IDOT Jobs

All dates · 21 jobs · —
★ My Jobs

Filtered by: County: Jackson Clear all

21 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 17, 2025 78998 JacksonDistrict 9 16.5 miles of fiber optic cable installation and signal modification on IL 13 in Carbondale from Striegel Road west to IL 127/149 and on IL13/127/149 in Murphysboro from IL 13/127/149 north to Industrial Park Road. — Executed Nov 25 New Gerstner Electric, Inc. $1,954,250 ·
Jan 17, 2025 78A59 JacksonDistrict 9 350' of storm sewer pipe replacement and channel excavation on IL 127 south of the MO Pacific Railroad and north of Industrial Park Road in Murphysboro. , 350' of storm sewer pipe replacement and channel excavation on IL 127 south of the MO Pacific Railroad and north of Industrial Park Road in Murphysboro. , 350' of storm sewer pipe replacement and channel excavation on IL 127 south of the MO Pacific Railroad and north of Industrial Park Road in Murphysboro. — Executed Nov 25 New Samron Midwest Contracting, Inc. $241,275 ·
Apr 25, 2025 99727 JacksonDistrict 9 HMA resurfacing on South Wall Street from East park Street to East Main Street in Carbondale. Includes; ADA improvements and Storm Sewers. — Executed Nov 25 New Samron Midwest Contracting, Inc. $1,596,208 ·
Jun 13, 2025 78985 JacksonDistrict 9 Slope repair on SN 039-0075 carrying IL 13 over the Big Muddy River, east of IL 127 in Murphysboro. — Executed Nov 25 New Samron Midwest Contracting, Inc. $11,674,263 ·
Jun 13, 2025 78A78 JacksonUnionDistrict 9 Joint reconstruction with strip seal and modular seal on SN 039-0048 carrying IL3 over a railroad in Jackson County and joint reconstruction with strip seals on SN 091-0031carrying IL3 over the Big Muddy River in Union County. — Executed Nov 25 New E. T. Simonds Construction Company $968,450 ·
Jun 13, 2025 78A97 JacksonDistrict 9 Aggregate shoulders, earth and furnished excavation, stone riprap, pipe underdrains and erosion control blanket to repair existing slopes along IL 149 at SN 039-7036, 0.4 miles west of the Williamson County line west of Hurst. — Executed Nov 25 New Sierra Bravo Contractors, LLC $170,723 ·
Jun 13, 2025 78B03 JacksonDistrict 9 Replacing 615' of pavement and shoulders on westbound IL 13 at Watson Road. — Executed Nov 25 New Samron Midwest Contracting, Inc. $1,041,511 ·
Jun 13, 2025 78B04 JacksonDistrict 9 Patching on US 51 in Carbondale from Willow Street to Grand Avenue and on Mill Street from South Normal Avenue to South Illinois Avenue. — Executed Nov 25 New E. T. Simonds Construction Company $543,043 ·
Jun 13, 2025 78B05 JacksonDistrict 9 Signal grounding at multiple locations on IL 149 and IL 13 in Murphysboro and Carbondale. — Executed Nov 25 New Gerstner Electric, Inc. $116,085 ·
Jun 13, 2025 78B22 JacksonDistrict 9 0.85 miles of overlay and pavement patching on Airport Road from IL 13 to 1 mile north of IL 13, northwest of Carbondale. — Executed Nov 25 New E. T. Simonds Construction Company $297,405 ·
Nov 7, 2025 78B54 JacksonDistrict 9 Resurfacing Sweets Drive from Reed Station Road to 0.5 miles west of Reed Station Road in Carbondale. — Executed Nov 25 New E. T. Simonds Construction Company $175,469 ·
Jan 16, 2026 78937 JacksonDistrict 9 Replacement of SN 039-0052 carrying US 51 over CN, IC Railroad, approximately 2.6 miles north of Desoto. — Executed Nov 25 New E. T. Simonds Construction Company $4,810,447 ·
Jan 16, 2026 99718 JacksonDistrict 9 HMA resurfacing and widening of W. Pleasant Hill Road from Union Hill Road to McLaufferty Road in Carbondale. Includes; HMA Shoulders, PCC driveways, and culverts. — Executed Nov 25 New Samron Midwest Contracting, Inc. $1,171,867 ·
Jan 16, 2026 99763 JacksonDistrict 9 Construction of PCC multi-use trail from E. Grand Street to Lewis Lane in Carbondale. Includes; ADS Ramps, light pole relocation, and storm sewers. — Executed Nov 25 New Samron Midwest Contracting, Inc. $1,263,057 ·
Feb 27, 2026 78967 JacksonDistrict 9 Replacement of SN 039-0026 carrying IL 3 over Worthen Bayou, 1.2 miles south of IL 149. — Executed Nov 25 New E. T. Simonds Construction Company $3,594,116 ·
Feb 27, 2026 78B00 JacksonDistrict 9 Signal modifications on IL 13 in Carbondale from Glenview Drive to McKinney Avenue. — Executed Nov 25 New Gerstner Electric, Inc. $2,170,000 ·
Feb 27, 2026 78B38 JacksonDistrict 9 Bridge deck overlay s at 3 locations: 1) US 51 over Little Crab Orchard Creek, 2 miles north of Carbondale; 2) US 51 over Big Muddy River, 1.8 miles south of DeSoto; 3) IL 149 over Beaucoup Creek, 3.3 miles west of DeSoto. (SN 039-0063, 039-0064, 039-0065). — Executed Nov 25 New Samron Midwest Contracting, Inc. $1,494,455 ·
Feb 27, 2026 78B91 JacksonUnionDistrict 9 Traffic signal modernization at 2 intersections: IL 13 and Reed Station Road; IL 146 and US 51. — Executed Nov 25 New F. W. Electric, Inc. $404,654 ·
Jul 31, 2026 78C18 JacksonWilliamsonDistrict 9 9.1 miles of tree planting along the Crab Orchard Greenway multi-use path and the Wolf Creek Interchange. — Executed Nov 25 New CSD Environmental Services, Inc. $241,350 ·
Sep 18, 2026 78B55 JacksonDistrict 9 This project has 5 locations. Location 1: Resurfacing and ADA upgrades on Old 13 (Murphysboro Road) from Tower Road to New IL 13 in Carbondale; Location 2: Resurfacing and ADA upgrades on IL 127 / Old 13 from Old Brick Road to the Big Muddy River Bridge; Location 3: Pavement replacement on IL 127 / Old IL 13 from the Big Muddy River Bridge to Shomaker Drive in Murphysboro; Location 4: Pavement replacement at the intersection of IL 127 / Old IL 13 and Shomaker Shomaker Drive in Murphysboro; Locat — Executed Nov 25 New Samron Midwest Contracting, Inc. $2,308,150 ·
Sep 18, 2026 78C30 JacksonDistrict 9 Traffic signal modernization at the intersection of IL 13 and Giant City Road. — Executed Nov 25 New Gerstner Electric, Inc. $212,000 ·
1–21 of 21

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.