Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Mar 9, 2018 85663 Jo DaviessDistrict 2 Replace the existing bridge with a 3-cell box culvert to carry Stagecoach Trail over the West Branch of Clear Creek, 3 miles west of Warren. — Executed Nov 26 New M & M Concrete, Inc. $409,500 ·
Apr 27, 2018 64K22 Jo DaviessDistrict 2 HMA resurfacing on US 20 from 0.1 mile west of Powder House Hill Road east of Galena to Mount Hope Road. — Executed Nov 26 New Civil Constructors, Inc. $1,036,169 ·
Apr 27, 2018 64K24 Jo DaviessDistrict 2 HMA resurfacing on IL 84 from US 20 to Duke Creek north of Hanover. — Rejected Nov 26 New Civil Constructors, Inc. $1,206,293 ·
Apr 27, 2018 64K60 Jo DaviessDistrict 2 1.73 miles of milling and resurfacing frm just west of Derinda Road to just east of Galena. — Executed Nov 26 New Civil Constructors, Inc. $1,104,457 ·
Apr 27, 2018 64M33 Jo DaviessDistrict 2 Replacing non-compliant guardrail end sections along US 20 from the Mississippi River to NB IL 84. — Executed Nov 26 New Lovewell Fencing, Inc. $589,385 ·
Apr 27, 2018 85653 Jo DaviessDistrict 2 Bridge rehabilitation with approach roadwork on CH 1 (West Council Hill Road) over the Galena River, 3 miles north of Galena. — Executed Nov 26 New Civil Constructors, Inc. $775,220 ·
Mar 8, 2019 64K59 Jo DaviessDistrict 2 1.15 miles of HMA resurfacing and ADA improvements on US 20, from Powder House Road Hill to 3rd Street in Galena. — Executed Nov 26 New Civil Constructors, Inc. $808,424 ·
Mar 8, 2019 64M80 Jo DaviessDistrict 2 Building removals at 481 Sisinawa Avenue, East Dubuque and 11653 US 20 NW of Galena. — Executed Nov 26 New Law Excavating, Inc. $64,388 ·
Mar 8, 2019 64N27 Jo DaviessDistrict 2 Expansion joint replacement, concrete overlay, repair and paint beam ends on SN 043-0039 carrying IL 78 over the Plum River — Executed Nov 26 New Civil Constructors, Inc. $427,850 ·
Apr 26, 2019 64M39 Jo DaviessDistrict 2 Cold milling, pavement patching, and HMA resurfacing on US 20/IL 84 from Mt. Hope Rd to Tippett Rd., southeast of Galena. — Executed Nov 26 New Civil Constructors, Inc. $2,803,709 ·
Nov 8, 2019 64N92 Jo DaviessDistrict 2 PAVEMENT PATCHING ON US 20 FROM 6TH ST IN EAST DUBUQUE TO DUNN RD. — Executed Nov 26 New G. M. Sipes Construction, Inc. $357,968 ·
Jan 17, 2020 64P01 Jo DaviessOgleDistrict 2 Cold milling and HMA resurfacing of the Stockton maintenance yard and the Creston maintenance yard. — Executed Nov 26 New Civil Constructors, Inc. $205,793 ·
Jan 15, 2021 64N02 Jo DaviessDistrict 2 Erosion repairs adjacent to US 20 from 0. 5 mile east to 1.3 miles east of Powder House Hill Road. — Executed Nov 26 New Law Excavating, Inc. $398,118 ·
Apr 23, 2021 85686 Jo DaviessDistrict 2 Replace the bridge carrying South Apple Road over the Apple River, 1.5 miles northwest of Woodbine. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $1,542,120 ·
Jun 11, 2021 64P49 Jo DaviessDistrict 2 1.705 miles; Application of a CRF Restorative Seal as a pavement preservation treatment over the IL 84 roadway centerline rumble strip; from 0.8 mile North to 0.9 mile South of Crazy Hollow Road. — Executed Nov 26 New Brandt Construction Co. $61,502 ·
Sep 17, 2021 64N63 Jo DaviessDistrict 2 1.0 mile of safety improvements - Road Diet, patching and resurfacing along US 20 from 6th St. to 0.1 mile W of Camillus Drive in East Dubuque. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $1,226,553 ·
Nov 5, 2021 64H58 Jo DaviessDistrict 2 Removal and replacement of the SN 043-0040 carrying IL 78 over the Plum River located 6.3 miles South of US 20. — Executed Nov 26 New Sjostrom & Sons, Inc. $2,878,168 ·
Jan 21, 2022 64880 Jo DaviessDistrict 2 Reconstruction of US 20 from Gear Street to Main Street in Galena. — Executed Nov 26 New Fischer Excavating, Inc. and Sjostrom & Sons, Inc. and Civil Constructors d/b/a Helm Civil $31,525,994 ·
Jan 21, 2022 64P16 Jo DaviessDistrict 2 Cold-milling, pavement patching, hot-mix asphalt resurfacing, removing and replacing damaged curb and gutter, and removing and replacing damaged inlet lids. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $1,451,862 ·
Jun 17, 2022 64K62 Jo DaviessDistrict 2 The proposed southern culvert (PSN 043-1117) will be replaced (ESN 043-1024). The proposed structure skews the alignment and adds riprap to control erosion. The proposed northern culvert (PSN 043-1118) will be replaced (ESN 043-1021). The proposed structure uses a dropbox on the upstream end, skews the alignment, and adds riprap to control erosion. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $2,281,460 ·
Jul 15, 2022 64P42 Jo DaviessDistrict 2 4.66 Miles - Cold Milling, Pavement Patching, ADA Ramps, and Hot-Mix Asphalt Galena Oaks Drive to 0.2 Miles West of Logemann Road. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $4,639,685 ·
Jun 16, 2023 64S16 Jo DaviessDistrict 2 House and Garage Demolition of 420 Wall St. in East Dubuque. — Executed Nov 26 New Fischer Excavating, Inc. $57,911 ·
Jan 19, 2024 64P11 Jo DaviessDistrict 2 Patching,Resurf. and ADA improvements on IL 84 from Duke Creek North of Hanover to Southeast of Garfield Street in Hanover. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $3,414,665 ·
Apr 26, 2024 64S55 Jo DaviessDistrict 2 1.3 miles of patching through Elizabeth. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $442,965 ·
Jun 14, 2024 64R35 Jo DaviessDistrict 2 Culvert end section and erosion repair 0.4 mile east of Galena Ridge Dr. on US 20. — Executed Nov 26 New Fischer Excavating, Inc. $286,287 ·
Jun 14, 2024 64S85 Jo DaviessDistrict 2 House and garage demolition at William Dr 3.2 mi S of Galena and Lust cleanup at IL 35: SE of 4th St in East Dubuque. — Executed Nov 26 New Law Excavating, Inc. $528,422 ·
Nov 8, 2024 64P26 Jo DaviessDistrict 2 1.5 miles of Reconstruction/HSIP Safety Funds_on US 20 (EB): 0.1 mile West to Frentress Lake Road and 0.2 mile West_to 0.6 mile East of Barge Terminal Rd and US 20 (WB): 0.4 mile to 0.1 mile East of Barge Terminal Rd. — Executed Nov 26 New McCarthy Improvement Company $13,559,978 ·
Nov 8, 2024 64R26 Jo DaviessDistrict 2 632' of bridge deck patching on SN 043-0043, carrying US 20/IL 84 over Galena River and ICG RR in Galena. — Rejected Nov 25 New Civil Constructors, Inc. d/b/a/ Helm Civil $732,334 ·
Nov 8, 2024 64U05 Jo DaviessDistrict 2 4.07 miles of tree removal on US 20 from 0.2 miles west of Logemann Rd to Rush St in Stockton. — Executed Nov 26 New Homer Tree Service, Inc. $349,563 ·
Nov 8, 2024 85766 Jo DaviessDistrict 2 Cold-in-Place recycling and resurfacing on Scout Camp Road from Stagecoach Trail to 0.2 mile east of Townsend Road. — Executed Nov 26 New Civil Constructors, Inc. d/b/a/ Helm Civil $2,153,129 ·
Jan 17, 2025 64S59 Jo DaviessDistrict 2 1.13 miles of pavement patching and inlet repair along US 20 in Galena. — Executed Nov 25 New G. M. Sipes Construction, Inc. $460,622 ·
Jun 13, 2025 64B40 Jo DaviessDistrict 2 4.07 miles of reconstruction of US 20 from 0.2 mile west of Logemann Rd to Rush St in Stockton. — Executed Nov 25 New Civil Constructors, Inc. d/b/a Helm Civil and Fischer Excavating, Inc. J.V. $31,655,626 ·
Feb 27, 2026 64U56 Jo DaviessDistrict 2 House demolition at 492 Wall St. and 380 Wisconsin Ave. in East Dubuque. — Executed Nov 25 New Louie's Trenching Service, Inc. $58,728 ·
Apr 24, 2026 64L51 Jo DaviessDistrict 2 3.98 miles of milling, Cold in Place recycling and HMA overlay from IL 84 from Wisconsin State Line to 0.2 miles north of US 20. — Executed Nov 25 New Civil Constructors, Inc. d/b/a/ Helm Civil $3,793,443 ·
Jul 31, 2026 64V16 Jo DaviessDistrict 2 The proposed scope of work is considered an interim repair only and includes installing lagging boards to the existing guardrail posts to prevent water from sheet flowing over the retaining wall and slow down the progression of failure on E. Canyon Road in Jo Daviess County in Section 3, Range 4E and Township 28N. The project is along E. Canyon Road approximately 0.5 miles west of Fiedler Road. — Executed Nov 25 New Law Excavating, Inc. $45,940 ·
1–35 of 35

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.