Filtered by: County: Various Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 17, 2025 | 46655 | VariousDistrict 3 | Repairing various widths of pavement marking including lines, letters, numbers, and symbols on various routes throughout District 3. | — | Executed | Varsity Striping & Construction Co. $1,718,445 · | ||
| Jan 17, 2025 | 46656 | VariousDistrict 0 | Repair, maintenance, or replacement of damaged sign components, furnishing new overhead sign structures or repairs, installing new signs or supports at locations as described in a work order including all traffic control in Regions 4 and 5. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $3,213,213 · | ||
| Jan 17, 2025 | 62X51 | VariousDistrict 1 | Restoring existing native landscapes at various roadside locations in D1. | — | Executed | McGinty Bros., Inc. $210,094 · | ||
| Jan 17, 2025 | 62X80 | VariousDistrict 1 | Mowing the roadsides of expressways This work consists of mowing the roadsides of expressways. The project is located along various expressways at various locations in D1. | — | Executed | MYS, Incorporated $656,550 · | ||
| Jan 17, 2025 | 64T35 | VariousDistrict 2 | Bridge washing of 8 structures over the Rock River in various Counties. | — | Executed | All States Painting, Inc. $68,748 · | ||
| Jan 17, 2025 | 64T39 | VariousDistrict 2 | Bridge washing of 6 structures over the Rock River in various Counties. | — | Executed | Pressure Washing Unlimited Inc. $59,230 · | ||
| Jan 17, 2025 | 64T75 | VariousDistrict 2 | Restoration of turf right-of-way caused by motorist damage on all State and and Interstate routes within the District. Work Orders include fertilizing, seeding, and installing soil retention blanket on disturbed areas. | — | Executed | O'Brien Civil Works, Inc. $94,200 · | ||
| Jan 17, 2025 | 64T93 | VariousDistrict 2 | Concrete sealer applied to bridge decks at various locations within District 2. | — | Executed | M & M Concrete, Inc. $49,078 · | ||
| Jan 17, 2025 | 66P97 | VariousDistrict 3 | Repair and maintain traffic signals, flashing beacons, roadway lighting, speed display signs, and other electrical services along various routes in Bureau, LaSalle, DeKalb, and Kendall Counties. | — | Executed | Laser Electric, Inc. $2,232,605 · | ||
| Jan 17, 2025 | 66P98 | VariousDistrict 3 | Repair and maintain traffic signals, flashing beacons, roadway lighting, speed display signs, and other electrical services along various routes in Ford, Iroquois, and Livingston Counties. | — | Executed | Leo P. Kelly Electric, Incorporated $384,646 · | ||
| Jan 17, 2025 | 68J32 | VariousDistrict 4 | Districtwide tree removal on an on call basis. | — | Executed | JIMAX Landscape LLC $233,844 · | ||
| Jan 17, 2025 | 68J35 | VariousDistrict 4 | Washing of nine bridges in District 4. | — | Executed | M & M Concrete, Inc. $492,999 · | ||
| Jan 17, 2025 | 68J37 | VariousDistrict 4 | Districtwide repairs to guardrail and cable guardrail caused by motorists (MCHD) throughout District Four. | — | Executed | Northern Contracting, Inc. $748,731 · | ||
| Jan 17, 2025 | 70H37 | VariousDistrict 5 | 567.5 miles of spraying; approximately 2004 acres on State ROW along US 51 and interstate routes including interchanges in Champaign, DeWitt, McLean, Piatt, and Vermilion Counties. | — | Executed | The Daltons Inc. $188,719 · | ||
| Jan 17, 2025 | 72007 | VariousDistrict 6 | Bridge washing on various Illinois and Mississippi River crossings in various counties of District 6. | — | Executed | Interstate Maintenance, Incorporated $103,300 · | ||
| Jan 17, 2025 | 74D22 | VariousDistrict 7 | Guardrail repair and on-call guardrail repair at various locations. | — | Executed | COLLINS & HERMANN, INC. $747,567 · | ||
| Jan 17, 2025 | 78A75 | VariousDistrict 9 | Cleaning and painting 17 bridges on various routes in various counties of District 9. | — | Executed | Venus Painting Co. $1,830,307 · | ||
| Jan 17, 2025 | 78B18 | VariousDistrict 9 | Weed spraying for broadleaf weeds along I-57 and I-64 at various locations in various counties. | — | Executed | The Daltons Inc. $224,685 · | ||
| Jan 17, 2025 | 78B19 | VariousDistrict 9 | Weed spraying for Johnson Grass along I-57 at various locations in various counties. | — | Executed | The Daltons Inc. $175,285 · | ||
| Mar 7, 2025 | 62W55 | VariousDistrict 1 | Various Expressway Routes (Daytime Sweeping) This work is located on various State maintained expressway routes located within the counties of Cook, DuPage, Lake and Will. | — | Executed | Central Sweeping of Illinois, LLC $11,515,816 · | ||
| Mar 7, 2025 | 62W61 | VariousDistrict 1 | This work includes replacement of existing span wire mounted traffic signals with new mast arm mounted traffic signals. installation of LED signal heads, traffic signal posts and mast arms, installation of accessible pedestrian signals, ADA ramp improvements, connection to KDOT and LCDOT centralized traffic signal systems at various locations in District 1. | — | Executed | H & H Electric Co. $2,125,601 · | ||
| Mar 7, 2025 | 62X91 | VariousDistrict 1 | The pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, dec The work to be done under Arterial Cleaning shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish. Location is on various State maintained arterial routes located within Kane and McHenry Counties. | — | Executed | Central Sweeping of Illinois, LLC $1,982,600 · | ||
| Mar 7, 2025 | 62X95 | VariousDistrict 1 | Weed Spraying within various areas in District 1 and IDOT District 1 maintenance yards: Alsip, Oakbrook, Gurnee, and Northbrook. | — | Executed | ALLEN CHASE ENTERPRISES INC. $338,044 · | ||
| Mar 7, 2025 | 64U10 | VariousDistrict 2 | Bridge washing of 9 structures in Boone and Winnebago Counties. | — | Executed | Pressure Washing Unlimited Inc. $92,050 · | ||
| Mar 7, 2025 | 64U11 | VariousDistrict 2 | Bridge washing of 12 structures in various counties. | — | Executed | Pressure Washing Unlimited Inc. $94,625 · | ||
| Mar 7, 2025 | 66P78 | VariousDistrict 3 | Weed spraying to aid in weed control along various routes in Bureau, LaSalle, Grundy, Livingston, Kankakee, Iroquois, and Ford Counties. | — | Executed | The Daltons Inc. $168,697 · | ||
| Mar 7, 2025 | 66R00 | VariousDistrict 3 | Litter removal from the interstate highways at interchanges and rest areas throughout District 3. | — | Active | The Final Connection, Inc. $327,337 · | ||
| Mar 7, 2025 | 66R07 | VariousDistrict 3 | Removal and replacement of damaged or deteriorated sand module impact attenuators on various interstate routes in various counties in District 3. | — | Executed | |||
| Mar 7, 2025 | 68J27 | VariousDistrict 4 | Installation of ITS and traffic signal equipment at various locations in District 4. | — | Rejected | Oberlander Electric Co. $382,690 · | ||
| Mar 7, 2025 | 68J33 | VariousDistrict 4 | Districtwide weed spraying. | — | Executed | The Daltons Inc. $157,527 · | ||
| Mar 7, 2025 | 68J86 | VariousDistrict 4 | Electrical maintenance contract (maintenance and repair D4 traffic signals, overhead lighting, and ITS facilities). | — | Executed | Laser Electric, Inc. $651,955 · | ||
| Mar 7, 2025 | 70G76 | VariousDistrict 5 | Bridge deck sealing of 109 structures in DeWitt, Piatt, and McLean Counties. | — | Executed | All States Painting, Inc. $188,013 · | ||
| Mar 7, 2025 | 72322 | VariousDistrict 6 | Bridge deck sealing on various routes in District 6. | — | Executed | All States Painting, Inc. $279,580 · | ||
| Mar 7, 2025 | 72590 | VariousDistrict 6 | Maintenance and repair of surveillance cameras, vehicle detectors, dynamic message signs, advanced traffic management systems, fiber optic communications, traffic signal interconnects, ethernet networks, and all peripheral equipment throughout District 6. | — | Executed | Capitol Construction Group, LLC d/b/a Egizii Electric $141,700 · | ||
| Mar 7, 2025 | 72602 | VariousDistrict 6 | Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes at various locations in the eastern half of District 6. | — | Executed | Capitol Construction Group, LLC d/b/a Egizii Electric $535,685 · | ||
| Mar 7, 2025 | 72603 | VariousDistrict 6 | Maintenance and repair of traffic signals, flashing beacons and roadway lighting along various routes at various locations in the western half of District 6. | — | Executed | Bodine Electric of Decatur $292,133 · | ||
| Mar 7, 2025 | 74D05 | VariousDistrict 7 | Bridge deck sealing of 93 bridge decks on various routes in Macon, Moultrie and Shelby Counties. | — | Executed | All States Painting, Inc. $179,337 · | ||
| Mar 7, 2025 | 76T97 | VariousDistrict 8 | Pavement patching at various locations throughout District 8. | — | Executed | Kinney Contractors, Inc. $1,950,920 · | ||
| Apr 25, 2025 | 46657 | VariousDistrict 7 | Removal and replacement of existing interstate guide signs and logo signs, including the transfer of the business service signs, at various locations on I-70 from Exit 119 to Exit 154. | — | Executed | COLLINS & HERMANN, INC. $656,964 · | ||
| Apr 25, 2025 | 46659 | VariousDistrict 2 | Placing various widths of Preformed Plastic and Modified Urethane pavement marking lines, letters, and symbols within the limits specified on each individual work order within District 2. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $3,447,500 · | ||
| Apr 25, 2025 | 46660 | VariousDistrict 2 | Removing and replacing reflectors, removing damaged raised reflective pavement marker castings, and placing new raised reflective pavement marker castings within the limits shown on each individual work order within District 2. | — | Executed | P & P Construction Co. $1,683,900 · | ||
| Apr 25, 2025 | 46662 | VariousDistrict 3 | Removing and replacing raised reflective pavement markers and reflectors in Bureau, Grundy, Kendall, LaSalle, and Putnam Counties. | — | Executed | Marking Specialists Corporation $412,448 · | ||
| Apr 25, 2025 | 46663 | VariousDistrict 3 | Removing and replacing raised reflective pavement markers and reflectors_on various highways in Ford, Iroquois, Kankakee, and Livingston Counties. | — | Executed | Marking Specialists Corporation $583,460 · | ||
| Apr 25, 2025 | 46666 | VariousDistrict 2 | Maintenance of signs and delineators along state maintained routes in District 2. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $696,970 · | ||
| Apr 25, 2025 | 62W56 | VariousDistrict 1 | The work under Full Expressway Nighttime Cleaning Cycle and Supplement Sweeping includes the pickup, removal, and proper disposal of debris such as limbs, sticks, leaves, sand, stones, dirt, weeds, deceased animal carcasses, refuse, litter. This work is located on various State maintained expressway routes located within the counties of Cook, DuPage, and Will. | — | Active | Interstate Business Solutions, LLC $4,828,264 · | ||
| Apr 25, 2025 | 62X92 | VariousDistrict 1 | Installing fence and gates at new locations and repairing existing damaged pedestrian barrier on a work order The work to be completed under this contract consists of installing fence and gates at new locations and repairing existing damaged pedestrian barrier on a work order basis._This work is located on various State maintained arterial and expressway routes within the counties of Cook, DuPage, Kane, Lake, McHenry and Will. | — | Executed | Fence Masters, Inc. $652,316 · | ||
| Apr 25, 2025 | 64T76 | VariousDistrict 2 | Various routes on-call guardrail. | — | Executed | Northern Contracting, Inc. $922,284 · | ||
| Apr 25, 2025 | 64U13 | VariousDistrict 2 | LED lighting and coupling replacement on existing poles at the interchange of I-90/IL 75, IL 251 at Rockton Rd., and I-90 Welcome Center in Winnebago County. | — | Executed | |||
| Apr 25, 2025 | 68J36 | VariousDistrict 4 | Districtwide pavement marking restoration. | — | Executed | Varsity Striping & Construction Co. $376,474 · | ||
| Apr 25, 2025 | 70H47 | VariousDistrict 5 | Bridge Painting of 4 Structure locations on various routes in Mclean, Douglas, Dewitt and Piatt Counties. | — | Executed | Three Star Painting, Inc. $402,640 · | ||
| Apr 25, 2025 | 72940 | VariousDistrict 6 | Bridge approach dip corrections on 11 structures on various routes in District 6. | — | Active | |||
| Apr 25, 2025 | 74D44 | VariousDistrict 7 | Repairing, replacing, servicing and maintaining electrical systems throughout District 7. | — | Executed | Bodine Electric of Decatur $508,030 · | ||
| Apr 25, 2025 | 76T79 | VariousDistrict 8 | Lighting and traffic signal modernization at various locations throughout District 8. | — | Executed | Electrico, Inc. $1,923,315 · | ||
| Jun 13, 2025 | 46658 | VariousDistrict 7 | Replacing guardrail reflectors and linear delineation panels on various routes throughout District 7. | — | Executed | Done Rite Construction Co., Inc. $227,213 · | ||
| Jun 13, 2025 | 46661 | VariousDistrict 2 | Removing existing guardrail delineators and barrier wall delineators and installing new guardrail delineators and barrier wall delineators within the limits of each individual work order. | — | Executed | O'Brien Civil Works, Inc. $167,625 · | ||
| Jun 13, 2025 | 46664 | VariousDistrict 4 | Repairing various widths of preformed plastic, epoxy, modified urethane pavement marking lines, letters and symbols and removal of existing pavement markings within the limits specified on each individual Work Order, and related collateral work necessary to complete the project on various routes throughout District 4. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $1,978,061 · | ||
| Jun 13, 2025 | 62W90 | VariousDistrict 1 | Replacement of old controllers, replace fiber optic cable, network switches, PTZ cameras, and controllers among other equipment to allow for remote access and monitoring capabilities, complete the ATMS system in Lake County allowing for fully remote access to all intersection. There are one hundred fifteen locations proposed on this project located in mainly in Lake County with fewer location in Cook and McHenry Counties. | — | Executed | H & H Electric Co. $3,357,143 · | ||
| Jun 13, 2025 | 62Y08 | VariousDistrict 1 | Repair and replacement work order contract for Impact Attenuators, Sand Barrels and Miscellaneous Traffic Control in coordination with MCHD to enhance roadway safety and manage traffic flow effectively. Location on various State maintained expressway and arterial routes within the counties of Cook, DuPage, Will, Lake, McHenry and Kane. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $2,141,300 · | ||
| Jun 13, 2025 | 62Y10 | VariousDistrict 1 | Pruning and/or removing dead, dying, diseased and hazardous trees and limbs, while providing proper traffic co This project consists of pruning and/or removing dead, dying, diseased and hazardous trees and limbs, while providing proper traffic control on a work basis. Located in District One (counties of Cook, DuPage, Kane, Lake, McHenry, and Will). | — | Executed | Homer Tree Service, Inc. $536,830 · | ||
| Jun 13, 2025 | 64U55 | VariousDistrict 2 | Tree removal along various routes throughout District 2. | — | Executed | Homer Tree Service, Inc. $151,000 · | ||
| Jun 13, 2025 | 66R45 | VariousDistrict 3 | Installation, maintenance, and pickup/removal of smart traffic monitoring systems or real-time traffic control systems completed on a work order basis for repairs and maintenance activities. | — | Executed | Traffic Control and Protection LLC dba High Star Traffic $676,713 · | ||
| Jun 13, 2025 | 66R71 | VariousDistrict 3 | One year contract to repair damaged High Tension Cable Median Barrier, Guardrail, Attenuators, etc., caused by motorists along various routes in District 3. | — | Executed | Northern Contracting, Inc. $1,878,255 · | ||
| Jun 13, 2025 | 68K10 | VariousDistrict 4 | 70.6 gross miles of added aggregate surface to shoulders along various routes in District 4. | — | Executed | Phoenix Corporation of the Quad Cities $492,482 · | ||
| Jun 13, 2025 | 70H64 | VariousDistrict 5 | On-call lighting repairs in the District West field areas consisting of DeWitt, McLean, and Piatt Counties. | — | Executed | |||
| Jun 13, 2025 | 70H65 | VariousDistrict 5 | East Field area lighting repairs in Champaign, Vermilion, Edgar, and Douglas Counties. | — | Executed | Champaign Signal and Lighting Co. a division of Evergreen Roadworks, LLC $354,350 · | ||
| Jun 13, 2025 | 70H67 | VariousDistrict 5 | District-wide on-call tree removal. | — | Executed | CSD Environmental Services, Inc. $182,500 · | ||
| Jun 13, 2025 | 72942 | VariousDistrict 6 | Minor bridge abutment repairs on 25 bridges on various routes in various counties of District 6. | — | Executed | County Contractors, Inc. $273,258 · | ||
| Jun 13, 2025 | 74D49 | VariousDistrict 7 | Repair of guardrail at various locations and on call repair of guardrail damage throughout District 7. | — | Executed | Kujo, Inc. $1,053,945 · | ||
| Jun 13, 2025 | 76R11 | VariousDistrict 8 | Guardrail and cable median repair at various locations throughout District 8. | — | Executed | Illini Excavation & Reclamation, Inc. $4,962,155 · | ||
| Jun 13, 2025 | 76R28 | VariousDistrict 8 | Highway lighting, traffic signal repair and maintenance at various locations throughout District 8. | — | Active | Electrico, Inc. $1,935,305 · | ||
| Jun 13, 2025 | 76R61 | VariousDistrict 8 | Maintenance and service of all ITS equipment at various locations throughout District 8. | — | Rejected | Electrico, Inc. $558,010 · | ||
| Jun 13, 2025 | 76U99 | VariousDistrict 8 | Tree removal in various locations throughout District 8. | — | Executed | Clean Cut Tree Service, Inc. $223,072 · | ||
| Jun 13, 2025 | 78B40 | VariousDistrict 9 | Electrical repair and/or maintenance on various routes throughout District 9. | — | Active | F. W. Electric, Inc. $230,826 · | ||
| Aug 1, 2025 | 66R72 | VariousDistrict 3 | Vegetation management control along various routes in DeKalb, Grundy, Iroquois, Kendall, LaSalle, Livingston, and Ford Counties. | — | Executed | Semper Fi Yard Service, Inc. d/b/a Semper Fi Land Service, Inc. $328,314 · | ||
| Aug 1, 2025 | 66R73 | VariousDistrict 3 | Tree removal at various locations throughout the District. | — | Executed | Clean Cut Tree Service, Inc. $530,912 · | ||
| Aug 1, 2025 | 68K35 | VariousDistrict 4 | Placing, grading and compacting an aggregate shoulder wedge level with adjacent HMA pavement or shoulder on various routes in various counties throughout the eastern section of District 4. | — | Executed | J.C. Dillon, Inc. $627,990 · | ||
| Aug 1, 2025 | 76T74 | VariousDistrict 8 | Lighting upgrades on I-255 at I-55/70, on I-255 at Collinsville Road and on I-55/70 at Black Lane in Collinsville. | — | Executed | Electrico, Inc. $1,999,091 · | ||
| Aug 1, 2025 | 76U44 | VariousDistrict 8 | Bridge structural repairs at various locations in various counties of District 8. | — | Executed | Keeley & Sons, Inc. $1,822,815 · | ||
| Aug 1, 2025 | 76U45 | VariousDistrict 8 | Bridge deck patching on various interstate bridges in Madison and St. Clair Counties. | — | Executed | Keeley & Sons, Inc. $1,894,424 · | ||
| Aug 1, 2025 | 76U62 | VariousDistrict 8 | Weed spraying for broadleaf weeds along I-64, I-55, I-55/70, I-255, I-270 and IL 255 in various counties of District 8. | — | Executed | The Daltons Inc. $192,882 · | ||
| Aug 1, 2025 | 76U63 | VariousDistrict 8 | Weed spraying for Johnson Grass along I-64, I-55, I-55/70, I-255, I-270 and IL 255 in various counties of District 8. | — | Executed | The Daltons Inc. $199,866 · | ||
| Aug 1, 2025 | 78B39 | VariousDistrict 9 | Repairing or replacing damaged guardrail, barrier terminals, impact attenuators, cable median barrier and fence on a work order basis throughout District 9. | — | Executed | COLLINS & HERMANN, INC. $1,540,098 · | ||
| Sep 19, 2025 | 46668 | VariousDistrict 7 | Repairing various types of pavement markings at various locations throughout District 7. | — | Executed | Varsity Striping & Construction Co. $719,860 · | ||
| Sep 19, 2025 | 62W89 | VariousDistrict 1 | This project involves the partial modernization of thirty-six (36) intersection to include Accessible Pedestrian Pushbuttons (APS) and/or Leading Pedestrian Interval (LPI) timing updates. Thirty-six (36) intersections located in the following District 1 counties: Cook, McHenry, Lake, Kane, and Dupage. | — | Executed | Meade Inc. $1,997,198 · | ||
| Sep 19, 2025 | 62Y06 | VariousDistrict 1 | Removing trees, as well as all incidental and collateral work necessary to complete the project The project consists of removing trees, as well as all incidental and collateral work necessary to complete the project. This project is in several locations throughout District One within Cook, Kane, Kendall, Lake McHenry and Will Counties. | — | Executed | Homer Tree Service, Inc. $1,042,409 · | ||
| Sep 19, 2025 | 62Y32 | VariousDistrict 1 | New guardrail and repair of damaged guardrail and traffic barrier terminals, includes removing damaged guardra This project consists of new guardrail and repair of damaged guardrail and traffic barrier terminals, includes removing damaged guardrail components and replacing all removed guardrail components. This work is located on various State maintained arterial and expressway routes and at other district-wide locations within the counties of Cook, DuPage, Kane, Lake, McHenry and Will. | — | Executed | Kujo, Inc. $2,998,621 · | ||
| Sep 19, 2025 | 68J20 | VariousDistrict 4 | Culvert lining of various sizes at various locations. | — | Executed | Hoerr Construction, Inc. $1,852,445 · | ||
| Sep 19, 2025 | 68K26 | VariousDistrict 4 | Installation of traffic signal controllers, cabinets, battery backup system, and CCTV cameras along various routes in District 4. | — | Executed | Oberlander Electric Co. $1,190,380 · | ||
| Sep 19, 2025 | 76U51 | VariousDistrict 8 | Call-out bridge deck patching at various locations throughout District 8 on access-controlled roadways. | — | Executed | Keeley & Sons, Inc. $1,280,653 · | ||
| Nov 7, 2025 | 46669 | VariousDistrict 6 | Removing and replacing damaged raised reflective pavement and markers and/or lenses throughout District 6. | — | Executed | |||
| Nov 7, 2025 | 62Y33 | VariousDistrict 1 | The installing new signs, removal, relocation and repair of existing signs Project consist of the installing new signs, removal, relocation and repair of existing signs. Location of the project is in various counties in District 1. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $484,900 · | ||
| Nov 7, 2025 | 62Y36 | VariousDistrict 1 | The intent of this contract is to provide prompt repair to the high-tension cable barrier median system. This work includes removing and replacing damaged high tension cable barrier system components. This work is located on various State maintained routes in Various Counties. | — | Executed | Fence Masters, Inc. $857,222 · | ||
| Nov 7, 2025 | 76U47 | VariousDistrict 8 | Bridge deck sealing on various bridges in Calhoun, Greene and Jersey Counties in District 8. | — | Executed | M & M Concrete, Inc. $43,640 · | ||
| Nov 7, 2025 | 76U48 | VariousDistrict 8 | Bridge deck sealing on various bridges in Bond, Clinton, Marion, and Washington Counties in District 8. | — | Executed | All States Painting, Inc. $274,243 · | ||
| Nov 7, 2025 | 76U64 | VariousDistrict 8 | Litter removal - IL 100 from Norman-s Landing to US 67; US 67 from IL 100 to IL 143; I-270 from the Mississippi River to IL 3; I-70 from the Mississippi Riv River to I-55/64; I-55/64 from the Mississippi River to I-70; I-255 from the Mississippi River to IL 3. | — | Executed | The Final Connection, Inc. $76,044 · | ||
| Nov 7, 2025 | 78B64 | VariousDistrict 9 | Bridge deck concrete sealing on various bridges in Alexander, Johnson, Massac, Pulaski and Union Counties. | — | Executed | M & M Concrete, Inc. $396,418 · | ||
| Nov 7, 2025 | 78B82 | VariousDistrict 9 | Painting structures on various routes in various counties: 3 in Johnson County, 7 in Union County and 2 in Williamson County. | — | Executed | Eagle Painting & Maintenance Company, Inc. $2,044,033 · | ||
| Jan 16, 2026 | 64U94 | VariousDistrict 2 | Restoration of turf right-of-way as a result of motorist caused damage. This involves tilling, fertilizing, seeding, and installing soil retention blanket on Disturbed areas throughout District 2. | — | Executed | O'Brien Civil Works, Inc. $83,680 · | ||
| Jan 16, 2026 | 64V02 | VariousDistrict 2 | Concrete sealer applied to bridge decks at various locations in Henry, Rock Island and Whiteside Counties. | — | Executed | M & M Concrete, Inc. $44,239 · | ||
| Jan 16, 2026 | 64V04 | VariousDistrict 2 | Concrete sealer applied to bridge decks at various locations in Carroll, Jo Daviess, Lee and Ogle Counties. | — | Executed | M & M Concrete, Inc. $27,283 · |
1–100 of 186Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.