2024-1059-BDS
- Let date
- Friday, September 18, 2026
- Contract
- 62Y03 · job page
- District
- District 1
- County
- Lake
- Highway
- Limits
- This Improvement consists of the placement of bridge deck concrete sealer upon the entire top surface of the bridge deck, sidewalks, top of inside vertical faces of the parapets, face of curbs and inside and outside of dividing walls along walkways of the structure, both faces of parapet where parapet separates roadway from sidewalk. These improvements are located on various routes/ structures within the Lake County limits.
- Classification
- The placement of bridge deck concrete sealer upon the entire top surface of the bridge deck, sidewalks, top of ·
- Project number
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | M & M Concrete, Inc. Low bidder | $262,641 | ||
| 2 | Path Construction Company, Inc. | $549,621 | +109.3% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 M & M Concrete,… | #2 Path Constructi… |
|---|---|---|---|---|---|---|---|
| 1 | X5870015 | BR DK CONCRETE SEALER | 604,129 | SQ FT | $0.3200 | $0.5000 | |
| 2 | X7011015 | TR C-PROT EXPRESSWAYS | 1 | L SUM | $5,000.00 | $78,000.00 | |
| 3 | X7200061 | TEMP INFO SIGNING | 51.4 | SQ FT | $50.00 | $40.00 | |
| 4 | 67100100 | MOBILIZATION | 1 | L SUM | $14,000.00 | $32,500.00 | |
| 5 | 70100310 | TRAF CONT-PROT 701421 | 1 | L SUM | $1,500.00 | $48,000.00 | |
| 6 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $1,500.00 | $24,500.00 | |
| 7 | 70102622 | TR CONT & PROT 701502 | 1 | L SUM | $14,000.00 | $24,500.00 | |
| 8 | 70102625 | TR CONT & PROT 701606 | 1 | L SUM | $15,000.00 | $14,000.00 | |
| 9 | 70102630 | TR CONT & PROT 701601 | 1 | L SUM | $15,000.00 | $5,000.00 | |
| 10 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $250.00 | $13,500.00 | |
| 11 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $250.00 | $500.00 | |
| 12 | 70200100 | NIGHT WORK ZONE LIGHT | 1 | L SUM | $250.00 | $5,000.00 |