| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 9, 2018 | 68E04 | PeoriaPutnamTazewellDistrict 4 | 31 miles of crack and joint sealing on US 150, IL 26 and I-155. | — | Executed | Complete Asphalt Service Co. $164,160 · | ||
| Aug 3, 2018 | 66J40 | BureauPutnamDistrict 3 | HMA wearing surface removal and replacement, and deck patching on the east bound lane of SN 078-001 carrying I-180 over the Illinois River. | — | Executed | D. Construction, Inc. $556,692 · | ||
| Jan 17, 2020 | 66F08 | BureauPutnamDistrict 3 | Complete deck replacement of the I-180 bridge over the Illinois River and pavement resurfacing and replacement on the approach to the bridge. | — | Executed | Civil Constructors, Inc. $25,110,125 · | ||
| Jan 17, 2020 | 89708 | PutnamDistrict 4 | Replace the bridge carrying CH16 over Illinois River tributary, includes roadway and channel realignment. Project is located 3.0 miles northeast of Granville. | — | Executed | Stark Excavating, Inc. $2,278,900 · | ||
| Mar 6, 2020 | 66K29 | LaSallePutnamDistrict 3 | 3.83 miles of microsurfacing (1-pass) full width on IL 71 from IL 89 to Cedar Creek in Cedar Point. , 8.390 miles of patching from W of I-55 to the Livingston County Line. | — | Executed | A. C. Pavement Striping Co. $306,765 · | ||
| Sep 18, 2020 | 68741 | PutnamDistrict 4 | Superstructure replacement on S This project is 550 feet long and consists of superstructure replacement on S.N. 078-0032, which carries IL Route 71 over Coffee Creek, 5.1 miles west of IL Route 89 in Putnam County. | — | Executed | D. Construction, Inc. $962,942 · | ||
| Jul 30, 2021 | 89807 | PutnamDistrict 4 | Resurfacing, aggregate shoulders, and guardrail on CH 11 from IL 89 to the LaSalle County line. | — | Executed | Advanced Asphalt Company $753,023 · | ||
| Mar 11, 2022 | 68F77 | PutnamDistrict 4 | Chip seal A-2 with fog seal on IL 26 South of IL 71 to IL 18. | — | Executed | Advanced Asphalt Company and Pavement Maintenance Services, Inc. JV $1,334,347 · | ||
| Jun 17, 2022 | 66M13 | PutnamDistrict 3 | Cleaning and painting all structural and non-structural steel components of the structure This project is located at Structure No. 078-0022 carrying CH 1 over I-180, approximately 0.46 miles west of the I-180 and IL Route 26 Interchange near Hennepin. This project consists of cleaning and painting all structural and non-structural steel components of the structure. | — | Executed | Venus Painting Co. $258,968 · | ||
| Sep 23, 2022 | 66M68 | PutnamDistrict 3 | HMA milling and resurfacing (designed overlay), pavement marking, and raised reflectors This project is located on FAS 2370/OR 26 (IL 26) from Old IL 26 0.32 mile North to the factory entrance. The work consists of HMA milling and resurfacing (designed overlay), pavement marking, and raised reflectors. | — | Executed | Advanced Asphalt Company $762,771 · | ||
| Jan 20, 2023 | 66M66 | LaSallePutnamDistrict 3 | This project consists on performing Bridge Decks Concrete Sealing with the parapets/curbs on various routes at various location throughout LaSalle and Putnam Counties. | — | Executed | All States Painting, Inc. $169,800 · | ||
| Apr 28, 2023 | 68666 | PutnamDistrict 4 | Replace structures carrying IL 89 over Clear Creek ESN 078-0025 (PSN 078-2011) and Clear Creek Tributary ESN 078-0024 (PSN 078-2012)Ù, 1.4 and 2.8 miles north of IL 18 in Putnam County. | — | Executed | D. Construction, Inc. $2,648,383 · | ||
| Sep 22, 2023 | 68H74 | PutnamTazewellDistrict 4 | Remove and replace guardrail and end sections. | — | Executed | Midwest Fence Corporation $878,935 · | ||
| Mar 8, 2024 | 66N30 | LaSallePutnamDistrict 3 | This project consists of 6.2 miles of shoulder widening and rumble strip installation, guardrail removal, and guardrail replacement on IL 18 from 200 feet east of IL 89 in Putnam County to 1.1 miles east of E 3rd Rd in LaSalle County. | — | Executed | Advanced Asphalt Company $1,993,993 · | ||
| Jun 14, 2024 | 66P15 | BureauPutnamDistrict 3 | 17.63 Miles. Centerline joint repair 3' wide and 2" depth resurfacing. This project begins south of the interchange between I 80 and I 180 and continues south to IL 29 and east toward Hennipen. The project terminates at both: the west side of Coffee Creek in Hennepin IL 29 and south at The Illinois River Road National Scenic Byway. | — | Executed | Advanced Asphalt Company $1,857,288 · | ||
| Mar 7, 2025 | 66N41 | PutnamDistrict 3 | Washing the entire structural steel superstructure, washing and sealing the concrete (deck surface, inside face of parapets, top surface of the abutments and piers) at Structure No. 078-0047 carrying IL Route 89 over the Illinois River approximately 0.91 mile south of US Route 6. | — | Executed | All States Painting, Inc. $74,028 · | ||
| Mar 7, 2025 | 68F90 | PutnamDistrict 4 | 5.91 miles of resurfacing (PPP) project extends from 1.4 miles east of the I-180/IL 26 interchange to IL 89. | — | Executed | Advanced Asphalt Company $5,166,321 · | ||
| Apr 24, 2026 | 68K89 | MarshallPutnamDistrict 4 | 8.9 miles of partial and full depth patching on Illinois Route 29 (FAP 318) beginning at the intersection of Illinois Route 29 and Illinois Route 18 in Marshall County to the northern border of Putnam County. | — | Executed | G. M. Sipes Construction, Inc. $883,425 · |
1–18 of 18
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.