Filtered by: County: Jo Daviess Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 9, 2018 | 85663 | Jo DaviessDistrict 2 | Replace the existing bridge with a 3-cell box culvert to carry Stagecoach Trail over the West Branch of Clear Creek, 3 miles west of Warren. | — | Executed | M & M Concrete, Inc. $409,500 · | ||
| Apr 27, 2018 | 64K22 | Jo DaviessDistrict 2 | HMA resurfacing on US 20 from 0.1 mile west of Powder House Hill Road east of Galena to Mount Hope Road. | — | Executed | Civil Constructors, Inc. $1,036,169 · | ||
| Apr 27, 2018 | 64K24 | Jo DaviessDistrict 2 | HMA resurfacing on IL 84 from US 20 to Duke Creek north of Hanover. | — | Rejected | Civil Constructors, Inc. $1,206,293 · | ||
| Apr 27, 2018 | 64K60 | Jo DaviessDistrict 2 | 1.73 miles of milling and resurfacing frm just west of Derinda Road to just east of Galena. | — | Executed | Civil Constructors, Inc. $1,104,457 · | ||
| Apr 27, 2018 | 64M33 | Jo DaviessDistrict 2 | Replacing non-compliant guardrail end sections along US 20 from the Mississippi River to NB IL 84. | — | Executed | Lovewell Fencing, Inc. $589,385 · | ||
| Apr 27, 2018 | 85653 | Jo DaviessDistrict 2 | Bridge rehabilitation with approach roadwork on CH 1 (West Council Hill Road) over the Galena River, 3 miles north of Galena. | — | Executed | Civil Constructors, Inc. $775,220 · | ||
| Mar 8, 2019 | 64K59 | Jo DaviessDistrict 2 | 1.15 miles of HMA resurfacing and ADA improvements on US 20, from Powder House Road Hill to 3rd Street in Galena. | — | Executed | Civil Constructors, Inc. $808,424 · | ||
| Mar 8, 2019 | 64M80 | Jo DaviessDistrict 2 | Building removals at 481 Sisinawa Avenue, East Dubuque and 11653 US 20 NW of Galena. | — | Executed | Law Excavating, Inc. $64,388 · | ||
| Mar 8, 2019 | 64N27 | Jo DaviessDistrict 2 | Expansion joint replacement, concrete overlay, repair and paint beam ends on SN 043-0039 carrying IL 78 over the Plum River | — | Executed | Civil Constructors, Inc. $427,850 · | ||
| Apr 26, 2019 | 64M39 | Jo DaviessDistrict 2 | Cold milling, pavement patching, and HMA resurfacing on US 20/IL 84 from Mt. Hope Rd to Tippett Rd., southeast of Galena. | — | Executed | Civil Constructors, Inc. $2,803,709 · | ||
| Nov 8, 2019 | 64N92 | Jo DaviessDistrict 2 | PAVEMENT PATCHING ON US 20 FROM 6TH ST IN EAST DUBUQUE TO DUNN RD. | — | Executed | G. M. Sipes Construction, Inc. $357,968 · | ||
| Jan 17, 2020 | 64P01 | Jo DaviessOgleDistrict 2 | Cold milling and HMA resurfacing of the Stockton maintenance yard and the Creston maintenance yard. | — | Executed | Civil Constructors, Inc. $205,793 · | ||
| Jan 15, 2021 | 64N02 | Jo DaviessDistrict 2 | Erosion repairs adjacent to US 20 from 0. 5 mile east to 1.3 miles east of Powder House Hill Road. | — | Executed | Law Excavating, Inc. $398,118 · | ||
| Apr 23, 2021 | 85686 | Jo DaviessDistrict 2 | Replace the bridge carrying South Apple Road over the Apple River, 1.5 miles northwest of Woodbine. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $1,542,120 · | ||
| Jun 11, 2021 | 64P49 | Jo DaviessDistrict 2 | 1.705 miles; Application of a CRF Restorative Seal as a pavement preservation treatment over the IL 84 roadway centerline rumble strip; from 0.8 mile North to 0.9 mile South of Crazy Hollow Road. | — | Executed | Brandt Construction Co. $61,502 · | ||
| Sep 17, 2021 | 64N63 | Jo DaviessDistrict 2 | 1.0 mile of safety improvements - Road Diet, patching and resurfacing along US 20 from 6th St. to 0.1 mile W of Camillus Drive in East Dubuque. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $1,226,553 · | ||
| Nov 5, 2021 | 64H58 | Jo DaviessDistrict 2 | Removal and replacement of the SN 043-0040 carrying IL 78 over the Plum River located 6.3 miles South of US 20. | — | Executed | Sjostrom & Sons, Inc. $2,878,168 · | ||
| Jan 21, 2022 | 64880 | Jo DaviessDistrict 2 | Reconstruction of US 20 from Gear Street to Main Street in Galena. | — | Executed | Fischer Excavating, Inc. and Sjostrom & Sons, Inc. and Civil Constructors d/b/a Helm Civil $31,525,994 · | ||
| Jan 21, 2022 | 64P16 | Jo DaviessDistrict 2 | Cold-milling, pavement patching, hot-mix asphalt resurfacing, removing and replacing damaged curb and gutter, and removing and replacing damaged inlet lids. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $1,451,862 · | ||
| Jun 17, 2022 | 64K62 | Jo DaviessDistrict 2 | The proposed southern culvert (PSN 043-1117) will be replaced (ESN 043-1024). The proposed structure skews the alignment and adds riprap to control erosion. The proposed northern culvert (PSN 043-1118) will be replaced (ESN 043-1021). The proposed structure uses a dropbox on the upstream end, skews the alignment, and adds riprap to control erosion. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $2,281,460 · | ||
| Jul 15, 2022 | 64P42 | Jo DaviessDistrict 2 | 4.66 Miles - Cold Milling, Pavement Patching, ADA Ramps, and Hot-Mix Asphalt Galena Oaks Drive to 0.2 Miles West of Logemann Road. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $4,639,685 · | ||
| Jun 16, 2023 | 64S16 | Jo DaviessDistrict 2 | House and Garage Demolition of 420 Wall St. in East Dubuque. | — | Executed | Fischer Excavating, Inc. $57,911 · | ||
| Jan 19, 2024 | 64P11 | Jo DaviessDistrict 2 | Patching,Resurf. and ADA improvements on IL 84 from Duke Creek North of Hanover to Southeast of Garfield Street in Hanover. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $3,414,665 · | ||
| Apr 26, 2024 | 64S55 | Jo DaviessDistrict 2 | 1.3 miles of patching through Elizabeth. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $442,965 · | ||
| Jun 14, 2024 | 64R35 | Jo DaviessDistrict 2 | Culvert end section and erosion repair 0.4 mile east of Galena Ridge Dr. on US 20. | — | Executed | Fischer Excavating, Inc. $286,287 · | ||
| Jun 14, 2024 | 64S85 | Jo DaviessDistrict 2 | House and garage demolition at William Dr 3.2 mi S of Galena and Lust cleanup at IL 35: SE of 4th St in East Dubuque. | — | Executed | Law Excavating, Inc. $528,422 · | ||
| Nov 8, 2024 | 64P26 | Jo DaviessDistrict 2 | 1.5 miles of Reconstruction/HSIP Safety Funds_on US 20 (EB): 0.1 mile West to Frentress Lake Road and 0.2 mile West_to 0.6 mile East of Barge Terminal Rd and US 20 (WB): 0.4 mile to 0.1 mile East of Barge Terminal Rd. | — | Executed | McCarthy Improvement Company $13,559,978 · | ||
| Nov 8, 2024 | 64R26 | Jo DaviessDistrict 2 | 632' of bridge deck patching on SN 043-0043, carrying US 20/IL 84 over Galena River and ICG RR in Galena. | — | Rejected | Civil Constructors, Inc. d/b/a/ Helm Civil $732,334 · | ||
| Nov 8, 2024 | 64U05 | Jo DaviessDistrict 2 | 4.07 miles of tree removal on US 20 from 0.2 miles west of Logemann Rd to Rush St in Stockton. | — | Executed | Homer Tree Service, Inc. $349,563 · | ||
| Nov 8, 2024 | 85766 | Jo DaviessDistrict 2 | Cold-in-Place recycling and resurfacing on Scout Camp Road from Stagecoach Trail to 0.2 mile east of Townsend Road. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $2,153,129 · | ||
| Jan 17, 2025 | 64S59 | Jo DaviessDistrict 2 | 1.13 miles of pavement patching and inlet repair along US 20 in Galena. | — | Executed | G. M. Sipes Construction, Inc. $460,622 · | ||
| Jun 13, 2025 | 64B40 | Jo DaviessDistrict 2 | 4.07 miles of reconstruction of US 20 from 0.2 mile west of Logemann Rd to Rush St in Stockton. | — | Executed | Civil Constructors, Inc. d/b/a Helm Civil and Fischer Excavating, Inc. J.V. $31,655,626 · | ||
| Feb 27, 2026 | 64U56 | Jo DaviessDistrict 2 | House demolition at 492 Wall St. and 380 Wisconsin Ave. in East Dubuque. | — | Executed | Louie's Trenching Service, Inc. $58,728 · | ||
| Apr 24, 2026 | 64L51 | Jo DaviessDistrict 2 | 3.98 miles of milling, Cold in Place recycling and HMA overlay from IL 84 from Wisconsin State Line to 0.2 miles north of US 20. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $3,793,443 · | ||
| Jul 31, 2026 | 64V16 | Jo DaviessDistrict 2 | The proposed scope of work is considered an interim repair only and includes installing lagging boards to the existing guardrail posts to prevent water from sheet flowing over the retaining wall and slow down the progression of failure on E. Canyon Road in Jo Daviess County in Section 3, Range 4E and Township 28N. The project is along E. Canyon Road approximately 0.5 miles west of Fiedler Road. | — | Executed | Law Excavating, Inc. $45,940 · |
1–35 of 35
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.