IDOT Jobs

All dates · 18 jobs · — Sign up free
★ My Jobs

Filtered by: County: Putnam Clear all

18 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Mar 9, 2018 68E04 PeoriaPutnamTazewellDistrict 4 31 miles of crack and joint sealing on US 150, IL 26 and I-155. — Executed Nov 26 New Complete Asphalt Service Co. $164,160 ·
Aug 3, 2018 66J40 BureauPutnamDistrict 3 HMA wearing surface removal and replacement, and deck patching on the east bound lane of SN 078-001 carrying I-180 over the Illinois River. — Executed Nov 26 New D. Construction, Inc. $556,692 ·
Jan 17, 2020 66F08 BureauPutnamDistrict 3 Complete deck replacement of the I-180 bridge over the Illinois River and pavement resurfacing and replacement on the approach to the bridge. — Executed Nov 26 New Civil Constructors, Inc. $25,110,125 ·
Jan 17, 2020 89708 PutnamDistrict 4 Replace the bridge carrying CH16 over Illinois River tributary, includes roadway and channel realignment. Project is located 3.0 miles northeast of Granville. — Executed Nov 26 New Stark Excavating, Inc. $2,278,900 ·
Mar 6, 2020 66K29 LaSallePutnamDistrict 3 3.83 miles of microsurfacing (1-pass) full width on IL 71 from IL 89 to Cedar Creek in Cedar Point. , 8.390 miles of patching from W of I-55 to the Livingston County Line. — Executed Nov 26 New A. C. Pavement Striping Co. $306,765 ·
Sep 18, 2020 68741 PutnamDistrict 4 Superstructure replacement on S This project is 550 feet long and consists of superstructure replacement on S.N. 078-0032, which carries IL Route 71 over Coffee Creek, 5.1 miles west of IL Route 89 in Putnam County. — Executed Nov 26 New D. Construction, Inc. $962,942 ·
Jul 30, 2021 89807 PutnamDistrict 4 Resurfacing, aggregate shoulders, and guardrail on CH 11 from IL 89 to the LaSalle County line. — Executed Nov 26 New Advanced Asphalt Company $753,023 ·
Mar 11, 2022 68F77 PutnamDistrict 4 Chip seal A-2 with fog seal on IL 26 South of IL 71 to IL 18. — Executed Nov 26 New Advanced Asphalt Company and Pavement Maintenance Services, Inc. JV $1,334,347 ·
Jun 17, 2022 66M13 PutnamDistrict 3 Cleaning and painting all structural and non-structural steel components of the structure This project is located at Structure No. 078-0022 carrying CH 1 over I-180, approximately 0.46 miles west of the I-180 and IL Route 26 Interchange near Hennepin. This project consists of cleaning and painting all structural and non-structural steel components of the structure. — Executed Nov 26 New Venus Painting Co. $258,968 ·
Sep 23, 2022 66M68 PutnamDistrict 3 HMA milling and resurfacing (designed overlay), pavement marking, and raised reflectors This project is located on FAS 2370/OR 26 (IL 26) from Old IL 26 0.32 mile North to the factory entrance. The work consists of HMA milling and resurfacing (designed overlay), pavement marking, and raised reflectors. — Executed Nov 26 New Advanced Asphalt Company $762,771 ·
Jan 20, 2023 66M66 LaSallePutnamDistrict 3 This project consists on performing Bridge Decks Concrete Sealing with the parapets/curbs on various routes at various location throughout LaSalle and Putnam Counties. — Executed Nov 26 New All States Painting, Inc. $169,800 ·
Apr 28, 2023 68666 PutnamDistrict 4 Replace structures carrying IL 89 over Clear Creek ESN 078-0025 (PSN 078-2011) and Clear Creek Tributary ESN 078-0024 (PSN 078-2012)Ù, 1.4 and 2.8 miles north of IL 18 in Putnam County. — Executed Nov 26 New D. Construction, Inc. $2,648,383 ·
Sep 22, 2023 68H74 PutnamTazewellDistrict 4 Remove and replace guardrail and end sections. — Executed Nov 26 New Midwest Fence Corporation $878,935 ·
Mar 8, 2024 66N30 LaSallePutnamDistrict 3 This project consists of 6.2 miles of shoulder widening and rumble strip installation, guardrail removal, and guardrail replacement on IL 18 from 200 feet east of IL 89 in Putnam County to 1.1 miles east of E 3rd Rd in LaSalle County. — Executed Nov 26 New Advanced Asphalt Company $1,993,993 ·
Jun 14, 2024 66P15 BureauPutnamDistrict 3 17.63 Miles. Centerline joint repair 3' wide and 2" depth resurfacing. This project begins south of the interchange between I 80 and I 180 and continues south to IL 29 and east toward Hennipen. The project terminates at both: the west side of Coffee Creek in Hennepin IL 29 and south at The Illinois River Road National Scenic Byway. — Executed Nov 26 New Advanced Asphalt Company $1,857,288 ·
Mar 7, 2025 66N41 PutnamDistrict 3 Washing the entire structural steel superstructure, washing and sealing the concrete (deck surface, inside face of parapets, top surface of the abutments and piers) at Structure No. 078-0047 carrying IL Route 89 over the Illinois River approximately 0.91 mile south of US Route 6. — Executed Nov 25 New All States Painting, Inc. $74,028 ·
Mar 7, 2025 68F90 PutnamDistrict 4 5.91 miles of resurfacing (PPP) project extends from 1.4 miles east of the I-180/IL 26 interchange to IL 89. — Executed Nov 25 New Advanced Asphalt Company $5,166,321 ·
Apr 24, 2026 68K89 MarshallPutnamDistrict 4 8.9 miles of partial and full depth patching on Illinois Route 29 (FAP 318) beginning at the intersection of Illinois Route 29 and Illinois Route 18 in Marshall County to the northern border of Putnam County. — Executed Nov 25 New G. M. Sipes Construction, Inc. $883,425 ·
1–18 of 18

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.