IDOT Jobs

All dates · 141 jobs · — Sign up free
★ My Jobs

Filtered by: County: Tazewell Clear all

141 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 19, 2018 72K18 LoganTazewellDistrict 4 Bituminous surface treatment A-2 and leveling binder on Armington Road from Monroe Street in Armington to US 136 and on Old IL 121 (CR 2500 E) from US 136 to the Tazewell County line. — Executed Nov 26 New Beniach Construction Co., Inc. $353,547 ·
Mar 9, 2018 68D16 PeoriaTazewellDistrict 4 Resurfacing on I-74 from Washington St. to Muller Road, from Morton Ave. to Mainstreet, from Sterling Ave. to the Union Pacific Railroad structure. Also, resurfacing on I-474 Roadway A and B in Peoria. — Executed Nov 26 New Advanced Asphalt Company $6,988,434 ·
Mar 9, 2018 68E04 PeoriaPutnamTazewellDistrict 4 31 miles of crack and joint sealing on US 150, IL 26 and I-155. — Executed Nov 26 New Complete Asphalt Service Co. $164,160 ·
Apr 27, 2018 68A79 McLeanTazewellWoodfordDistrict 4 10.97 miles of pavement rubblization, overlay and new pavement construction with drainage and bridge work from west of the Tazell county line near Deer Creek to east of the Carlock interchange. — Executed Nov 26 New Rowe Construction, a Division of UCM, Inc. and Advanced Asphalt Company Joint Venture $57,888,042 ·
Apr 27, 2018 68D69 TazewellDistrict 4 0.97 mile of patching, milling and resurfacing on US 24/IL 29 from Margaret Drive to north of Lasalle Boulevard in Creve Coeur. — Rejected Nov 26 New Advanced Asphalt Company $1,885,690 ·
Apr 27, 2018 68E01 MarshallMasonTazewellDistrict 4 Wash 9 bridges over the Illinois River. — Executed Nov 26 New All States Painting, Inc. $833,300 ·
Apr 27, 2018 68E05 StarkTazewellDistrict 4 Pollinator habitat restoration and preservation in Stark and Tazewell Counties. — Executed Nov 26 New CSD Environmental Services, Inc. $41,978 ·
Jun 15, 2018 68088 TazewellDistrict 4 Scour mitigation to SN 090-0112 carrying Illinois Route 29 over Lost Creek, 1.5 miles south of Pekin. — Rejected Nov 26 New Lee Hood d/b/a Hood Demolition & Excavation $262,717 ·
Jun 15, 2018 68D09 TazewellDistrict 4 Intersection reconstruction at US 24 and Spring Creek Road. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $1,212,722 ·
Jun 15, 2018 68D61 TazewellDistrict 4 550 feet of riprap slope repair and culvert lining along IL 116 from Mariner's Way to 0.5 mile south, in East Peoria. — Executed Nov 26 New Illinois Civil Contractors, Inc. $246,702 ·
Jun 15, 2018 68E00 TazewellDistrict 4 Building demolition at 500 West Pearl Street in Tremont. — Executed Nov 26 New Stark Excavating, Inc. $37,009 ·
Jun 15, 2018 68E02 TazewellDistrict 4 Paint 5 bridges in Tazewell County; SN 090-0104, 0105, 0106, 0107 and 090-0141. — Executed Nov 26 New Three Star Painting, Inc. $871,891 ·
Jun 15, 2018 68E10 TazewellWoodfordDistrict 4 Patching on US 24 from the McClugage Bridge to Cummings Lane, and on IL 116 from the Upper Spring Bay to Lourdes (CH 19). — Rejected Nov 26 New
Jun 15, 2018 68E39 PeoriaTazewellDistrict 4 Installation of turn signals, luminaires, light poles, lighting controller and relocation of existing railroad interconnected traffic signal controller cabinet at various locations. — Executed Nov 26 New Laser Electric, Inc. $183,757 ·
Aug 3, 2018 89746 TazewellDistrict 4 Construction of a shared-use path along West Cruger Road from Nofsinger Road to Main Street in the City of Washington. — Executed Nov 26 New Stark Excavating, Inc. $359,285 ·
Sep 21, 2018 68E65 TazewellDistrict 4 Patching and joint repair on the on-ramps and off-ramps at the westbound I-74 Morton interchange. — Executed Nov 26 New G. M. Sipes Construction, Inc. $261,656 ·
Nov 9, 2018 68D85 TazewellDistrict 4 Bridge repair project, approximately 500' in length, located in the US 24/IL 116 Interchange just east of the McClugage Bridge. — Executed Nov 26 New Halverson Construction Co., Inc. $1,885,363 ·
Jan 18, 2019 68D59 TazewellDistrict 4 Bridge repair on Washington Street (IL 40) and the Industrial Spur (IL 40). — Executed Nov 26 New Halverson Construction Co., Inc. $3,848,556 ·
Jan 18, 2019 68E76 TazewellDistrict 4 Installation and removal of guardrail, inlet adjustments and miscellaneous concrete work to separate US 150 (West Jackson Street) from the adjacent multi-use trial from Beverly Avenue to Cedar Avenue, on the northwest side of Morton — Executed Nov 26 New Illinois Civil Contractors, Inc. $149,100 ·
Jan 18, 2019 68E78 TazewellDistrict 4 Install communications duct, communications vaults, fiber optic cable, CCTV cameras along US 24 and Business Route 24 in and around Washington. — Executed Nov 26 New Bodine Electric of Decatur $427,439 ·
Mar 8, 2019 68C63 TazewellDistrict 4 Culvert replacement on IL 98, 0.1 mile east of Cole Hollow Rd (SN 090-1002) — Executed Nov 26 New Kinney Contractors, Inc. $734,500 ·
Mar 8, 2019 68E14 TazewellDistrict 4 Substructure repairs to SN 090-0037 carrying US RTE 150 over Farm Creek, TWP Railroad, and Norfolk Southern Railroad. — Executed Nov 26 New Otto Baum Company, Inc. $138,518 ·
Mar 8, 2019 68E68 MarshallMasonTazewellDistrict 4 Bridge washing of eleven bridges over the Illinois River — Executed Nov 26 New All States Painting, Inc. $881,690 ·
Mar 8, 2019 68E75 TazewellDistrict 4 Crack and joint sealing on I-155 from I-74 to the Tazewell/Logan county line. — Executed Nov 26 New Complete Asphalt Service Co. $197,480 ·
Mar 8, 2019 68E81 TazewellDistrict 4 Longitudinal joint repair, raised pavement markers, pavement striping on US 24 from east of College Drive to east of Cummings Lane. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $431,734 ·
Mar 8, 2019 89713 TazewellDistrict 4 Resurfacing, sidewalks, street and pedestrian lighting, storm sewer, curb and g gutter, and pavement markings on IL 29 (Main Street) from Poplar Street to Margaret Drive in Creve Coeur. — Executed Nov 26 New Illinois Civil Contractors, Inc. $3,914,270 ·
Apr 26, 2019 68D77 TazewellDistrict 4 Rehabilitation of SN 090-0047 carrying IL 29/IL 116/IL 8/US 24 over Farm Creek west of Camp Street in East Peoria. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $571,771 ·
Apr 26, 2019 68E37 TazewellDistrict 4 Bridge painting at various locations in Taxewell County. (SN 090-0117, 0116, 0102, 0118, and 090-0119). — Executed Nov 26 New Civil Coatings and Construction Inc. $2,237,590 ·
Jun 14, 2019 68D99 PeoriaTazewellDistrict 4 TEMPORARY SIGNUNG FOR I-74 CLOSURE AND DETOUR ROUTES FOR THE MURRAY BAKER BRIDGE REHABILITATION PROJECT. — Executed Nov 26 New T.M.F. Construction Company $824,481 ·
Jun 14, 2019 68E71 PeoriaTazewellDistrict 4 DETOUR ROUTE PREPARATION, INCLUDING TEMPORARY PAVEMENT AND MISCELLANEOUS ELECTRICAL WORK, ALONG IL RTE 40 IN PEORIA AND EAST PEORIA FOR MURRAY BAKER REHABILITATION PROJECT. — Executed Nov 26 New Otto Baum Company, Inc. $1,476,305 ·
Jun 14, 2019 68E73 TazewellDistrict 4 Resurfacing ramp from Washington St to IL Rte 40 in East Peoria. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $140,362 ·
Jun 14, 2019 68E89 TazewellDistrict 4 PARTIAL DEPTH PATCHING ON IL 8/BUS 24 FROM LEGION RD. TO EAST CITY LIMITS IN WASHINGTON. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $359,429 ·
Jul 12, 2019 68C97 TazewellWoodfordDistrict 4 Resurfacing on BUS 24 from E of Lynn St. in Washington to US 24, W of Eureka. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $3,974,381 ·
Aug 2, 2019 68E92 TazewellDistrict 4 Patching on IL 29/IL IL/8 116/US 24 from Wesley Rd. in Creve Coeur to camp street in East Peoria. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $316,579 ·
Sep 20, 2019 68E16 PeoriaTazewellDistrict 4 CULVERT LINING ON VARIOUS ROUTES WITHIN PEORIA AND TAZEWELL COUNTIES. — Executed Nov 26 New Hoerr Construction, Inc. $769,350 ·
Sep 20, 2019 68E27 TazewellDistrict 4 BRIDGE JOINT REPAIR, BRIDGE REPAIR TO SN 090-0127 CARRYING I-155 RAMP (NB) OVER BNSF AT IL 98 AND SN 090-0131 CARRYING MAIN ST (SB) OVER I-155 1.6 MI W OF IL 98 NEAR MORTON. — Executed Nov 26 New Halverson Construction Co., Inc. $853,648 ·
Sep 20, 2019 68E53 PeoriaTazewellDistrict 4 CONSTRUCTION, REPLACEMENT OR CROSSWALKS ALONG IL 29 (ADAMS and JEFFERSON ST) FROM HANCOCK ST TO WAYNE STREET IN PEORIA, IL 8 FROM CHERRY LANE TO MEADOWVIEW LN IN SUNNYLAND, IL 8 AT LEGION RD AND BUS 24 AT BONDURANT ST IN WASHINGTON. — Executed Nov 26 New Otto Baum Company, Inc. $537,618 ·
Sep 20, 2019 89749 TazewellDistrict 4 Roadway reconstruction on Distillery Road from Front Street to IL 29, on Front Street from Distillery Road to Fayette Street and on Fayette Street from Front Street to IL 29 in the city of Pekin. — Executed Nov 26 New Otto Baum Company, Inc. $6,378,025 ·
Nov 8, 2019 68C89 TazewellDistrict 4 Deck replacement, structural steel repairs, roadway lighting, navigation lightning, decorative lighting, and scour countermeasures to SN 090-0001 (Murray Baker Bridge), carrying I-74 over the Illinois River. — Executed Nov 26 New ICC Group Inc. $42,221,000 ·
Mar 6, 2020 68E72 PeoriaTazewellDistrict 4 Installation of dynamic message signs and associated work at four locations along I-74. — Executed Nov 26 New Western Remac, Inc. $1,157,885 ·
Mar 6, 2020 68E79 TazewellDistrict 4 Bridge rehabilitation, joint replacement, and deck repairs to SN 090-0114 over the Illinois River at Pekin. — Rejected Nov 26 New ICC Group Inc. $4,871,500 ·
Apr 24, 2020 68F20 PeoriaTazewellDistrict 4 Replacement of traffic signal mast arms at various locations in Peoria and Tazewell Counties. — Executed Nov 26 New Oberlander Electric Co. $374,200 ·
Jun 12, 2020 68894 TazewellDistrict 4 Replacement of SN 090-0091 carrying Pinecrest Dr over I-74, 2 miles E of the IL 8 interchange. — Executed Nov 26 New Otto Baum Company, Inc. $9,626,406 ·
Jul 31, 2020 89735 TazewellDistrict 4 Reconstruct the intersection of Camp Street and River Road in East Peoria. — Executed Nov 26 New Otto Baum Company, Inc. $1,295,159 ·
Jul 31, 2020 89768 TazewellDistrict 4 Construct a shared-use path along North Main Street from Cruger Road to Easy Street in Washington. — Executed Nov 26 New Gensini Excavating, Inc. $240,310 ·
Jul 31, 2020 89770 TazewellDistrict 4 Construction of sidewalks and ADA Ramps at various locations in Pekin. — Executed Nov 26 New Otto Baum Company, Inc. $203,635 ·
Nov 6, 2020 68F98 TazewellWoodfordDistrict 4 Culvert lining at various locations along US 24 in Tazewell and Woodford Counties. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $217,465 ·
Nov 6, 2020 68G05 PeoriaTazewellDistrict 4 Replacement of existing video detection systems at various locations in Peoria various locations in Peoria and Tazewell Counties in District Four. — Executed Nov 26 New Oberlander Electric Co. $406,250 ·
Nov 6, 2020 89769 TazewellDistrict 4 Sidewalk construction algon the north side of Bobolink Drive, from Elgin Street to Eagle Avenue, and along the east side of Eagle Avenue from Bobolink Drive to the north entrance to Central Intermediate School in Washington. — Executed Nov 26 New Stark Excavating, Inc. $207,461 ·
Jan 15, 2021 68F54 TazewellDistrict 4 Bridge painting, bridge deck scarification and overlay, joint replacement, bearing replacement, slopewall repa This project is 5.5 miles long and the structure repair work consists of bridge painting, bridge deck scarification and overlay, joint replacement, bearing replacement, slopewall repair, substructure repair, and other related work on various structures on 1-74 from 0.8 miles east of Morton Ave. to the Woodford County line. — Executed Nov 26 New Stark Excavating, Inc. $4,871,748 ·
Jan 15, 2021 68F63 MarshallMasonTazewellDistrict 4 Bridge washing of eight (8) bridges over the Illinois River in Marshall, Tazewell and Mason counties. — Executed Nov 26 New Interstate Maintenance, Incorporated $239,996 ·
Jan 15, 2021 89720 TazewellDistrict 4 Replace the bridge carrying CH 14 over Dry Creek, 2.3 miles east of Green Valley. — Executed Nov 26 New Illinois Civil Contractors, Inc. $559,587 ·
Mar 5, 2021 68F69 TazewellDistrict 4 0.89 mile, resurfacing of Main Street (IL 1 16/US 150) from North of 1-74 to South Highview Road in East Peoria, Tazewell County. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $1,449,784 ·
Apr 23, 2021 68G21 PeoriaTazewellDistrict 4 Installation of new traffic signal cabinets, traffic signal controllers, communications equipment, and video detection systems at various locations in District Four. — Executed Nov 26 New Laser Electric, Inc. $482,887 ·
Apr 23, 2021 68G23 TazewellDistrict 4 Installation of overhead light poles, luminaires, flashing beacons, signs, pavement markings, rumble strips on IL Route 9 in Woodford County. — Executed Nov 26 New Laser Electric, Inc. $122,483 ·
Jun 11, 2021 68G25 TazewellWoodfordDistrict 4 Patching on IL Route 116 from IL Route 26 to East of Lourdes Road in Germantown Hills. — Executed Nov 26 New Kinney Contractors, Inc. $615,751 ·
Jun 11, 2021 68G26 TazewellDistrict 4 Patching on US 24/US 150 from the East end of the McClugage Bridge to East of Hollands Grove Road in Tazewell County. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $671,702 ·
Jun 11, 2021 68G56 TazewellDistrict 4 Highway lighting improvements along WB I-74 between I-474 and I-155 and US 24/BUS 24 interchange near Washington in Tazewell County. — Executed Nov 26 New Bodine Electric of Decatur $218,685 ·
Jun 11, 2021 89681 TazewellDistrict 4 Realignment, pavement reconstruction, culvert extensions, culverts and pavement markings on Allentown Road from 1000 feet east of Court Street and extending 1,000 feet into the city of Pekin. — Executed Nov 26 New Otto Baum Company, Inc. $617,543 ·
Jun 11, 2021 89725 TazewellDistrict 4 Construction of a PCC multi-use path and drainage items along Centennial Drive from Spring Creek Road to IL 8 in Washington. — Rejected Nov 26 New Knapp Concrete Contractors, Inc. $388,163 ·
Jul 30, 2021 89784 TazewellDistrict 4 Resurfacing on Parkway Drive from Lick Creek to Willow Street in Pekin. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $1,195,692 ·
Nov 5, 2021 68G64 TazewellDistrict 4 Remove and replace existing high mast light tower, luminaires and concrete foundation on Riverfront Drive Spur, e ast of W ashinton Street in East Peoria. — Executed Nov 26 New Oberlander Electric Co. $127,380 ·
Nov 5, 2021 89721 TazewellDistrict 4 Replace the bridge carrying Furrow Road over Lost Creek, one half mile east of Pekin. — Executed Nov 26 New Stark Excavating, Inc. $1,138,863 ·
Nov 5, 2021 89727 TazewellDistrict 4 Resurfacing, HMA shoulders, concrete curb, drainage improvements and pavement markings on Broadway Road from Veterans Drive to Springfield Road. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $4,998,272 ·
Jan 21, 2022 68D73 TazewellDistrict 4 Resurfacing on IL-9 from East Chestnut St. in Tremont to just West of the Prairie Creek Bridge (S.N. 090-0061). — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $1,282,674 ·
Jan 21, 2022 68F11 TazewellDistrict 4 This pavement patching and HMA overlay project is located on Interstate 74 from 0.8 miles East of Morton to the Woodford Co. line. Project length is 6.42 miles. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $11,367,686 ·
Jan 21, 2022 68G75 PeoriaTazewellDistrict 4 Repair and replace traffic signals, overhead lighting, and ITS facilities at various locations in East Peoria, Peoria, Pekin and Peoria County. — Executed Nov 26 New Oberlander Electric Co. $301,890 ·
Jan 21, 2022 89787 TazewellDistrict 4 Reconstruction and widening of Courtland Street to a 5-lane section from Walton Avenue to Main Street in Morton. — Executed Nov 26 New Gensini Excavating, Inc. $2,572,414 ·
Mar 11, 2022 68F32 TazewellDistrict 4 Drainage improvenments along the East fore slope of US 24/IL 29 South of Ravine St This project will be .10 miles long and will consist of drainage improvenments along the East fore slope of US 24/IL 29 South of Ravine St. in the city of East Peoria. — Executed Nov 26 New Stark Excavating, Inc. $79,890 ·
Mar 11, 2022 68F75 TazewellDistrict 4 Bridge joint replace/repair, bridge deck repairs, bridge repair on S.N. 090-0136 on Townline Road over 1-155, 3 miles South of IL Route 9. — Executed Nov 26 New Stark Excavating, Inc. $357,062 ·
Mar 11, 2022 68G28 PeoriaTazewellDistrict 4 Crack and Joint Sealing on US 24/IL 9 from N of Pfeiffer Rd in Bartonville to 0.16 mi SW of IL 9 (E.) and on IL 29 from Margaret Drive in Creve Coeur to N of LaSalle BLVD in Marquette Heights. — Executed Nov 26 New Denler, Inc. $214,975 ·
Mar 11, 2022 68G58 MarshallMasonTazewellDistrict 4 Bridge washing of nine (9) bridges over the Illinois River in Tazewell, Mason, and Marshall Counties. — Executed Nov 26 New Interstate Maintenance, Incorporated $219,300 ·
Mar 11, 2022 68G68 TazewellDistrict 4 Bridge repairs to SN 090-0104 Springfield Rd; 090-0105 Cole St; 090-0119 EB Ramp to WB I-74 (replace rocker bearings, misc. structural steel and substructure repairs). — Executed Nov 26 New Stark Excavating, Inc. $294,240 ·
Apr 29, 2022 68G50 TazewellDistrict 4 Bridge deck sealing at various locations in Tazewell County. — Executed Nov 26 New All States Painting, Inc. $293,000 ·
Apr 29, 2022 68G73 TazewellDistrict 4 Lighting upgrades at IL 29/1-474 interchange in Creve Coeur, I-155/IL 98 and I-155/Queenwood Rd. interchanges in Morton. — Executed Nov 26 New Bodine Electric of Decatur $248,640 ·
Jun 17, 2022 68H04 TazewellWoodfordDistrict 4 2.9 miles of median removal and manhole/inlet repairs. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $155,327 ·
Jun 17, 2022 68H05 TazewellDistrict 4 HMA Patching on Business US 24 in Washington (2.65 miles); HMA Patching on IL 122 West of Minier (2.00 miles). — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $579,057 ·
Aug 5, 2022 68H12 TazewellDistrict 4 The installation of new traffic signals, pavement markings, ADA ramp, curb and gutter, riprap, median reconstr This profect consists of the installation of new traffic signals, pavement markings, ADA ramp, curb and gutter, riprap, median reconstruction, and all related collateral work necessary to complete the improvements on this project. Located at the intersection of VFW Rd. and 14th St. in Pekin, Tazewell Co. — Executed Nov 26 New Otto Baum Company, Inc. $649,720 ·
Nov 18, 2022 68F38 PeoriaTazewellDistrict 4 Bridge Rehabilitation with bridge deck overlay, beam repairs, beam additions, navigation and roadway lighting, traffic signal improvements, drainage improvements, full depth pavement removal and replacement, sidewalk removals, multi-use path construction and related collateral work. Bob Michel Bridge (SN 090-0122) in Peoria and Tazewell Counties on IL 40 (William Kumpf Blvd.) over the Illinois River and Washington Street. — Executed Nov 26 New ICC Group Inc. $24,657,000 ·
Jan 20, 2023 68E42 TazewellDistrict 4 0.47 miles, Bridge Replacement on I-155 over Indian Creek near Hopedale. — Executed Nov 26 New Stark Excavating, Inc. $8,247,342 ·
Mar 10, 2023 68H16 TazewellDistrict 4 Replace expansion joints and partial depth deck patching to S.N. 090-0063 carrying IL 9 over Mackinaw River. — Executed Nov 26 New Otto Baum Company, Inc. $371,800 ·
Mar 10, 2023 68H21 PeoriaTazewellDistrict 4 Crack and joint sealing at various locations along 1-74 and 1-474 in Peoria and Tazewell Counties. — Executed Nov 26 New Complete Asphalt Service Co. $224,649 ·
Apr 28, 2023 68H13 TazewellDistrict 4 Centerline joint repair on IL 8/US 150 (Washington/Camp Streets) from east of Main Street to east of Rosedale Street in East Peoria in Tazewell County. — Executed Nov 26 New Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $355,408 ·
Apr 28, 2023 89805 TazewellDistrict 4 Roadway extension of Freedom Parkway from east of IL 8 to Cummings Lane in Washington. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $6,595,005 ·
Jun 16, 2023 68H15 TazewellDistrict 4 Replace expansion joints and substructure repairs to structures carrying I-155 over IL 98 and TPandWRR. — Executed Nov 26 New Otto Baum Company, Inc. $1,191,200 ·
Aug 4, 2023 89804 TazewellDistrict 4 Resurfacing and intersection improvements on Court Street from Stadium Drive to Hilltop Drive in Pekin. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $9,959,061 ·
Aug 4, 2023 89849 TazewellDistrict 4 Re-align and reconstruct Nofsinger Road at the intersection of US 24 in the City of Washington. — Executed Nov 26 New Gensini Excavating, Inc. $6,846,974 ·
Sep 22, 2023 68H74 PutnamTazewellDistrict 4 Remove and replace guardrail and end sections. — Executed Nov 26 New Midwest Fence Corporation $878,935 ·
Sep 22, 2023 68H75 TazewellDistrict 4 Building demolition at three locations between Cedar Street and Ravine Street in East Peoria, Tazewell County. 607 S. Main St. (Parcel #4ABL008), 627 S. Main St. (Parcel #4ABL005) and 711 S. Main St. (Parcel #4ABL002). — Executed Nov 26 New JIMAX Landscape LLC $80,207 ·
Nov 17, 2023 68C00 TazewellDistrict 4 3R project has a length of 0.58 miles extending from the east end of the Cedar St Bridge over the Illinois River to just east of Center St, including the Edmund St interchange. Work includes pavement patching, milling, resurfacing, and bridge rehabilitation. — Executed Nov 26 New ICC Group Inc. $14,978,000 ·
Nov 17, 2023 89824 TazewellDistrict 4 Resurfacing Fischer Road from IL 29 to Creve Coeur Avenue in Creve Coeur. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $408,195 ·
Mar 8, 2024 68H88 TazewellDistrict 4 0.3 miles HMA partial depth patching and longitudinal joint repair. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $546,748 ·
Mar 8, 2024 89850 TazewellDistrict 4 Construction of PCC Sidewalk, combination curb and gutter, pavement markings, signing and fencing along Stadiam Drive from Court Street North to the existing Pekin park District Trail in Pekin. — Executed Nov 26 New Illinois Civil Contractors, Inc. $573,961 ·
Apr 26, 2024 68H71 TazewellDistrict 4 D4 Bridge Joint Repair 2024 at SN's 090-0130, 090-0132, 090-0133, 090-0137, 090-0138 and 090-0139 in Tazewell County. — Active Nov 26 New Otto Baum Company, Inc. $5,662,800 ·
Apr 26, 2024 68H81 TazewellDistrict 4 Bridge deck patching on SN 090-0141 on Morton Ave (FAU 6729) over I-74 in Morton in Tazewell County. — Executed Nov 26 New Path Construction Company, Inc. $211,896 ·
Apr 26, 2024 68I05 TazewellDistrict 4 Traffic signal mast arm replacement at IL 98 (Birchwood St.) and I-155 NB ramps in Morton. — Executed Nov 26 New Laser Electric, Inc. $243,063 ·
Jun 14, 2024 68H95 TazewellDistrict 4 4.2 miles of construction of HMA shoulders with an aggregate shoulder wedge, between Pekin and Tremont. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $1,978,846 ·
Jun 14, 2024 68J08 TazewellDistrict 4 4.61 miles of CIR and Mill and Overlay on IL 122 in Tazewell County. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $5,783,311 ·
Jun 14, 2024 68J24 PeoriaTazewellDistrict 4 D4 highway lighting 2025: Inspection of existing high mast towers, luminaire repair and re-lamping, maintenance of existing lighting controllers in Peoria and Tazewell Counties. — Executed Nov 26 New Laser Electric, Inc. $516,745 ·
Jun 14, 2024 68J25 TazewellDistrict 4 Lighting upgrades at I-74 and I-155 interchange in Morton in Tazewell County. — Executed Nov 26 New Laser Electric, Inc. $455,220 ·
1–100 of 141Next ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.