2025-2037-I,PP
- Let date
- Friday, June 12, 2026
- Contract
- 80B77 · job page
- District
- District 1
- County
- Will
- Highway
- Limits
- The project consists of the removal and replacement of a fixed platform scale that includes removal and replacement of pavement, curb and gutter removal and replacement, median surface removal and replacement, sidewalk improvements, pavement marking, landscaping, and erosion control located in Village of Bolingbrook, Will County, Illinois.
- Classification
- The removal and replacement of a fixed platform scale that includes removal and replacement of pavement, curb ·
- Project number
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | D. Construction, Inc. Low bidder | $1,130,242 | ||
| 2 | Alliance Contractors, Inc. | $1,169,328 | +3.5% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 D. Construction… | #2 Alliance Contra… |
|---|---|---|---|---|---|---|---|
| 1 | X4400223 | CURB REM&REPL > 10FT | 458 | FOOT | $50.00 | $115.00 | |
| 2 | X4400501 | CC&G RMVL REPL < = 10 | 4 | FOOT | $200.00 | $115.00 | |
| 3 | X4400503 | CC&G RMVL REPL > 10FT | 55 | FOOT | $70.00 | $115.00 | |
| 4 | X6065706 | MEDIAN SURF REM/REP | 687 | SQ FT | $30.00 | $25.00 | |
| 5 | X6700407 | ENGRS FLD OFC TY A D1 | 12 | CAL MO | $3,000.00 | $500.00 | |
| 6 | X7011015 | TR C-PROT EXPRESSWAYS | 1 | L SUM | $36,330.00 | $5,225.00 | |
| 7 | X7200061 | TEMP INFO SIGNING | 200 | SQ FT | $30.00 | $20.00 | |
| 8 | Z0025710 | F&I STATIC SCALE COMP | 1 | L SUM | $540,765.00 | $405,000.00 | |
| 9 | 20200100 | EARTH EXCAVATION | 20 | CU YD | $100.00 | $100.00 | |
| 10 | 20400800 | FURNISHED EXCAVATION | 5 | CU YD | $100.00 | $100.00 | |
| 11 | 21101505 | TOPSOIL EXC & PLAC | 15 | CU YD | $100.00 | $100.00 | |
| 12 | 25000210 | SEEDING CL 2A | 0.25 | ACRE | $8,800.00 | $8,000.00 | |
| 13 | 25000400 | NITROGEN FERT NUTR | 23 | POUND | $11.00 | $10.00 | |
| 14 | 25000500 | PHOSPHORUS FERT NUTR | 23 | POUND | $11.00 | $10.00 | |
| 15 | 25000600 | POTASSIUM FERT NUTR | 23 | POUND | $11.00 | $10.00 | |
| 16 | 25100630 | EROSION CONTR BLANKET | 112 | SQ YD | $17.60 | $16.00 | |
| 17 | 28000250 | TEMP EROS CONTR SEED | 7 | POUND | $27.50 | $25.00 | |
| 18 | 42000060 | WELDED WIRE REINF | 109 | SQ YD | $30.00 | $10.00 | |
| 19 | 42400200 | PC CONC SIDEWALK 5 | 1,719 | SQ FT | $10.00 | $13.00 | |
| 20 | 42400300 | PC CONC SIDEWALK 6 | 301 | SQ FT | $12.00 | $14.00 | |
| 21 | 42400800 | DETECTABLE WARNINGS | 22 | SQ FT | $30.00 | $40.00 | |
| 22 | 44000600 | SIDEWALK REM | 1,833 | SQ FT | $3.50 | $10.00 | |
| 23 | 44004250 | PAVED SHLD REMOVAL | 10 | SQ YD | $50.00 | $100.00 | |
| 24 | 44201000 | CL B PATCH T4 12 | 109 | SQ YD | $250.00 | $525.00 | |
| 25 | 44201299 | DOWEL BARS 1 1/2 | 80 | EACH | $25.00 | $20.00 | |
| 26 | 44213200 | SAW CUTS | 151 | FOOT | $7.50 | $10.00 | |
| 27 | 44213204 | TIE BARS 3/4 | 200 | EACH | $20.00 | $10.00 | |
| 28 | 48101200 | AGGREGATE SHLDS B | 4 | TON | $200.00 | $100.00 | |
| 29 | 48203021 | HMA SHOULDERS 6 | 11 | SQ YD | $200.00 | $700.00 | |
| 30 | 50101500 | REM EXIST SUP-STR | 2 | EACH | $20,000.00 | $47,000.00 | |
| 31 | 50102400 | CONC REM | 31.8 | CU YD | $1,700.00 | $4,750.00 | |
| 32 | 50300225 | CONC STRUCT | 23 | CU YD | $2,000.00 | $4,000.00 | |
| 33 | 50300300 | PROTECTIVE COAT | 156 | SQ YD | $1.00 | $0.0100 | |
| 34 | 50301350 | CONC SUPSTR APP SLAB | 8.8 | CU YD | $875.00 | $1,550.00 | |
| 35 | 50500405 | F & E STRUCT STEEL | 9,720 | POUND | $10.00 | $6.00 | |
| 36 | 50800205 | REINF BARS, EPOXY CTD | 3,220 | POUND | $4.50 | $4.00 | |
| 37 | 53212754 | STR REP CON DP = < 5 | 40 | SQ FT | $350.00 | $470.00 | |
| 38 | 66900200 | NON SPL WASTE DISPOSL | 5 | CU YD | $200.00 | $400.00 | |
| 39 | 66900530 | SOIL DISPOSAL ANALY | 2 | EACH | $1,750.00 | $900.00 | |
| 40 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,250.00 | $4,200.00 | |
| 41 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,250.00 | $500.00 | |
| 42 | 66901006 | REG SUB MON | 10 | CAL DA | $1,000.00 | $750.00 | |
| 43 | 67100100 | MOBILIZATION | 1 | L SUM | $67,750.00 | $59,794.00 | |
| 44 | 70300150 | SHRT TRM PAVT MK REM | 440 | SQ FT | $0.0100 | $0.9000 | |
| 45 | 70307140 | TEMP PVT MK L8 T4 TAPE | 660 | FOOT | $0.0100 | $2.60 | |
| 46 | 78009006 | MOD URETH PM LINE 6 | 619 | FOOT | $8.25 | $7.50 | |
| 47 | 78009012 | MOD URETH PM LINE 12 | 57 | FOOT | $17.60 | $16.00 | |
| 48 | 78009024 | MOD URETH PM LINE 24 | 138 | FOOT | $35.20 | $32.00 | |
| 49 | 89502376 | REBUILD EX HANDHOLE | 3 | EACH | $4,500.00 | $5,650.75 |