Filtered by: County: Jackson Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 17, 2025 | 78998 | JacksonDistrict 9 | 16.5 miles of fiber optic cable installation and signal modification on IL 13 in Carbondale from Striegel Road west to IL 127/149 and on IL13/127/149 in Murphysboro from IL 13/127/149 north to Industrial Park Road. | — | Executed | Gerstner Electric, Inc. $1,954,250 · | ||
| Jan 17, 2025 | 78A59 | JacksonDistrict 9 | 350' of storm sewer pipe replacement and channel excavation on IL 127 south of the MO Pacific Railroad and north of Industrial Park Road in Murphysboro. , 350' of storm sewer pipe replacement and channel excavation on IL 127 south of the MO Pacific Railroad and north of Industrial Park Road in Murphysboro. , 350' of storm sewer pipe replacement and channel excavation on IL 127 south of the MO Pacific Railroad and north of Industrial Park Road in Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $241,275 · | ||
| Apr 25, 2025 | 99727 | JacksonDistrict 9 | HMA resurfacing on South Wall Street from East park Street to East Main Street in Carbondale. Includes; ADA improvements and Storm Sewers. | — | Executed | Samron Midwest Contracting, Inc. $1,596,208 · | ||
| Jun 13, 2025 | 78985 | JacksonDistrict 9 | Slope repair on SN 039-0075 carrying IL 13 over the Big Muddy River, east of IL 127 in Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $11,674,263 · | ||
| Jun 13, 2025 | 78A78 | JacksonUnionDistrict 9 | Joint reconstruction with strip seal and modular seal on SN 039-0048 carrying IL3 over a railroad in Jackson County and joint reconstruction with strip seals on SN 091-0031carrying IL3 over the Big Muddy River in Union County. | — | Executed | E. T. Simonds Construction Company $968,450 · | ||
| Jun 13, 2025 | 78A97 | JacksonDistrict 9 | Aggregate shoulders, earth and furnished excavation, stone riprap, pipe underdrains and erosion control blanket to repair existing slopes along IL 149 at SN 039-7036, 0.4 miles west of the Williamson County line west of Hurst. | — | Executed | Sierra Bravo Contractors, LLC $170,723 · | ||
| Jun 13, 2025 | 78B03 | JacksonDistrict 9 | Replacing 615' of pavement and shoulders on westbound IL 13 at Watson Road. | — | Executed | Samron Midwest Contracting, Inc. $1,041,511 · | ||
| Jun 13, 2025 | 78B04 | JacksonDistrict 9 | Patching on US 51 in Carbondale from Willow Street to Grand Avenue and on Mill Street from South Normal Avenue to South Illinois Avenue. | — | Executed | E. T. Simonds Construction Company $543,043 · | ||
| Jun 13, 2025 | 78B05 | JacksonDistrict 9 | Signal grounding at multiple locations on IL 149 and IL 13 in Murphysboro and Carbondale. | — | Executed | Gerstner Electric, Inc. $116,085 · | ||
| Jun 13, 2025 | 78B22 | JacksonDistrict 9 | 0.85 miles of overlay and pavement patching on Airport Road from IL 13 to 1 mile north of IL 13, northwest of Carbondale. | — | Executed | E. T. Simonds Construction Company $297,405 · | ||
| Nov 7, 2025 | 78B54 | JacksonDistrict 9 | Resurfacing Sweets Drive from Reed Station Road to 0.5 miles west of Reed Station Road in Carbondale. | — | Executed | E. T. Simonds Construction Company $175,469 · | ||
| Jan 16, 2026 | 78937 | JacksonDistrict 9 | Replacement of SN 039-0052 carrying US 51 over CN, IC Railroad, approximately 2.6 miles north of Desoto. | — | Executed | E. T. Simonds Construction Company $4,810,447 · | ||
| Jan 16, 2026 | 99718 | JacksonDistrict 9 | HMA resurfacing and widening of W. Pleasant Hill Road from Union Hill Road to McLaufferty Road in Carbondale. Includes; HMA Shoulders, PCC driveways, and culverts. | — | Executed | Samron Midwest Contracting, Inc. $1,171,867 · | ||
| Jan 16, 2026 | 99763 | JacksonDistrict 9 | Construction of PCC multi-use trail from E. Grand Street to Lewis Lane in Carbondale. Includes; ADS Ramps, light pole relocation, and storm sewers. | — | Executed | Samron Midwest Contracting, Inc. $1,263,057 · | ||
| Feb 27, 2026 | 78967 | JacksonDistrict 9 | Replacement of SN 039-0026 carrying IL 3 over Worthen Bayou, 1.2 miles south of IL 149. | — | Executed | E. T. Simonds Construction Company $3,594,116 · | ||
| Feb 27, 2026 | 78B00 | JacksonDistrict 9 | Signal modifications on IL 13 in Carbondale from Glenview Drive to McKinney Avenue. | — | Executed | Gerstner Electric, Inc. $2,170,000 · | ||
| Feb 27, 2026 | 78B38 | JacksonDistrict 9 | Bridge deck overlay s at 3 locations: 1) US 51 over Little Crab Orchard Creek, 2 miles north of Carbondale; 2) US 51 over Big Muddy River, 1.8 miles south of DeSoto; 3) IL 149 over Beaucoup Creek, 3.3 miles west of DeSoto. (SN 039-0063, 039-0064, 039-0065). | — | Executed | Samron Midwest Contracting, Inc. $1,494,455 · | ||
| Feb 27, 2026 | 78B91 | JacksonUnionDistrict 9 | Traffic signal modernization at 2 intersections: IL 13 and Reed Station Road; IL 146 and US 51. | — | Executed | F. W. Electric, Inc. $404,654 · | ||
| Jul 31, 2026 | 78C18 | JacksonWilliamsonDistrict 9 | 9.1 miles of tree planting along the Crab Orchard Greenway multi-use path and the Wolf Creek Interchange. | — | Executed | CSD Environmental Services, Inc. $241,350 · | ||
| Sep 18, 2026 | 78B55 | JacksonDistrict 9 | This project has 5 locations. Location 1: Resurfacing and ADA upgrades on Old 13 (Murphysboro Road) from Tower Road to New IL 13 in Carbondale; Location 2: Resurfacing and ADA upgrades on IL 127 / Old 13 from Old Brick Road to the Big Muddy River Bridge; Location 3: Pavement replacement on IL 127 / Old IL 13 from the Big Muddy River Bridge to Shomaker Drive in Murphysboro; Location 4: Pavement replacement at the intersection of IL 127 / Old IL 13 and Shomaker Shomaker Drive in Murphysboro; Locat | — | Executed | Samron Midwest Contracting, Inc. $2,308,150 · | ||
| Sep 18, 2026 | 78C30 | JacksonDistrict 9 | Traffic signal modernization at the intersection of IL 13 and Giant City Road. | — | Executed | Gerstner Electric, Inc. $212,000 · |
1–21 of 21
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.