| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Sep 19, 2025 | 46668 | VariousDistrict 7 | Repairing various types of pavement markings at various locations throughout District 7. | — | Executed | |||
| Sep 19, 2025 | 61K52 | LakeDistrict 1 | Construction of an open-spandrel arch bridge with cast-in-place concrete deck and bituminous overlay on Lake Road over an unamed ravine in Lake Forest. | — | Executed | |||
| Sep 19, 2025 | 61K93 | CookDistrict 1 | Reconstruction of Tonne road from Lanmeier Road to Clearmont Drive in Elk Grove Village. | — | Executed | |||
| Sep 19, 2025 | 61L21 | CookDistrict 1 | Remove and replace traffic signals and pedestrian accommodations along Desplaines River Road and Balmoral Avenue in Rosemont. | — | Rejected | H & H Electric Co. $4,177,932 · | ||
| Sep 19, 2025 | 61L28 | KaneDistrict 1 | Construction of additonal through lanes on each side of Randall Road at the intersection of IL 72, widening to 3 NB and SB lanes. Includes HMA multi- use patch, curb and gutter, drainage improvements, traffic signal modifications, and lighting. | — | Executed | Martam Construction Incorporated $11,987,774 · | ||
| Sep 19, 2025 | 61L35 | CookDistrict 1 | Construct an HMA Multi-Use Path, sidewalk replacement and traffic signal modifications along Lake Street from Church Street to Gary Avenue in Hanover Park. | — | Executed | |||
| Sep 19, 2025 | 61L68 | CookDistrict 1 | Resurfacing, sidewalk replacement, curb and gutter, and accessible pedestrian signals on Pratt Avenue, from Lincolnwood Drive to McCormick Boulevard in Lincolnwood. | — | Executed | |||
| Sep 19, 2025 | 61L69 | DuPageDistrict 1 | Construct a prefabicated pedestrian truss bridge to carry Cricket Trail extension over IL 83 in Elmhurst. | — | Executed | |||
| Sep 19, 2025 | 61L70 | CookDistrict 1 | Sidewalk construction on Prairie Avenue from Hillside Avenue to South Street, and South Street from Summit Street to Prairie Avenue in Barrington. | — | Executed | |||
| Sep 19, 2025 | 61L71 | CookDistrict 1 | HMA resurfacing on Dee Road from Devon Avenue to the Union Pacific Railroad in Park Ridge. | — | Executed | |||
| Sep 19, 2025 | 61L72 | CookDistrict 1 | HMA Resurfacing of State Street from 127th Street to Cass Street in Lemont. Includes; ADA Ramps, curb and gutter, and drainage adjustments. | — | Executed | P. T. Ferro Construction Co. $1,092,187 · | ||
| Sep 19, 2025 | 61L74 | KaneDistrict 1 | Construction of PCC Sidewalk along various routes in Hampshire. Includes; HMA an PCC Driveways and pavement markings. | — | Executed | |||
| Sep 19, 2025 | 62B64 | CookDistrict 1 | (1,354-Ft) Intersection and ADA Improvements include pavement widening, HMA resurfacing, patching, traffic signal modernization, drainage improvements, pavement markings and landscaping. Located at Joliet Rd and Brainard Ave. in the City of Countryside in Cook County. | — | Executed | R. W. Dunteman Company $2,431,246 · | ||
| Sep 19, 2025 | 62F86 | CookDistrict 1 | Pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course, sidewalk ramps (3,542-Mile) This improvement consists of pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course, sidewalk ramps improvements, curb and gutter replacement, thermoplastic pavement marking, raised reflective pavement markers, accessible pedestrian signals. Located in the Villages of Arlington Heights, Buffalo Grove, and Wheeling in Cook County. | — | Executed | |||
| Sep 19, 2025 | 62J29 | LakeDistrict 1 | Tree removal along IL Route 22, from east of Quentin Road to west of IL Route 83 (3.27-Mile) The improvement consists of tree removal along IL Route 22, from east of Quentin Road to west of IL Route 83. The project is located within the Villages of Hawthorn Woods, Kildeer and Long Grove and within Lake County. | — | Executed | Clean Cut Tree Service, Inc. $586,632 · | ||
| Sep 19, 2025 | 62K78 | KaneDistrict 1 | Cold milling existing (HMA) surface, full-depth patches (Class D), resurfacing (inlay) with HMA binder and sur (2.54-Mile) Designed Overlay, New Shoulders, and ADA Improvements: The proposed consists of cold milling existing (HMA) surface, full-depth patches (Class D), resurfacing (inlay) with HMA binder and surface course, longitudinal joint sealing, replacement of curb and gutter, sidewalk removal and replacement for for sidewalks (ADA), replacement of existing aggregate shoulders with HMA, drainage structures adjustments and cleaning, pavement markings and raised reflective Location: IL 25 (Saint Char | — | Executed | Plote Construction, Inc. $4,318,000 · | ||
| Sep 19, 2025 | 62L15 | CookDistrict 1 | (2.23-Mile) Designed Overlay and ADA Improvements consisting of asphalt surface removal, pavement patching, hot-mix asphalt resurfacing, detector loop replacement, concrete curb and gutter replacement, curb ramps for sidewalks (ADA) improvements and new thermoplastic pavement marking on Lincoln Avenue from 138th Street to IL 83 (Sibley Boulevard) within the Village of Dolton, in in Cook County. | — | Executed | D. Construction, Inc. $2,190,770 · | ||
| Sep 19, 2025 | 62R22 | WillDistrict 1 | (3,775-Ft) Realignment and Reconstruction of the mainline and interchange pavement and related roadway elements, including ramp and cross-road reconstruction, existing bridge removal, storm sewer, drainage structures, detention ponds, earth excavation and grading, retaining and noise walls, barrier and moment slab construction, bridge rehabilitation and replacement, roadway lighting, traffic signals, ITS implementation, erosion and sediment control, landscaping, traffic control and protection, d | — | Executed | D. Construction, Inc. $93,597,946 · | ||
| Sep 19, 2025 | 62T23 | McHenryDistrict 1 | Advanced tree removal, selective clearing as well as all incidental and collateral work necessary to complete The project scope of work consists of advanced tree removal, selective clearing as well as all incidental and collateral work necessary to complete the project shown on the plans. This project is in the City of Crystal Lake, City of McHenry, Village of Prairie Grove, and Nunda Township in McHenry County. | — | Executed | Clean Cut Tree Service, Inc. $257,146 · | ||
| Sep 19, 2025 | 62U11 | CookWillDistrict 1 | Drainage Improvements. Work includes ditch regrading, culvert replacement and other drainage improvements. Locations: US 30 between 84th Avenue and 82nd Avenue in Will County; US 52 at Draves Road and Offner Road in Will County; Intersection of 115th Street and Homan Avenue in Cook County; Intersection of Taft Avenue and Elm Avenue in Cook County; Along Palatine Road, West of Roselle Road in Cook County. | — | Executed | |||
| Sep 19, 2025 | 62W62 | CookDuPageWillDistrict 1 | This work includes replacement of existing span wire mounted traffic signals with new mast arm mounted traffic signals, installation of LED signal heads, traffic signal posts and mast arms, installation of accessible pedestrian signals. Installations are various locations in District 1. | — | Executed | |||
| Sep 19, 2025 | 62W89 | VariousDistrict 1 | This project involves the partial modernization of thirty-six (36) intersection to include Accessible Pedestrian Pushbuttons (APS) and/or Leading Pedestrian Interval (LPI) timing updates. Thirty-six (36) intersections located in the following District 1 counties: Cook, McHenry, Lake, Kane, and Dupage. | — | Executed | |||
| Sep 19, 2025 | 62X00 | LakeDistrict 1 | Advance tree removal as well as all incidental and collateral work necessary to complete the project The scope of work consists of advance tree removal as well as all incidental and collateral work necessary to complete the project. This project is in the City of Highland in Lake County. | — | Executed | Clean Cut Tree Service, Inc. $151,131 · | ||
| Sep 19, 2025 | 62X01 | WillDistrict 1 | (7.04-Mile) Designed Overlay and Shoulder Reconstruction includes (HMA) removal earth excavation, pavement patching, resurfacing with HMA asphalt, full depth HMA shoulder, pavement markings, raised reflective markers, curb and gutter removal and replacement. Project located on US 45/52 (96th Ave / LaGrange Road) from North of Monee Manhattan Road to Wilmington Peotone Road in the Townships of Green Garden, Peotone and Wilton Center in Will County. | — | Executed | Iroquois Paving Corporation $7,332,294 · | ||
| Sep 19, 2025 | 62X58 | CookDistrict 1 | Resurfacing the existing HMA pavement with HMA surface course, HMA binder course, thermoplastic pavement marki (4,646-Ft) The resurfacing project consists of resurfacing the existing HMA pavement with HMA surface course, HMA binder course, thermoplastic pavement markings located FAU 2916 (State Street) from Sauk Trail to Steger Road in the Villages of South Chicago Heights and Steger in Cook County. Also included is a box culvert (SN 016-1413), cleaning project consists of debris removal. The Torrence Avenue over a ditch in the Village of Sauk Village in Cook County. | — | Executed | |||
| Sep 19, 2025 | 62X84 | CookDistrict 1 | (2.28-Mile) Standard Overlay (1st HMA overlay of bare PCC pavement), ADA Improvements. Work includes curb and gutter removal and replacement, curb ramps for sidewalk (ADA), pedestrian signals (APS), pavement patching, PCC milling, resurfacing with hot-mix asphalt, drainage structure adjustment and cleaning, pavement markings, raised reflective markers, detector loops. Location: Pershing Road, from US 34 Ogden Avenue to West of Central Avenue within the municipalities of Berwyn, Cicero, Lyons and | — | Rejected | K-Five Construction Corporation $4,154,377 · | ||
| Sep 19, 2025 | 62X87 | CookDistrict 1 | Asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt binder and surface course, concre (3,089-Ft) Standard Overlay consists of asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt binder and surface course, concrete curb and gutter removal and replacement, pedestrian curb ramps (ADA) improvements, raised reflective pavement markers, thermoplastic pavement marking. Located along Dolton Avenue from 142nd Street to I-94 (Bishop Ford Freeway) in the Village of Dolton. | — | Executed | D. Construction, Inc. $682,549 · | ||
| Sep 19, 2025 | 62Y06 | VariousDistrict 1 | Removing trees, as well as all incidental and collateral work necessary to complete the project The project consists of removing trees, as well as all incidental and collateral work necessary to complete the project. This project is in several locations throughout District One within Cook, Kane, Kendall, Lake McHenry and Will Counties. | — | Executed | Homer Tree Service, Inc. $1,042,409 · | ||
| Sep 19, 2025 | 62Y12 | CookDistrict 1 | (269-Ft) Bridge Preservation Project: deck overlay, joint replacement/ repair. Work includes hydroscarification, deck repairs, latex modified concrete overlay diamond grinding, structural repair of concrete, joint replacement with strip seals, relief joints cleaning, approach slab repair, concrete sealer, HMA butt joints, curb and gutter replacement, sidewalk replacement and collateral and incidental work. Location: Bridge carrying Foster Avenue over the North Shore Channel, just East of North A | — | Executed | Martam Construction Incorporated $955,094 · | ||
| Sep 19, 2025 | 62Y13 | CookDistrict 1 | Staged construction to complete partial and full depth deck slab repair and latex overlay of existing bridge (304-Ft) Bridge Deck Overlay, Bridge Joint Replacement / Repair consists of staged construction to complete partial and full depth deck slab repair and latex overlay of existing bridge. The scope also includes sidewalk and curb and gutter removal and replacement. (Existing Structure No. 016-2672). This project is on IL 19 (Irving Park Road) at Des Plaines River in Schiller Park, IL. in Cook County. | — | Executed | Martam Construction Incorporated $966,309 · | ||
| Sep 19, 2025 | 62Y32 | VariousDistrict 1 | New guardrail and repair of damaged guardrail and traffic barrier terminals, includes removing damaged guardra This project consists of new guardrail and repair of damaged guardrail and traffic barrier terminals, includes removing damaged guardrail components and replacing all removed guardrail components. This work is located on various State maintained arterial and expressway routes and at other district-wide locations within the counties of Cook, DuPage, Kane, Lake, McHenry and Will. | — | Executed | |||
| Sep 19, 2025 | 64P02 | OgleDistrict 2 | Pedestrian button upgrades, sidewalk ADA improvements on IL 2: Market St to Lincoln St and IL 72: IL 2 to Diamond St. 3,480 gross feet. | — | Executed | |||
| Sep 19, 2025 | 64P76 | HenryDistrict 2 | 2.34 miles of cold milling, pavement patching, HMA resurfacing, and inlet erosion repair on IL 81 from 1st St. in Cambridge to 0.2 mile east of IL 82(N). | — | Executed | |||
| Sep 19, 2025 | 64U45 | StephensonWinnebagoDistrict 2 | Installation of stop ahead/stop signs, advance flashing beacons, and pavement markings on IL 75 at Rock City Rd.; and Springfield Ave. at Safford Rd. in Stephenson and Winnebago Counties. | — | Executed | |||
| Sep 19, 2025 | 64U54 | Rock IslandDistrict 2 | Tree removal along I-74 from 0.9 miles south of 23rd Ave. in Moline to 0.5 miles south of IL 5 and along IL 5 from west of 16th St. to 0.2 miles west of 38th St. (approximately 2.0 miles total). | — | Executed | |||
| Sep 19, 2025 | 66295 | GrundyDistrict 3 | Railroad Separation Structure Replacement at WCL Railroad over I-80 (SN 032-9906) and Bridge Repair at Wabena Rd. over I-80 (SN 032-0065 in Kendall and Grundy Counties. | — | Executed | |||
| Sep 19, 2025 | 66R59 | LaSalleDistrict 3 | Scour mitigation by placing stone dumped riprap at both ends of the culvert and other related construction items at SN 050-2006 carrying IL 18 over Eagle Creek approximately 1.7 miles west of IL Route 23 near Streator. | — | Executed | |||
| Sep 19, 2025 | 66R60 | BureauDistrict 3 | Shoulder removal and replacement, concrete removal, remove and replace expansion bearings, expansion joint replacement at SN 006-0116 carrying Backbone Rd. over I-80, 1.8 miles west of IL Route 26 near Princeton. | — | Executed | |||
| Sep 19, 2025 | 66R62 | LivingstonDistrict 3 | Deck slab repairs (patching on the bridge deck and approach slabs) included in this work is structural concrete repairs to piers and debris removal on SN 053-0150 carrying IL Route 17 over the east branch of the Mazon River approximately 6.1 miles east of IL Route 47 in Livingston County. | — | Executed | |||
| Sep 19, 2025 | 66R70 | LivingstonDistrict 3 | Scour mitigation by placing stone dumped riprap and other related construction items at SN 053-0011 carrying OR 66 over Wolf Creek approximately 5.15 miles northeast of IL Route 23 near Pontiac. | — | Executed | |||
| Sep 19, 2025 | 68J20 | VariousDistrict 4 | Culvert lining of various sizes at various locations. | — | Executed | |||
| Sep 19, 2025 | 68J62 | PeoriaDistrict 4 | Resurfacing of IL 8 from East Kickapoo Creek to Main St in Peoria. 1.68 miles. | — | Executed | |||
| Sep 19, 2025 | 68K24 | PeoriaDistrict 4 | Upgrade HPS to LED luminaries along Interstate 74 (I-74) on existing light towers, light poles, and inside tunnels from Sterling Ave. in Peoria to Illinois River in Peoria County. | — | Executed | |||
| Sep 19, 2025 | 68K25 | PeoriaTazewellDistrict 4 | Installation of LED luminaries along I-74 on existing light towers, light poles, and inside tunnels from Knoxville Interchange in Peoria to Washington St. Interchange in East Peoria in Peoria and Tazewell Counties. | — | Executed | |||
| Sep 19, 2025 | 68K26 | VariousDistrict 4 | Installation of traffic signal controllers, cabinets, battery backup system, and CCTV cameras along various routes in District 4. | — | Executed | |||
| Sep 19, 2025 | 70C33 | McLeanDistrict 5 | 0.88 miles of drainage improvements at the intersection of and along US 136 and IL 54, 2.0 miles SW of Bellflower. | — | Executed | |||
| Sep 19, 2025 | 70D66 | VermilionDistrict 5 | Staged removaland replacement of dual structures (SN's 092-001 and 092-002) on I-74 at Stony Creek. | — | Executed | |||
| Sep 19, 2025 | 70F21 | McLeanDistrict 5 | 3P Policy, Designed Overlay, ADA improvements, curb and gutter, and traffic signal replacement on IL 9 from west of Towanda Ave to Carnahan Dr east of Bloomington; and on Hershey Rd from Lamon Dr to Castleton Dr in Bloomington. Gross length of 2.189 mi. | — | Executed | |||
| Sep 19, 2025 | 70H51 | McLeanDistrict 5 | Replacing light towers and poles with aluminum poles and LED lighting on US 51 from I-74 to Filbert Rd. | — | Executed | |||
| Sep 19, 2025 | 72286 | PikeDistrict 6 | Bridge deck overlay and bridge deck painting on various structures on I-72: (SN 075-0090 and 0091) over McCraney Creek 1.8 miles east of the IL 96/Hull Interchange, (SN 075-0124 and 0125) over tributary to McCraney Creek 2.1 miles east of the IL 96/Hull interchange, (SN 075-0092) TR 52 (205th Street) overhead 2.2 miles east of the IL 96/Hull Interchange and (SN 075-0094 and 0095) over TR 62 (213th Street) 3.3 miles east of the IL 96/Hull Interchange. | — | Executed | |||
| Sep 19, 2025 | 72324 | ScottDistrict 6 | Bridge deck overlay on SN 086-0029 carrying CH 14 (800E Hoots Road) over I-72, 0.9 miles east of Plum Creek. | — | Executed | |||
| Sep 19, 2025 | 72416 | SangamonDistrict 6 | 7.5 miles of crack and joint sealing on I-55 from north of the Glenarm interchange to 0.2 miles north of Southwind Road. | — | Executed | |||
| Sep 19, 2025 | 72974 | LoganDistrict 6 | Installing helical ground anchors at SN 054-7102 carrying I-55 over a drainage ditch 0.4 miles north of IL 10 near Lincoln. | — | Executed | |||
| Sep 19, 2025 | 72976 | CassDistrict 6 | Filed tile removal and replacement on IL 125 east of Philadelphia. | — | Executed | |||
| Sep 19, 2025 | 72977 | LoganDistrict 6 | Installation of highway lighting on I-55 at the Elkhart interchange. | — | Executed | |||
| Sep 19, 2025 | 72M33 | PikeDistrict 6 | Bridge deck overlay on I-72 at Bay Creek, 0.9 miles west of CH 3 at the New Salem interchange. | — | Executed | |||
| Sep 19, 2025 | 74164 | LawrenceDistrict 7 | Complete structure replacement of SN 051-0004 carrying IL 1 over the Embarras River Overflow approximately 1 mile north of US 50. | — | Executed | |||
| Sep 19, 2025 | 74597 | CumberlandDistrict 7 | Bridge replacement on I-57 over Eastern Illinois Railroad, 0.3 miles south of the Neoga interchange, and over US 45 at the Neoga interchange. (SN 018-0001, 018-0002, 018-0003, 018-0004) | — | Executed | |||
| Sep 19, 2025 | 74608 | EffinghamDistrict 7 | 0.3 miles of resurfacing and ADA improvements on Dietrich Blacktop from IL 33 to Church Street in Dietrich. | — | Executed | |||
| Sep 19, 2025 | 74654 | ClayDistrict 7 | Bridge superstructure replacement on SN 013-0037 carrying Old US 50 over Raccoon Creek, 2.5 miles west of the US 45 North Junction. | — | Executed | |||
| Sep 19, 2025 | 74A04 | EffinghamDistrict 7 | Structure removal and replacement, paved shoulder removal, pavement removal, pipe underdrains, PCC pavement, PCC shoulders, HMA base course, guardrail and median crossovers on I-57 at Green Creek, 1.5 miles south of the Shelby County line. (SN 025-0003) | — | Executed | |||
| Sep 19, 2025 | 74D09 | WayneDistrict 7 | Expansion joint replacement, bridge deck patching, scarification, bridge deck overlay and HMA surface course to tie into the existing pavement on IL 15 over Skillet Fork and Skillet Fork Overflow approximately 0.5 and 0.2 miles southwest of CR 635E near Wayne City. | — | Executed | |||
| Sep 19, 2025 | 74D11 | ClarkDistrict 7 | Bridge deck overlay, bridge joint repair/replacement, bridge deck repairs and striping on I-70 at Crooked Creek, 1.8 miles west of US 40. | — | Executed | |||
| Sep 19, 2025 | 74D31 | LawrenceDistrict 7 | Tree removal and tree installation along US 50 from 320E to 750E. | — | Active | Homer Tree Service, Inc. $526,741 · | ||
| Sep 19, 2025 | 74D57 | EffinghamDistrict 7 | Installation of a median crossover on I-70 approximately 0.4 miles west of the IL 128 interchange. | — | Executed | |||
| Sep 19, 2025 | 76F84 | MadisonDistrict 8 | Intersection reconstruction on IL 3 at Delmar Avenue and at Pierce Lane, both in Godfrey. | — | Executed | |||
| Sep 19, 2025 | 76R08 | ClintonDistrict 8 | 1.3 miles of resurfacing and ADA improvements on Old US 50, 0.6 miles east of Pipeline Road to 13th Street in Carlyle. | — | Executed | |||
| Sep 19, 2025 | 76T17 | St. ClairDistrict 8 | Bridge replacement, pavement reconstruction, ADA and APS improvements, new intersection and traffic signal installation, upgrading drainage system and signage upgrades on IL 203 from 0.1 miles north of IL 3 Connector to 0.1 miles south of IL 3 Connector in Madison. | — | Executed | |||
| Sep 19, 2025 | 76U51 | VariousDistrict 8 | Call-out bridge deck patching at various locations throughout District 8 on access-controlled roadways. | — | Executed | |||
| Sep 19, 2025 | 78789 | GallatinWhiteDistrict 9 | Shoulder widening, culvert replacement and culvert extensions on US 45 / IL 141 from south of TR400N to 0.1 miles south of IL 141. Project also includes pavement removal and replacement at the intersection of US 45 and IL 141. | — | Executed | |||
| Sep 19, 2025 | 78793 | PulaskiDistrict 9 | Removal and replacement of the existing single span bridge (SN 077-0023) carrying IL 169 over Kitchel Slough, west of Karnak. | — | Executed | |||
| Sep 19, 2025 | 78B70 | JeffersonDistrict 9 | 1.2 miles of pavement patching on I-64 ramps at Exit 89. | — | Executed | |||
| Sep 19, 2025 | 85764 | WinnebagoDistrict 2 | construct a three-span steel plate girder bridge to carry Prairie Hill Road over the Rock River, 1.75 miles southwest of South Beloit. Includes; HMA approach, pavement patching, guardrails, and HMA shoulders. | — | Executed | |||
| Sep 19, 2025 | 85782 | Rock IslandDistrict 2 | Sidewalk replacement on 10th Street from 12th Avenue to 16th Avenue, on 10th Street from 16th Avenue to 17th Avenue, and on 16th Avenue from 10th Street to 11th street in Moline. | — | Executed | |||
| Sep 19, 2025 | 87846 | KendallDistrict 3 | Convert the intersecton of Wolf's Crossing Road and Douglas Road to a roundabout. Includes; full depth HMA paving, drainage improvements, detention pond grading, culverts, multi-use path and sidewalks. | — | Executed | |||
| Sep 19, 2025 | 87871 | LaSalleDistrict 3 | Sidewalk construction at various locations in Oglesby. | — | Executed | |||
| Sep 19, 2025 | 93841 | ChristianDistrict 6 | Reconstruction of West Main Cross Street from Silver Street to Clay Street in Taylorville. Includes; HMA pavement, PCC driveways, ADA Ram and storm sewer. | — | Executed | |||
| Sep 19, 2025 | 95980 | MoultrieDistrict 7 | Remove and replace sidewalks, curb and driveway pavements, and install flashing beacons for pedestrian crossing on IL 121 from Jefferson Street to Church Street in Bethany. | — | Executed | |||
| Sep 19, 2025 | 95983 | MoultrieDistrict 7 | Construction of three pipe culverts, earth embankment and approaches on Joe Pound Road from 0.4 mile east of 1300 E Road to 0.6 mile east of 1300 E Road. | — | Executed | Stark Excavating, Inc. $369,000 · | ||
| Sep 19, 2025 | 95984 | WayneDistrict 7 | Construct a single-span steel plate girder bridge with concrete deck to carry 250 N Road over Little Pond Creek, 4.5 miles south of Golden Gate. | — | Executed | |||
| Sep 19, 2025 | 95988 | ClayDistrict 7 | Sidewalk construction and sidewalk replacement along Shadwell Street to Floyd Henson Jr. High School in Flora. | — | Executed | |||
| Sep 19, 2025 | 97833 | MadisonDistrict 8 | Reconstruction of Summit Avenue with a shared-use path from Notting Hill Court to Dooner Drive in Collinsville. | — | Executed | |||
| Sep 19, 2025 | 97868 | MadisonDistrict 8 | Contruction of a new sidewalk and shared-use path from Pontoon Road to Raes Creek Drive in Granite City. | — | Executed | |||
| Sep 19, 2025 | 97869 | MadisonDistrict 8 | Resurfacing on Madison Avenue from 14th Street to 3rd Street in Madison. | — | Executed | |||
| Sep 19, 2025 | 97874 | MadisonDistrict 8 | Reconstruction of C Street from West 7th Street to 1st Street, and the reconstruction of West 7th Street from C Street to D Street within America's Central Post District. | — | Executed | |||
| Sep 19, 2025 | 99745 | MassacDistrict 9 | Construct a 12'x 6' precast box culvert to carry Country Club Road over an unnamed creek one mile northwest of Metropolis. Includes PCC pavement and Guardrail. | — | Executed | |||
| Sep 19, 2025 | 99749 | PerryDistrict 9 | Intersection reconstruction and replace the bridge carrying Greens Mark Road over Six Mile Creek, one mile west of US 51. | — | Executed | |||
| Nov 7, 2025 | 46669 | VariousDistrict 6 | Removing and replacing damaged raised reflective pavement and markers and/or lenses throughout District 6. | — | Executed | |||
| Nov 7, 2025 | 46944 | WhitesideDistrict 2 | Bridge deck replacement and other brige repairs to structure SN 098-3751 in Whiteside County. | — | Executed | Martin & Company Excavating $1,029,566 · | ||
| Nov 7, 2025 | 61J54 | DuPageDistrict 1 | Extension of the west branch of DuPage River Trail from Gary's Mill Road to an existing trail within the West DuPage Woods Forest Preserve. | — | Executed | Lorig Construction Company $6,927,969 · | ||
| Nov 7, 2025 | 61J94 | CookDistrict 1 | Construct a shared-use path adjacent to Meacham Road, from IL 72 to American Lane, and adjacent to Golf Road from Meacham Road to Roosevelt Boulevard in Schaumburg. | — | Executed | A Lamp Concrete Contractors, Inc. $997,000 · | ||
| Nov 7, 2025 | 61K01 | DuPageDistrict 1 | Sidewalk construction, traffic signals and street lights on York Street from WB I-290 ramps/Crestview Avenue to lake Street in Elmhurst. | — | Executed | Martam Construction Incorporated $2,649,349 · | ||
| Nov 7, 2025 | 61L43 | CookDistrict 1 | HMA resurfacing on Woodfield Road from Plum Grove Road to Meacham Road in Schaumburg. Includes; HMA full depth patching, curb and gutter, sidewalks, shared use path, traffic signal modifications, and lighting. | — | Executed | K-Five Construction Corporation $5,837,039 · | ||
| Nov 7, 2025 | 61L57 | DuPageDistrict 1 | Resurfacing Stonebridge Boulevard from Sheffer Road to Indian head Road, and from Sheffer Road to Eola Road in Aurora. | — | Executed | K-Five Construction Corporation $1,786,248 · | ||
| Nov 7, 2025 | 61L73 | WillDistrict 1 | Extension of Old Renwick Road Trial from the DuPage River to West Renwick Road. | — | Executed | D. Construction, Inc. $352,856 · | ||
| Nov 7, 2025 | 61L76 | CookDistrict 1 | Resurfacing and pedestrian safety improvements at the intersection of 9th Ave. at Van Buren Street, and at Quiney Street in Maywood. | — | Executed | Davis Concrete Construction Co. $298,167 · | ||
| Nov 7, 2025 | 61L77 | CookDistrict 1 | Construct PCC Sidewalks along Center Avenue from Maple Avenue to Laurel Avenue. Includes: ADA Ramps, curb and gutter, landscaping, pavement markings and driveways. | — | Executed | Triggi Construction, Inc. $359,832 · | ||
| Nov 7, 2025 | 61L78 | DuPageDistrict 1 | Resurfacing Rober Palmer Drive from North York Street to South York Street in Elmhurst. | — | Executed | A Lamp Concrete Contractors, Inc. $1,308,888 · | ||
| Nov 7, 2025 | 61L79 | DuPageDistrict 1 | HMA resurfacing on Lambert Road from the South Village limits to IL 38 in Glen Ellyn. Includes; pavement patching, curb and gutter, sidewalks, ADA ramps, and q traffic signal maintenance. | — | Executed | K-Five Construction Corporation $1,759,309 · | ||
| Nov 7, 2025 | 61L80 | DuPageDistrict 1 | Resurfacing Riford Road from St. Harles Road to Crescent Boulevard in Glen Ellyn. | — | Executed | Schroeder Asphalt Services, Inc. $603,175 · |
1–100 of 3,416Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.