2024-964-TS
- Let date
- Friday, September 19, 2025
- Contract
- 62W89 · job page
- District
- District 1
- County
- Various
- Highway
- Limits
- This project involves the partial modernization of thirty-six (36) intersection to include Accessible Pedestrian Pushbuttons (APS) and/or Leading Pedestrian Interval (LPI) timing updates. Thirty-six (36) intersections located in the following District 1 counties: Cook, McHenry, Lake, Kane, and Dupage.
- Classification
- ·
- Project number
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Meade Inc. Low bidder | $1,997,198 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Meade Inc. |
|---|---|---|---|---|---|---|
| 1 | X1400144 | UNINT PWR SUP & C SPL | 6 | EACH | $8,541.52 | |
| 2 | X1400150 | SERV INSTL GR MT MTR | 15 | EACH | $5,714.86 | |
| 3 | X1400367 | PED SIGNAL POST 10 FT | 5 | EACH | $1,707.27 | |
| 4 | X1400378 | PED SIGNAL POST 5 FT | 45 | EACH | $1,243.78 | |
| 5 | X1400486 | UNINTER PS UPS | 2 | EACH | $8,541.52 | |
| 6 | X2010516 | SELECTIVE CLEARING | 3 | UNIT | $1,764.00 | |
| 7 | X7200061 | TEMP INFO SIGNING | 2,853 | SQ FT | $19.95 | |
| 8 | X8040108 | ELECTRIC METER | 1 | EACH | $1,108.47 | |
| 9 | X8510204 | PAINT NEW PED P-B PST | 24 | EACH | $72.00 | |
| 10 | X8570215 | FAC IN EXIST CAB | 11 | EACH | $10,058.98 | |
| 11 | X8570226 | FAC T4 CAB SPL | 6 | EACH | $32,324.24 | |
| 12 | X8571215 | RR FAC & TY IV CAB SP | 1 | EACH | $30,990.42 | |
| 13 | X8620200 | UNINTER POWER SUP SPL | 2 | EACH | $8,541.52 | |
| 14 | X8620310 | REM REPL BATTERY UPSE | 17 | EACH | $3,257.96 | |
| 15 | X8760200 | ACCESSIBLE PED SIGNAL | 136 | EACH | $2,333.38 | |
| 16 | X8780012 | CONC FDN TY A 12D | 200 | FOOT | $284.27 | |
| 17 | X8809005 | LED SF LENS COVER | 13 | EACH | $438.75 | |
| 18 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $20,265.00 | |
| 19 | Z0033044 | RE-OPTIMIZE TR SIG SYS 1 | 34 | EACH | $178.50 | |
| 20 | Z0033046 | RE-OPTIMIZE TR SIG SYS 2 | 2 | EACH | $787.50 | |
| 21 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $6,300.00 | |
| 22 | Z0076600 | TRAINEES | 500 | HOUR | $0.8000 | |
| 23 | Z0076604 | TRAINEES TPG | 500 | HOUR | $15.00 | |
| 24 | 28000400 | PERIMETER EROS BAR | 496 | FOOT | $10.50 | |
| 25 | 66900200 | NON SPL WASTE DISPOSL | 70 | CU YD | $105.00 | |
| 26 | 66900530 | SOIL DISPOSAL ANALY | 5 | EACH | $1,732.50 | |
| 27 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $4,147.50 | |
| 28 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $630.00 | |
| 29 | 66901006 | REG SUB MON | 56 | CAL DA | $735.00 | |
| 30 | 67000400 | ENGR FIELD OFFICE A | 9 | CAL MO | $10,500.00 | |
| 31 | 67100100 | MOBILIZATION | 1 | L SUM | $119,800.00 | |
| 32 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $2,100.00 | |
| 33 | 70102622 | TR CONT & PROT 701502 | 1 | L SUM | $2,100.00 | |
| 34 | 70102625 | TR CONT & PROT 701606 | 1 | L SUM | $2,100.00 | |
| 35 | 70102630 | TR CONT & PROT 701601 | 1 | L SUM | $2,100.00 | |
| 36 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $2,100.00 | |
| 37 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $2,100.00 | |
| 38 | 72000100 | SIGN PANEL T1 | 5 | SQ FT | $262.50 | |
| 39 | 81028200 | UNDRGRD C GALVS 2 | 1,043 | FOOT | $124.89 | |
| 40 | 81028220 | UNDRGRD C GALVS 3 | 48 | FOOT | $205.43 | |
| 41 | 85000200 | MAIN EX TR SIG INSTAL | 35 | EACH | $518.98 | |
| 42 | 87301215 | ELCBL C SIGNAL 14 2C | 8,140 | FOOT | $5.08 | |
| 43 | 87301225 | ELCBL C SIGNAL 14 3C | 839 | FOOT | $5.24 | |
| 44 | 87301245 | ELCBL C SIGNAL 14 5C | 195 | FOOT | $5.63 | |
| 45 | 87301255 | ELCBL C SIGNAL 14 7C | 129 | FOOT | $6.01 | |
| 46 | 87301305 | ELCBL C LEAD 14 1PR | 13,131 | FOOT | $7.60 | |
| 47 | 87301805 | ELCBL C SERV 6 2C | 549 | FOOT | $13.96 | |
| 48 | 87301900 | ELCBL C EGRDC 6 1C | 2,170 | FOOT | $5.85 | |
| 49 | 87501200 | TS POST 16 | 2 | EACH | $2,957.96 | |
| 50 | 87800100 | CONC FDN TY A | 60 | FOOT | $500.98 | |
| 51 | 87900200 | DRILL EX HANDHOLE | 52 | EACH | $917.96 | |
| 52 | 88030020 | SH LED 1F 3S MAM | 4 | EACH | $1,519.16 | |
| 53 | 88030050 | SH LED 1F 3S BM | 4 | EACH | $1,418.36 | |
| 54 | 88030100 | SH LED 1F 5S BM | 2 | EACH | $1,721.96 | |
| 55 | 88030110 | SH LED 1F 5S MAM | 2 | EACH | $1,839.56 | |
| 56 | 88102717 | PED SH LED 1F BM CDT | 18 | EACH | $1,277.96 | |
| 57 | 88200410 | TS BACKPLATE L F PLAS | 6 | EACH | $227.77 | |
| 58 | 88500100 | INDUCTIVE LOOP DETECT | 37 | EACH | $243.37 | |
| 59 | 88600100 | DET LOOP T1 | 194 | FOOT | $40.42 | |
| 60 | 89501250 | RELOC EX TS EQUIP | 6 | EACH | $2,075.92 | |
| 61 | 89501410 | REL EM VEH PR SYS P U | 8 | EACH | $114.75 | |
| 62 | 89502200 | MOD EX CONTR | 6 | EACH | $818.98 | |
| 63 | 89502300 | REM ELCBL FR CON | 4,761 | FOOT | $0.9200 | |
| 64 | 89502375 | REMOV EX TS EQUIP | 35 | EACH | $2,409.65 | |
| 65 | 89502376 | REBUILD EX HANDHOLE | 2 | EACH | $3,353.88 | |
| 66 | 89502385 | REMOV EX CONC FDN | 4 | EACH | $1,147.45 |