188Let jobs
$528,652,135Total low bids
—Total estimates
—Low bids vs estimates
Apr 2026 results
Bid tabs (Excel) ExcelCSV| Let date | Contract | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Apr 24, 2026 | 80C85 | Mchenry District 1 |
2025-2127-R,C,TS,SW · Pavement removal, earth excavation and placement of embankment, box culvert installation, storm sewer installa | — | $49,786,194 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. | 4 | |
| Apr 24, 2026 | 87899 | Kendall District 3 |
22-00168-00-RP · | — | $32,828,299 | Austin Tyler Construction, Inc. | 3 | |
| Apr 24, 2026 | 62K33 | Cook District 1 |
2019-161-W · | — | $31,680,000 | Plote Construction, Inc. | 4 | |
| Apr 24, 2026 | 66M55 | Lasalle District 3 |
(30)SW,RS-4 & (E-1)BR · | — | $20,377,827 | D. Construction, Inc. | 1 | |
| Apr 24, 2026 | 70F20 | Mclean District 5 |
109RS-4 · | — | $15,389,316 | Stark Excavating, Inc. | 1 | |
| Apr 24, 2026 | 70E14 | Mclean District 5 |
(57-20(1),21,22)RS-4 · | — | $14,480,725 | Rowe Construction, a div of UCM, Inc. | 1 | |
| Apr 24, 2026 | 72N43 | Sangamon District 6 |
TIM TRAINING TRACK 2026 · | — | $13,405,307 | Baxmeyer Construction, Inc. | 3 | |
| Apr 24, 2026 | 61L48 | Kane, Mchenry District 1 |
20-00050-00-PV · | — | $12,274,333 | William Charles Construction Company, LLC | 2 | |
| Apr 24, 2026 | 68K23 | Knox District 4 |
22RS-2 · | — | $11,296,811 | Gunther Construction, a div of UCM, Inc. | 1 | |
| Apr 24, 2026 | 68K17 | Fulton District 4 |
(17,110,111)RS-5;18RS-6 · | — | $10,922,962 | Illinois Valley Paving, a div of UCM, Inc. | 1 | |
| Apr 24, 2026 | 61M15 | Cook District 1 |
21-00174-00-BR · | — | $10,744,243 | Dunnet Bay Construction Company | 3 | |
| Apr 24, 2026 | 61L54 | Cook District 1 |
17-00175-00-LS · | — | $10,340,904 | Martam Construction Incorporated | 2 | |
| Apr 24, 2026 | 62Y28 | Cook District 1 |
2025-1076-I · Furnishing all labor, materials, equipment, and other incidentals necessary for the conversion of existing ITS | — | $9,649,148 | Meade Inc. | 2 | |
| Apr 24, 2026 | 68J95 | Marshall District 4 |
(2,3)RS-5 · | — | $9,352,996 | Advanced Asphalt Company | 1 | |
| Apr 24, 2026 | 68J60 | Tazewell District 4 |
127RS-6;128RS-4 · | — | $8,241,332 | R. A. Cullinan and Son, a div of UCM, Inc. | 1 | |
| Apr 24, 2026 | 76U41 | Calhoun District 8 |
(4,5)RS-2 · | — | $7,451,559 | Illinois Valley Paving, a div of UCM, Inc. | 2 | |
| Apr 24, 2026 | 66R50 | Iroquois District 3 |
(118,119)RS-4 · | — | $6,694,992 | Iroquois Paving Corporation | 1 | |
| Apr 24, 2026 | 72B63 | Adams District 6 |
(101,102)RS-6 · | — | $6,499,144 | Diamond Construction Company | 1 | |
| Apr 24, 2026 | 80B39 | Cook District 1 |
2025-2015-RS,SW · Resurfacing and existing HMA pavement with HMA surface and binder course, thermoplastic pavement markings, sid | — | $6,442,571 | K-Five Construction Corporation | 3 | |
| Apr 24, 2026 | 62P51 | Cook District 1 |
2021-133-N · Earth excavation, pavement removal, sidewalk removal, driveway removal, (HMA) surface removal, curb and gutter | — | $6,339,172 | Martam Construction Incorporated | 3 | |
| Apr 24, 2026 | 80B27 | Cook District 1 |
2025-2008-RS · (HMA) surface removal, resurfacing with polymerized (HMA) surface course, (HMA) binder course, and polymerized | — | $5,915,339 | Plote Construction, Inc. | 4 | |
| Apr 24, 2026 | 80C91 | Various District 1 |
2025-2128-SWP(EXPNT) · | — | $5,894,295 | ROADSAFE TRAFFIC SYSTEMS, INC. | 2 | |
| Apr 24, 2026 | 70E82 | Mclean District 5 |
(120)RS-1 · | — | $5,132,498 | Rowe Construction, a div of UCM, Inc. | 1 | |
| Apr 24, 2026 | 85798 | Winnebago District 2 |
18-00661-00-BR · | — | $4,934,200 | ICC Group Inc. | 2 | |
| Apr 24, 2026 | 80B68 | Dupage District 1 |
2025-2023-PP · Concrete surface removal, placement of HMA binder and surface courses, pavement patching, placement of pavemen | — | $4,613,164 | D. Construction, Inc. | 3 | |
| Apr 24, 2026 | 61L86 | Mchenry District 1 |
19-00510-00-BR · | — | $4,604,844 | Dunnet Bay Construction Company | 2 | |
| Apr 24, 2026 | 80B21 | Cook District 1 |
2025-2000-RS · (HMA) surface removal, (HMA) resurfacing, pavement reconstruction of existing PCC pavement (remove and replace | — | $4,582,944 | K-Five Construction Corporation | 3 | |
| Apr 24, 2026 | 68J89 | Peoria District 4 |
Z[(E,2)15D]RS-5;Z-1V-RS-6 · | — | $4,472,093 | Advanced Asphalt Company | 2 | |
| Apr 24, 2026 | 72348 | Sangamon District 6 |
1RS-5, 3RS-7 · | — | $4,462,601 | P. H. Broughton & Sons, Inc. | 3 | |
| Apr 24, 2026 | 80B09 | Cook District 1 |
2025-1097-RS · (HMA) surface removal, resurfacing with (HMA) surface course, polymerized (HMA) surface course, and polymerize | — | $4,440,808 | Builders Paving, LLC | 3 | |
| Apr 24, 2026 | 66P86 | Bureau District 3 |
(11Y)RS-2 & (11X)RS-4 · | — | $4,400,787 | Advanced Asphalt Company | 1 | |
| Apr 24, 2026 | 80C49 | Cook District 1 |
2025-2106-RS · Milling the existing (HMA) surface, pavement patching, resurfacing with (HMA) surface course and (HMA) binder | — | $4,164,775 | K-Five Construction Corporation | 5 | |
| Apr 24, 2026 | 80B30 | Cook District 1 |
2025-2011-RS · | — | $4,118,431 | K-Five Construction Corporation | 5 | |
| Apr 24, 2026 | 64T42 | Stephenson District 2 |
177(-4HB(-1,-2,-3,-4)(2VB)BRR · | — | $4,082,943 | Martin & Company Excavating | 2 | |
| Apr 24, 2026 | 76R78 | St.clair District 8 |
(130,130-1,130-2)TS-3,82-5TS · | — | $3,960,000 | Gerstner Electric, Inc. | 1 | |
| Apr 24, 2026 | 99764 | Pulaski District 9 |
24-00079-00-RS · | — | $3,887,941 | E. T. Simonds Construction Company | 2 | |
| Apr 24, 2026 | 64L51 | Jodaviess District 2 |
101RS-3 · | — | $3,793,443 | Civil Constructors, Inc. d/b/a/ Helm Civil | 1 | |
| Apr 24, 2026 | 61M17 | Kane District 1 |
22-00093-00-PV · | — | $3,694,062 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. | 6 | |
| Apr 24, 2026 | 76N37 | Washington District 8 |
(4,5)RS-3 · | — | $3,340,535 | The Kilian Corporation | 2 | |
| Apr 24, 2026 | 64T06 | Ogle District 2 |
((141-3HB)&(141-3VB)BDR · | — | $3,168,316 | Martin & Company Excavating | 2 | |
| Apr 24, 2026 | 61M41 | Lake District 1 |
19-00137-00-BT · | — | $3,060,718 | Alliance Contractors, Inc. | 3 | |
| Apr 24, 2026 | 80B26 | Cook District 1 |
2025-2007-RS · Pavement patching, hot-mix asphalt surface removal resurfacing with binder and surface course, sidewalk ramps | — | $2,940,592 | Gallagher Asphalt Corporation | 3 | |
| Apr 24, 2026 | 66P68 | Iroquois District 3 |
(20)RS-7 · A SMART resurfacing along with an experimental mix design of the eastbound lane | — | $2,884,241 | Iroquois Paving Corporation | 1 | |
| Apr 24, 2026 | 87893 | Grundy District 3 |
24-00202-00-BR · | — | $2,879,699 | D. Construction, Inc. | 1 | |
| Apr 24, 2026 | 46672 | Various District 2 |
D2 HT PVMNT MRK RPR 26-09 · | — | $2,856,750 | America's Parking ReMarking, LLC. | 4 | |
| Apr 24, 2026 | 76U53 | Various District 8 |
DIST 8 LTS 2026-1 · | — | $2,846,040 | Electrico, Inc. | 1 | |
| Apr 24, 2026 | 68K20 | Stark District 4 |
123RS-7;(123RA)RS · | — | $2,839,793 | Advanced Asphalt Company | 1 | |
| Apr 24, 2026 | 62V71 | Will District 1 |
FAP 0577 23 SMART · Hot-mix asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pede | — | $2,821,627 | D. Construction, Inc. | 6 | |
| Apr 24, 2026 | 76V14 | Various District 8 |
DIST 8 PATCHING 2026-6 · | — | $2,792,065 | Keeley & Sons, Inc. | 2 | |
| Apr 24, 2026 | 46948 | Macon District 7 |
SPITLER/LTH · | — | $2,699,505 | Illinois Valley Paving, a div of UCM, Inc. | 2 | |
| Apr 24, 2026 | 95A04 | Richland District 7 |
23-00130-00-SD · | — | $2,499,037 | Ambraw Asphalt Materials, Inc. | 2 | |
| Apr 24, 2026 | 89844 | Mcdonough District 4 |
21-00112-00-BR · | — | $2,420,262 | County Contractors, Inc. | 3 | |
| Apr 24, 2026 | 66T17 | Kankakee District 3 |
(140,139Z,124CS,10CS,18CS)RS-1 · Intermittent HMA milling and resurfacing, pavement marking, raised reflective markers, and detector loops on F | — | $2,380,597 | Kankakee Valley Construction Company, Inc. | 2 | |
| Apr 24, 2026 | 61L84 | Dupage District 1 |
24-00071-00-RS · | — | $2,324,754 | K-Five Construction Corporation | 7 | |
| Apr 24, 2026 | 68K22 | Woodford District 4 |
D4 BRIDGE PRESERVATION 2026 · | — | $2,172,735 | Stark Excavating, Inc. | 2 | |
| Apr 24, 2026 | 89898 | Tazewell District 4 |
25-00057-07-RS · | — | $2,149,810 | R. A. Cullinan and Son, a div of UCM, Inc. | 1 | |
| Apr 24, 2026 | 80B31 | Will District 1 |
2025-2012-RS · | — | $2,127,428 | P. T. Ferro Construction Co. | 4 | |
| Apr 24, 2026 | 74D61 | Various District 7 |
D7 BRIDGE PAINTING 2026-1 · | — | $2,124,012 | ERA-Valdivia Contractors, Inc. | 4 | |
| Apr 24, 2026 | 68K12 | Tazewell District 4 |
90(6,7)RS-2 · | — | $2,076,981 | Beniach Construction Co., Inc. | 3 | |
| Apr 24, 2026 | 68J88 | Peoria District 4 |
Z[1V-RS-5;D-15D-RS-8;15D-RS-6] · | — | $1,996,962 | Advanced Asphalt Company | 2 | |
| Apr 24, 2026 | 64T73 | Lee District 2 |
101RS · | — | $1,988,394 | Martin & Company Excavating | 2 | |
| Apr 24, 2026 | 76V05 | Randolph District 8 |
DIST 8 PATCHING 2026-2 · | — | $1,969,789 | G. M. Sipes Construction, Inc. | 3 | |
| Apr 24, 2026 | 68K33 | Mercer District 4 |
121RS-2 · | — | $1,862,714 | Valley Construction Co. | 2 | |
| Apr 24, 2026 | 89871 | Henderson District 4 |
23-00074-77-BR · | — | $1,814,953 | County Contractors, Inc. | 2 | |
| Apr 24, 2026 | 80B20 | Mchenry District 1 |
2025-1094-RS · Class B patches, and joint sealing, curb and gutter removal and replacement, drainage structure adjustments, p | — | $1,799,920 | Triggi Construction, Inc. | 4 | |
| Apr 24, 2026 | 78B36 | Franklin District 9 |
(4-1)BRR-1 · | — | $1,755,135 | E. T. Simonds Construction Company | 2 | |
| Apr 24, 2026 | 66M03 | Bureau District 3 |
(104C-BR1)BR-1 · | — | $1,719,727 | D. Construction, Inc. | 1 | |
| Apr 24, 2026 | 93783 | Morgan District 6 |
21-00123-00-RS · | — | $1,699,658 | K. E. Vas Company | 1 | |
| Apr 24, 2026 | 46671 | Various District 3 |
D3 HT PVMNT MRK RPR 26-08 · | — | $1,689,828 | ROADSAFE TRAFFIC SYSTEMS, INC. | 5 | |
| Apr 24, 2026 | 61M37 | Dupage District 1 |
24-00170-00-RS · | — | $1,684,000 | R. W. Dunteman Company | 4 | |
| Apr 24, 2026 | 72669 | Macoupin District 6 |
(7B-1)BDR-1,BP,BRR,BJR · | — | $1,677,084 | Sangamo Construction Company | 1 | |
| Apr 24, 2026 | 64U90 | Winnebago District 2 |
(102BR-4)BJR · | — | $1,670,253 | Martin & Company Excavating | 3 | |
| Apr 24, 2026 | 72441 | Logan District 6 |
134RS-11, 135RS-2 · | — | $1,665,367 | Illinois Valley Paving, a div of UCM, Inc. | 3 | |
| Apr 24, 2026 | 66N58 | Grundy District 3 |
(G-BR)BR-1 · | — | $1,596,194 | D. Construction, Inc. | 2 | |
| Apr 24, 2026 | 97840 | Madison District 8 |
17-00048-00-RS · | — | $1,584,636 | Christ Bros. Asphalt, Inc. | 2 | |
| Apr 24, 2026 | 80B07 | Dupage District 1 |
2025-1095-RS · Hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt surface course, placement | — | $1,578,728 | Builders Paving, LLC | 5 | |
| Apr 24, 2026 | 76V10 | Marion District 8 |
61-(1-1,1-2,2,3,3-1,4,5,5-1,6)PP-1 · | — | $1,565,730 | G. M. Sipes Construction, Inc. | 5 | |
| Apr 24, 2026 | 62X57 | Cook District 1 |
2024-1024-RS · Pavement patching, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement | — | $1,529,254 | Schroeder Asphalt Services, Inc. | 4 | |
| Apr 24, 2026 | 85793 | Lee District 2 |
25-00358-00-RS · | — | $1,489,962 | Martin & Company Excavating | 3 | |
| Apr 24, 2026 | 80B62 | Cook District 1 |
(0404.2-1B) BD,BJR 25 · | — | $1,446,233 | Martam Construction Incorporated | 3 | |
| Apr 24, 2026 | 80B05 | Will District 1 |
2025-2018-RS,SW · Class B patches, Diamond Grinding, ADA ramp improvements, pavement marking restriping | — | $1,433,491 | D. Construction, Inc. | 5 | |
| Apr 24, 2026 | 76V07 | St. Clair District 8 |
DIST 8 PATCHING 2026-3 · | — | $1,394,429 | Kinney Contractors, Inc. | 2 | |
| Apr 24, 2026 | 76U70 | Greene District 8 |
(48,49,50,51-1,52-1,53,54,55,62)PP-1 · | — | $1,293,514 | Keeley & Sons, Inc. | 3 | |
| Apr 24, 2026 | 97808 | St. Clair District 8 |
20-00044-00-RS · | — | $1,289,612 | The Kilian Corporation | 2 | |
| Apr 24, 2026 | 95A07 | Lawrence District 7 |
24-00144-00-SD · | — | $1,286,849 | Ambraw Asphalt Materials, Inc. | 1 | |
| Apr 24, 2026 | 70H85 | Mclean District 5 |
(57-6,7,20)PP · | — | $1,233,555 | Kinney Contractors, Inc. | 2 | |
| Apr 24, 2026 | 80B10 | Mchenry District 1 |
2025-1098-RS · Milling of the existing hot-mix asphalt (HMA) surface, pavement patching, resurfacing with hot-mix asphalt sur | — | $1,180,922 | Peter Baker & Son Co. | 3 | |
| Apr 24, 2026 | 74D10 | Fayette District 7 |
(24,25)RS-4 · | — | $1,158,719 | Howell Paving, Inc. | 1 | |
| Apr 24, 2026 | 99768 | Perry District 9 |
22-00152-00-RS · | — | $1,139,387 | E. T. Simonds Construction Company | 2 | |
| Apr 24, 2026 | 78B50 | Pulaski District 9 |
D9 BRIDGE REPAIR 2026-1 · | — | $1,137,235 | E. T. Simonds Construction Company | 2 | |
| Apr 24, 2026 | 80B55 | Cook District 1 |
(2626.2-4B-R(85))BP 25 · Bridge painting of the structures (Roosevelt Rd | — | $1,123,158 | ERA-Valdivia Contractors, Inc. | 2 | |
| Apr 24, 2026 | 80B48 | Cook District 1 |
(1010B-89) BDR,BJR 25 · | — | $1,108,954 | Martam Construction Incorporated | 4 | |
| Apr 24, 2026 | 80B76 | Will District 1 |
2025-2038-I,PP,DR · The removal and replacement of a fixed platform scale includes removal and replacement of pavement and shoulde | — | $1,101,862 | D. Construction, Inc. | 2 | |
| Apr 24, 2026 | 46675 | Various District 2 |
D2 SIGN MAINT INT 26-12 · | — | $1,094,894 | ROADSAFE TRAFFIC SYSTEMS, INC. | 1 | |
| Apr 24, 2026 | 99767 | Franklin District 9 |
25-00201-00-RS · | — | $1,090,460 | E. T. Simonds Construction Company | 2 | |
| Apr 24, 2026 | 74E18 | Macon District 7 |
(11,12) PARTIAL WIDTH RS · | — | $994,305 | Illinois Valley Paving, a div of UCM, Inc. | 1 | |
| Apr 24, 2026 | 61M36 | Dupage District 1 |
23-00077-00-RS · | — | $979,958 | Builders Paving, LLC | 6 | |
| Apr 24, 2026 | 99761 | Williamson District 9 |
24-00133-00-SP · | — | $979,828 | Samron Midwest Contracting, Inc. | 2 | |
| Apr 24, 2026 | 64U93 | Various District 2 |
D2 GR 2026 · | — | $973,094 | Northern Contracting, Inc. | 2 | |
| Apr 24, 2026 | 80D22 | Various District 1 |
2026-2149-DTR · Pruning and/or removing dead, dying, diseased and hazardous trees and limbs, while providing proper traffic co | — | $968,950 | Homer Tree Service, Inc. | 3 |
1–100 of 188Next ›
Source: IDOT Transportation Bulletin "Unit Price Tabulation of Bids" for each letting. Totals are as read; IDOT does not publish an engineer's estimate there, so estimate columns stay blank. Bid Potato backfills the last two years. Confirm against IDOT's As Accepted tabulation.