| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 17, 2025 | 61K91 | LakeDistrict 1 | Resurfacing Washington Avenue from Western Avenue to Sheridan Road in Highland. | — | Executed | Peter Baker & Son Co. $464,636 · | ||
| Jan 17, 2025 | 62W32 | LakeDistrict 1 | The installing scour countermeasures such as riprap erosion control and landscaping The improvement consists of the installing scour countermeasures such as riprap erosion control and landscaping. The project is located approximately 0.1 miles west of the Tri-State Tollway (I-94) and 1,100 ft east of Illinois Route 21 at SN 049-0046 and SN 049-0047 along Illinois Route 120 in the Village of Gurnee in Lake County. | — | Executed | Martam Construction Incorporated $617,286 · | ||
| Jan 17, 2025 | 62X49 | LakeDistrict 1 | A Bridge Painting of the existing structure (049-0171) carrying IL 59 over Rollins Road, the existing structur This improvement consists of a Bridge Painting of the existing structure (049-0171) carrying IL 59 over Rollins Road, the existing structure (049-0016) carrying Washington Road over US 41, and the existing structure (049-0097) carrying Washington Road over the UP RR in the Village of FOX Lake, and the Village of FOX Lake, and the City of Park City in Lake County for a total length of 749 feet. | — | Executed | Capital Industrial Services, LLC $893,330 · | ||
| Mar 7, 2025 | 61L05 | LakeDistrict 1 | Resurfacing, PCC base course, decorative PCC sidewalk, granite cobble curb, brick paver banding, and crosswalks, decorative lighting, and landscaping on Deerpath Road from Oakwood Avenue to Western Avenue in Lake Forest. | — | Executed | D'Land Construction, LLC $2,990,057 · | ||
| Mar 7, 2025 | 61L16 | LakeDistrict 1 | Sidewalk improvements at various intersections in Lake Forest. | — | Executed | D'Land Construction, LLC $246,136 · | ||
| Mar 7, 2025 | 61L17 | LakeDistrict 1 | Resurfacing Hart Road from West of the Village limits to Round Lake Road in Round Lake | — | Executed | Peter Baker & Son Co. $388,288 · | ||
| Mar 7, 2025 | 62U91 | LakeDistrict 1 | (1.61-Mile) Standard Overlay, New Shoulders improvement consisting of hot-mix asphalt surface removal, pavement patching, nominal curb and gutter replacement hot-mix asphalt resurfacing, installation of hot-mix asphalt shoulders, grading and shaping of existing aggregate shoulders, and thermoplastic pavement marking Old Skokie Road from US 41 (Skokie Highway) to the Wisconsin State Line within the Village of Wadsworth, in Lake County. | — | Executed | Payne & Dolan, Inc. $2,424,972 · | ||
| Mar 7, 2025 | 62X21 | CookLakeDistrict 1 | Cleaning and painting designated steel surfaces This is a bridge painting project consists of cleaning and painting designated steel surfaces. Location #1: IL-58 (Dempster St) over I-94 (Edens Expwy) Village of Skokie in Cook County SN: 016-0943. Location #2: Clavey Rd over US-41 (Edens) City of Highland Park in Lake County SN: 049-0165. Location #3: Tower Rd over I-94/US-41 (Edens) Village of Northfield in Cook County SN: 016-0815. | — | Executed | ERA-Valdivia Contractors, Inc. $1,181,744 · | ||
| Mar 7, 2025 | 62X79 | CookLakeDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish located on I-94 (Edens Expwy) / US 41 (Skokie Hwy) expressway from Clavey Rd to I-90 (Kennedy Expwy) in Cook and Lake Counties. | — | Executed | The Final Connection, Inc. $164,400 · | ||
| Mar 7, 2025 | 62X90 | LakeDistrict 1 | The pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, dec The work to be done under Arterial Cleaning shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish located on various State maintained arterial routes located within the county of Lake. | — | Executed | Central Sweeping of Illinois, LLC $2,728,800 · | ||
| Apr 25, 2025 | 61L31 | LakeDistrict 1 | Resurfacing, curb and gutter, and sidewalk replacement on Sheridan Road from Washington Street to south of Liberty Street in Waukegan. | — | Executed | Peter Baker & Son Co. $605,278 · | ||
| Apr 25, 2025 | 61L32 | LakeDistrict 1 | Resurfcing, curb and gutter, and sidewalk replacement on Galilee Avenue from 21st Street to 33rd Street in Zion. | — | Executed | Peter Baker & Son Co. $892,838 · | ||
| Apr 25, 2025 | 62V38 | LakeDistrict 1 | (2.07-Mile) Pavement Patching, hot-mix asphalt surface removal and resurfacing, pavement patching, aggregate wedge shoulder and thermoplastic pavement marking. This improvement is in Village of Old Mill Creek and Unincorporated Lake Villa and Antioch Township in Lake County. | — | Executed | Peter Baker & Son Co. $682,917 · | ||
| Apr 25, 2025 | 62V75 | LakeDistrict 1 | (2.80-Mile) SMART Overlay, Traffic Signal Modernization and ADA Ramp Improvements hot-mix asphalt surface removal, placement of hot mix surface course, pedestrian ramp improvements, pavement patching, placement of pavement markings. Location: IL 59 (Fox Lake Rd) from IL 173 to Highwoods Dr within the Village of Antioch. | — | Executed | Peter Baker & Son Co. $1,949,721 · | ||
| Apr 25, 2025 | 62W59 | LakeDistrict 1 | Trombone Mast Arms replacement project including new traffic signal heads, pedestrian traffic signal heads, accessible pedestrian signals, traffic signal posts, conduits, electric cable, and handholes installations at various locations in District 1. | — | Executed | H & H Electric Co. $1,101,716 · | ||
| Apr 25, 2025 | 62X32 | LakeDistrict 1 | (3.38-Mile) Standard and Designed Overlay, ADA Improvements: HMA surface removal and replacement, Class D patches, sidewalk and curb removal and replacement, drainage structures adjustments, detector loops replacement, pavement markings and collateral work. Location 1) Sheridan Road (Naval Station G Street to Moffett Road), Location 2) Scranton Avenue (Green Bay Road to Sheridan Road, both located in the Village of Lake Bluff. | — | Executed | Peter Baker & Son Co. $2,996,992 · | ||
| Apr 25, 2025 | 62X39 | LakeDistrict 1 | (126-Ft) Surface Removal and HMA Overlay including guardrail and terminal removal and reinstallation, preformed joint seal removal and replacement, crack routing and filling, pavement markings. Located at the west approach of (S.N. 049-0221) on IL 120 (Belvidere Road) over I-94 in the Village of Libertyville in Lake County, and at the south approach of (S.N. 049-0209) on U.S. 41 (Skokie Highway) over IL 132 (Grand Avenue) in the Village of Gurnee in Lake County. | — | Executed | Schroeder Asphalt Services, Inc. $198,854 · | ||
| Jun 13, 2025 | 61J86 | LakeDistrict 1 | Construction of new pavement to extend Hook Drive from Nicole Lane to Orchard Lane, and the construction of Nicole Lane from Hook Drive to Rollins Road in Round Lake Beach. Includes; Excavation, Aggregate base and sub-base, HMA Pavement, Sidewalk, curb and gutter, storm and sanitary sewer, water main, landscaping, lighting foundations and conduit. | — | Executed | Lake County Grading Company, LLC $4,391,124 · | ||
| Jun 13, 2025 | 61K96 | LakeDistrict 1 | HMA resurfacing and shoulder widening on Saunders Road from Duffy Lane to Riverwoods Road in Riverwoods. | — | Executed | |||
| Jun 13, 2025 | 61L52 | LakeDistrict 1 | Construction of an HMA Bike Path in Round Lake. Includes sidewalk removal, storm sewer, pavement markings, and parkway restoration. | — | Executed | Alliance Contractors, Inc. $521,885 · | ||
| Jun 13, 2025 | 62P73 | LakeDistrict 1 | US RTE 12 (10 The projects consist of US RTE 12 (10.39 miles) - SMART Overlay, shoulders, shoulder rumble strips, channelization, and pavement markings and IL RTE 176 (0.71 miles) - shoulder and centerline rumble strips and pavement markings. Project located in Villages of Fox Lake, Volo, Lakemoor, Wauconda and Mundelein | — | Executed | Curran Contracting Company $16,944,587 · | ||
| Jun 13, 2025 | 62V39 | LakeDistrict 1 | Resurfacing of the existing HMA pavement with HMA surface course, adding 4-foot wide HMA shoulders, thermoplas (1.91-Mile) Project consists of resurfacing of the existing HMA pavement with HMA surface course, adding 4-foot wide HMA shoulders, thermoplastic pavement markings. This project is located along US 45 in the Village of Antioch and the Township of Antioch in Lake County. | — | Executed | Payne & Dolan, Inc. $1,630,685 · | ||
| Jun 13, 2025 | 62V58 | LakeDistrict 1 | (2.02-Mile) SMART Overlay, Shoulder Repair and ADA Improvements consists (HMA) removal, earth excavation, pavement patching, resurfacing with (HMA) asphalt, full depth hot-mix asphalt shoulder, placement of pavement markings, installation of raised reflective pavement markers, ADA ramps, traffic signals, detector loops. Project located on IL 131 (Green Bay Road) from IL 173 (Rosecrans Road) to Russell Road in the City of Zion. | — | Executed | Peter Baker & Son Co. $3,524,201 · | ||
| Sep 19, 2025 | 61K52 | LakeDistrict 1 | Construction of an open-spandrel arch bridge with cast-in-place concrete deck and bituminous overlay on Lake Road over an unamed ravine in Lake Forest. | — | Executed | Dunnet Bay Construction Company $4,297,627 · | ||
| Sep 19, 2025 | 62J29 | LakeDistrict 1 | Tree removal along IL Route 22, from east of Quentin Road to west of IL Route 83 (3.27-Mile) The improvement consists of tree removal along IL Route 22, from east of Quentin Road to west of IL Route 83. The project is located within the Villages of Hawthorn Woods, Kildeer and Long Grove and within Lake County. | — | Executed | Clean Cut Tree Service, Inc. $586,632 · | ||
| Sep 19, 2025 | 62X00 | LakeDistrict 1 | Advance tree removal as well as all incidental and collateral work necessary to complete the project The scope of work consists of advance tree removal as well as all incidental and collateral work necessary to complete the project. This project is in the City of Highland in Lake County. | — | Executed | Clean Cut Tree Service, Inc. $151,131 · | ||
| Nov 7, 2025 | 61L83 | LakeDistrict 1 | HMA resurfacing on Oak Spring Road from Appley Avenue to St. Mary's Road in Libertyville. Includes; pavement pathcing, ADA ramps, and signage. | — | Executed | Peter Baker & Son Co. $774,012 · | ||
| Jan 16, 2026 | 46943 | LakeDistrict 1 | Bridge replacement (Ex SN 049-0185, Pr SN 049-0400) and other misc repairs at Illinois Beach State Park in Lak This project consists of bridge replacement (Ex SN 049-0185, Pr SN 049-0400) and other misc repairs at Illinois Beach State Park in Lake County, IL. | — | Executed | Alliance Contractors, Inc. $578,450 · | ||
| Jan 16, 2026 | 61L19 | LakeDistrict 1 | Construction of a single-span PPC IL-beam bridge with intgral abutments carrying Greenwood Avenue over the Union Pacific Railroad in Waukegan. Additional work includes MSE retaining walls, HMA approach roadways, guardrail, and lighting. | — | Executed | Dunnet Bay Construction Company $7,980,812 · | ||
| Jan 16, 2026 | 61L42 | LakeDistrict 1 | Roadway widening and HMA resurfacing of Waukegan Road and Westleigh Road in Lake Forest. Includes traffic signal modernization, lighting, curb and gutter, sidewalks, and storm sewer. | — | Executed | D'Land Construction, LLC $3,663,043 · | ||
| Jan 16, 2026 | 61M08 | LakeDistrict 1 | Reconstruction of Green Bay Road from IL 176 to South of Witchwood Lane in the Village of Lake Bluff. | — | Executed | Campanella and Sons, Inc. $3,131,134 · | ||
| Jan 16, 2026 | 80B29 | LakeDistrict 1 | (0.46-mile) Designed Overlay consisting of hot-mix asphalt surface removal, depth patches (Class D), curb and gutter spot repairs (removal and replacement) hot-mix asphalt resurfacing (cold milling and inlay), new thermoplastic pavement markings. Located on US 45 (Lake Street) from north of Tempel Drive to Ramp to IL 137 within the Village of Libertyville. | — | Executed | Peter Baker & Son Co. $1,013,752 · | ||
| Jan 16, 2026 | 80B50 | LakeDistrict 1 | (1.08-Mile) Standard Overlay and ADA Improvements: curb and gutter spot repairs (remove and replace), sidewalk removal and replacement for curb ramps for sidewalks (ADA), hot-mix asphalt (HMA) surface removal and replacement (cold milling and inlay), full-depth patches (Class D), drainage structures adjustments and cleaning, new thermoplastic pavement markings raised reflective pavement markers, accessible pedestrian signals (APS) improvements and detector loops. Location: US 45 (Lake Street), f | — | Executed | Builders Paving, LLC $1,797,808 · | ||
| Feb 27, 2026 | 62T82 | LakeDistrict 1 | A single culvert removal and replacement includes shoulder widening at the culvert, guardrail removal and repl Project consists of a single culvert removal and replacement includes shoulder widening at the culvert, guardrail removal and replacement and ditch regrading. Project is located on Illinois Route 173 over an unnamed Ditch, 0.5 miles east of Illinois Route 131 in the city of Zion, IL. | — | Executed | Martam Construction Incorporated $1,524,058 · | ||
| Feb 27, 2026 | 62W78 | LakeDistrict 1 | Project includes Lighting Improvement including removal of light towers and replace it with poles, LED luminaires, metal foundations, lighting controller, conduit and cables lighting improvements at US 41 at Park Ave and US 41 at Clavey Rd. in Highland Park. | — | Executed | Hecker and Company, Inc. $1,798,186 · | ||
| Feb 27, 2026 | 80B75 | LakeDistrict 1 | Asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian r (4.21-Mile) Standard overlay and ADA curb ramp improvement project consists of asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian ramp improvements, pavement patching, placement of pavement markings, traffic signal modernization. Located on IL-59 from North of IL-132 (Grand Ave) to US-12, within the Villages of Fox Lake, Lake Villa and Unincorporated Ingleside in Lake County. | — | Executed | Peter Baker & Son Co. $3,291,674 · | ||
| Apr 24, 2026 | 61M34 | LakeDistrict 1 | Resurfacing Brierwoods Lane from Lake Zurich City Limits to Bruce Circle N; Bruce Circle N from Brierwoods Lane to Acorn Drive and Acorn Drive from Bruce Circle N to Old McHenry Road in the Village of Hawthorn Woods. | — | Executed | Geske and Sons, Inc. $518,460 · | ||
| Apr 24, 2026 | 61M41 | LakeDistrict 1 | PCC sidewalk along Sheridan Road from Cedar Avenue to roger Williams Avenue in Highland Park. Includes; HMA resurfacing, PCC driveways, retaining wall, and drainage improvements. | — | Executed | Alliance Contractors, Inc. $3,060,718 · | ||
| Apr 24, 2026 | 80B80 | CookLakeDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot LITTER PICKING. The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish which has accumulated on the highway located on I-94 (Edens Expwy) / US 41 (Skokie Hwy) expressway from Clavey Road to I-90 (Kennedy Expwy) in Cook and Lake Counties. | — | Executed | Orlando Lawn Service, Inc. $150,790 · | ||
| Jun 12, 2026 | 62V77 | LakeDistrict 1 | Routing, cleaning, and sealing of longitudinal cracks in existing HMA (Hot-Mix Asphalt) pavement and between t (9,669-Ft) Crack and Joint Sealing project consists of routing, cleaning, and sealing of longitudinal cracks in existing HMA (Hot-Mix Asphalt) pavement and between the existing HMA pavement and curb and gutter, restriping with Modified Urethane pavement marking lines. The project is located within the Village of Lake Villa and unincorporated Lake Villa Township in Lake County. | — | Executed | Mosley Construction 1, LLC $579,146 · | ||
| Jun 12, 2026 | 80C48 | LakeDistrict 1 | (3,760-Ft) Standard Overlay, HMA surface removal and overlay, pavement patching maintenance of traffic, pavement marking, landscaping, ADA curb ramps, APS improvements, curb and gutter removal and replacement, median removal and replacement, guardrail removal and replacement, impact attenuator installation, bridge pier crash wall repairs. Located on W. Peterson Road from west of IL 137 to US 45 in the Village of Libertyville in Lake County. | — | Executed | Peter Baker & Son Co. $2,084,785 · | ||
| Jun 12, 2026 | 80C89 | CookLakeDistrict 1 | This work includes mast arm and pole replacement, installation of LED signal heads, installation of accessible pedestrian signals, controller replacement and all incidental and collateral work necessary to complete the project. This project is located in Lake and Cook Counties in District 1. | — | Executed | H & H Electric Co. $2,718,198 · | ||
| Jun 12, 2026 | 80D46 | LakeDistrict 1 | The scope of work for this improvement includes a new 5x3 culvert under US 41 with associated pavement removal and patching, ditch grading, pavement removal and patching, temporary concrete barriers, curb and gutter, barrier median and landscaping. Located in the Village of Lake Bluff and Shields Township in Lake County. | — | Executed | Curran Contracting Company $1,087,000 · | ||
| Jul 31, 2026 | 62V79 | LakeDistrict 1 | 5,203-Ft) Crack and Joint Sealant improvement consisting of routing, cleaning, and sealing of longitudinal cracks and joints within the hot-mix asphalt pavement, grading and shaping shoulders, restriping with modified urethane pavement marking is located within the Villages of Island Lake and Wauconda in Lake County. | — | Executed | Denler, Inc. $190,610 · | ||
| Sep 18, 2026 | 61K62 | LakeDistrict 1 | Reconstruction of Deerfield Rd. from Milwaukee Ave. to Saunders Rd. in the villages of Buffalo Grove, Riverwoods and Deerfield. Work includes full-depth HMA pavement, curb and gutter, drainage improvements, precast box culverts, bridge deck replacement, sidewalk, multi-use path, traffic signal modernization and other required work. | — | Active | |||
| Sep 18, 2026 | 62Y03 | LakeDistrict 1 | The placement of bridge deck concrete sealer upon the entire top surface of the bridge deck, sidewalks, top of This Improvement consists of the placement of bridge deck concrete sealer upon the entire top surface of the bridge deck, sidewalks, top of inside vertical faces of the parapets, face of curbs and inside and outside of dividing walls along walkways of the structure, both faces of parapet where parapet separates roadway from sidewalk. These improvements are located on various routes/ structures within the Lake County limits. | — | Executed | M & M Concrete, Inc. $262,641 · |
1–46 of 46
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.