Filtered by: County: Tazewell Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2018 | 72K18 | LoganTazewellDistrict 4 | Bituminous surface treatment A-2 and leveling binder on Armington Road from Monroe Street in Armington to US 136 and on Old IL 121 (CR 2500 E) from US 136 to the Tazewell County line. | — | Executed | Beniach Construction Co., Inc. $353,547 · | ||
| Mar 9, 2018 | 68D16 | PeoriaTazewellDistrict 4 | Resurfacing on I-74 from Washington St. to Muller Road, from Morton Ave. to Mainstreet, from Sterling Ave. to the Union Pacific Railroad structure. Also, resurfacing on I-474 Roadway A and B in Peoria. | — | Executed | Advanced Asphalt Company $6,988,434 · | ||
| Mar 9, 2018 | 68E04 | PeoriaPutnamTazewellDistrict 4 | 31 miles of crack and joint sealing on US 150, IL 26 and I-155. | — | Executed | Complete Asphalt Service Co. $164,160 · | ||
| Apr 27, 2018 | 68A79 | McLeanTazewellWoodfordDistrict 4 | 10.97 miles of pavement rubblization, overlay and new pavement construction with drainage and bridge work from west of the Tazell county line near Deer Creek to east of the Carlock interchange. | — | Executed | Rowe Construction, a Division of UCM, Inc. and Advanced Asphalt Company Joint Venture $57,888,042 · | ||
| Apr 27, 2018 | 68D69 | TazewellDistrict 4 | 0.97 mile of patching, milling and resurfacing on US 24/IL 29 from Margaret Drive to north of Lasalle Boulevard in Creve Coeur. | — | Rejected | Advanced Asphalt Company $1,885,690 · | ||
| Apr 27, 2018 | 68E01 | MarshallMasonTazewellDistrict 4 | Wash 9 bridges over the Illinois River. | — | Executed | All States Painting, Inc. $833,300 · | ||
| Apr 27, 2018 | 68E05 | StarkTazewellDistrict 4 | Pollinator habitat restoration and preservation in Stark and Tazewell Counties. | — | Executed | CSD Environmental Services, Inc. $41,978 · | ||
| Jun 15, 2018 | 68088 | TazewellDistrict 4 | Scour mitigation to SN 090-0112 carrying Illinois Route 29 over Lost Creek, 1.5 miles south of Pekin. | — | Rejected | Lee Hood d/b/a Hood Demolition & Excavation $262,717 · | ||
| Jun 15, 2018 | 68D09 | TazewellDistrict 4 | Intersection reconstruction at US 24 and Spring Creek Road. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $1,212,722 · | ||
| Jun 15, 2018 | 68D61 | TazewellDistrict 4 | 550 feet of riprap slope repair and culvert lining along IL 116 from Mariner's Way to 0.5 mile south, in East Peoria. | — | Executed | Illinois Civil Contractors, Inc. $246,702 · | ||
| Jun 15, 2018 | 68E00 | TazewellDistrict 4 | Building demolition at 500 West Pearl Street in Tremont. | — | Executed | Stark Excavating, Inc. $37,009 · | ||
| Jun 15, 2018 | 68E02 | TazewellDistrict 4 | Paint 5 bridges in Tazewell County; SN 090-0104, 0105, 0106, 0107 and 090-0141. | — | Executed | Three Star Painting, Inc. $871,891 · | ||
| Jun 15, 2018 | 68E10 | TazewellWoodfordDistrict 4 | Patching on US 24 from the McClugage Bridge to Cummings Lane, and on IL 116 from the Upper Spring Bay to Lourdes (CH 19). | — | Rejected | |||
| Jun 15, 2018 | 68E39 | PeoriaTazewellDistrict 4 | Installation of turn signals, luminaires, light poles, lighting controller and relocation of existing railroad interconnected traffic signal controller cabinet at various locations. | — | Executed | Laser Electric, Inc. $183,757 · | ||
| Aug 3, 2018 | 89746 | TazewellDistrict 4 | Construction of a shared-use path along West Cruger Road from Nofsinger Road to Main Street in the City of Washington. | — | Executed | Stark Excavating, Inc. $359,285 · | ||
| Sep 21, 2018 | 68E65 | TazewellDistrict 4 | Patching and joint repair on the on-ramps and off-ramps at the westbound I-74 Morton interchange. | — | Executed | G. M. Sipes Construction, Inc. $261,656 · | ||
| Nov 9, 2018 | 68D85 | TazewellDistrict 4 | Bridge repair project, approximately 500' in length, located in the US 24/IL 116 Interchange just east of the McClugage Bridge. | — | Executed | Halverson Construction Co., Inc. $1,885,363 · | ||
| Jan 18, 2019 | 68D59 | TazewellDistrict 4 | Bridge repair on Washington Street (IL 40) and the Industrial Spur (IL 40). | — | Executed | Halverson Construction Co., Inc. $3,848,556 · | ||
| Jan 18, 2019 | 68E76 | TazewellDistrict 4 | Installation and removal of guardrail, inlet adjustments and miscellaneous concrete work to separate US 150 (West Jackson Street) from the adjacent multi-use trial from Beverly Avenue to Cedar Avenue, on the northwest side of Morton | — | Executed | Illinois Civil Contractors, Inc. $149,100 · | ||
| Jan 18, 2019 | 68E78 | TazewellDistrict 4 | Install communications duct, communications vaults, fiber optic cable, CCTV cameras along US 24 and Business Route 24 in and around Washington. | — | Executed | Bodine Electric of Decatur $427,439 · | ||
| Mar 8, 2019 | 68C63 | TazewellDistrict 4 | Culvert replacement on IL 98, 0.1 mile east of Cole Hollow Rd (SN 090-1002) | — | Executed | Kinney Contractors, Inc. $734,500 · | ||
| Mar 8, 2019 | 68E14 | TazewellDistrict 4 | Substructure repairs to SN 090-0037 carrying US RTE 150 over Farm Creek, TWP Railroad, and Norfolk Southern Railroad. | — | Executed | Otto Baum Company, Inc. $138,518 · | ||
| Mar 8, 2019 | 68E68 | MarshallMasonTazewellDistrict 4 | Bridge washing of eleven bridges over the Illinois River | — | Executed | All States Painting, Inc. $881,690 · | ||
| Mar 8, 2019 | 68E75 | TazewellDistrict 4 | Crack and joint sealing on I-155 from I-74 to the Tazewell/Logan county line. | — | Executed | Complete Asphalt Service Co. $197,480 · | ||
| Mar 8, 2019 | 68E81 | TazewellDistrict 4 | Longitudinal joint repair, raised pavement markers, pavement striping on US 24 from east of College Drive to east of Cummings Lane. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $431,734 · | ||
| Mar 8, 2019 | 89713 | TazewellDistrict 4 | Resurfacing, sidewalks, street and pedestrian lighting, storm sewer, curb and g gutter, and pavement markings on IL 29 (Main Street) from Poplar Street to Margaret Drive in Creve Coeur. | — | Executed | Illinois Civil Contractors, Inc. $3,914,270 · | ||
| Apr 26, 2019 | 68D77 | TazewellDistrict 4 | Rehabilitation of SN 090-0047 carrying IL 29/IL 116/IL 8/US 24 over Farm Creek west of Camp Street in East Peoria. | — | Executed | Phoenix Corporation of the Quad Cities $571,771 · | ||
| Apr 26, 2019 | 68E37 | TazewellDistrict 4 | Bridge painting at various locations in Taxewell County. (SN 090-0117, 0116, 0102, 0118, and 090-0119). | — | Executed | Civil Coatings and Construction Inc. $2,237,590 · | ||
| Jun 14, 2019 | 68D99 | PeoriaTazewellDistrict 4 | TEMPORARY SIGNUNG FOR I-74 CLOSURE AND DETOUR ROUTES FOR THE MURRAY BAKER BRIDGE REHABILITATION PROJECT. | — | Executed | T.M.F. Construction Company $824,481 · | ||
| Jun 14, 2019 | 68E71 | PeoriaTazewellDistrict 4 | DETOUR ROUTE PREPARATION, INCLUDING TEMPORARY PAVEMENT AND MISCELLANEOUS ELECTRICAL WORK, ALONG IL RTE 40 IN PEORIA AND EAST PEORIA FOR MURRAY BAKER REHABILITATION PROJECT. | — | Executed | Otto Baum Company, Inc. $1,476,305 · | ||
| Jun 14, 2019 | 68E73 | TazewellDistrict 4 | Resurfacing ramp from Washington St to IL Rte 40 in East Peoria. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $140,362 · | ||
| Jun 14, 2019 | 68E89 | TazewellDistrict 4 | PARTIAL DEPTH PATCHING ON IL 8/BUS 24 FROM LEGION RD. TO EAST CITY LIMITS IN WASHINGTON. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $359,429 · | ||
| Jul 12, 2019 | 68C97 | TazewellWoodfordDistrict 4 | Resurfacing on BUS 24 from E of Lynn St. in Washington to US 24, W of Eureka. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $3,974,381 · | ||
| Aug 2, 2019 | 68E92 | TazewellDistrict 4 | Patching on IL 29/IL IL/8 116/US 24 from Wesley Rd. in Creve Coeur to camp street in East Peoria. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $316,579 · | ||
| Sep 20, 2019 | 68E16 | PeoriaTazewellDistrict 4 | CULVERT LINING ON VARIOUS ROUTES WITHIN PEORIA AND TAZEWELL COUNTIES. | — | Executed | Hoerr Construction, Inc. $769,350 · | ||
| Sep 20, 2019 | 68E27 | TazewellDistrict 4 | BRIDGE JOINT REPAIR, BRIDGE REPAIR TO SN 090-0127 CARRYING I-155 RAMP (NB) OVER BNSF AT IL 98 AND SN 090-0131 CARRYING MAIN ST (SB) OVER I-155 1.6 MI W OF IL 98 NEAR MORTON. | — | Executed | Halverson Construction Co., Inc. $853,648 · | ||
| Sep 20, 2019 | 68E53 | PeoriaTazewellDistrict 4 | CONSTRUCTION, REPLACEMENT OR CROSSWALKS ALONG IL 29 (ADAMS and JEFFERSON ST) FROM HANCOCK ST TO WAYNE STREET IN PEORIA, IL 8 FROM CHERRY LANE TO MEADOWVIEW LN IN SUNNYLAND, IL 8 AT LEGION RD AND BUS 24 AT BONDURANT ST IN WASHINGTON. | — | Executed | Otto Baum Company, Inc. $537,618 · | ||
| Sep 20, 2019 | 89749 | TazewellDistrict 4 | Roadway reconstruction on Distillery Road from Front Street to IL 29, on Front Street from Distillery Road to Fayette Street and on Fayette Street from Front Street to IL 29 in the city of Pekin. | — | Executed | Otto Baum Company, Inc. $6,378,025 · | ||
| Nov 8, 2019 | 68C89 | TazewellDistrict 4 | Deck replacement, structural steel repairs, roadway lighting, navigation lightning, decorative lighting, and scour countermeasures to SN 090-0001 (Murray Baker Bridge), carrying I-74 over the Illinois River. | — | Executed | ICC Group Inc. $42,221,000 · | ||
| Mar 6, 2020 | 68E72 | PeoriaTazewellDistrict 4 | Installation of dynamic message signs and associated work at four locations along I-74. | — | Executed | Western Remac, Inc. $1,157,885 · | ||
| Mar 6, 2020 | 68E79 | TazewellDistrict 4 | Bridge rehabilitation, joint replacement, and deck repairs to SN 090-0114 over the Illinois River at Pekin. | — | Rejected | ICC Group Inc. $4,871,500 · | ||
| Apr 24, 2020 | 68F20 | PeoriaTazewellDistrict 4 | Replacement of traffic signal mast arms at various locations in Peoria and Tazewell Counties. | — | Executed | Oberlander Electric Co. $374,200 · | ||
| Jun 12, 2020 | 68894 | TazewellDistrict 4 | Replacement of SN 090-0091 carrying Pinecrest Dr over I-74, 2 miles E of the IL 8 interchange. | — | Executed | Otto Baum Company, Inc. $9,626,406 · | ||
| Jul 31, 2020 | 89735 | TazewellDistrict 4 | Reconstruct the intersection of Camp Street and River Road in East Peoria. | — | Executed | Otto Baum Company, Inc. $1,295,159 · | ||
| Jul 31, 2020 | 89768 | TazewellDistrict 4 | Construct a shared-use path along North Main Street from Cruger Road to Easy Street in Washington. | — | Executed | Gensini Excavating, Inc. $240,310 · | ||
| Jul 31, 2020 | 89770 | TazewellDistrict 4 | Construction of sidewalks and ADA Ramps at various locations in Pekin. | — | Executed | Otto Baum Company, Inc. $203,635 · | ||
| Nov 6, 2020 | 68F98 | TazewellWoodfordDistrict 4 | Culvert lining at various locations along US 24 in Tazewell and Woodford Counties. | — | Executed | Phoenix Corporation of the Quad Cities $217,465 · | ||
| Nov 6, 2020 | 68G05 | PeoriaTazewellDistrict 4 | Replacement of existing video detection systems at various locations in Peoria various locations in Peoria and Tazewell Counties in District Four. | — | Executed | Oberlander Electric Co. $406,250 · | ||
| Nov 6, 2020 | 89769 | TazewellDistrict 4 | Sidewalk construction algon the north side of Bobolink Drive, from Elgin Street to Eagle Avenue, and along the east side of Eagle Avenue from Bobolink Drive to the north entrance to Central Intermediate School in Washington. | — | Executed | Stark Excavating, Inc. $207,461 · | ||
| Jan 15, 2021 | 68F54 | TazewellDistrict 4 | Bridge painting, bridge deck scarification and overlay, joint replacement, bearing replacement, slopewall repa This project is 5.5 miles long and the structure repair work consists of bridge painting, bridge deck scarification and overlay, joint replacement, bearing replacement, slopewall repair, substructure repair, and other related work on various structures on 1-74 from 0.8 miles east of Morton Ave. to the Woodford County line. | — | Executed | Stark Excavating, Inc. $4,871,748 · | ||
| Jan 15, 2021 | 68F63 | MarshallMasonTazewellDistrict 4 | Bridge washing of eight (8) bridges over the Illinois River in Marshall, Tazewell and Mason counties. | — | Executed | Interstate Maintenance, Incorporated $239,996 · | ||
| Jan 15, 2021 | 89720 | TazewellDistrict 4 | Replace the bridge carrying CH 14 over Dry Creek, 2.3 miles east of Green Valley. | — | Executed | Illinois Civil Contractors, Inc. $559,587 · | ||
| Mar 5, 2021 | 68F69 | TazewellDistrict 4 | 0.89 mile, resurfacing of Main Street (IL 1 16/US 150) from North of 1-74 to South Highview Road in East Peoria, Tazewell County. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $1,449,784 · | ||
| Apr 23, 2021 | 68G21 | PeoriaTazewellDistrict 4 | Installation of new traffic signal cabinets, traffic signal controllers, communications equipment, and video detection systems at various locations in District Four. | — | Executed | Laser Electric, Inc. $482,887 · | ||
| Apr 23, 2021 | 68G23 | TazewellDistrict 4 | Installation of overhead light poles, luminaires, flashing beacons, signs, pavement markings, rumble strips on IL Route 9 in Woodford County. | — | Executed | Laser Electric, Inc. $122,483 · | ||
| Jun 11, 2021 | 68G25 | TazewellWoodfordDistrict 4 | Patching on IL Route 116 from IL Route 26 to East of Lourdes Road in Germantown Hills. | — | Executed | Kinney Contractors, Inc. $615,751 · | ||
| Jun 11, 2021 | 68G26 | TazewellDistrict 4 | Patching on US 24/US 150 from the East end of the McClugage Bridge to East of Hollands Grove Road in Tazewell County. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $671,702 · | ||
| Jun 11, 2021 | 68G56 | TazewellDistrict 4 | Highway lighting improvements along WB I-74 between I-474 and I-155 and US 24/BUS 24 interchange near Washington in Tazewell County. | — | Executed | Bodine Electric of Decatur $218,685 · | ||
| Jun 11, 2021 | 89681 | TazewellDistrict 4 | Realignment, pavement reconstruction, culvert extensions, culverts and pavement markings on Allentown Road from 1000 feet east of Court Street and extending 1,000 feet into the city of Pekin. | — | Executed | Otto Baum Company, Inc. $617,543 · | ||
| Jun 11, 2021 | 89725 | TazewellDistrict 4 | Construction of a PCC multi-use path and drainage items along Centennial Drive from Spring Creek Road to IL 8 in Washington. | — | Rejected | Knapp Concrete Contractors, Inc. $388,163 · | ||
| Jul 30, 2021 | 89784 | TazewellDistrict 4 | Resurfacing on Parkway Drive from Lick Creek to Willow Street in Pekin. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $1,195,692 · | ||
| Nov 5, 2021 | 68G64 | TazewellDistrict 4 | Remove and replace existing high mast light tower, luminaires and concrete foundation on Riverfront Drive Spur, e ast of W ashinton Street in East Peoria. | — | Executed | Oberlander Electric Co. $127,380 · | ||
| Nov 5, 2021 | 89721 | TazewellDistrict 4 | Replace the bridge carrying Furrow Road over Lost Creek, one half mile east of Pekin. | — | Executed | Stark Excavating, Inc. $1,138,863 · | ||
| Nov 5, 2021 | 89727 | TazewellDistrict 4 | Resurfacing, HMA shoulders, concrete curb, drainage improvements and pavement markings on Broadway Road from Veterans Drive to Springfield Road. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $4,998,272 · | ||
| Jan 21, 2022 | 68D73 | TazewellDistrict 4 | Resurfacing on IL-9 from East Chestnut St. in Tremont to just West of the Prairie Creek Bridge (S.N. 090-0061). | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $1,282,674 · | ||
| Jan 21, 2022 | 68F11 | TazewellDistrict 4 | This pavement patching and HMA overlay project is located on Interstate 74 from 0.8 miles East of Morton to the Woodford Co. line. Project length is 6.42 miles. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $11,367,686 · | ||
| Jan 21, 2022 | 68G75 | PeoriaTazewellDistrict 4 | Repair and replace traffic signals, overhead lighting, and ITS facilities at various locations in East Peoria, Peoria, Pekin and Peoria County. | — | Executed | Oberlander Electric Co. $301,890 · | ||
| Jan 21, 2022 | 89787 | TazewellDistrict 4 | Reconstruction and widening of Courtland Street to a 5-lane section from Walton Avenue to Main Street in Morton. | — | Executed | Gensini Excavating, Inc. $2,572,414 · | ||
| Mar 11, 2022 | 68F32 | TazewellDistrict 4 | Drainage improvenments along the East fore slope of US 24/IL 29 South of Ravine St This project will be .10 miles long and will consist of drainage improvenments along the East fore slope of US 24/IL 29 South of Ravine St. in the city of East Peoria. | — | Executed | Stark Excavating, Inc. $79,890 · | ||
| Mar 11, 2022 | 68F75 | TazewellDistrict 4 | Bridge joint replace/repair, bridge deck repairs, bridge repair on S.N. 090-0136 on Townline Road over 1-155, 3 miles South of IL Route 9. | — | Executed | Stark Excavating, Inc. $357,062 · | ||
| Mar 11, 2022 | 68G28 | PeoriaTazewellDistrict 4 | Crack and Joint Sealing on US 24/IL 9 from N of Pfeiffer Rd in Bartonville to 0.16 mi SW of IL 9 (E.) and on IL 29 from Margaret Drive in Creve Coeur to N of LaSalle BLVD in Marquette Heights. | — | Executed | Denler, Inc. $214,975 · | ||
| Mar 11, 2022 | 68G58 | MarshallMasonTazewellDistrict 4 | Bridge washing of nine (9) bridges over the Illinois River in Tazewell, Mason, and Marshall Counties. | — | Executed | Interstate Maintenance, Incorporated $219,300 · | ||
| Mar 11, 2022 | 68G68 | TazewellDistrict 4 | Bridge repairs to SN 090-0104 Springfield Rd; 090-0105 Cole St; 090-0119 EB Ramp to WB I-74 (replace rocker bearings, misc. structural steel and substructure repairs). | — | Executed | Stark Excavating, Inc. $294,240 · | ||
| Apr 29, 2022 | 68G50 | TazewellDistrict 4 | Bridge deck sealing at various locations in Tazewell County. | — | Executed | All States Painting, Inc. $293,000 · | ||
| Apr 29, 2022 | 68G73 | TazewellDistrict 4 | Lighting upgrades at IL 29/1-474 interchange in Creve Coeur, I-155/IL 98 and I-155/Queenwood Rd. interchanges in Morton. | — | Executed | Bodine Electric of Decatur $248,640 · | ||
| Jun 17, 2022 | 68H04 | TazewellWoodfordDistrict 4 | 2.9 miles of median removal and manhole/inlet repairs. | — | Executed | Phoenix Corporation of the Quad Cities $155,327 · | ||
| Jun 17, 2022 | 68H05 | TazewellDistrict 4 | HMA Patching on Business US 24 in Washington (2.65 miles); HMA Patching on IL 122 West of Minier (2.00 miles). | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $579,057 · | ||
| Aug 5, 2022 | 68H12 | TazewellDistrict 4 | The installation of new traffic signals, pavement markings, ADA ramp, curb and gutter, riprap, median reconstr This profect consists of the installation of new traffic signals, pavement markings, ADA ramp, curb and gutter, riprap, median reconstruction, and all related collateral work necessary to complete the improvements on this project. Located at the intersection of VFW Rd. and 14th St. in Pekin, Tazewell Co. | — | Executed | Otto Baum Company, Inc. $649,720 · | ||
| Nov 18, 2022 | 68F38 | PeoriaTazewellDistrict 4 | Bridge Rehabilitation with bridge deck overlay, beam repairs, beam additions, navigation and roadway lighting, traffic signal improvements, drainage improvements, full depth pavement removal and replacement, sidewalk removals, multi-use path construction and related collateral work. Bob Michel Bridge (SN 090-0122) in Peoria and Tazewell Counties on IL 40 (William Kumpf Blvd.) over the Illinois River and Washington Street. | — | Executed | ICC Group Inc. $24,657,000 · | ||
| Jan 20, 2023 | 68E42 | TazewellDistrict 4 | 0.47 miles, Bridge Replacement on I-155 over Indian Creek near Hopedale. | — | Executed | Stark Excavating, Inc. $8,247,342 · | ||
| Mar 10, 2023 | 68H16 | TazewellDistrict 4 | Replace expansion joints and partial depth deck patching to S.N. 090-0063 carrying IL 9 over Mackinaw River. | — | Executed | Otto Baum Company, Inc. $371,800 · | ||
| Mar 10, 2023 | 68H21 | PeoriaTazewellDistrict 4 | Crack and joint sealing at various locations along 1-74 and 1-474 in Peoria and Tazewell Counties. | — | Executed | Complete Asphalt Service Co. $224,649 · | ||
| Apr 28, 2023 | 68H13 | TazewellDistrict 4 | Centerline joint repair on IL 8/US 150 (Washington/Camp Streets) from east of Main Street to east of Rosedale Street in East Peoria in Tazewell County. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $355,408 · | ||
| Apr 28, 2023 | 89805 | TazewellDistrict 4 | Roadway extension of Freedom Parkway from east of IL 8 to Cummings Lane in Washington. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $6,595,005 · | ||
| Jun 16, 2023 | 68H15 | TazewellDistrict 4 | Replace expansion joints and substructure repairs to structures carrying I-155 over IL 98 and TPandWRR. | — | Executed | Otto Baum Company, Inc. $1,191,200 · | ||
| Aug 4, 2023 | 89804 | TazewellDistrict 4 | Resurfacing and intersection improvements on Court Street from Stadium Drive to Hilltop Drive in Pekin. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $9,959,061 · | ||
| Aug 4, 2023 | 89849 | TazewellDistrict 4 | Re-align and reconstruct Nofsinger Road at the intersection of US 24 in the City of Washington. | — | Executed | Gensini Excavating, Inc. $6,846,974 · | ||
| Sep 22, 2023 | 68H74 | PutnamTazewellDistrict 4 | Remove and replace guardrail and end sections. | — | Executed | Midwest Fence Corporation $878,935 · | ||
| Sep 22, 2023 | 68H75 | TazewellDistrict 4 | Building demolition at three locations between Cedar Street and Ravine Street in East Peoria, Tazewell County. 607 S. Main St. (Parcel #4ABL008), 627 S. Main St. (Parcel #4ABL005) and 711 S. Main St. (Parcel #4ABL002). | — | Executed | JIMAX Landscape LLC $80,207 · | ||
| Nov 17, 2023 | 68C00 | TazewellDistrict 4 | 3R project has a length of 0.58 miles extending from the east end of the Cedar St Bridge over the Illinois River to just east of Center St, including the Edmund St interchange. Work includes pavement patching, milling, resurfacing, and bridge rehabilitation. | — | Executed | ICC Group Inc. $14,978,000 · | ||
| Nov 17, 2023 | 89824 | TazewellDistrict 4 | Resurfacing Fischer Road from IL 29 to Creve Coeur Avenue in Creve Coeur. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $408,195 · | ||
| Mar 8, 2024 | 68H88 | TazewellDistrict 4 | 0.3 miles HMA partial depth patching and longitudinal joint repair. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $546,748 · | ||
| Mar 8, 2024 | 89850 | TazewellDistrict 4 | Construction of PCC Sidewalk, combination curb and gutter, pavement markings, signing and fencing along Stadiam Drive from Court Street North to the existing Pekin park District Trail in Pekin. | — | Executed | Illinois Civil Contractors, Inc. $573,961 · | ||
| Apr 26, 2024 | 68H71 | TazewellDistrict 4 | D4 Bridge Joint Repair 2024 at SN's 090-0130, 090-0132, 090-0133, 090-0137, 090-0138 and 090-0139 in Tazewell County. | — | Active | Otto Baum Company, Inc. $5,662,800 · | ||
| Apr 26, 2024 | 68H81 | TazewellDistrict 4 | Bridge deck patching on SN 090-0141 on Morton Ave (FAU 6729) over I-74 in Morton in Tazewell County. | — | Executed | Path Construction Company, Inc. $211,896 · | ||
| Apr 26, 2024 | 68I05 | TazewellDistrict 4 | Traffic signal mast arm replacement at IL 98 (Birchwood St.) and I-155 NB ramps in Morton. | — | Executed | Laser Electric, Inc. $243,063 · | ||
| Jun 14, 2024 | 68H95 | TazewellDistrict 4 | 4.2 miles of construction of HMA shoulders with an aggregate shoulder wedge, between Pekin and Tremont. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $1,978,846 · | ||
| Jun 14, 2024 | 68J08 | TazewellDistrict 4 | 4.61 miles of CIR and Mill and Overlay on IL 122 in Tazewell County. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $5,783,311 · | ||
| Jun 14, 2024 | 68J24 | PeoriaTazewellDistrict 4 | D4 highway lighting 2025: Inspection of existing high mast towers, luminaire repair and re-lamping, maintenance of existing lighting controllers in Peoria and Tazewell Counties. | — | Executed | Laser Electric, Inc. $516,745 · | ||
| Jun 14, 2024 | 68J25 | TazewellDistrict 4 | Lighting upgrades at I-74 and I-155 interchange in Morton in Tazewell County. | — | Executed | Laser Electric, Inc. $455,220 · |
1–100 of 141Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.