(99-5HB-3) BDR,BJR 25
- Let date
- Friday, April 24, 2026
- Contract
- 80B46 · job page
- District
- District 1
- County
- Will
- Highway
- Limits
- (500-Ft) Bridge Repair and Bridge Deck Latex Overlay project consists of concrete removal, concrete superstructure, steel reinforcement bars, finger plate expansion joints, bridge deck scarification, latex overlay, and grooving, structural repair of concrete, deck slab repair and diamond grinding including HMA surface removal, butt joints, HMA surface course, shoulder removal and HMA reconstruction, guardrail removal and replacement, pavement markings, road closure, detour installation and maint
- Classification
- Concrete removal, concrete superstructure, steel reinforcement bars, finger plate expansion joints, bridge dec ·
- Project number
Bidders 4
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | D. Construction, Inc. Low bidder | $583,219 | ||
| 2 | Areatha Construction Co., Inc. | $626,330 | +7.4% | |
| 3 | Lorig Construction Company | $661,877 | +13.5% | |
| 4 | MYS, Incorporated | $908,473 | +55.8% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 D. Construction… | #2 Areatha Constru… | #3 Lorig Construct… | #4 MYS, Incorporat… |
|---|---|---|---|---|---|---|---|---|---|
| 1 | X4404262 | SHLDR REM SPL | 59 | SQ YD | $50.00 | $46.90 | $61.00 | $332.86 | |
| 2 | X5030250 | BR DECK GROOVING LONG | 944 | SQ YD | $5.50 | $5.00 | $7.00 | $7.21 | |
| 3 | X5230172 | DRAINAGE SCUPPERS ADJ | 6 | EACH | $1,500.00 | $823.20 | $1,100.00 | $769.07 | |
| 4 | X6700407 | ENGRS FLD OFC TY A D1 | 6 | CAL MO | $4,000.00 | $2,500.00 | $3,700.00 | $4,456.89 | |
| 5 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $30,500.00 | $21,000.00 | $80,000.00 | $23,965.90 | |
| 6 | X7011015 | TR C-PROT EXPRESSWAYS | 1 | L SUM | $0.0100 | $33,000.00 | $1,000.00 | $64,666.41 | |
| 7 | X7200061 | TEMP INFO SIGNING | 52 | SQ FT | $30.00 | $20.00 | $22.00 | $22.19 | |
| 8 | X8900104 | TEMP TR SIGNAL TIMING | 2 | EACH | $1,320.00 | $1,200.00 | $1,000.00 | $1,386.91 | |
| 9 | Z0001800 | APPR SLAB REPAIR (PD) | 4 | SQ YD | $1,000.00 | $1,214.15 | $1,600.00 | $2,066.42 | |
| 10 | Z0029090 | DIAMOND GRIND BR SEC | 1,238 | SQ YD | $7.45 | $9.05 | $9.00 | $11.10 | |
| 11 | Z0041895 | POLYMER CONCRETE | 20 | CU FT | $1,000.00 | $927.95 | $1,900.00 | $1,837.35 | |
| 12 | 40600290 | BIT MATLS TACK CT | 352 | POUND | $0.0100 | $0.1000 | $0.1000 | $0.1100 | |
| 13 | 40600370 | LONG JOINT SEALANT | 183 | FOOT | $55.85 | $35.00 | $72.00 | $83.21 | |
| 14 | 40600982 | HMA SURF REM BUTT JT | 179 | SQ YD | $0.0100 | $23.10 | $52.00 | $22.19 | |
| 15 | 40604062 | HMA SC IL-9.5 D N70 | 50 | TON | $150.00 | $375.00 | $300.00 | $943.10 | |
| 16 | 44000150 | HMA SURF REM 1/4 | 121 | SQ YD | $25.00 | $39.55 | $50.00 | $33.29 | |
| 17 | 44213200 | SAW CUTS | 118 | FOOT | $6.00 | $4.00 | $11.00 | $9.40 | |
| 18 | 45000120 | RELIEF JOINT 3 | 109 | FOOT | $90.00 | $69.05 | $65.00 | $94.31 | |
| 19 | 48203004 | HMA SHOULDERS 1 3/4 | 34 | SQ YD | $25.00 | $65.00 | $71.00 | $72.12 | |
| 20 | 48203029 | HMA SHOULDERS 8 | 58 | SQ YD | $72.00 | $175.00 | $135.00 | $499.29 | |
| 21 | 50102400 | CONC REM | 1.3 | CU YD | $5,000.00 | $2,399.90 | $6,000.00 | $1,997.15 | |
| 22 | 50157300 | PROTECTIVE SHIELD | 811 | SQ YD | $80.00 | $5.00 | $30.00 | $116.50 | |
| 23 | 50300300 | PROTECTIVE COAT | 1,238 | SQ YD | $1.00 | $2.40 | $2.00 | $2.62 | |
| 24 | 52000037 | PREF JOINT SEAL 3 | 118 | FOOT | $120.00 | $77.00 | $76.00 | $234.92 | |
| 25 | 53016002 | DECK SLAB REP (FD-T2) | 1 | SQ YD | $3,000.00 | $4,443.50 | $4,000.00 | $5,270.26 | |
| 26 | 53101002 | BR DECK SCAR 3/4 | 1,238 | SQ YD | $60.00 | $95.85 | $52.00 | $69.17 | |
| 27 | 53101410 | BR DK LTX C OLY 2 3/4 | 1,238 | SQ YD | $130.00 | $173.05 | $117.00 | $178.84 | |
| 28 | 53212754 | STR REP CON DP = < 5 | 300 | SQ FT | $150.00 | $144.35 | $335.00 | $194.17 | |
| 29 | 58700300 | CONCRETE SEALER | 3,087 | SQ FT | $2.00 | $1.15 | $5.00 | $4.24 | |
| 30 | 63000001 | SPBGR TY A 6FT POSTS | 100 | FOOT | $43.12 | $39.20 | $61.00 | $43.49 | |
| 31 | 63200310 | GUARDRAIL REMOV | 100 | FOOT | $10.59 | $9.65 | $6.00 | $10.68 | |
| 32 | 67100100 | MOBILIZATION | 1 | L SUM | $33,000.00 | $37,700.00 | $35,000.00 | $47,486.74 | |
| 33 | 70107025 | CHANGEABLE MESSAGE SN | 28 | CAL DA | $100.00 | $50.00 | $50.00 | $55.48 | |
| 34 | 78000200 | THPL PVT MK LINE 4 | 724 | FOOT | $4.95 | $0.8500 | $0.9000 | $4.99 | |
| 35 | 78009004 | MOD URETH PM LINE 4 | 1,720 | FOOT | $5.23 | $0.9000 | $1.00 | $5.27 | |
| 36 | 78100100 | RAISED REFL PAVT MKR | 12 | EACH | $302.50 | $49.45 | $52.00 | $305.12 | |
| 37 | 78300200 | RAISED REF PVT MK REM | 32 | EACH | $30.00 | $25.00 | $20.00 | $65.46 | |
| 38 | 78300202 | PVT MKG REM WTR BLAST | 117 | SQ FT | $28.60 | $12.00 | $13.00 | $13.31 |