Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 19, 2018 64K27 OgleDistrict 2 Cold milling, HMA resurfacing, and bridge deck repairs on IL 2 from Rock River Bridge in Grand Detour to 0.3 mile south of Pines Road in Oregon. — Executed Nov 26 New Martin & Company Excavating $5,970,636 ·
Mar 9, 2018 85665 OgleDistrict 2 Resurfacing on S Chana Road from IL 64 to Flagg Road. — Executed Nov 26 New Martin & Company Excavating $404,593 ·
Mar 9, 2018 85666 OgleDistrict 2 Resurfacing on Freeport Road from US 52 to Sterling Road. — Executed Nov 26 New Martin & Company Excavating $798,894 ·
Apr 27, 2018 64H59 LeeOgleDistrict 2 Removal and replacement of two concrete box culverts carrying IL 38 over drainage ditches. SN 052-1107 is 0.1 mile east of of Daysville Road in Franklin Grove and SN 071-1191 is 0.2 mile east of Center Rd west of Rochelle. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $782,777 ·
Apr 27, 2018 64H61 OgleDistrict 2 HMA resurfacing on IL 251 from the Winnebago county line to 0.3 mile north of Flagg Road. — Rejected Nov 26 New Rock Road Companies, Inc. $5,745,379 ·
Apr 27, 2018 64M49 OgleDistrict 2 Clean and paint bridge SN 071-0045 carrying McNeal Road over I-39, 1.0 mile south of the Winnebago County line. — Executed Nov 26 New Venus Painting Co. $167,767 ·
Sep 21, 2018 64M77 OgleDistrict 2 Repair Bridge SN 071-0061 carrying Creston Road over FAI 39. — Executed Nov 26 New Sjostrom & Sons, Inc. $1,721,200 ·
Jan 18, 2019 64M21 OgleWinnebagoDistrict 2 19.53 miles routing, cleaning, and sealing the centerline and shoulder joints on I-39 from the Lee County line to 0.4 miles north of Baxter Road. — Executed Nov 26 New Freehill Asphalt, Inc. $666,361 ·
Jan 18, 2019 64N21 OgleDistrict 2 Cold milling and HMA resurfacing on IL 2 from chestnut Street to 0.2 mile north in Byron. — Executed Nov 26 New Martin & Company Excavating $149,653 ·
Mar 8, 2019 85677 OgleDistrict 2 Resurfacing Freeport Road from Lanark Road to US 52. — Executed Nov 26 New Martin & Company Excavating $629,098 ·
Apr 26, 2019 64L59 OgleDistrict 2 HMA resurfacing on IL 251 from Lakeview Dr to Veterans Parkway in Rochelle. — Executed Nov 26 New Martin & Company Excavating $390,364 ·
Sep 20, 2019 64L16 OgleDistrict 2 Pedestrian "ADA" ramps a various locations in Oregon and Polo. — Rejected Nov 26 New Stenstrom Excavation & Blacktop, Inc. $1,414,865 ·
Nov 8, 2019 64N93 OgleDistrict 2 PAVEMENT PATCHING ON IL 38 FROM PHILL RD TO I-39 EAST OF ROCHELLE. — Executed Nov 26 New G. M. Sipes Construction, Inc. $197,462 ·
Jan 17, 2020 64M43 LeeOgleDistrict 2 Cold milling, patching, and resurfacing from Wilson St in Polo to 0.1 mile N of Liberty Ct in Dixon. — Executed Nov 26 New Civil Constructors, Inc. $5,375,394 ·
Jan 17, 2020 64P01 Jo DaviessOgleDistrict 2 Cold milling and HMA resurfacing of the Stockton maintenance yard and the Creston maintenance yard. — Executed Nov 26 New Civil Constructors, Inc. $205,793 ·
Mar 6, 2020 64N31 OgleDistrict 2 Expansion joint replacement, deck patching, and concrete overlay on SN 071-0040 carrying IL 72 over the Rock River in Byron. — Executed Nov 26 New Martin & Company Excavating $945,424 ·
Mar 6, 2020 85675 OgleDistrict 2 Sidewalk construction on various routes in the Village of Creston. — Rejected Nov 26 New Alliance Contractors, Inc. $191,488 ·
Mar 6, 2020 85691 OgleDistrict 2 Resurfacing Freeport Road from IL 26 to Lanark Road. — Executed Nov 26 New Martin & Company Excavating $554,816 ·
Apr 24, 2020 64N35 OgleDistrict 2 Cold milling, pavement patching, and HMA resurfacing on IL 2 from Pines Rd to Jefferson St in Oregon. — Executed Nov 26 New Martin & Company Excavating $356,027 ·
Apr 24, 2020 85694 OgleDistrict 2 Replace the bridge carrying Water Road over Mill Creek, 5.0 miles northeast of Leaf River. — Executed Nov 26 New Curnyn Construction Co. $246,611 ·
Jun 12, 2020 64N99 OgleDistrict 2 Painting and cleaning of SN's 071-0050 carrying Big Mound Rd over I-39 located 1.5 miles S of IL 72 and 071-0056 carrying Bethel Rd over I-39 located 1 mile S of IL 64. — Executed Nov 26 New Three Star Painting, Inc. $285,000 ·
Jun 12, 2020 64P35 OgleDistrict 2 Expansion joint replacement on SN 071-0085 carrying IL 251 over Kyte Creek 0.6 N of IL 38 in Rochelle. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $266,643 ·
Nov 6, 2020 64P04 OgleDistrict 2 Deck patching, expansion joint replacement, concrete overlay, substructure and other miscellaneous repairs on SN's 071-0052 and 071-0053 over Kilbuck Creek. — Executed Nov 26 New Martam Construction Incorporated $1,754,249 ·
Nov 6, 2020 85702 OgleDistrict 2 Sidewalk Replacement, pavement markings and the installation of a solar powered pedestrian crossing signal system on IL 26 adjacent to Forreston Grade School, and on IL 72 adjacent to Forreston Junior High School in Forreston. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $92,146 ·
Mar 5, 2021 85707 OgleDistrict 2 Resurface Meridian Road from IL 72 to IL 64. — Executed Nov 26 New William Charles Construction Company, LLC $892,032 ·
Apr 23, 2021 64G99 OgleDistrict 2 Cold milling, Cold In-Place (CIP) Recycling, HMA resurfacing on IL Route 64 from 0.1 mile East of US 52 to 0.04 mile West of IL 26. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $1,497,763 ·
Jun 11, 2021 64L45 OgleWinnebagoDistrict 2 Guardrail and Traffic Barrier Terminal Improvement, 0.1 mile North of Luther Drive in Byron to 0.1 mile South of Beltline Road South of Rockford. — Executed Nov 26 New COLLINS & HERMANN, INC. $802,543 ·
Sep 17, 2021 64L75 OgleDistrict 2 Deck replacement and substructure repairs, IL 251 over Soo Line Railroad 0.1 mile South of Il 72. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $2,189,925 ·
Nov 5, 2021 64R25 OgleDistrict 2 Repair slope failure of Northbound embankment 0.6 mile South of IL 38. — Executed Nov 26 New Law Excavating, Inc. $122,553 ·
Jan 21, 2022 64P88 OgleDistrict 2 Bridge deck overlay, deck repairs and joint repairs on structure carrying IL 64 over I-39/US 51 (SN 071-0055). — Executed Nov 26 New Martin & Company Excavating $782,871 ·
Mar 11, 2022 64R33 OgleDistrict 2 Approach pavement repair and resurfacing on SN 071-0015. — Executed Nov 26 New Martin & Company Excavating $238,027 ·
Mar 11, 2022 64R34 OgleDistrict 2 Bridge deck patching on SN's 071-0077, 071-0084, 071-0088. — Executed Nov 26 New Martin & Company Excavating $352,324 ·
Mar 11, 2022 85714 OgleDistrict 2 Resurfacing Mt. Morris Road from IL 72 to the north city limits of Mt. Morris. — Executed Nov 26 New Martin & Company Excavating $662,789 ·
Mar 11, 2022 85720 OgleDistrict 2 Resurfacing Montague Road from Conger Road to Tower Road — Executed Nov 26 New Martin & Company Excavating $353,666 ·
Apr 29, 2022 64R38 OgleDistrict 2 Full cleaning and painting of structural steel of SN 071-0040 carrying IL 72 over Rock River and partial cleaning and painting of SN 071-0022 carrying IL 2/72 over Mill Creek. — Executed Nov 26 New Three Star Painting, Inc. $1,060,875 ·
Jun 17, 2022 64R62 OgleDistrict 2 Approximately 600 ft. of Concrete Pavement with the Installation of a New Weigh-In-Motion Sensors. — Executed Nov 26 New G. M. Sipes Construction, Inc. $1,134,110 ·
Nov 18, 2022 64H57 OgleDistrict 2 Remove and replace (SN 071-0070) over Elkhorn Creek 0.5 m (s) of IL 64 near Brookville. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $3,263,935 ·
Nov 18, 2022 64R12 OgleDistrict 2 Bridge deck overlay, expansion joint replacement and miscellaneous repairs on SN 071-0072 carrying IL 2 over drainage ditch 2 miles North of Grand Detour at the Whiteside County Line. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $410,622 ·
Jan 20, 2023 85731 OgleDistrict 2 Remove 3 span steel girder bridge and replace with 3-span I-beam bridge with HMA approach, and raised roadway profile on Milledgeville Road over Buffalo Creek. — Executed Nov 26 New Sjostrom & Sons, Inc. $2,993,599 ·
Mar 10, 2023 85733 OgleDistrict 2 Resurfacing on Lowell Park Road from Pines Road to the Lee County Line — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $940,932 ·
Apr 28, 2023 64S01 OgleWinnebagoDistrict 2 10.6miles pavement patching from IL 72 (E) in Byron to Beltline Road South of Rockford. — Executed Nov 26 New Martin & Company Excavating $1,472,257 ·
Jun 16, 2023 64F57 OgleWhitesideDistrict 2 Removal and Replacment of two structures carrying Freeport Rd. over Jordan Creek: SN 071-1001 located 0.5M (N) of Pilgrim Rd. in Ogle Co. and SN 098-0049 located 0.2M (S) of Pilgrim Rd. in Whiteside Co., Jordan Creek 6 Mi N of Sterling and Sterling and Jordan Creek 0.4 Mi N of Lee/Whiteside Co Line. — Executed Nov 26 New Martin & Company Excavating $2,530,997 ·
Jan 19, 2024 64R56 OgleDistrict 2 Lighting at I-88 SE of Rochelle. — Executed Nov 26 New Helm Electric Facility Solutions, Inc. d/b/a Helm Electric $609,204 ·
Mar 8, 2024 64S66 OgleWinnebagoDistrict 2 Bridge repair, deck repair, joint replacement on SN 071-0022, carrying IL 2 over Mill Creek and SN 101-0087 carrying IL 70 over Drainage Ditch, 0.2 miles East of Leech Road. — Executed Nov 26 New Martin & Company Excavating $392,380 ·
Mar 8, 2024 85756 OgleDistrict 2 HMA overlay with HMA shoulders on Mantague Road from IL 26 to Baileyville Road and on Baileyville Road from Montague Road to IL 26. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $1,059,060 ·
Apr 26, 2024 64P58 OgleDistrict 2 1.08 miles of cold milling, pavement patching, hot-mix asphalt resurfacing from West of Illinois St to 1st St in Oregon. — Executed Nov 26 New Martin & Company Excavating $1,070,501 ·
Apr 26, 2024 64S38 OgleDistrict 2 0.15 mile milling and standard overlay; tollway ramp (EB) to Steward Rd south of Rochelle. — Executed Nov 26 New Curran Contracting Company $201,632 ·
Apr 26, 2024 64T15 OgleWhitesideDistrict 2 8.8 miles of patching, milling, and resurfacing on Freeport Rd from West Sterling Rd to East Lynn Blvd in Sterling. — Executed Nov 26 New Martin & Company Excavating $3,350,526 ·
Jun 14, 2024 64R17 OgleDistrict 2 4.51 mi. resurfacing, IL 64 from Illinois Railway in Mt. Morris to west of Illinois St. in Oregon. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $2,468,747 ·
Jun 14, 2024 64R99 OgleDistrict 2 6.35 miles of cold milling, patching, and hot-mix asphalt resurfacing on IL 64 from IL 251 to the DeKalb County Line. — Executed Nov 26 New Rock Road Companies, Inc. $3,806,433 ·
Jun 14, 2024 64T17 CarrollOgleDistrict 2 6.65 miles, design overlay, cold milling, pavement patching, 0.2 mile NW of IL 64 to IL 26. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $2,854,652 ·
Jun 14, 2024 64T19 OgleDistrict 2 3.55 miles of cold milling, patching, and hot-mix asphalt resurfacing on IL 38 from 0.5 mile west of Mulford Road to DeKalb County Line. — Executed Nov 26 New Rock Road Companies, Inc. $2,139,439 ·
Jun 14, 2024 64T26 OgleDistrict 2 Inlet replacement and pavement patching along IL 2 on SN 071-0097 approach pavement. — Executed Nov 26 New Sjostrom & Sons, Inc. $108,222 ·
Jun 14, 2024 64T44 OgleDistrict 2 13 miles of aggregate shoulder improvement. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $223,592 ·
Jun 14, 2024 85760 OgleDistrict 2 Resurface Caron Road from 7th Avenue south of Creston Road, and resurface Creston Road from West ;of Carton Road to the I-39 overpass in Rochelle. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $1,545,544 ·
Jan 17, 2025 64T04 OgleDistrict 2 Lighting at I-39 IL 64 interchange. — Executed Nov 25 New William Charles Construction Co, LLC $258,017 ·
Mar 7, 2025 64U25 OgleDistrict 2 7.931 miles of HMA milling and resurfacing on IL 64 from Chana Rd to Il 251. — Executed Nov 25 New Martin & Company Excavating $3,123,589 ·
Mar 7, 2025 85768 OgleDistrict 2 HMA Overlay with HMA Shoulders on Tower Road from Water Road to Montague Road north of Byron. — Executed Nov 25 New Martin & Company Excavating $534,977 ·
Apr 25, 2025 64N98 OgleDistrict 2 Reconstruction of the IL 38/I-39 Interchange including replacement of 2 traffic signals, construction of 1 new signal, and new roadway lighting. The project extends on IL 38 from Dement Rd east 2,150 ft. — Executed Nov 25 New William Charles Construction Company, LLC $23,945,140 ·
Apr 25, 2025 64T85 OgleDistrict 2 0.10 mile HSIP improvements (pavement remarking) at IL 251 intersection. — Executed Nov 25 New Countryman, Inc. $90,474 ·
Apr 25, 2025 85778 OgleDistrict 2 Extension of two industrial rail spurs from east of Steward Street to south of Ritchie Road in Rochelle. Includes; concrete paving, precast concrete box culverts, storm sewers, and landscaping. — Executed Nov 25 New McCarthy Improvement Company $4,668,879 ·
Jun 13, 2025 64P13 OgleDistrict 2 Hot-Mix Asphalt resurfacing south of IL-72 (W) to south of Willow St and ADA improvements on IL-72. 4.51 gross miles. — Executed Nov 25 New Martin & Company Excavating $4,385,762 ·
Jun 13, 2025 64T30 OgleWinnebagoDistrict 2 Crack joint sealing on US 20 from 0.2 mi W of Falconer Rd to Simpson Rd and US BUS 20 from US 20 to Weldon Rd SW of Rockford. US 64 from 0.1 mi E of US 52 to ILL 26. IL 70 from Pecatonica River to 0.1 mi W of Safford Rd in Rockford. 4.91 miles gross length. — Executed Nov 25 New
Jun 13, 2025 64T97 OgleDistrict 2 Bridge deck repairs, joint replacement, and miscellaneous repairs on SN 071-0064, carrying Ritchie Rd over I-39, 0.5 miles south of I-88. — Executed Nov 25 New Martin & Company Excavating $315,487 ·
Jun 13, 2025 64U19 OgleDistrict 2 7.92 miles of HMA milling and resurfacing on IL 72 from IL 26 in Forreston to 0.3 mi E of Mt. Morris Rd E of Leaf River. — Executed Nov 25 New Civil Constructors, Inc. d/b/a/ Helm Civil $5,307,008 ·
Jun 13, 2025 64U22 OgleDistrict 2 9.33 miles of patching, milling, and resurfacing on IL 26 from south of Willow St. in Forreston to Hillside Dr. north of Polo on FAP_316. — Executed Nov 25 New Civil Constructors, Inc. d/b/a/ Helm Civil $5,308,846 ·
Sep 19, 2025 64P02 OgleDistrict 2 Pedestrian button upgrades, sidewalk ADA improvements on IL 2: Market St to Lincoln St and IL 72: IL 2 to Diamond St. 3,480 gross feet. — Executed Nov 25 New Stenstrom Excavation & Blacktop, Inc. $1,269,521 ·
Jan 16, 2026 64T05 OgleDistrict 2 Bridge repairs and joint replacement on SN 071-0082, carrying IL 64 over Elkhorn Creek Tributary, 0.4 mile east of US 52. — Executed Nov 25 New Martin & Company Excavating $460,374 ·
Feb 27, 2026 64T23 OgleDistrict 2 1,200 feet gross pavement patching on I-39 under Twombly Rd overpass. 2 Miles NE of Rochelle. — Executed Nov 25 New Martin & Company Excavating $138,615 ·
Feb 27, 2026 85789 OgleDistrict 2 Resurfacing German Church Road from IL 72 to Deer Path Road. — Executed Nov 25 New Martin & Company Excavating $830,341 ·
Apr 24, 2026 64T06 OgleDistrict 2 Bridge repairs and joint replacement on SN's 071-0046/0047, carrying I-39 over IL 72 3.5 miles south of Winnebago County Line and SN's 071-0048/0049 carrying I-39 over DME RR 0.025 miles south of IL 72. — Executed Nov 25 New Martin & Company Excavating $3,168,316 ·
Jun 12, 2026 64T07 OgleDistrict 2 Bridge repairs and joint replacement on SN 071-0036, carrying IL 72 over drainage, 4.1 miles east of IL 26 and SN 071-0037, carrying IL 72 over drainage, 7.9 miles east of IL 26. — Executed Nov 25 New Martin & Company Excavating $747,738 ·
Jun 12, 2026 64T47 OgleDistrict 2 Bridge repairs, deck overlay and joint replacement on SN 071-0078, carrying IL 64 over Pine Creek, 4.1 miles east of IL 26. — Executed Nov 25 New Martin & Company Excavating $618,490 ·
Jul 31, 2026 64T49 OgleDistrict 2 Bridge repairs and joint replacement on SN 071-0015, carrying IL 64 over drainage ditch, 5.7 miles east of junction IL 26. — Executed Nov 25 New Martin & Company Excavating $443,472 ·
Sep 18, 2026 64V24 OgleDistrict 2 0.57 miles of pavmement patching and 770' of Standard overlay on IL 251 from 0.3 miles south of IL 38 to 5th Ave in Ogle County. — Executed Nov 25 New
1–75 of 75

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.