | CONC FDN TY E 42D | 21 | FOOT | $856.74 | $1,151.69 | $1,177.00 | $1,223.39 | |
| 68 | 88040410 | SH P LED 4F 1S MAM | 1 | EACH | $2,088.30 | $1,785.30 | $1,819.00 | $1,896.45 | |
| 69 | 88200100 | TS BACKPLATE | 4 | EACH | $396.24 | $275.13 | $281.41 | $292.26 |