IDOT Jobs

All dates · 99 jobs · —
★ My Jobs

Filtered by: County: Will Clear all

99 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Dec 13, 2024 62T04 WillDistrict 1 Bridge deck overlay, reconstruction of abutment deck joint, approach slab repairs and substructure repairs of The proposed improvement consists of bridge deck overlay, reconstruction of abutment deck joint, approach slab repairs and substructure repairs of the bridge located on La Grange Road/US 45 at Hickory Creek in Will County. Gross length: 4854 Ft (0.919 Mi), Net length: 1327 Ft (0.252 Mi). — Executed Nov 25 New D. Construction, Inc. $1,407,207 ·
Dec 13, 2024 78633 WilliamsonDistrict 9 7.8 miles of resurfacing, HMA shoulders, aggregate shoulders, earthwork, culvert replacement, tree removal, guardrail updates, addition of a right turn lane, and construction of a roundabout on IL 37, south of Marion, from Wildcat Road to IL 148. — Executed Nov 25 New E. T. Simonds Construction Company $16,365,141 ·
Dec 13, 2024 78798 WilliamsonDistrict 9 8 miles of earthwork, HMA pavement, HMA resurfacing, drainage and guardrail in order to add a lane in each direction of I-57 from Westminster Drive in Marion to just south of the I-24 interchange. — Executed Nov 25 New Samron Midwest Contracting, Inc. $41,665,230 ·
Dec 13, 2024 78A65 WilliamsonDistrict 9 7.8 miles of standard overlay on Crab Orchard Road from the IL 13 West Connector to the IL 13 East Connector. — Executed Nov 25 New Samron Midwest Contracting, Inc. $643,012 ·
Jan 17, 2025 61J25 WillDistrict 1 Widening and reconstruction of Plainfield-Naperville Road at 127th Street and Reagan Boulevard in Plainfield. Includes addition of left turn lanes, curb and Gutter, HMA and Aggregate shoulders, concrete medians, guardrail, traffic signals and lighting. — Executed Nov 25 New P. T. Ferro Construction Co. $3,803,259 ·
Jan 17, 2025 61K81 WillDistrict 1 Widen and resurface Theodore Street from west of Staghorn Drive to Wesmere Parkway in Joliet. — Executed Nov 25 New Austin Tyler Construction, Inc. $2,764,372 ·
Jan 17, 2025 61K84 WillDistrict 1 Construction of an HMA multi-use path, PCC Sidewalk, storm sewer, box culvert extension, retaining wall, and landscaping along Bridge Street in Channahon. — Executed Nov 25 New D. Construction, Inc. $2,494,970 ·
Jan 17, 2025 62U88 WillDistrict 1 (4.32-Mile) Patching (full depth, class D patches) work includes: Earth excavation, aggregate subgrade improvement, subbase granular material, full depth Class D (HMA) patches, special, detector loops, pavement markings and and incidental and collateral work. Located on IL 53, from South of Arsenal Road to Hoff Road within the City of Wilmington and the Village of Elwood in Will County. — Executed Nov 25 New K-Five Construction Corporation $9,653,442 ·
Jan 17, 2025 62W52 WillDistrict 1 Furnishing the structural steel and bearings for the I-80 bridges over the Des Plaines River The proposed scope of work consists of furnishing the structural steel and bearings for the I-80 bridges over the Des Plaines River. Steel will also need to be stored until it can arrive on-site as part of the Contract (62R23). Steel will be for WB and EB of I-80 (SN 099-8309 WB and 099-8325 EB) over the Des Plain River, CSX Railroad, US-6, as well as several existing and proposed local roads The project is in the City of Joliet in Will County. — Executed Nov 25 New Veritas Steel LLC $28,658,382 ·
Jan 17, 2025 62X78 CookWillDistrict 1 Expressway Cleaning (Litter/Debris Removal), This work is located on I-57 expressway from I-90/94 (Dan Ryan Expressway) to Will / Kankakee County Line in Cook and Will Counties. — Executed Nov 25 New Orlando Lawn Service, Inc. $227,238 ·
Jan 17, 2025 62X81 CookWillDistrict 1 Expressway Cleaning (Litter/Debris Removal), This work is located on FAI 80, I-80 Expressway from I-294 (Tri-State Tollway) to Will / Kendall County Line in Cook and Will Counties. — Executed Nov 25 New Thor General Contracting LLC $210,330 ·
Jan 17, 2025 99687 WilliamsonDistrict 9 Construction of a Roundabout at Skyline Drive and Crenshaw Road. Work includes PCC Pavement, curb and gutter, storm sewers, pipe culverts, signage, and lighting . — Executed Nov 25 New Samron Midwest Contracting, Inc. $2,026,739 ·
Jan 17, 2025 99736 WilliamsonDistrict 9 Guardrail Replacemnent, pavment markings and signage at the intersection of of Creal Springs Road and Borton Street in Creal Springs. — Executed Nov 25 New Midwest Fence Corporation $92,499 ·
Mar 7, 2025 61L02 WillDistrict 1 Construct an HMA Multi-Use Path in Home Glen, from Coachman Lane to Heatherwood Drive. Includes HMA Pavement removal, sidewalks, ADA ramps, and signage. — Executed Nov 25 New D. Construction, Inc. $398,891 ·
Mar 7, 2025 61L13 WillDistrict 1 HMA resurfacing on Highpoint Drive from Discovery Park to Weber Road in Romeoville. Additional work includes Class D patches, PCC driveways, sidewalks, drainage and utility structures, and pavement markings. — Executed Nov 25 New P. T. Ferro Construction Co. $392,397 ·
Mar 7, 2025 62G55 WillDistrict 1 Pavement patching, milling of existing HMA surface, placing hot-mix asphalt leveling binder and surface course The Standard Overlay consists of pavement patching, milling of existing HMA surface, placing hot-mix asphalt leveling binder and surface course, drainage structures adjustment and cleaning, grading and shaping ditches, placement of pavement markings. Located on Illinois Route 171 (Archer Ave.) begins at Boula Ave. and extends in a northeasterly direction for 4,542.2 feet (0.86 mile ) to approximately 0.1 miles southwest of I-355. The improvement is in the City of Lockport, in Will County. — Executed Nov 25 New Gallagher Asphalt Corporation $1,427,655 ·
Mar 7, 2025 62U89 WillDistrict 1 The building demolition at various locations The proposed scope of work consists of the building demolition at various locations. Each building removal will include removal any structure above and below the ground, including the main building frames, attached and detached buildings, and facilities. It will also include the removal of fences, sidewalk and_driveways, utilities and trees within the parcels limits. The project is in Will County. — Executed Nov 25 New Scanlon Excavating & Concrete, Inc. $498,400 ·
Mar 7, 2025 62X76 CookDuPageWillDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish. This work is located on I-55 Expressway from ILL 43 (Harlem Ave) to Reed Road in Cook, DuPage, and Will Counties. — Executed Nov 25 New Thor General Contracting LLC $305,910 ·
Mar 7, 2025 62X77 CookWillDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish. This work is located on I-94 (Bishop Ford Expwy) from Dan Ryan Expwy to I-80 in Cook County, on IL-394 from I-80 to IL 1 (Dixie Hwy) in Cook and Will Counties, on Stony Island Ave from I-94 to US 12 (95th St) and on 103rd St from Cottage Groove to Stony Island. — Executed Nov 25 New Thor General Contracting LLC $477,405 ·
Apr 25, 2025 61K44 WillDistrict 1 Construct an HMA shared-use path with pedestrial bridge and two boardwalks from 265th strett to the south end of the existing trail south of Burville Rd. — Executed Nov 25 New D. Construction, Inc. $3,654,428 ·
Apr 25, 2025 61K61 WillDistrict 1 Construction of three 7'X 5' precast concrete box culverts to carry Woodcreek Drive over Lily Cache Lane Tributary in Bollingbrook. Includes; lighting, HMA Pavement, curb and gutter, and sidewalks. — Executed Nov 25 New D. Construction, Inc. $753,049 ·
Apr 25, 2025 62T27 WillDistrict 1 (3,073-Ft) Bridge repairs on (S.N.099-0292), includes bridge deck scarification latex concrete overlay, joint reconstruction, bearings and substructures repair repairs and bearing painting. The roadway work encompasses concrete scarification, butt joints, asphalt overlay, removal and replacement of the median, and curb and gutter, reconstruction of a catch basin and adjustment of inlets. Located along IL 171 (N. State St.) over Fiddyment Creek in the City of Lockport in Will County, Illinois. — Executed Nov 25 New D. Construction, Inc. $1,260,740 ·
Apr 25, 2025 62V35 WillDistrict 1 Hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt surface course, placement (4857.6-Ft) Smart overlay consists of hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt surface course, placement of thermoplastic pavement markings. Located on Illinois Route FAP 112, IL 53 (Independence Blvd), it begins N of University Pkwy and ends at Renwick Rd. in the City of Lockport in Will County. — Executed Nov 25 New Builders Paving, LLC $731,556 ·
Apr 25, 2025 62X20 CookWillDistrict 1 (627-Ft) Bridge Painting project consisting of cleaning and painting steel surfaces. The project is located at the structure No. 1 (SN. 016-1062) carrying I-94 eastbound to I-55 southbound over Archer Avenue/BNSF and ICC RR in the City of Chicago in Cook County, and structure No. 2 (SN. 099-0198) carrying Maple Road Over I-80 in the Village of Mokena in Will County. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $649,580 ·
Apr 25, 2025 62X22 CookWillDistrict 1 This is a bridge painting project includes cleaning and painting steel surfaces as designated on the plans. LOCATION #1: New Avenue over Long Run Creek Overflow City of Lockport in Will County (SN: 099-0299). LOCATION #2: US 45 over Hickory Creek Village of Frankfort in Will County (SN: 099-0293). LOCATION #3: IL 43 (Harlem Ave.) over I-80 Village of Tinley Park in Cook County (SN: 016-0325). — Executed Nov 25 New Capital Industrial Services, LLC $503,300 ·
Apr 25, 2025 62X85 WillDistrict 1 (1.19-Mile) Pavement Patching includes asphalt surface removal, resurfacing asphalt binder and surface course, aggregate wedge shoulders, grading and shaping shoulders, pavement markings, raised reflective pavement marker. This project is located along I-55 West Frontage Road from South of Stripmine Road to IL 113 (Division Street) in the City of Wilmington and the Village of Diamond in Will County. — Executed Nov 25 New P. T. Ferro Construction Co. $410,872 ·
Apr 25, 2025 62X93 WillDistrict 1 Modernizing bridge lift gates at structures carrying McDonough Street and Brandon Street over the Des Plaines The work on this improvement consists of modernizing bridge lift gates at structures carrying McDonough Street and Brandon Street over the Des Plaines River. This improvement has 2 locations: the first locations is at McDonough Street (SN: 099-9904) over the Des Plaines River and the second location is at Brandon Street (SN: 099-9903) over the Des Plaines River in Will County. — Executed Nov 25 New D. Construction, Inc. $1,901,944 ·
Apr 25, 2025 78373 WilliamsonDistrict 9 3.6 miles of roadway reconstruction including adding lanes, reconstruction of 4 bridges and intersection reconstruction on IL 13 from Spillway Road to Shawnee Trail. — Executed Nov 25 New Samron Midwest Contracting, Inc. $40,895,392 ·
Apr 25, 2025 78B10 WilliamsonDistrict 9 1.5 miles of resurfacing and patching on Moellers Road from IL 13 to Pittsburg Road. — Executed Nov 25 New Samron Midwest Contracting, Inc. $526,107 ·
Apr 25, 2025 78B12 WilliamsonDistrict 9 3.2 miles of HMA surface removal, HMA surfacing and patching on Old IL 13 from the east city limits of Carterville to IL 148. — Executed Nov 25 New E. T. Simonds Construction Company $974,757 ·
Jun 13, 2025 60R76 WillDistrict 1 Construction of a retaining wall, guardrail replacement, shoulder widening, headwall replacement and culvert e (1225-Ft) Bridge Deck Replacement consists of construction of a retaining wall, guardrail replacement, shoulder widening, headwall replacement and culvert extension located on I-57 at Pauling Road (Overhead) in Will County. — Executed Nov 25 New D. Construction, Inc. $4,142,053 ·
Jun 13, 2025 62G52 WillDistrict 1 (1.716-Mile) Designed Overlay improvements include: Curb and gutter spot repair , asphalt surface removal and replacement with new binder and surface (cold milling and inlay), full-depth patches (Class D), drainage structures adjustment and cleaning, pavement markings, raised reflective pavement markers, detector loops replacement. Location: IL 53 (Independence Boulevard), from Joliet Road to Belmont Drive within the Village of Romeoville. — Executed Nov 25 New K-Five Construction Corporation $3,382,064 ·
Jun 13, 2025 62U39 WillDistrict 1 Removal and replacement of the Bridge (SN 099-0205) carrying Francis Road over I-80 and the subsequent pavemen Project consists of removal and replacement of the Bridge (SN 099-0205) carrying Francis Road over I-80 and the subsequent pavement improvements necessary for this replacement. Located on FAI 80 (I-80) at Francis Road, Will County, IL. — Executed Nov 25 New D. Construction, Inc. $5,328,033 ·
Jun 13, 2025 62W15 WillDistrict 1 (1.59-Mile) Replace light towers with poles, LED luminaries, foundations, conduits/cables, restorations. Project located in the Villages of Mokena, Orland Park, and Tinley Park in Will County, at I-80 and US-45 interchange. — Executed Nov 25 New John Burns Construction Company $1,709,237 ·
Jun 13, 2025 62X34 WillDistrict 1 Asphalt surface removal, pavement patching, combination concrete curb and gutter removal and replacement, conc (2.88-Mile) Designed overlay and pedestrian ramp (ADA) project consists of asphalt surface removal, pavement patching, combination concrete curb and gutter removal and replacement, concrete sidewalk removal replacement, resurfacing with asphalt binder course and asphalt surface course, pavement markings. The improvement is in the Cities of Braidwood and Wilmington in Will County. — Executed Nov 25 New Iroquois Paving Corporation $1,353,712 ·
Jun 13, 2025 62X99 WillDistrict 1 Building demolition for ten (10) residential and/or commercial parcels and outbuildings, include removing any The work consists of building demolition for ten (10) residential and/or commercial parcels and outbuildings, include removing any structure above and below the ground, main building frames, attached and detached buildings, facilities, and filling of basements, removal of fences, sidewalks and driveways, utilities, and trees, grading and seeding. Located in the City of Joliet, in the vicinity of FAI Route 80 (Interstate 80) and Des Plaines River in Will County. — Executed Nov 25 New C & D Recycling Services, Inc. $469,833 ·
Jun 13, 2025 78831 WilliamsonDistrict 9 Replacement of SN 100-0053 carrying Stiritz Road (TR 23) over I-57, approximately 0.6 miles west of IL 37. — Executed Nov 25 New E. T. Simonds Construction Company $4,956,078 ·
Jun 13, 2025 78A33 WilliamsonDistrict 9 Signal modifications, pedestrian crossings and sidewalks at the intersection of IL 13 and Halfway Road in Marion. — Executed Nov 25 New Brown Electric, Inc. $1,056,436 ·
Jun 13, 2025 78B31 WilliamsonDistrict 9 1.1miles of pavement patching and resurfacing on IL 37 from 0.1 miles north of 18th Street to south of 4th Street in Johnston City. — Executed Nov 25 New E. T. Simonds Construction Company $685,210 ·
Jun 13, 2025 99756 WilliamsonDistrict 9 HMA Overlay with Aggregate Wedge Shoulders on Power Plant Road from County Club Road to McKinny Chapel Road. — Executed Nov 25 New E. T. Simonds Construction Company $660,852 ·
Aug 1, 2025 62X50 WillDistrict 1 Milling existing asphalt surface, pavement patching, HMA surface course and HMA binder course, sidewalk remova (2,067-Ft) Designed Overlay, Curb Ramps improvements (ADA), Sidewalk Replacement consists of milling existing asphalt surface, pavement patching, HMA surface course and HMA binder course, sidewalk removal and replacement, drainage structures adjustments and cleaning, replacement of curb and gutter, longitudinal joint sealing, pavement markings, curb ramps for sidewalks, raised reflective pavement markers, Location: IL 53 (Baltimore Street), from Kankakee Street to West of Forked Creek within the — Executed Nov 25 New Gallagher Asphalt Corporation $975,357 ·
Aug 1, 2025 62X86 WillDistrict 1 Asphalt surface removal, pavement patching, (Hot Mix Asphalt) binder course, polymerized binder course and sur (3,435-Ft) Design and Standard Overlay consists of asphalt surface removal, pavement patching, (Hot Mix Asphalt) binder course, polymerized binder course and surface course, thermoplastic pavement markings. Located on Illinois Route FAU 388, I-55 Frontage Road NB in the Village of Channahon in Will County. — Executed Nov 25 New D. Construction, Inc. $250,346 ·
Aug 1, 2025 78916 WilliamsonDistrict 9 Signal modifications, railroad interconnects and fiber optic installation on IL 37 from IL 13 to Boyton Street in Marion. — Executed Nov 25 New Gerstner Electric, Inc. $1,302,315 ·
Aug 1, 2025 78A74 JohnsonWilliamsonDistrict 9 9.5 miles of resurfacing on IL 166 from 0.1 miles south of Tune Road to US 45. Also includes ADA improvements in Creal Springs. — Executed Nov 25 New E. T. Simonds Construction Company $3,949,325 ·
Aug 1, 2025 99284 WilliamsonDistrict 9 Extend Ritter Road north to Grand Avenue in Herrin. — Executed Nov 25 New Samron Midwest Contracting, Inc. $2,069,759 ·
Aug 1, 2025 99760 WilliamsonDistrict 9 Construction of a PCC multi-use path from the RIDES Mass Transit Center and VA Hospital along Main Street and Halfway Road in Marion. — Executed Nov 25 New Samron Midwest Contracting, Inc. $2,142,142 ·
Sep 19, 2025 62R22 WillDistrict 1 (3,775-Ft) Realignment and Reconstruction of the mainline and interchange pavement and related roadway elements, including ramp and cross-road reconstruction, existing bridge removal, storm sewer, drainage structures, detention ponds, earth excavation and grading, retaining and noise walls, barrier and moment slab construction, bridge rehabilitation and replacement, roadway lighting, traffic signals, ITS implementation, erosion and sediment control, landscaping, traffic control and protection, d — Executed Nov 25 New D. Construction, Inc. $93,597,946 ·
Sep 19, 2025 62U11 CookWillDistrict 1 Drainage Improvements. Work includes ditch regrading, culvert replacement and other drainage improvements. Locations: US 30 between 84th Avenue and 82nd Avenue in Will County; US 52 at Draves Road and Offner Road in Will County; Intersection of 115th Street and Homan Avenue in Cook County; Intersection of Taft Avenue and Elm Avenue in Cook County; Along Palatine Road, West of Roselle Road in Cook County. — Executed Nov 25 New Everlast Blacktop Inc. $1,530,704 ·
Sep 19, 2025 62W62 CookDuPageWillDistrict 1 This work includes replacement of existing span wire mounted traffic signals with new mast arm mounted traffic signals, installation of LED signal heads, traffic signal posts and mast arms, installation of accessible pedestrian signals. Installations are various locations in District 1. — Executed Nov 25 New John Burns Construction Company $2,170,856 ·
Sep 19, 2025 62X01 WillDistrict 1 (7.04-Mile) Designed Overlay and Shoulder Reconstruction includes (HMA) removal earth excavation, pavement patching, resurfacing with HMA asphalt, full depth HMA shoulder, pavement markings, raised reflective markers, curb and gutter removal and replacement. Project located on US 45/52 (96th Ave / LaGrange Road) from North of Monee Manhattan Road to Wilmington Peotone Road in the Townships of Green Garden, Peotone and Wilton Center in Will County. — Executed Nov 25 New Iroquois Paving Corporation $7,332,294 ·
Nov 7, 2025 61L73 WillDistrict 1 Extension of Old Renwick Road Trial from the DuPage River to West Renwick Road. — Executed Nov 25 New D. Construction, Inc. $352,856 ·
Nov 7, 2025 62R51 WillDistrict 1 (3,400-Ft) Intersection Improvement (channelization, pavement widening, resurfacing),traffic signal Installation at railroad crossing, traffic signal modernization, Interconnect, minor lighting improvements, drainage Improvements (including new storm sewer at Monee Maintenance Yard), Location: IL 50 (Cicero Avenue) at Dralle Road, at Governors Hwy and at Monee Maintenance Yard, located withing the Villages of University Park and Monee. — Executed Nov 25 New Iroquois Paving Corporation $3,192,530 ·
Nov 7, 2025 62Y00 WillDistrict 1 Building demolition for eleven (11) residential and/or commercial parcels and outbuildings The work consists of building demolition for eleven (11) residential and/or commercial parcels and outbuildings. Each parcel removal will include removing any structure above and below the ground, including the main building frames, attached and detached buildings, facilities, and filling of basements, removal of fences, sidewalks and driveways, utilities, and trees within the parcels' limits. Interim grading and seeding. The project located in the City of Joliet, in the vicinity of FAI Route 80 — Executed Nov 25 New C & D Recycling Services, Inc. $346,900 ·
Nov 7, 2025 78209 WilliamsonDistrict 9 Replacement of SN 100-0031 carrying IL 166 over Sugar Creek at the east corporate limits of Creal Springs. — Executed Nov 25 New Samron Midwest Contracting, Inc. $2,526,591 ·
Nov 7, 2025 78B74 WilliamsonDistrict 9 Patching on IL 166 from IL 13 to Tune Road east of Marion. — Executed Nov 25 New E. T. Simonds Construction Company $118,588 ·
Nov 7, 2025 80B72 WillDistrict 1 Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of lim This project consists of Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas located on various State maintained arterial routes located within the county of Will. — Executed Nov 25 New Central Sweeping of Illinois, LLC $1,303,855 ·
Jan 16, 2026 61L81 WillDistrict 1 Resurfacing Remington Road from Weber Road to Claar Boulevard in Romeoville. — Executed Nov 25 New K-Five Construction Corporation $596,750 ·
Jan 16, 2026 61L99 WillDistrict 1 Decorative lighting, landscaping and parkway restoration on IL 50 from Bruce Street Road to Steger Drive in University Park. — Executed Nov 25 New Iroquois Paving Corporation $1,829,797 ·
Jan 16, 2026 61M01 WillDistrict 1 Widening and reconstruction of Seil Road and replacement of the Seil Road Bridge across the DuPage River in Shorewood. Includes; mini roundabouts and street lighting at Seil Road and Raven Road, and at Seil Road and States Lane. — Executed Nov 25 New Austin Tyler Construction, Inc. $8,923,156 ·
Jan 16, 2026 62F94 WillDistrict 1 The realignment and reconstruction of the mainline and interchange pavement and related roadway elements, incl (2,577-Ft) The work consists of the realignment and reconstruction of the mainline and interchange pavement and related roadway elements, including ramp and cross-road reconstruction, existing bridge removal, enclosed storm sewer system with drainage structures and detention ponds, earth excavation and embankment grading, installation of retaining and noise walls, barrier and moment slab construction, bridge replacement, roadway lighting, traffic signals ITS implementation, erosion and sediment — Executed Nov 25 New D. Construction, Inc. $104,386,503 ·
Jan 16, 2026 62R76 WillDistrict 1 Reconstruction of the expansion joints with strip seals, hydro scarification (3/4-), deck and approach slab re (290-Ft) Bridge Deck Overlay, (SN 099-0210) over I-55. The project consists of reconstruction of the expansion joints with strip seals, hydro scarification (3/4-), deck and approach slab repairs, latex concrete overlay (2¼-) with diamond grinding and longitudinal grooving, application of a protective coat, and substructure concrete repair. Roadway improvements include HMA on each side of the bridge. I-55 at Caton Farm Road (3 miles north of US 52) in the Village of Plainfield. — Executed Nov 25 New D. Construction, Inc. $647,187 ·
Jan 16, 2026 62Y09 WillDistrict 1 This is an advance procurement of selective mechanical, electrical, and structural components for the existing rolling movable bridges at Jackson Street and Jefferson Street over the Des Plaines River, Structure Number 099- 0239 and 099-0166 in Will County. — Executed Nov 25 New GRANITE CONSTRUCTION COMPANY $2,400,000 ·
Jan 16, 2026 80B11 WillDistrict 1 (6,160-Ft) Standard Overlay, New Shoulders, and ADA Improvements include: Hot- mix asphalt (HMA) surface removal (cold milling), full-depth patches (Class D), resurfacing (inlay) with HMA binder and surface course, longitudinal joint sealing, replacement of curb and gutter, sidewalk removal and replacement for curb ramps for sidewalks (ADA), replacement of existing aggregate shoulders with HMA, drainage structures adjustments and cleaning, new thermoplastic pavement markings and raised reflectiv — Executed Nov 25 New Iroquois Paving Corporation $1,297,699 ·
Jan 16, 2026 80B14 WillDistrict 1 Resurfacing the existing HMA pavement with HMA surface and binder course, thermoplastic pavement markings loca (1.19-Mile) This project-s scope is designed overlay. It consists of resurfacing the existing HMA pavement with HMA surface and binder course, thermoplastic pavement markings located along US 6 (Channahon Rd) from Terry Drive of IL 7 (Larkin Ave) in the City of Joliet in Will County. — Executed Nov 25 New D. Construction, Inc. $2,039,223 ·
Jan 16, 2026 80B34 WillDistrict 1 Resurfacing the existing HMA pavement with HMA surface and binder course, HMA Shoulder, thermoplastic pavement 3,241 Ft) Standard Overlay, consists of resurfacing the existing HMA pavement with HMA surface and binder course, HMA Shoulder, thermoplastic pavement markings, ADA Improvements for curb ramps. Located on IL 7(159th St.) from Robson Dr. to E of Adellman Dr. in the City of Lockport in Will County. — Executed Nov 25 New Gallagher Asphalt Corporation $977,777 ·
Jan 16, 2026 80B36 WillDistrict 1 Pavement patching, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement (1.6-Mile) Project consists of pavement patching, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement, median removal and replacement and curb and gutter replacement, thermoplastic pavement marking. This improvement is in the Village of Frankfort and Frankfort Township in Will County. — Executed Nov 25 New D. Construction, Inc. $3,250,096 ·
Jan 16, 2026 80B86 CookDuPageWillDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking project shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish. This work is located on I-55 - Stevenson expressway from Reed Road to Lake Shore Dr in Cook, DuPage, and Will Counties. — Executed Nov 25 New Thor General Contracting LLC $515,515 ·
Jan 16, 2026 80C53 WillDistrict 1 Fabrication an delivery of structural steel and bearings for the construction of two bridges (SN 099-0902 EB and 099-0903 WB) carrying I-80 over Chicago Ramp B, BNSF RR, UP RR, and Gardner Street in Joliet. — Executed Nov 25 New Industrial Steel Construction, Inc. $10,415,094 ·
Feb 27, 2026 61M25 WillDistrict 1 Rehabilitate of three-span RC channel beam bridge carrying Smith Road over Long Run Creek between W. 138th Street and W. 135th Street in Will County. Work includes replacement of existing channel beams with steel tub girder and concrete deck superstructure, substructure repair, pavement widening, HMA resurfacing and other required work. — Executed Nov 25 New D. Construction, Inc. $1,561,361 ·
Feb 27, 2026 62P01 WillDistrict 1 A single culvert removal and replacement located at Grant Creek on IL Route 53 in Will County, IL The project primarily consists of a single culvert removal and replacement located at Grant Creek on IL Route 53 in Will County, IL. — Executed Nov 25 New Austin Tyler Construction, Inc. $4,980,727 ·
Feb 27, 2026 62R23 WillDistrict 1 (2,215.87-Ft) Replacement of the Des Plaines River Bridge including the realignment and reconstruction of the mainline pavement, cross-road reconstruction, enclosed storm sewer system with drainage structures, detention ponds, earth excavation and embankment grading, retaining and noise abatement walls, barrier and moment slab construction, bridge replacement, roadway lighting, ITS implementation, erosion and sediment control, landscaping, traffic control and protection, navigation lighting, tra — Executed Nov 25 New D. Construction, Inc. & Kraemer North America, LLC JV $164,963,136 ·
Feb 27, 2026 62Y26 WillDistrict 1 (4,658.13-Ft) Bridge Repairs (S.N. 099-0298) includes bridge deck scarification latex concrete overlay, joint reconstruction, patching, and substructure repair butt joints, HMA overlay of the approach pavement, drainage structure adjustments, and pavement marking replacement located along IL Route 50 (Governors Highway) over the CN railroad from Watson Road to Egyptian Trail, in the Village of Monee in Will County, Illinois. — Executed Nov 25 New Iroquois Paving Corporation $1,191,152 ·
Feb 27, 2026 78B58 WilliamsonDistrict 9 1.9 miles of patching and resurfacing on IL 148 from 0.8 miles south of the Franklin County line to 17th Street, north of Herrin. — Executed Nov 25 New Samron Midwest Contracting, Inc. $744,591 ·
Feb 27, 2026 80B13 WillDistrict 1 (1.07-Mile) Standard Overlay and ADA Improvements project includes hot-mix asphalt removal, PCC removal, pavement patching, PCC milling, resurfacing with hot-mix asphalt, drainage structure adjustment and cleaning, pavement markings, raised reflective markers, ADA ramps, pedestrian signals, detector loops. Location: IL 53 (Broadway Street/ Ruby Street) from Teale Woods Trail (South of IL 7) to Bluff Street, within the City of Joliet. — Executed Nov 25 New P. T. Ferro Construction Co. $1,424,777 ·
Feb 27, 2026 80B83 CookWillDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish located on FAI 80, I-80 Expressway from I-294 (Tri-State Tollway) to Will / Kendall County Line in Cook and Will Counties. — Executed Nov 25 New ABC Traffic Safety $160,313 ·
Feb 27, 2026 80B84 CookWillDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish located on I-57 expressway from I-90/94 (Dan Ryan Expressway) to Will / Kankakee County Line in Cook and Will Counties. — Executed Nov 25 New ABC Traffic Safety $211,275 ·
Feb 27, 2026 99757 WilliamsonDistrict 9 Construction of a roundabout intersection at Cambria Road and Cardinal Road/ Grand Avenue intersection. Work includes PCC pavement, curb and gutter, drainage improvements, lighting and other required work. , Construction of a roundabout intersection at Cambria Road and Cardinal Road/Grand Avenue intersection. Work includes PCC pavement, curb and gutter, drainage improvements, lighting and other required work. — Executed Nov 25 New Samron Midwest Contracting, Inc. $1,715,790 ·
Apr 24, 2026 62V71 WillDistrict 1 Hot-mix asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pede (3.87-Mile) Standard overlay and ADA curb ramp improvement project consists of hot-mix asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian ramp improvements, pavement patching, placement of pavement markings. The project is in the Cities of Lockport and Joliet within Will County. — Executed Nov 25 New D. Construction, Inc. $2,821,627 ·
Apr 24, 2026 62X31 CookWillDistrict 1 (650-Ft) Two culverts (SN 016-2290 and SN 099-0541) will undergo routine maintenance and repairs. Items include structural repair of concrete on headwalls and the removal and replacement of a wingwall. This project is located at FAI Route 57 over Butterfield Creek (0.04 Miles North of Village Commons Drive) and FAI Route 57 over Culvert (0.38 Miles North of Harlem Ave) — Executed Nov 25 New D. Construction, Inc. $135,363 ·
Apr 24, 2026 78B47 WilliamsonDistrict 9 Bridge overlay on SN 100-0070 carrying IL 166 over South Fork Saline River. — Executed Nov 25 New Samron Midwest Contracting, Inc. $304,465 ·
Apr 24, 2026 80B05 WillDistrict 1 Class B patches, Diamond Grinding, ADA ramp improvements, pavement marking restriping This improvement consists of class B patches, Diamond Grinding, ADA ramp improvements, pavement marking restriping. This project is located on IL 7 (Theodore Ave) at the asphalt concrete joint approximately 100 ft west of US 30 and extends east approximately 9293 ft east to the concrete asphalt joint at IL 53 in the Cities of Crest Hill and Joliet. — Executed Nov 25 New D. Construction, Inc. $1,433,491 ·
Apr 24, 2026 80B31 WillDistrict 1 Design Overlay and new Hot-Mix Asphalt Shoulder project includes hot-mix asphalt removal, earth excavation, pavement patching, resurfacing with hot-mix asphalt, full depth hot-mix asphalt shoulder, placement of pavement markings, ADA Improvements, installation of raised reflective pavement markers. Located on US Route 45 (LaGrange Road) in the Township of Green Garden and Village of Manhattan in Will County. — Executed Nov 25 New P. T. Ferro Construction Co. $2,127,428 ·
Apr 24, 2026 80B46 WillDistrict 1 Concrete removal, concrete superstructure, steel reinforcement bars, finger plate expansion joints, bridge dec (500-Ft) Bridge Repair and Bridge Deck Latex Overlay project consists of concrete removal, concrete superstructure, steel reinforcement bars, finger plate expansion joints, bridge deck scarification, latex overlay, and grooving, structural repair of concrete, deck slab repair and diamond grinding including HMA surface removal, butt joints, HMA surface course, shoulder removal and HMA reconstruction, guardrail removal and replacement, pavement markings, road closure, detour installation and maint — Executed Nov 25 New D. Construction, Inc. $583,219 ·
Apr 24, 2026 80B76 WillDistrict 1 The removal and replacement of a fixed platform scale includes removal and replacement of pavement and shoulde (500-Ft) Project consists of the removal and replacement of a fixed platform scale includes removal and replacement of pavement and shoulders along the ramp curb and gutter removal and replacement, drainage improvements, sidewalk improvements, pavement marking, landscaping, and erosion control. Location on westbound I-80 at the westbound Frankfort weigh station in Village of Tinley Park, Will County. — Executed Nov 25 New D. Construction, Inc. $1,101,862 ·
Apr 24, 2026 80B79 CookWillDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot LITTER PICKING consists of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish which has accumulated on the highway located on I-94 (Bishop Ford Expwy) from Dan Ryan Expwy to I-80 in Cook County, on IL-394 from I-80 to IL 1 (Dixie Hwy) in Cook and Will Counties, on Stony Island Ave from I-94 to US 12 (95th St) and on 103rd St from Cottage Groove to Stony Island. — Executed Nov 25 New Charles & Charlie Janitorial Landscaping LLC $628,506 ·
Apr 24, 2026 99761 WilliamsonDistrict 9 Reconstruction of South Market Street from Boyton Street to 0.1 mile south of Texas Avenue in Marion. — Executed Nov 25 New Samron Midwest Contracting, Inc. $979,828 ·
Jun 12, 2026 62X28 WillDistrict 1 Concrete removal, concrete structures, structural repair of concrete, steel reinforcement bars, performed join (1,079.50-Ft) Bridge Joint replace/repair culvert repair, and wing wall and abutment repair project consist of concrete removal, concrete structures, structural repair of concrete, steel reinforcement bars, performed joint seal, and polymer concrete, guardrail removal and replacement, traffic control, erosion control, furnishing and placing topsoil. This project is in the Village of Channahon in Will County, Illinois. — Executed Nov 25 New D. Construction, Inc. $248,599 ·
Jun 12, 2026 62X37 WillDistrict 1 (4.25-Mile) Furnishing and installing landscaping along I-80 corridor from Gardner Street to Gouger Road in the City of Joliet, Joliet Township and the Village of New Lenox within Will County. — Executed Nov 25 New Semper Fi Yard Service, Inc. d/b/a Semper Fi Land Service, Inc. $3,580,280 ·
Jun 12, 2026 78C13 WilliamsonDistrict 9 Slope repairs on IL 148 over Crab Orchard Lake, 1.5 miles south of Old IL 13. — Executed Nov 25 New Samron Midwest Contracting, Inc. $328,825 ·
Jun 12, 2026 80B17 WillDistrict 1 Thermoplastic pavement markings, and incidental work (2,809-Ft) Smart Overlay consists of thermoplastic pavement markings, and incidental work. Located in the City of Crete in Will County. — Executed Nov 25 New Iroquois Paving Corporation $197,734 ·
Jun 12, 2026 80B77 WillDistrict 1 The removal and replacement of a fixed platform scale that includes removal and replacement of pavement, curb The project consists of the removal and replacement of a fixed platform scale that includes removal and replacement of pavement, curb and gutter removal and replacement, median surface removal and replacement, sidewalk improvements, pavement marking, landscaping, and erosion control located in Village of Bolingbrook, Will County, Illinois. — Executed Nov 25 New D. Construction, Inc. $1,130,242 ·
Jun 12, 2026 80D36 WillDistrict 1 This is an advanced procurement of selective mechanical and electrical components for the existing movable bridge (SN 099-0101) including the furnishing of the machinery brakes, motor brakes, and select bearings for the movable structure located at US 30 (Cass Street) Bridge over the Des Plaines River in the City of Joliet in Will County. — Executed Nov 25 New GRANITE CONSTRUCTION COMPANY $900,000 ·
Jun 12, 2026 99748 WilliamsonDistrict 9 Construction of new sidewalks along Fair St. and Morning Side Dr. in the city of Marion. — Rejected Nov 25 New
Jul 31, 2026 62V46 WillDistrict 1 (3,381-Ft) Crack and Joint Seal project includes routing, cleaning, and sealing of longitudinal cracks in existing hot-mix asphalt (HMA) pavement and PCC pavement, performing class B patching on PCC Pavement and refreshing existing pavement marks with modified urethane pavement markings. This project is in the City of Joliet, Will County. — Executed Nov 25 New Mosley Construction 1, LLC $424,498 ·
Jul 31, 2026 62V80 WillDistrict 1 Routing, cleaning, and sealing of longitudinal cracks in existing pavement, between the existing pavement and (2,897-Ft) This improvement consists of routing, cleaning, and sealing of longitudinal cracks in existing pavement, between the existing pavement and curb and gutter, restriping with modified urethane marking lines. This project is located within the Village of Plainfield in Will County. — Executed Nov 25 New Denler, Inc. $51,792 ·
Jul 31, 2026 78C18 JacksonWilliamsonDistrict 9 9.1 miles of tree planting along the Crab Orchard Greenway multi-use path and the Wolf Creek Interchange. — Executed Nov 25 New CSD Environmental Services, Inc. $241,350 ·
Jul 31, 2026 99775 WilliamsonDistrict 9 Resurfacing Bandyville Rd. from Stotlar Rd. to Crenshaw Rd. and Crenshaw Rd. from 0.3 mile west of Bandyville Rd. to Bandyville Rd. in the city of Herrin. — Executed Nov 25 New Samron Midwest Contracting, Inc. $693,605 ·
Sep 18, 2026 61M61 WillDistrict 1 Replace the bridge carrying Royce Road over the DuPage River, west of IL 53 in Bolingbrook. — Active Nov 25 New
Sep 18, 2026 80C95 WillDistrict 1 SMART Overlay up to the omission and Designed Overlay includes pavement patches hot-mix asphalt (HMA) surface removal, resurfacing with HMA binder and surface course, longitudinal joint sealing, curb and gutter removal and replacement, drainage structures adjustments and cleaning, new thermoplastic pavement markings, detector loops replacement, curb ramps for sidewalk (ADA) improvement installation of raised reflective pavement markers, and minor traffic signal improvements. The project is locat — Executed Nov 25 New Gallagher Asphalt Corporation $1,094,428 ·
1–99 of 99

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.