Filtered by: County: Will Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Dec 13, 2024 | 62T04 | WillDistrict 1 | Bridge deck overlay, reconstruction of abutment deck joint, approach slab repairs and substructure repairs of The proposed improvement consists of bridge deck overlay, reconstruction of abutment deck joint, approach slab repairs and substructure repairs of the bridge located on La Grange Road/US 45 at Hickory Creek in Will County. Gross length: 4854 Ft (0.919 Mi), Net length: 1327 Ft (0.252 Mi). | — | Executed | D. Construction, Inc. $1,407,207 · | ||
| Dec 13, 2024 | 78633 | WilliamsonDistrict 9 | 7.8 miles of resurfacing, HMA shoulders, aggregate shoulders, earthwork, culvert replacement, tree removal, guardrail updates, addition of a right turn lane, and construction of a roundabout on IL 37, south of Marion, from Wildcat Road to IL 148. | — | Executed | E. T. Simonds Construction Company $16,365,141 · | ||
| Dec 13, 2024 | 78798 | WilliamsonDistrict 9 | 8 miles of earthwork, HMA pavement, HMA resurfacing, drainage and guardrail in order to add a lane in each direction of I-57 from Westminster Drive in Marion to just south of the I-24 interchange. | — | Executed | Samron Midwest Contracting, Inc. $41,665,230 · | ||
| Dec 13, 2024 | 78A65 | WilliamsonDistrict 9 | 7.8 miles of standard overlay on Crab Orchard Road from the IL 13 West Connector to the IL 13 East Connector. | — | Executed | Samron Midwest Contracting, Inc. $643,012 · | ||
| Jan 17, 2025 | 61J25 | WillDistrict 1 | Widening and reconstruction of Plainfield-Naperville Road at 127th Street and Reagan Boulevard in Plainfield. Includes addition of left turn lanes, curb and Gutter, HMA and Aggregate shoulders, concrete medians, guardrail, traffic signals and lighting. | — | Executed | P. T. Ferro Construction Co. $3,803,259 · | ||
| Jan 17, 2025 | 61K81 | WillDistrict 1 | Widen and resurface Theodore Street from west of Staghorn Drive to Wesmere Parkway in Joliet. | — | Executed | Austin Tyler Construction, Inc. $2,764,372 · | ||
| Jan 17, 2025 | 61K84 | WillDistrict 1 | Construction of an HMA multi-use path, PCC Sidewalk, storm sewer, box culvert extension, retaining wall, and landscaping along Bridge Street in Channahon. | — | Executed | D. Construction, Inc. $2,494,970 · | ||
| Jan 17, 2025 | 62U88 | WillDistrict 1 | (4.32-Mile) Patching (full depth, class D patches) work includes: Earth excavation, aggregate subgrade improvement, subbase granular material, full depth Class D (HMA) patches, special, detector loops, pavement markings and and incidental and collateral work. Located on IL 53, from South of Arsenal Road to Hoff Road within the City of Wilmington and the Village of Elwood in Will County. | — | Executed | K-Five Construction Corporation $9,653,442 · | ||
| Jan 17, 2025 | 62W52 | WillDistrict 1 | Furnishing the structural steel and bearings for the I-80 bridges over the Des Plaines River The proposed scope of work consists of furnishing the structural steel and bearings for the I-80 bridges over the Des Plaines River. Steel will also need to be stored until it can arrive on-site as part of the Contract (62R23). Steel will be for WB and EB of I-80 (SN 099-8309 WB and 099-8325 EB) over the Des Plain River, CSX Railroad, US-6, as well as several existing and proposed local roads The project is in the City of Joliet in Will County. | — | Executed | Veritas Steel LLC $28,658,382 · | ||
| Jan 17, 2025 | 62X78 | CookWillDistrict 1 | Expressway Cleaning (Litter/Debris Removal), This work is located on I-57 expressway from I-90/94 (Dan Ryan Expressway) to Will / Kankakee County Line in Cook and Will Counties. | — | Executed | Orlando Lawn Service, Inc. $227,238 · | ||
| Jan 17, 2025 | 62X81 | CookWillDistrict 1 | Expressway Cleaning (Litter/Debris Removal), This work is located on FAI 80, I-80 Expressway from I-294 (Tri-State Tollway) to Will / Kendall County Line in Cook and Will Counties. | — | Executed | Thor General Contracting LLC $210,330 · | ||
| Jan 17, 2025 | 99687 | WilliamsonDistrict 9 | Construction of a Roundabout at Skyline Drive and Crenshaw Road. Work includes PCC Pavement, curb and gutter, storm sewers, pipe culverts, signage, and lighting . | — | Executed | Samron Midwest Contracting, Inc. $2,026,739 · | ||
| Jan 17, 2025 | 99736 | WilliamsonDistrict 9 | Guardrail Replacemnent, pavment markings and signage at the intersection of of Creal Springs Road and Borton Street in Creal Springs. | — | Executed | Midwest Fence Corporation $92,499 · | ||
| Mar 7, 2025 | 61L02 | WillDistrict 1 | Construct an HMA Multi-Use Path in Home Glen, from Coachman Lane to Heatherwood Drive. Includes HMA Pavement removal, sidewalks, ADA ramps, and signage. | — | Executed | D. Construction, Inc. $398,891 · | ||
| Mar 7, 2025 | 61L13 | WillDistrict 1 | HMA resurfacing on Highpoint Drive from Discovery Park to Weber Road in Romeoville. Additional work includes Class D patches, PCC driveways, sidewalks, drainage and utility structures, and pavement markings. | — | Executed | P. T. Ferro Construction Co. $392,397 · | ||
| Mar 7, 2025 | 62G55 | WillDistrict 1 | Pavement patching, milling of existing HMA surface, placing hot-mix asphalt leveling binder and surface course The Standard Overlay consists of pavement patching, milling of existing HMA surface, placing hot-mix asphalt leveling binder and surface course, drainage structures adjustment and cleaning, grading and shaping ditches, placement of pavement markings. Located on Illinois Route 171 (Archer Ave.) begins at Boula Ave. and extends in a northeasterly direction for 4,542.2 feet (0.86 mile ) to approximately 0.1 miles southwest of I-355. The improvement is in the City of Lockport, in Will County. | — | Executed | Gallagher Asphalt Corporation $1,427,655 · | ||
| Mar 7, 2025 | 62U89 | WillDistrict 1 | The building demolition at various locations The proposed scope of work consists of the building demolition at various locations. Each building removal will include removal any structure above and below the ground, including the main building frames, attached and detached buildings, and facilities. It will also include the removal of fences, sidewalk and_driveways, utilities and trees within the parcels limits. The project is in Will County. | — | Executed | Scanlon Excavating & Concrete, Inc. $498,400 · | ||
| Mar 7, 2025 | 62X76 | CookDuPageWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish. This work is located on I-55 Expressway from ILL 43 (Harlem Ave) to Reed Road in Cook, DuPage, and Will Counties. | — | Executed | Thor General Contracting LLC $305,910 · | ||
| Mar 7, 2025 | 62X77 | CookWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish. This work is located on I-94 (Bishop Ford Expwy) from Dan Ryan Expwy to I-80 in Cook County, on IL-394 from I-80 to IL 1 (Dixie Hwy) in Cook and Will Counties, on Stony Island Ave from I-94 to US 12 (95th St) and on 103rd St from Cottage Groove to Stony Island. | — | Executed | Thor General Contracting LLC $477,405 · | ||
| Apr 25, 2025 | 61K44 | WillDistrict 1 | Construct an HMA shared-use path with pedestrial bridge and two boardwalks from 265th strett to the south end of the existing trail south of Burville Rd. | — | Executed | D. Construction, Inc. $3,654,428 · | ||
| Apr 25, 2025 | 61K61 | WillDistrict 1 | Construction of three 7'X 5' precast concrete box culverts to carry Woodcreek Drive over Lily Cache Lane Tributary in Bollingbrook. Includes; lighting, HMA Pavement, curb and gutter, and sidewalks. | — | Executed | D. Construction, Inc. $753,049 · | ||
| Apr 25, 2025 | 62T27 | WillDistrict 1 | (3,073-Ft) Bridge repairs on (S.N.099-0292), includes bridge deck scarification latex concrete overlay, joint reconstruction, bearings and substructures repair repairs and bearing painting. The roadway work encompasses concrete scarification, butt joints, asphalt overlay, removal and replacement of the median, and curb and gutter, reconstruction of a catch basin and adjustment of inlets. Located along IL 171 (N. State St.) over Fiddyment Creek in the City of Lockport in Will County, Illinois. | — | Executed | D. Construction, Inc. $1,260,740 · | ||
| Apr 25, 2025 | 62V35 | WillDistrict 1 | Hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt surface course, placement (4857.6-Ft) Smart overlay consists of hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt surface course, placement of thermoplastic pavement markings. Located on Illinois Route FAP 112, IL 53 (Independence Blvd), it begins N of University Pkwy and ends at Renwick Rd. in the City of Lockport in Will County. | — | Executed | Builders Paving, LLC $731,556 · | ||
| Apr 25, 2025 | 62X20 | CookWillDistrict 1 | (627-Ft) Bridge Painting project consisting of cleaning and painting steel surfaces. The project is located at the structure No. 1 (SN. 016-1062) carrying I-94 eastbound to I-55 southbound over Archer Avenue/BNSF and ICC RR in the City of Chicago in Cook County, and structure No. 2 (SN. 099-0198) carrying Maple Road Over I-80 in the Village of Mokena in Will County. | — | Executed | ERA-Valdivia Contractors, Inc. $649,580 · | ||
| Apr 25, 2025 | 62X22 | CookWillDistrict 1 | This is a bridge painting project includes cleaning and painting steel surfaces as designated on the plans. LOCATION #1: New Avenue over Long Run Creek Overflow City of Lockport in Will County (SN: 099-0299). LOCATION #2: US 45 over Hickory Creek Village of Frankfort in Will County (SN: 099-0293). LOCATION #3: IL 43 (Harlem Ave.) over I-80 Village of Tinley Park in Cook County (SN: 016-0325). | — | Executed | Capital Industrial Services, LLC $503,300 · | ||
| Apr 25, 2025 | 62X85 | WillDistrict 1 | (1.19-Mile) Pavement Patching includes asphalt surface removal, resurfacing asphalt binder and surface course, aggregate wedge shoulders, grading and shaping shoulders, pavement markings, raised reflective pavement marker. This project is located along I-55 West Frontage Road from South of Stripmine Road to IL 113 (Division Street) in the City of Wilmington and the Village of Diamond in Will County. | — | Executed | P. T. Ferro Construction Co. $410,872 · | ||
| Apr 25, 2025 | 62X93 | WillDistrict 1 | Modernizing bridge lift gates at structures carrying McDonough Street and Brandon Street over the Des Plaines The work on this improvement consists of modernizing bridge lift gates at structures carrying McDonough Street and Brandon Street over the Des Plaines River. This improvement has 2 locations: the first locations is at McDonough Street (SN: 099-9904) over the Des Plaines River and the second location is at Brandon Street (SN: 099-9903) over the Des Plaines River in Will County. | — | Executed | D. Construction, Inc. $1,901,944 · | ||
| Apr 25, 2025 | 78373 | WilliamsonDistrict 9 | 3.6 miles of roadway reconstruction including adding lanes, reconstruction of 4 bridges and intersection reconstruction on IL 13 from Spillway Road to Shawnee Trail. | — | Executed | Samron Midwest Contracting, Inc. $40,895,392 · | ||
| Apr 25, 2025 | 78B10 | WilliamsonDistrict 9 | 1.5 miles of resurfacing and patching on Moellers Road from IL 13 to Pittsburg Road. | — | Executed | Samron Midwest Contracting, Inc. $526,107 · | ||
| Apr 25, 2025 | 78B12 | WilliamsonDistrict 9 | 3.2 miles of HMA surface removal, HMA surfacing and patching on Old IL 13 from the east city limits of Carterville to IL 148. | — | Executed | E. T. Simonds Construction Company $974,757 · | ||
| Jun 13, 2025 | 60R76 | WillDistrict 1 | Construction of a retaining wall, guardrail replacement, shoulder widening, headwall replacement and culvert e (1225-Ft) Bridge Deck Replacement consists of construction of a retaining wall, guardrail replacement, shoulder widening, headwall replacement and culvert extension located on I-57 at Pauling Road (Overhead) in Will County. | — | Executed | D. Construction, Inc. $4,142,053 · | ||
| Jun 13, 2025 | 62G52 | WillDistrict 1 | (1.716-Mile) Designed Overlay improvements include: Curb and gutter spot repair , asphalt surface removal and replacement with new binder and surface (cold milling and inlay), full-depth patches (Class D), drainage structures adjustment and cleaning, pavement markings, raised reflective pavement markers, detector loops replacement. Location: IL 53 (Independence Boulevard), from Joliet Road to Belmont Drive within the Village of Romeoville. | — | Executed | K-Five Construction Corporation $3,382,064 · | ||
| Jun 13, 2025 | 62U39 | WillDistrict 1 | Removal and replacement of the Bridge (SN 099-0205) carrying Francis Road over I-80 and the subsequent pavemen Project consists of removal and replacement of the Bridge (SN 099-0205) carrying Francis Road over I-80 and the subsequent pavement improvements necessary for this replacement. Located on FAI 80 (I-80) at Francis Road, Will County, IL. | — | Executed | D. Construction, Inc. $5,328,033 · | ||
| Jun 13, 2025 | 62W15 | WillDistrict 1 | (1.59-Mile) Replace light towers with poles, LED luminaries, foundations, conduits/cables, restorations. Project located in the Villages of Mokena, Orland Park, and Tinley Park in Will County, at I-80 and US-45 interchange. | — | Executed | John Burns Construction Company $1,709,237 · | ||
| Jun 13, 2025 | 62X34 | WillDistrict 1 | Asphalt surface removal, pavement patching, combination concrete curb and gutter removal and replacement, conc (2.88-Mile) Designed overlay and pedestrian ramp (ADA) project consists of asphalt surface removal, pavement patching, combination concrete curb and gutter removal and replacement, concrete sidewalk removal replacement, resurfacing with asphalt binder course and asphalt surface course, pavement markings. The improvement is in the Cities of Braidwood and Wilmington in Will County. | — | Executed | Iroquois Paving Corporation $1,353,712 · | ||
| Jun 13, 2025 | 62X99 | WillDistrict 1 | Building demolition for ten (10) residential and/or commercial parcels and outbuildings, include removing any The work consists of building demolition for ten (10) residential and/or commercial parcels and outbuildings, include removing any structure above and below the ground, main building frames, attached and detached buildings, facilities, and filling of basements, removal of fences, sidewalks and driveways, utilities, and trees, grading and seeding. Located in the City of Joliet, in the vicinity of FAI Route 80 (Interstate 80) and Des Plaines River in Will County. | — | Executed | C & D Recycling Services, Inc. $469,833 · | ||
| Jun 13, 2025 | 78831 | WilliamsonDistrict 9 | Replacement of SN 100-0053 carrying Stiritz Road (TR 23) over I-57, approximately 0.6 miles west of IL 37. | — | Executed | E. T. Simonds Construction Company $4,956,078 · | ||
| Jun 13, 2025 | 78A33 | WilliamsonDistrict 9 | Signal modifications, pedestrian crossings and sidewalks at the intersection of IL 13 and Halfway Road in Marion. | — | Executed | Brown Electric, Inc. $1,056,436 · | ||
| Jun 13, 2025 | 78B31 | WilliamsonDistrict 9 | 1.1miles of pavement patching and resurfacing on IL 37 from 0.1 miles north of 18th Street to south of 4th Street in Johnston City. | — | Executed | E. T. Simonds Construction Company $685,210 · | ||
| Jun 13, 2025 | 99756 | WilliamsonDistrict 9 | HMA Overlay with Aggregate Wedge Shoulders on Power Plant Road from County Club Road to McKinny Chapel Road. | — | Executed | E. T. Simonds Construction Company $660,852 · | ||
| Aug 1, 2025 | 62X50 | WillDistrict 1 | Milling existing asphalt surface, pavement patching, HMA surface course and HMA binder course, sidewalk remova (2,067-Ft) Designed Overlay, Curb Ramps improvements (ADA), Sidewalk Replacement consists of milling existing asphalt surface, pavement patching, HMA surface course and HMA binder course, sidewalk removal and replacement, drainage structures adjustments and cleaning, replacement of curb and gutter, longitudinal joint sealing, pavement markings, curb ramps for sidewalks, raised reflective pavement markers, Location: IL 53 (Baltimore Street), from Kankakee Street to West of Forked Creek within the | — | Executed | Gallagher Asphalt Corporation $975,357 · | ||
| Aug 1, 2025 | 62X86 | WillDistrict 1 | Asphalt surface removal, pavement patching, (Hot Mix Asphalt) binder course, polymerized binder course and sur (3,435-Ft) Design and Standard Overlay consists of asphalt surface removal, pavement patching, (Hot Mix Asphalt) binder course, polymerized binder course and surface course, thermoplastic pavement markings. Located on Illinois Route FAU 388, I-55 Frontage Road NB in the Village of Channahon in Will County. | — | Executed | D. Construction, Inc. $250,346 · | ||
| Aug 1, 2025 | 78916 | WilliamsonDistrict 9 | Signal modifications, railroad interconnects and fiber optic installation on IL 37 from IL 13 to Boyton Street in Marion. | — | Executed | Gerstner Electric, Inc. $1,302,315 · | ||
| Aug 1, 2025 | 78A74 | JohnsonWilliamsonDistrict 9 | 9.5 miles of resurfacing on IL 166 from 0.1 miles south of Tune Road to US 45. Also includes ADA improvements in Creal Springs. | — | Executed | E. T. Simonds Construction Company $3,949,325 · | ||
| Aug 1, 2025 | 99284 | WilliamsonDistrict 9 | Extend Ritter Road north to Grand Avenue in Herrin. | — | Executed | Samron Midwest Contracting, Inc. $2,069,759 · | ||
| Aug 1, 2025 | 99760 | WilliamsonDistrict 9 | Construction of a PCC multi-use path from the RIDES Mass Transit Center and VA Hospital along Main Street and Halfway Road in Marion. | — | Executed | Samron Midwest Contracting, Inc. $2,142,142 · | ||
| Sep 19, 2025 | 62R22 | WillDistrict 1 | (3,775-Ft) Realignment and Reconstruction of the mainline and interchange pavement and related roadway elements, including ramp and cross-road reconstruction, existing bridge removal, storm sewer, drainage structures, detention ponds, earth excavation and grading, retaining and noise walls, barrier and moment slab construction, bridge rehabilitation and replacement, roadway lighting, traffic signals, ITS implementation, erosion and sediment control, landscaping, traffic control and protection, d | — | Executed | D. Construction, Inc. $93,597,946 · | ||
| Sep 19, 2025 | 62U11 | CookWillDistrict 1 | Drainage Improvements. Work includes ditch regrading, culvert replacement and other drainage improvements. Locations: US 30 between 84th Avenue and 82nd Avenue in Will County; US 52 at Draves Road and Offner Road in Will County; Intersection of 115th Street and Homan Avenue in Cook County; Intersection of Taft Avenue and Elm Avenue in Cook County; Along Palatine Road, West of Roselle Road in Cook County. | — | Executed | Everlast Blacktop Inc. $1,530,704 · | ||
| Sep 19, 2025 | 62W62 | CookDuPageWillDistrict 1 | This work includes replacement of existing span wire mounted traffic signals with new mast arm mounted traffic signals, installation of LED signal heads, traffic signal posts and mast arms, installation of accessible pedestrian signals. Installations are various locations in District 1. | — | Executed | John Burns Construction Company $2,170,856 · | ||
| Sep 19, 2025 | 62X01 | WillDistrict 1 | (7.04-Mile) Designed Overlay and Shoulder Reconstruction includes (HMA) removal earth excavation, pavement patching, resurfacing with HMA asphalt, full depth HMA shoulder, pavement markings, raised reflective markers, curb and gutter removal and replacement. Project located on US 45/52 (96th Ave / LaGrange Road) from North of Monee Manhattan Road to Wilmington Peotone Road in the Townships of Green Garden, Peotone and Wilton Center in Will County. | — | Executed | Iroquois Paving Corporation $7,332,294 · | ||
| Nov 7, 2025 | 61L73 | WillDistrict 1 | Extension of Old Renwick Road Trial from the DuPage River to West Renwick Road. | — | Executed | D. Construction, Inc. $352,856 · | ||
| Nov 7, 2025 | 62R51 | WillDistrict 1 | (3,400-Ft) Intersection Improvement (channelization, pavement widening, resurfacing),traffic signal Installation at railroad crossing, traffic signal modernization, Interconnect, minor lighting improvements, drainage Improvements (including new storm sewer at Monee Maintenance Yard), Location: IL 50 (Cicero Avenue) at Dralle Road, at Governors Hwy and at Monee Maintenance Yard, located withing the Villages of University Park and Monee. | — | Executed | Iroquois Paving Corporation $3,192,530 · | ||
| Nov 7, 2025 | 62Y00 | WillDistrict 1 | Building demolition for eleven (11) residential and/or commercial parcels and outbuildings The work consists of building demolition for eleven (11) residential and/or commercial parcels and outbuildings. Each parcel removal will include removing any structure above and below the ground, including the main building frames, attached and detached buildings, facilities, and filling of basements, removal of fences, sidewalks and driveways, utilities, and trees within the parcels' limits. Interim grading and seeding. The project located in the City of Joliet, in the vicinity of FAI Route 80 | — | Executed | C & D Recycling Services, Inc. $346,900 · | ||
| Nov 7, 2025 | 78209 | WilliamsonDistrict 9 | Replacement of SN 100-0031 carrying IL 166 over Sugar Creek at the east corporate limits of Creal Springs. | — | Executed | Samron Midwest Contracting, Inc. $2,526,591 · | ||
| Nov 7, 2025 | 78B74 | WilliamsonDistrict 9 | Patching on IL 166 from IL 13 to Tune Road east of Marion. | — | Executed | E. T. Simonds Construction Company $118,588 · | ||
| Nov 7, 2025 | 80B72 | WillDistrict 1 | Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of lim This project consists of Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas located on various State maintained arterial routes located within the county of Will. | — | Executed | Central Sweeping of Illinois, LLC $1,303,855 · | ||
| Jan 16, 2026 | 61L81 | WillDistrict 1 | Resurfacing Remington Road from Weber Road to Claar Boulevard in Romeoville. | — | Executed | K-Five Construction Corporation $596,750 · | ||
| Jan 16, 2026 | 61L99 | WillDistrict 1 | Decorative lighting, landscaping and parkway restoration on IL 50 from Bruce Street Road to Steger Drive in University Park. | — | Executed | Iroquois Paving Corporation $1,829,797 · | ||
| Jan 16, 2026 | 61M01 | WillDistrict 1 | Widening and reconstruction of Seil Road and replacement of the Seil Road Bridge across the DuPage River in Shorewood. Includes; mini roundabouts and street lighting at Seil Road and Raven Road, and at Seil Road and States Lane. | — | Executed | Austin Tyler Construction, Inc. $8,923,156 · | ||
| Jan 16, 2026 | 62F94 | WillDistrict 1 | The realignment and reconstruction of the mainline and interchange pavement and related roadway elements, incl (2,577-Ft) The work consists of the realignment and reconstruction of the mainline and interchange pavement and related roadway elements, including ramp and cross-road reconstruction, existing bridge removal, enclosed storm sewer system with drainage structures and detention ponds, earth excavation and embankment grading, installation of retaining and noise walls, barrier and moment slab construction, bridge replacement, roadway lighting, traffic signals ITS implementation, erosion and sediment | — | Executed | D. Construction, Inc. $104,386,503 · | ||
| Jan 16, 2026 | 62R76 | WillDistrict 1 | Reconstruction of the expansion joints with strip seals, hydro scarification (3/4-), deck and approach slab re (290-Ft) Bridge Deck Overlay, (SN 099-0210) over I-55. The project consists of reconstruction of the expansion joints with strip seals, hydro scarification (3/4-), deck and approach slab repairs, latex concrete overlay (2¼-) with diamond grinding and longitudinal grooving, application of a protective coat, and substructure concrete repair. Roadway improvements include HMA on each side of the bridge. I-55 at Caton Farm Road (3 miles north of US 52) in the Village of Plainfield. | — | Executed | D. Construction, Inc. $647,187 · | ||
| Jan 16, 2026 | 62Y09 | WillDistrict 1 | This is an advance procurement of selective mechanical, electrical, and structural components for the existing rolling movable bridges at Jackson Street and Jefferson Street over the Des Plaines River, Structure Number 099- 0239 and 099-0166 in Will County. | — | Executed | GRANITE CONSTRUCTION COMPANY $2,400,000 · | ||
| Jan 16, 2026 | 80B11 | WillDistrict 1 | (6,160-Ft) Standard Overlay, New Shoulders, and ADA Improvements include: Hot- mix asphalt (HMA) surface removal (cold milling), full-depth patches (Class D), resurfacing (inlay) with HMA binder and surface course, longitudinal joint sealing, replacement of curb and gutter, sidewalk removal and replacement for curb ramps for sidewalks (ADA), replacement of existing aggregate shoulders with HMA, drainage structures adjustments and cleaning, new thermoplastic pavement markings and raised reflectiv | — | Executed | Iroquois Paving Corporation $1,297,699 · | ||
| Jan 16, 2026 | 80B14 | WillDistrict 1 | Resurfacing the existing HMA pavement with HMA surface and binder course, thermoplastic pavement markings loca (1.19-Mile) This project-s scope is designed overlay. It consists of resurfacing the existing HMA pavement with HMA surface and binder course, thermoplastic pavement markings located along US 6 (Channahon Rd) from Terry Drive of IL 7 (Larkin Ave) in the City of Joliet in Will County. | — | Executed | D. Construction, Inc. $2,039,223 · | ||
| Jan 16, 2026 | 80B34 | WillDistrict 1 | Resurfacing the existing HMA pavement with HMA surface and binder course, HMA Shoulder, thermoplastic pavement 3,241 Ft) Standard Overlay, consists of resurfacing the existing HMA pavement with HMA surface and binder course, HMA Shoulder, thermoplastic pavement markings, ADA Improvements for curb ramps. Located on IL 7(159th St.) from Robson Dr. to E of Adellman Dr. in the City of Lockport in Will County. | — | Executed | Gallagher Asphalt Corporation $977,777 · | ||
| Jan 16, 2026 | 80B36 | WillDistrict 1 | Pavement patching, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement (1.6-Mile) Project consists of pavement patching, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement, median removal and replacement and curb and gutter replacement, thermoplastic pavement marking. This improvement is in the Village of Frankfort and Frankfort Township in Will County. | — | Executed | D. Construction, Inc. $3,250,096 · | ||
| Jan 16, 2026 | 80B86 | CookDuPageWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking project shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish. This work is located on I-55 - Stevenson expressway from Reed Road to Lake Shore Dr in Cook, DuPage, and Will Counties. | — | Executed | Thor General Contracting LLC $515,515 · | ||
| Jan 16, 2026 | 80C53 | WillDistrict 1 | Fabrication an delivery of structural steel and bearings for the construction of two bridges (SN 099-0902 EB and 099-0903 WB) carrying I-80 over Chicago Ramp B, BNSF RR, UP RR, and Gardner Street in Joliet. | — | Executed | Industrial Steel Construction, Inc. $10,415,094 · | ||
| Feb 27, 2026 | 61M25 | WillDistrict 1 | Rehabilitate of three-span RC channel beam bridge carrying Smith Road over Long Run Creek between W. 138th Street and W. 135th Street in Will County. Work includes replacement of existing channel beams with steel tub girder and concrete deck superstructure, substructure repair, pavement widening, HMA resurfacing and other required work. | — | Executed | D. Construction, Inc. $1,561,361 · | ||
| Feb 27, 2026 | 62P01 | WillDistrict 1 | A single culvert removal and replacement located at Grant Creek on IL Route 53 in Will County, IL The project primarily consists of a single culvert removal and replacement located at Grant Creek on IL Route 53 in Will County, IL. | — | Executed | Austin Tyler Construction, Inc. $4,980,727 · | ||
| Feb 27, 2026 | 62R23 | WillDistrict 1 | (2,215.87-Ft) Replacement of the Des Plaines River Bridge including the realignment and reconstruction of the mainline pavement, cross-road reconstruction, enclosed storm sewer system with drainage structures, detention ponds, earth excavation and embankment grading, retaining and noise abatement walls, barrier and moment slab construction, bridge replacement, roadway lighting, ITS implementation, erosion and sediment control, landscaping, traffic control and protection, navigation lighting, tra | — | Executed | D. Construction, Inc. & Kraemer North America, LLC JV $164,963,136 · | ||
| Feb 27, 2026 | 62Y26 | WillDistrict 1 | (4,658.13-Ft) Bridge Repairs (S.N. 099-0298) includes bridge deck scarification latex concrete overlay, joint reconstruction, patching, and substructure repair butt joints, HMA overlay of the approach pavement, drainage structure adjustments, and pavement marking replacement located along IL Route 50 (Governors Highway) over the CN railroad from Watson Road to Egyptian Trail, in the Village of Monee in Will County, Illinois. | — | Executed | Iroquois Paving Corporation $1,191,152 · | ||
| Feb 27, 2026 | 78B58 | WilliamsonDistrict 9 | 1.9 miles of patching and resurfacing on IL 148 from 0.8 miles south of the Franklin County line to 17th Street, north of Herrin. | — | Executed | Samron Midwest Contracting, Inc. $744,591 · | ||
| Feb 27, 2026 | 80B13 | WillDistrict 1 | (1.07-Mile) Standard Overlay and ADA Improvements project includes hot-mix asphalt removal, PCC removal, pavement patching, PCC milling, resurfacing with hot-mix asphalt, drainage structure adjustment and cleaning, pavement markings, raised reflective markers, ADA ramps, pedestrian signals, detector loops. Location: IL 53 (Broadway Street/ Ruby Street) from Teale Woods Trail (South of IL 7) to Bluff Street, within the City of Joliet. | — | Executed | P. T. Ferro Construction Co. $1,424,777 · | ||
| Feb 27, 2026 | 80B83 | CookWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish located on FAI 80, I-80 Expressway from I-294 (Tri-State Tollway) to Will / Kendall County Line in Cook and Will Counties. | — | Executed | ABC Traffic Safety $160,313 · | ||
| Feb 27, 2026 | 80B84 | CookWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish located on I-57 expressway from I-90/94 (Dan Ryan Expressway) to Will / Kankakee County Line in Cook and Will Counties. | — | Executed | ABC Traffic Safety $211,275 · | ||
| Feb 27, 2026 | 99757 | WilliamsonDistrict 9 | Construction of a roundabout intersection at Cambria Road and Cardinal Road/ Grand Avenue intersection. Work includes PCC pavement, curb and gutter, drainage improvements, lighting and other required work. , Construction of a roundabout intersection at Cambria Road and Cardinal Road/Grand Avenue intersection. Work includes PCC pavement, curb and gutter, drainage improvements, lighting and other required work. | — | Executed | Samron Midwest Contracting, Inc. $1,715,790 · | ||
| Apr 24, 2026 | 62V71 | WillDistrict 1 | Hot-mix asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pede (3.87-Mile) Standard overlay and ADA curb ramp improvement project consists of hot-mix asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian ramp improvements, pavement patching, placement of pavement markings. The project is in the Cities of Lockport and Joliet within Will County. | — | Executed | D. Construction, Inc. $2,821,627 · | ||
| Apr 24, 2026 | 62X31 | CookWillDistrict 1 | (650-Ft) Two culverts (SN 016-2290 and SN 099-0541) will undergo routine maintenance and repairs. Items include structural repair of concrete on headwalls and the removal and replacement of a wingwall. This project is located at FAI Route 57 over Butterfield Creek (0.04 Miles North of Village Commons Drive) and FAI Route 57 over Culvert (0.38 Miles North of Harlem Ave) | — | Executed | D. Construction, Inc. $135,363 · | ||
| Apr 24, 2026 | 78B47 | WilliamsonDistrict 9 | Bridge overlay on SN 100-0070 carrying IL 166 over South Fork Saline River. | — | Executed | Samron Midwest Contracting, Inc. $304,465 · | ||
| Apr 24, 2026 | 80B05 | WillDistrict 1 | Class B patches, Diamond Grinding, ADA ramp improvements, pavement marking restriping This improvement consists of class B patches, Diamond Grinding, ADA ramp improvements, pavement marking restriping. This project is located on IL 7 (Theodore Ave) at the asphalt concrete joint approximately 100 ft west of US 30 and extends east approximately 9293 ft east to the concrete asphalt joint at IL 53 in the Cities of Crest Hill and Joliet. | — | Executed | D. Construction, Inc. $1,433,491 · | ||
| Apr 24, 2026 | 80B31 | WillDistrict 1 | Design Overlay and new Hot-Mix Asphalt Shoulder project includes hot-mix asphalt removal, earth excavation, pavement patching, resurfacing with hot-mix asphalt, full depth hot-mix asphalt shoulder, placement of pavement markings, ADA Improvements, installation of raised reflective pavement markers. Located on US Route 45 (LaGrange Road) in the Township of Green Garden and Village of Manhattan in Will County. | — | Executed | P. T. Ferro Construction Co. $2,127,428 · | ||
| Apr 24, 2026 | 80B46 | WillDistrict 1 | Concrete removal, concrete superstructure, steel reinforcement bars, finger plate expansion joints, bridge dec (500-Ft) Bridge Repair and Bridge Deck Latex Overlay project consists of concrete removal, concrete superstructure, steel reinforcement bars, finger plate expansion joints, bridge deck scarification, latex overlay, and grooving, structural repair of concrete, deck slab repair and diamond grinding including HMA surface removal, butt joints, HMA surface course, shoulder removal and HMA reconstruction, guardrail removal and replacement, pavement markings, road closure, detour installation and maint | — | Executed | D. Construction, Inc. $583,219 · | ||
| Apr 24, 2026 | 80B76 | WillDistrict 1 | The removal and replacement of a fixed platform scale includes removal and replacement of pavement and shoulde (500-Ft) Project consists of the removal and replacement of a fixed platform scale includes removal and replacement of pavement and shoulders along the ramp curb and gutter removal and replacement, drainage improvements, sidewalk improvements, pavement marking, landscaping, and erosion control. Location on westbound I-80 at the westbound Frankfort weigh station in Village of Tinley Park, Will County. | — | Executed | D. Construction, Inc. $1,101,862 · | ||
| Apr 24, 2026 | 80B79 | CookWillDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot LITTER PICKING consists of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish which has accumulated on the highway located on I-94 (Bishop Ford Expwy) from Dan Ryan Expwy to I-80 in Cook County, on IL-394 from I-80 to IL 1 (Dixie Hwy) in Cook and Will Counties, on Stony Island Ave from I-94 to US 12 (95th St) and on 103rd St from Cottage Groove to Stony Island. | — | Executed | Charles & Charlie Janitorial Landscaping LLC $628,506 · | ||
| Apr 24, 2026 | 99761 | WilliamsonDistrict 9 | Reconstruction of South Market Street from Boyton Street to 0.1 mile south of Texas Avenue in Marion. | — | Executed | Samron Midwest Contracting, Inc. $979,828 · | ||
| Jun 12, 2026 | 62X28 | WillDistrict 1 | Concrete removal, concrete structures, structural repair of concrete, steel reinforcement bars, performed join (1,079.50-Ft) Bridge Joint replace/repair culvert repair, and wing wall and abutment repair project consist of concrete removal, concrete structures, structural repair of concrete, steel reinforcement bars, performed joint seal, and polymer concrete, guardrail removal and replacement, traffic control, erosion control, furnishing and placing topsoil. This project is in the Village of Channahon in Will County, Illinois. | — | Executed | D. Construction, Inc. $248,599 · | ||
| Jun 12, 2026 | 62X37 | WillDistrict 1 | (4.25-Mile) Furnishing and installing landscaping along I-80 corridor from Gardner Street to Gouger Road in the City of Joliet, Joliet Township and the Village of New Lenox within Will County. | — | Executed | Semper Fi Yard Service, Inc. d/b/a Semper Fi Land Service, Inc. $3,580,280 · | ||
| Jun 12, 2026 | 78C13 | WilliamsonDistrict 9 | Slope repairs on IL 148 over Crab Orchard Lake, 1.5 miles south of Old IL 13. | — | Executed | Samron Midwest Contracting, Inc. $328,825 · | ||
| Jun 12, 2026 | 80B17 | WillDistrict 1 | Thermoplastic pavement markings, and incidental work (2,809-Ft) Smart Overlay consists of thermoplastic pavement markings, and incidental work. Located in the City of Crete in Will County. | — | Executed | Iroquois Paving Corporation $197,734 · | ||
| Jun 12, 2026 | 80B77 | WillDistrict 1 | The removal and replacement of a fixed platform scale that includes removal and replacement of pavement, curb The project consists of the removal and replacement of a fixed platform scale that includes removal and replacement of pavement, curb and gutter removal and replacement, median surface removal and replacement, sidewalk improvements, pavement marking, landscaping, and erosion control located in Village of Bolingbrook, Will County, Illinois. | — | Executed | D. Construction, Inc. $1,130,242 · | ||
| Jun 12, 2026 | 80D36 | WillDistrict 1 | This is an advanced procurement of selective mechanical and electrical components for the existing movable bridge (SN 099-0101) including the furnishing of the machinery brakes, motor brakes, and select bearings for the movable structure located at US 30 (Cass Street) Bridge over the Des Plaines River in the City of Joliet in Will County. | — | Executed | GRANITE CONSTRUCTION COMPANY $900,000 · | ||
| Jun 12, 2026 | 99748 | WilliamsonDistrict 9 | Construction of new sidewalks along Fair St. and Morning Side Dr. in the city of Marion. | — | Rejected | |||
| Jul 31, 2026 | 62V46 | WillDistrict 1 | (3,381-Ft) Crack and Joint Seal project includes routing, cleaning, and sealing of longitudinal cracks in existing hot-mix asphalt (HMA) pavement and PCC pavement, performing class B patching on PCC Pavement and refreshing existing pavement marks with modified urethane pavement markings. This project is in the City of Joliet, Will County. | — | Executed | Mosley Construction 1, LLC $424,498 · | ||
| Jul 31, 2026 | 62V80 | WillDistrict 1 | Routing, cleaning, and sealing of longitudinal cracks in existing pavement, between the existing pavement and (2,897-Ft) This improvement consists of routing, cleaning, and sealing of longitudinal cracks in existing pavement, between the existing pavement and curb and gutter, restriping with modified urethane marking lines. This project is located within the Village of Plainfield in Will County. | — | Executed | Denler, Inc. $51,792 · | ||
| Jul 31, 2026 | 78C18 | JacksonWilliamsonDistrict 9 | 9.1 miles of tree planting along the Crab Orchard Greenway multi-use path and the Wolf Creek Interchange. | — | Executed | CSD Environmental Services, Inc. $241,350 · | ||
| Jul 31, 2026 | 99775 | WilliamsonDistrict 9 | Resurfacing Bandyville Rd. from Stotlar Rd. to Crenshaw Rd. and Crenshaw Rd. from 0.3 mile west of Bandyville Rd. to Bandyville Rd. in the city of Herrin. | — | Executed | Samron Midwest Contracting, Inc. $693,605 · | ||
| Sep 18, 2026 | 61M61 | WillDistrict 1 | Replace the bridge carrying Royce Road over the DuPage River, west of IL 53 in Bolingbrook. | — | Active | |||
| Sep 18, 2026 | 80C95 | WillDistrict 1 | SMART Overlay up to the omission and Designed Overlay includes pavement patches hot-mix asphalt (HMA) surface removal, resurfacing with HMA binder and surface course, longitudinal joint sealing, curb and gutter removal and replacement, drainage structures adjustments and cleaning, new thermoplastic pavement markings, detector loops replacement, curb ramps for sidewalk (ADA) improvement installation of raised reflective pavement markers, and minor traffic signal improvements. The project is locat | — | Executed | Gallagher Asphalt Corporation $1,094,428 · |
1–99 of 99
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.