$23,863.53Avg low bid / L SUM
$28,189.81Avg of all bids
—Avg engineer's estimate
320Jobs · 320 L SUM
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2026 | 135 | 135 | $29,822.16 | $31,061.41 |
| 2025 | 181 | 181 | $19,918.32 | $26,454.03 |
| 2024 | 4 | 4 | $1,280.48 | $2,265.24 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Sep 18, 2026 | 64V52 | WinnebagoDistrict 2 | 1 L SUM | $25,000.00 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Sep 18, 2026 | 66T15 | LasalleDistrict 3 | 1 L SUM | $25,000.00 | ROADSAFE TRAFFIC SYSTEMS, INC. |
| Sep 18, 2026 | 78B55 | JacksonDistrict 9 | 1 L SUM | $48,000.00 | Samron Midwest Contracting, Inc. |
| Sep 18, 2026 | 80C95 | WillDistrict 1 | 1 L SUM | $5,102.84 | Gallagher Asphalt Corporation |
| Sep 18, 2026 | 61M68 | KaneDistrict 1 | 1 L SUM | $0.0100 | D. Construction, Inc. |
| Sep 18, 2026 | 61M10 | Kane, DupageDistrict 1 | 1 L SUM | $1.00 | K-Five Construction Corporation |
| Sep 18, 2026 | 62V55 | CookDistrict 1 | 1 L SUM | $5,000.00 | Gallagher Asphalt Corporation |
| Sep 18, 2026 | 62V90 | CookDistrict 1 | 1 L SUM | $1.00 | K-Five Construction Corporation |
| Sep 18, 2026 | 62X33 | KaneDistrict 1 | 1 L SUM | $10,000.00 | Builders Paving, LLC |
| Sep 18, 2026 | 62X38 | VariousDistrict 1 | 1 L SUM | $72,500.00 | Semper Fi Yard Service, Inc. d/b/a Semper Fi Land Service, Inc. |
| Sep 18, 2026 | 62Y03 | LakeDistrict 1 | 1 L SUM | $1,500.00 | M & M Concrete, Inc. |
| Jul 31, 2026 | 66M85 | LivingstonDistrict 3 | 1 L SUM | $500.00 | ICC Group Inc. |
| Jul 31, 2026 | 72J00 | Macoupin, SangamonDistrict 6 | 1 L SUM | $100.00 | Freehill Asphalt, Inc. |
| Jul 31, 2026 | 72J44 | Brown, PikeDistrict 6 | 1 L SUM | $22,377.42 | Illinois Valley Paving, a div of UCM, Inc. |
| Jul 31, 2026 | 62V79 | LakeDistrict 1 | 1 L SUM | $45,000.00 | Denler, Inc. |
| Jul 31, 2026 | 74829 | MoultrieDistrict 7 | 1 L SUM | $53,217.36 | Howell Paving, Inc. |
| Jul 31, 2026 | 62V80 | WillDistrict 1 | 1 L SUM | $5,000.00 | Denler, Inc. |
| Jul 31, 2026 | 62W91 | CookDistrict 1 | 1 L SUM | $175.10 | H & H Electric Co. |
| Jul 31, 2026 | 76V11 | MadisonDistrict 8 | 1 L SUM | $3,500.00 | Kinney Contractors, Inc. |
| Jul 31, 2026 | 61K67 | KaneDistrict 1 | 1 L SUM | $9,400.00 | Builders Paving, LLC |
| Jul 31, 2026 | 66T37 | LasalleDistrict 3 | 1 L SUM | $13,750.00 | Ficek Electric & Communication Systems, Inc. |
| Jul 31, 2026 | 92621 | SangamonDistrict 6 | 1 L SUM | $0.0100 | Illinois Valley Paving, a div of UCM, Inc. |
| Jul 31, 2026 | 62J64 | CookDistrict 1 | 1 L SUM | $1.00 | Peter Baker & Son Co. |
| Jul 31, 2026 | 80B42 | VariousDistrict 1 | 1 L SUM | $0.0100 | D. Construction, Inc. |
| Jun 12, 2026 | 68J56 | PeoriaDistrict 4 | 1 L SUM | $0.0100 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Jun 12, 2026 | 61L30 | KaneDistrict 1 | 1 L SUM | $1,000.00 | Builders Paving, LLC |
| Jun 12, 2026 | 80B33 | CookDistrict 1 | 1 L SUM | $42,170.00 | D. Construction, Inc. |
| Jun 12, 2026 | 64N73 | StephensonDistrict 2 | 1 L SUM | $100.00 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Jun 12, 2026 | 76U38 | Madison, St.clairDistrict 8 | 1 L SUM | $2,500.00 | Gerstner Electric, Inc. |
| Jun 12, 2026 | 61M53 | CookDistrict 1 | 1 L SUM | $15,000.00 | Builders Paving, LLC |
| Jun 12, 2026 | 68J70 | WoodfordDistrict 4 | 1 L SUM | $15,100.00 | Advanced Asphalt Company |
| Jun 12, 2026 | 61M42 | KaneDistrict 1 | 1 L SUM | $39,300.00 | D. Construction, Inc. |
| Jun 12, 2026 | 80C45 | MchenryDistrict 1 | 1 L SUM | $5,000.00 | Peter Baker & Son Co. |
| Jun 12, 2026 | 64V39 | StephensonDistrict 2 | 1 L SUM | $5,000.00 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Jun 12, 2026 | 76V12 | St.clairDistrict 8 | 1 L SUM | $50,000.00 | Kinney Contractors, Inc. |
| Jun 12, 2026 | 62V08 | Cook, Dupage, KaneDistrict 1 | 1 L SUM | $0.0100 | D. Construction, Inc. |
| Jun 12, 2026 | 68J72 | MarshallDistrict 4 | 1 L SUM | $3,257.17 | Advanced Asphalt Company |
| Jun 12, 2026 | 61M43 | KaneDistrict 1 | 1 L SUM | $26,750.00 | D. Construction, Inc. |
| Jun 12, 2026 | 80C89 | Cook, LakeDistrict 1 | 1 L SUM | $157.74 | H & H Electric Co. |
| Jun 12, 2026 | 66M84 | LasalleDistrict 3 | 1 L SUM | $0.0100 | D. Construction, Inc. |
| Jun 12, 2026 | 78B49 | JeffersonDistrict 9 | 1 L SUM | $5,000.00 | Samron Midwest Contracting, Inc. |
| Jun 12, 2026 | 62W83 | CookDistrict 1 | 1 L SUM | $158.70 | H & H Electric Co. |
| Jun 12, 2026 | 72J41 | AdamsDistrict 6 | 1 L SUM | $20,500.00 | W. L. Miller Company |
| Jun 12, 2026 | 61M44 | KaneDistrict 1 | 1 L SUM | $8,165.00 | Geske and Sons, Inc. |
| Jun 12, 2026 | 66T10 | LasalleDistrict 3 | 1 L SUM | $5,000.00 | Riber Construction, Inc. |
| Jun 12, 2026 | 78B59 | FranklinDistrict 9 | 1 L SUM | $8,000.00 | Samron Midwest Contracting, Inc. |
| Jun 12, 2026 | 62X37 | WillDistrict 1 | 1 L SUM | $16,533.00 | Semper Fi Yard Service, Inc. d/b/a Semper Fi Land Service, Inc. |
| Jun 12, 2026 | 74D54 | ColesDistrict 7 | 1 L SUM | $0.0100 | Howell Paving, Inc. |
| Jun 12, 2026 | 61M49 | CookDistrict 1 | 1 L SUM | $25,000.00 | Sjostrom & Sons, Inc. |
| Jun 12, 2026 | 66T11 | LasalleDistrict 3 | 1 L SUM | $6,000.00 | All States Painting, Inc. |
| Jun 12, 2026 | 80B23 | KaneDistrict 1 | 1 L SUM | $10,000.00 | Plote Construction, Inc. |
| Jun 12, 2026 | 64L94 | HenryDistrict 2 | 1 L SUM | $23,750.00 | Valley Construction Co. |
| Jun 12, 2026 | 76R32 | MadisonDistrict 8 | 1 L SUM | $6,050.00 | Stutz Excavating, Inc. |
| Jun 12, 2026 | 61M51 | CookDistrict 1 | 1 L SUM | $82,551.14 | Martam Construction Incorporated |
| Apr 24, 2026 | 76V07 | St. ClairDistrict 8 | 1 L SUM | $23,000.00 | Kinney Contractors, Inc. |
| Apr 24, 2026 | 62V71 | WillDistrict 1 | 1 L SUM | $0.0100 | D. Construction, Inc. |
| Apr 24, 2026 | 62X57 | CookDistrict 1 | 1 L SUM | $4,000.00 | Schroeder Asphalt Services, Inc. |
| Apr 24, 2026 | 76V05 | RandolphDistrict 8 | 1 L SUM | $4,000.00 | G. M. Sipes Construction, Inc. |
| Apr 24, 2026 | 61M37 | DupageDistrict 1 | 1 L SUM | $67,680.95 | R. W. Dunteman Company |
| Apr 24, 2026 | 80B10 | MchenryDistrict 1 | 1 L SUM | $204,400.00 | Peter Baker & Son Co. |
| Apr 24, 2026 | 62X44 | CookDistrict 1 | 1 L SUM | $1,600.00 | Mosley Construction 1, LLC |
| Apr 24, 2026 | 64T73 | LeeDistrict 2 | 1 L SUM | $16,500.00 | Martin & Company Excavating |
| Apr 24, 2026 | 80B30 | CookDistrict 1 | 1 L SUM | $66,700.00 | K-Five Construction Corporation |
| Apr 24, 2026 | 87909 | LasalleDistrict 3 | 1 L SUM | $5,000.00 | Davis Concrete Construction Co. |
| Apr 24, 2026 | 80B26 | CookDistrict 1 | 1 L SUM | $500.00 | Gallagher Asphalt Corporation |
| Apr 24, 2026 | 66P86 | BureauDistrict 3 | 1 L SUM | $3,000.00 | Advanced Asphalt Company |
| Apr 24, 2026 | 66P68 | IroquoisDistrict 3 | 1 L SUM | $21,525.00 | Iroquois Paving Corporation |
| Apr 24, 2026 | 80B31 | WillDistrict 1 | 1 L SUM | $2,072.00 | P. T. Ferro Construction Co. |
| Apr 24, 2026 | 87907 | GrundyDistrict 3 | 1 L SUM | $0.0100 | D. Construction, Inc. |
| Apr 24, 2026 | 68K89 | Putnam, MarshallDistrict 4 | 1 L SUM | $0.0100 | G. M. Sipes Construction, Inc. |
| Apr 24, 2026 | 76U41 | CalhounDistrict 8 | 1 L SUM | $3,300.00 | Illinois Valley Paving, a div of UCM, Inc. |
| Apr 24, 2026 | 61L84 | DupageDistrict 1 | 1 L SUM | $8,000.00 | K-Five Construction Corporation |
| Apr 24, 2026 | 80C49 | CookDistrict 1 | 1 L SUM | $270,625.00 | K-Five Construction Corporation |
| Apr 24, 2026 | 61L54 | CookDistrict 1 | 1 L SUM | $534,659.42 | Martam Construction Incorporated |
| Apr 24, 2026 | 72E74 | Adams, MacoupinDistrict 6 | 1 L SUM | $1,850.00 | Capitol Construction Group, LLC d/b/a Egizii Electric |
| Apr 24, 2026 | 76U70 | GreeneDistrict 8 | 1 L SUM | $31,855.00 | Keeley & Sons, Inc. |
| Apr 24, 2026 | 62L85 | CookDistrict 1 | 1 L SUM | $60,751.33 | K-Five Construction Corporation |
| Apr 24, 2026 | 61M36 | DupageDistrict 1 | 1 L SUM | $5,000.00 | Builders Paving, LLC |
| Apr 24, 2026 | 76U79 | St. ClairDistrict 8 | 1 L SUM | $17,500.00 | DMS Contracting, Inc. |
| Apr 24, 2026 | 61M34 | LakeDistrict 1 | 1 L SUM | $4,620.00 | Geske and Sons, Inc. |
| Feb 27, 2026 | 61M32 | CookDistrict 1 | 1 L SUM | $103,000.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 64V14 | VariousDistrict 2 | 1 L SUM | $500.00 | All States Painting, Inc. |
| Feb 27, 2026 | 62R23 | WillDistrict 1 | 1 L SUM | $0.0100 | D. Construction, Inc. & Kraemer North America, LLC JV |
| Feb 27, 2026 | 68K11 | VariousDistrict 4 | 1 L SUM | $500.00 | All States Painting, Inc. |
| Feb 27, 2026 | 78B52 | JeffersonDistrict 9 | 1 L SUM | $42,641.79 | E. T. Simonds Construction Company |
| Feb 27, 2026 | 68F91 | Fulton, McdonoughDistrict 4 | 1 L SUM | $15,784.61 | Gunther Construction, a div of UCM, Inc. |
| Feb 27, 2026 | 62W92 | VariousDistrict 1 | 1 L SUM | $0.0100 | Helm Electric Facility Solutions, Inc. d/b/a Helm Electric |
| Feb 27, 2026 | 76V02 | St. ClairDistrict 8 | 1 L SUM | $72,875.00 | The Kilian Corporation |
| Feb 27, 2026 | 78B83 | Franklin, SalineDistrict 9 | 1 L SUM | $0.0100 | Samron Midwest Contracting, Inc. |
| Feb 27, 2026 | 72A82 | VariousDistrict 6 | 1 L SUM | $2,500.00 | SKC Construction, Inc. |
| Feb 27, 2026 | 64R72 | WinnebagoDistrict 2 | 1 L SUM | $1.00 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Feb 27, 2026 | 61L66 | KaneDistrict 1 | 1 L SUM | $12,000.00 | Schroeder Asphalt Services, Inc. |
| Feb 27, 2026 | 80B25 | DupageDistrict 1 | 1 L SUM | $153,625.00 | R. W. Dunteman Company |
| Feb 27, 2026 | 61L93 | CookDistrict 1 | 1 L SUM | $149,454.94 | K-Five Construction Corporation |
| Feb 27, 2026 | 74D47 | Effingham, FayetteDistrict 7 | 1 L SUM | $500.00 | All States Painting, Inc. |
| Feb 27, 2026 | 64S71 | CarrollDistrict 2 | 1 L SUM | $1.00 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Feb 27, 2026 | 61L87 | CookDistrict 1 | 1 L SUM | $40,000.00 | Gallagher Asphalt Corporation |
| Feb 27, 2026 | 80B75 | LakeDistrict 1 | 1 L SUM | $73,405.00 | Peter Baker & Son Co. |
| Feb 27, 2026 | 61M05 | CookDistrict 1 | 1 L SUM | $21,545.95 | K-Five Construction Corporation |
| Feb 27, 2026 | 76U40 | MarionDistrict 8 | 1 L SUM | $42,804.96 | Howell Paving, Inc. |
| Feb 27, 2026 | 61M18 | CookDistrict 1 | 1 L SUM | $4,000.00 | Gallagher Asphalt Corporation |
| Feb 27, 2026 | 64V13 | Winnebago, BooneDistrict 2 | 1 L SUM | $50.00 | M & M Concrete, Inc. |
| Feb 27, 2026 | 61M31 | CookDistrict 1 | 1 L SUM | $13,750.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 64U56 | Jo DaviessDistrict 2 | 1 L SUM | $650.00 | Louie's Trenching Service, Inc. |
| Feb 27, 2026 | 76U67 | St. ClairDistrict 8 | 1 L SUM | $98,433.00 | Christ Bros. Asphalt, Inc. |
| Jan 16, 2026 | 64V02 | VariousDistrict 2 | 1 L SUM | $50.00 | M & M Concrete, Inc. |
| Jan 16, 2026 | 61L90 | CookDistrict 1 | 1 L SUM | $461,444.80 | A Lamp Concrete Contractors, Inc. |
| Jan 16, 2026 | 61L81 | WillDistrict 1 | 1 L SUM | $100.00 | K-Five Construction Corporation |
| Jan 16, 2026 | 80B29 | LakeDistrict 1 | 1 L SUM | $1,958.00 | Peter Baker & Son Co. |
| Jan 16, 2026 | 78B53 | PerryDistrict 9 | 1 L SUM | $0.0100 | E. T. Simonds Construction Company |
| Jan 16, 2026 | 61L94 | MchenryDistrict 1 | 1 L SUM | $3,352.80 | Geske and Sons, Inc. |
| Jan 16, 2026 | 64V03 | WinnebagoDistrict 2 | 1 L SUM | $50.00 | M & M Concrete, Inc. |
| Jan 16, 2026 | 64V08 | VariousDistrict 2 | 1 L SUM | $300.00 | Pressure Washing Unlimited Inc. |
| Jan 16, 2026 | 61L99 | Will, CookDistrict 1 | 1 L SUM | $0.0100 | Iroquois Paving Corporation |
| Jan 16, 2026 | 80B34 | WillDistrict 1 | 1 L SUM | $12,000.00 | Gallagher Asphalt Corporation |
| Jan 16, 2026 | 78B63 | UnionDistrict 9 | 1 L SUM | $30,254.83 | E. T. Simonds Construction Company |
| Jan 16, 2026 | 61L95 | Kane, Dupage, WillDistrict 1 | 1 L SUM | $55,000.00 | Geneva Construction Company LLC. |
| Jan 16, 2026 | 64V04 | VariousDistrict 2 | 1 L SUM | $50.00 | M & M Concrete, Inc. |
| Jan 16, 2026 | 61L44 | DupageDistrict 1 | 1 L SUM | $1.00 | Builders Paving, LLC |
| Jan 16, 2026 | 61M09 | CookDistrict 1 | 1 L SUM | $246,000.00 | Martam Construction Incorporated |
| Jan 16, 2026 | 66R42 | KankakeeDistrict 3 | 1 L SUM | $500.00 | Van-Mack Electric Co. |
| Jan 16, 2026 | 78B75 | FranklinDistrict 9 | 1 L SUM | $0.0100 | E. T. Simonds Construction Company |
| Jan 16, 2026 | 61M07 | MchenryDistrict 1 | 1 L SUM | $40,000.00 | Curran Contracting Company |
| Jan 16, 2026 | 66R77 | VariousDistrict 3 | 1 L SUM | $50.00 | M & M Concrete, Inc. |
| Jan 16, 2026 | 61L89 | CookDistrict 1 | 1 L SUM | $9,000.00 | Builders Paving, LLC |
| Jan 16, 2026 | 62321 | CookDistrict 1 | 1 L SUM | $4,600.00 | MAT Construction Leasing, Inc. |
| Jan 16, 2026 | 74D34 | ShelbyDistrict 7 | 1 L SUM | $5,743.43 | A & R Mechanical Service, Inc. |
| Jan 16, 2026 | 61L56 | Kane, DupageDistrict 1 | 1 L SUM | $1.00 | K-Five Construction Corporation |
| Jan 16, 2026 | 74D37 | EffinghamDistrict 7 | 1 L SUM | $3,565.00 | Capitol Construction Group, LLC d/b/a Egizii Electric |
| Jan 16, 2026 | 64V22 | HenryDistrict 2 | 1 L SUM | $12,000.00 | Homer Tree Service, Inc. |
| Jan 16, 2026 | 62P93 | CookDistrict 1 | 1 L SUM | $47,500.00 | Triggi Construction, Inc. |
| Jan 16, 2026 | 61L36 | DupageDistrict 1 | 1 L SUM | $3,000.00 | Acura Inc. |
| Jan 16, 2026 | 61L75 | CookDistrict 1 | 1 L SUM | $92,750.00 | A Lamp Concrete Contractors, Inc. |
| Jan 16, 2026 | 78B51 | GallatinDistrict 9 | 1 L SUM | $2,500.00 | Samron Midwest Contracting, Inc. |
| Jan 16, 2026 | 72G90 | ChristianDistrict 6 | 1 L SUM | $20,891.37 | Illinois Valley Paving, a div of UCM, Inc. |
| Nov 7, 2025 | 61L73 | WillDistrict 1 | 1 L SUM | $0.0100 | D. Construction, Inc. |
| Nov 7, 2025 | 61L83 | LakeDistrict 1 | 1 L SUM | $7,430.00 | Peter Baker & Son Co. |
| Nov 7, 2025 | 61L77 | CookDistrict 1 | 1 L SUM | $5,500.00 | Triggi Construction, Inc. |
| Nov 7, 2025 | 61L79 | DupageDistrict 1 | 1 L SUM | $4,156.60 | K-Five Construction Corporation |
| Nov 7, 2025 | 61L76 | CookDistrict 1 | 1 L SUM | $1.00 | Davis Concrete Construction Co. |
| Nov 7, 2025 | 78B54 | JacksonDistrict 9 | 1 L SUM | $8,597.90 | E. T. Simonds Construction Company |
| Nov 7, 2025 | 61L80 | DupageDistrict 1 | 1 L SUM | $20,000.00 | Schroeder Asphalt Services, Inc. |
| Nov 7, 2025 | 61L97 | KaneDistrict 1 | 1 L SUM | $7,275.58 | Everlast Blacktop Inc. |
| Nov 7, 2025 | 87843 | DekalbDistrict 3 | 1 L SUM | $8,000.00 | Martin & Company Excavating |
| Nov 7, 2025 | 64R26 | JodaviessDistrict 2 | 1 L SUM | $100.00 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Nov 7, 2025 | 62Y00 | WillDistrict 1 | 1 L SUM | $0.0100 | C & D Recycling Services, Inc. |
| Nov 7, 2025 | 68F45 | WoodfordDistrict 4 | 1 L SUM | $289,899.99 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Nov 7, 2025 | 61L57 | DupageDistrict 1 | 1 L SUM | $10,000.00 | K-Five Construction Corporation |
| Nov 7, 2025 | 78813 | PerryDistrict 9 | 1 L SUM | $5,000.00 | Samron Midwest Contracting, Inc. |
| Nov 7, 2025 | 87884 | LivingstonDistrict 3 | 1 L SUM | $10,000.00 | D. Construction, Inc. |