IDOT Jobs

All dates · 46 jobs · —
★ My Jobs

Filtered by: County: Lake Clear all

46 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 17, 2025 61K91 LakeDistrict 1 Resurfacing Washington Avenue from Western Avenue to Sheridan Road in Highland. — Executed Nov 25 New Peter Baker & Son Co. $464,636 ·
Jan 17, 2025 62W32 LakeDistrict 1 The installing scour countermeasures such as riprap erosion control and landscaping The improvement consists of the installing scour countermeasures such as riprap erosion control and landscaping. The project is located approximately 0.1 miles west of the Tri-State Tollway (I-94) and 1,100 ft east of Illinois Route 21 at SN 049-0046 and SN 049-0047 along Illinois Route 120 in the Village of Gurnee in Lake County. — Executed Nov 25 New Martam Construction Incorporated $617,286 ·
Jan 17, 2025 62X49 LakeDistrict 1 A Bridge Painting of the existing structure (049-0171) carrying IL 59 over Rollins Road, the existing structur This improvement consists of a Bridge Painting of the existing structure (049-0171) carrying IL 59 over Rollins Road, the existing structure (049-0016) carrying Washington Road over US 41, and the existing structure (049-0097) carrying Washington Road over the UP RR in the Village of FOX Lake, and the Village of FOX Lake, and the City of Park City in Lake County for a total length of 749 feet. — Executed Nov 25 New Capital Industrial Services, LLC $893,330 ·
Mar 7, 2025 61L05 LakeDistrict 1 Resurfacing, PCC base course, decorative PCC sidewalk, granite cobble curb, brick paver banding, and crosswalks, decorative lighting, and landscaping on Deerpath Road from Oakwood Avenue to Western Avenue in Lake Forest. — Executed Nov 25 New D'Land Construction, LLC $2,990,057 ·
Mar 7, 2025 61L16 LakeDistrict 1 Sidewalk improvements at various intersections in Lake Forest. — Executed Nov 25 New D'Land Construction, LLC $246,136 ·
Mar 7, 2025 61L17 LakeDistrict 1 Resurfacing Hart Road from West of the Village limits to Round Lake Road in Round Lake — Executed Nov 25 New Peter Baker & Son Co. $388,288 ·
Mar 7, 2025 62U91 LakeDistrict 1 (1.61-Mile) Standard Overlay, New Shoulders improvement consisting of hot-mix asphalt surface removal, pavement patching, nominal curb and gutter replacement hot-mix asphalt resurfacing, installation of hot-mix asphalt shoulders, grading and shaping of existing aggregate shoulders, and thermoplastic pavement marking Old Skokie Road from US 41 (Skokie Highway) to the Wisconsin State Line within the Village of Wadsworth, in Lake County. — Executed Nov 25 New Payne & Dolan, Inc. $2,424,972 ·
Mar 7, 2025 62X21 CookLakeDistrict 1 Cleaning and painting designated steel surfaces This is a bridge painting project consists of cleaning and painting designated steel surfaces. Location #1: IL-58 (Dempster St) over I-94 (Edens Expwy) Village of Skokie in Cook County SN: 016-0943. Location #2: Clavey Rd over US-41 (Edens) City of Highland Park in Lake County SN: 049-0165. Location #3: Tower Rd over I-94/US-41 (Edens) Village of Northfield in Cook County SN: 016-0815. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $1,181,744 ·
Mar 7, 2025 62X79 CookLakeDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish located on I-94 (Edens Expwy) / US 41 (Skokie Hwy) expressway from Clavey Rd to I-90 (Kennedy Expwy) in Cook and Lake Counties. — Executed Nov 25 New The Final Connection, Inc. $164,400 ·
Mar 7, 2025 62X90 LakeDistrict 1 The pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, dec The work to be done under Arterial Cleaning shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish located on various State maintained arterial routes located within the county of Lake. — Executed Nov 25 New Central Sweeping of Illinois, LLC $2,728,800 ·
Apr 25, 2025 61L31 LakeDistrict 1 Resurfacing, curb and gutter, and sidewalk replacement on Sheridan Road from Washington Street to south of Liberty Street in Waukegan. — Executed Nov 25 New Peter Baker & Son Co. $605,278 ·
Apr 25, 2025 61L32 LakeDistrict 1 Resurfcing, curb and gutter, and sidewalk replacement on Galilee Avenue from 21st Street to 33rd Street in Zion. — Executed Nov 25 New Peter Baker & Son Co. $892,838 ·
Apr 25, 2025 62V38 LakeDistrict 1 (2.07-Mile) Pavement Patching, hot-mix asphalt surface removal and resurfacing, pavement patching, aggregate wedge shoulder and thermoplastic pavement marking. This improvement is in Village of Old Mill Creek and Unincorporated Lake Villa and Antioch Township in Lake County. — Executed Nov 25 New Peter Baker & Son Co. $682,917 ·
Apr 25, 2025 62V75 LakeDistrict 1 (2.80-Mile) SMART Overlay, Traffic Signal Modernization and ADA Ramp Improvements hot-mix asphalt surface removal, placement of hot mix surface course, pedestrian ramp improvements, pavement patching, placement of pavement markings. Location: IL 59 (Fox Lake Rd) from IL 173 to Highwoods Dr within the Village of Antioch. — Executed Nov 25 New Peter Baker & Son Co. $1,949,721 ·
Apr 25, 2025 62W59 LakeDistrict 1 Trombone Mast Arms replacement project including new traffic signal heads, pedestrian traffic signal heads, accessible pedestrian signals, traffic signal posts, conduits, electric cable, and handholes installations at various locations in District 1. — Executed Nov 25 New H & H Electric Co. $1,101,716 ·
Apr 25, 2025 62X32 LakeDistrict 1 (3.38-Mile) Standard and Designed Overlay, ADA Improvements: HMA surface removal and replacement, Class D patches, sidewalk and curb removal and replacement, drainage structures adjustments, detector loops replacement, pavement markings and collateral work. Location 1) Sheridan Road (Naval Station G Street to Moffett Road), Location 2) Scranton Avenue (Green Bay Road to Sheridan Road, both located in the Village of Lake Bluff. — Executed Nov 25 New Peter Baker & Son Co. $2,996,992 ·
Apr 25, 2025 62X39 LakeDistrict 1 (126-Ft) Surface Removal and HMA Overlay including guardrail and terminal removal and reinstallation, preformed joint seal removal and replacement, crack routing and filling, pavement markings. Located at the west approach of (S.N. 049-0221) on IL 120 (Belvidere Road) over I-94 in the Village of Libertyville in Lake County, and at the south approach of (S.N. 049-0209) on U.S. 41 (Skokie Highway) over IL 132 (Grand Avenue) in the Village of Gurnee in Lake County. — Executed Nov 25 New Schroeder Asphalt Services, Inc. $198,854 ·
Jun 13, 2025 61J86 LakeDistrict 1 Construction of new pavement to extend Hook Drive from Nicole Lane to Orchard Lane, and the construction of Nicole Lane from Hook Drive to Rollins Road in Round Lake Beach. Includes; Excavation, Aggregate base and sub-base, HMA Pavement, Sidewalk, curb and gutter, storm and sanitary sewer, water main, landscaping, lighting foundations and conduit. — Executed Nov 25 New Lake County Grading Company, LLC $4,391,124 ·
Jun 13, 2025 61K96 LakeDistrict 1 HMA resurfacing and shoulder widening on Saunders Road from Duffy Lane to Riverwoods Road in Riverwoods. — Executed Nov 25 New
Jun 13, 2025 61L52 LakeDistrict 1 Construction of an HMA Bike Path in Round Lake. Includes sidewalk removal, storm sewer, pavement markings, and parkway restoration. — Executed Nov 25 New Alliance Contractors, Inc. $521,885 ·
Jun 13, 2025 62P73 LakeDistrict 1 US RTE 12 (10 The projects consist of US RTE 12 (10.39 miles) - SMART Overlay, shoulders, shoulder rumble strips, channelization, and pavement markings and IL RTE 176 (0.71 miles) - shoulder and centerline rumble strips and pavement markings. Project located in Villages of Fox Lake, Volo, Lakemoor, Wauconda and Mundelein — Executed Nov 25 New Curran Contracting Company $16,944,587 ·
Jun 13, 2025 62V39 LakeDistrict 1 Resurfacing of the existing HMA pavement with HMA surface course, adding 4-foot wide HMA shoulders, thermoplas (1.91-Mile) Project consists of resurfacing of the existing HMA pavement with HMA surface course, adding 4-foot wide HMA shoulders, thermoplastic pavement markings. This project is located along US 45 in the Village of Antioch and the Township of Antioch in Lake County. — Executed Nov 25 New Payne & Dolan, Inc. $1,630,685 ·
Jun 13, 2025 62V58 LakeDistrict 1 (2.02-Mile) SMART Overlay, Shoulder Repair and ADA Improvements consists (HMA) removal, earth excavation, pavement patching, resurfacing with (HMA) asphalt, full depth hot-mix asphalt shoulder, placement of pavement markings, installation of raised reflective pavement markers, ADA ramps, traffic signals, detector loops. Project located on IL 131 (Green Bay Road) from IL 173 (Rosecrans Road) to Russell Road in the City of Zion. — Executed Nov 25 New Peter Baker & Son Co. $3,524,201 ·
Sep 19, 2025 61K52 LakeDistrict 1 Construction of an open-spandrel arch bridge with cast-in-place concrete deck and bituminous overlay on Lake Road over an unamed ravine in Lake Forest. — Executed Nov 25 New Dunnet Bay Construction Company $4,297,627 ·
Sep 19, 2025 62J29 LakeDistrict 1 Tree removal along IL Route 22, from east of Quentin Road to west of IL Route 83 (3.27-Mile) The improvement consists of tree removal along IL Route 22, from east of Quentin Road to west of IL Route 83. The project is located within the Villages of Hawthorn Woods, Kildeer and Long Grove and within Lake County. — Executed Nov 25 New Clean Cut Tree Service, Inc. $586,632 ·
Sep 19, 2025 62X00 LakeDistrict 1 Advance tree removal as well as all incidental and collateral work necessary to complete the project The scope of work consists of advance tree removal as well as all incidental and collateral work necessary to complete the project. This project is in the City of Highland in Lake County. — Executed Nov 25 New Clean Cut Tree Service, Inc. $151,131 ·
Nov 7, 2025 61L83 LakeDistrict 1 HMA resurfacing on Oak Spring Road from Appley Avenue to St. Mary's Road in Libertyville. Includes; pavement pathcing, ADA ramps, and signage. — Executed Nov 25 New Peter Baker & Son Co. $774,012 ·
Jan 16, 2026 46943 LakeDistrict 1 Bridge replacement (Ex SN 049-0185, Pr SN 049-0400) and other misc repairs at Illinois Beach State Park in Lak This project consists of bridge replacement (Ex SN 049-0185, Pr SN 049-0400) and other misc repairs at Illinois Beach State Park in Lake County, IL. — Executed Nov 25 New Alliance Contractors, Inc. $578,450 ·
Jan 16, 2026 61L19 LakeDistrict 1 Construction of a single-span PPC IL-beam bridge with intgral abutments carrying Greenwood Avenue over the Union Pacific Railroad in Waukegan. Additional work includes MSE retaining walls, HMA approach roadways, guardrail, and lighting. — Executed Nov 25 New Dunnet Bay Construction Company $7,980,812 ·
Jan 16, 2026 61L42 LakeDistrict 1 Roadway widening and HMA resurfacing of Waukegan Road and Westleigh Road in Lake Forest. Includes traffic signal modernization, lighting, curb and gutter, sidewalks, and storm sewer. — Executed Nov 25 New D'Land Construction, LLC $3,663,043 ·
Jan 16, 2026 61M08 LakeDistrict 1 Reconstruction of Green Bay Road from IL 176 to South of Witchwood Lane in the Village of Lake Bluff. — Executed Nov 25 New Campanella and Sons, Inc. $3,131,134 ·
Jan 16, 2026 80B29 LakeDistrict 1 (0.46-mile) Designed Overlay consisting of hot-mix asphalt surface removal, depth patches (Class D), curb and gutter spot repairs (removal and replacement) hot-mix asphalt resurfacing (cold milling and inlay), new thermoplastic pavement markings. Located on US 45 (Lake Street) from north of Tempel Drive to Ramp to IL 137 within the Village of Libertyville. — Executed Nov 25 New Peter Baker & Son Co. $1,013,752 ·
Jan 16, 2026 80B50 LakeDistrict 1 (1.08-Mile) Standard Overlay and ADA Improvements: curb and gutter spot repairs (remove and replace), sidewalk removal and replacement for curb ramps for sidewalks (ADA), hot-mix asphalt (HMA) surface removal and replacement (cold milling and inlay), full-depth patches (Class D), drainage structures adjustments and cleaning, new thermoplastic pavement markings raised reflective pavement markers, accessible pedestrian signals (APS) improvements and detector loops. Location: US 45 (Lake Street), f — Executed Nov 25 New Builders Paving, LLC $1,797,808 ·
Feb 27, 2026 62T82 LakeDistrict 1 A single culvert removal and replacement includes shoulder widening at the culvert, guardrail removal and repl Project consists of a single culvert removal and replacement includes shoulder widening at the culvert, guardrail removal and replacement and ditch regrading. Project is located on Illinois Route 173 over an unnamed Ditch, 0.5 miles east of Illinois Route 131 in the city of Zion, IL. — Executed Nov 25 New Martam Construction Incorporated $1,524,058 ·
Feb 27, 2026 62W78 LakeDistrict 1 Project includes Lighting Improvement including removal of light towers and replace it with poles, LED luminaires, metal foundations, lighting controller, conduit and cables lighting improvements at US 41 at Park Ave and US 41 at Clavey Rd. in Highland Park. — Executed Nov 25 New Hecker and Company, Inc. $1,798,186 ·
Feb 27, 2026 80B75 LakeDistrict 1 Asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian r (4.21-Mile) Standard overlay and ADA curb ramp improvement project consists of asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian ramp improvements, pavement patching, placement of pavement markings, traffic signal modernization. Located on IL-59 from North of IL-132 (Grand Ave) to US-12, within the Villages of Fox Lake, Lake Villa and Unincorporated Ingleside in Lake County. — Executed Nov 25 New Peter Baker & Son Co. $3,291,674 ·
Apr 24, 2026 61M34 LakeDistrict 1 Resurfacing Brierwoods Lane from Lake Zurich City Limits to Bruce Circle N; Bruce Circle N from Brierwoods Lane to Acorn Drive and Acorn Drive from Bruce Circle N to Old McHenry Road in the Village of Hawthorn Woods. — Executed Nov 25 New Geske and Sons, Inc. $518,460 ·
Apr 24, 2026 61M41 LakeDistrict 1 PCC sidewalk along Sheridan Road from Cedar Avenue to roger Williams Avenue in Highland Park. Includes; HMA resurfacing, PCC driveways, retaining wall, and drainage improvements. — Executed Nov 25 New Alliance Contractors, Inc. $3,060,718 ·
Apr 24, 2026 80B80 CookLakeDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot LITTER PICKING. The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish which has accumulated on the highway located on I-94 (Edens Expwy) / US 41 (Skokie Hwy) expressway from Clavey Road to I-90 (Kennedy Expwy) in Cook and Lake Counties. — Executed Nov 25 New Orlando Lawn Service, Inc. $150,790 ·
Jun 12, 2026 62V77 LakeDistrict 1 Routing, cleaning, and sealing of longitudinal cracks in existing HMA (Hot-Mix Asphalt) pavement and between t (9,669-Ft) Crack and Joint Sealing project consists of routing, cleaning, and sealing of longitudinal cracks in existing HMA (Hot-Mix Asphalt) pavement and between the existing HMA pavement and curb and gutter, restriping with Modified Urethane pavement marking lines. The project is located within the Village of Lake Villa and unincorporated Lake Villa Township in Lake County. — Executed Nov 25 New Mosley Construction 1, LLC $579,146 ·
Jun 12, 2026 80C48 LakeDistrict 1 (3,760-Ft) Standard Overlay, HMA surface removal and overlay, pavement patching maintenance of traffic, pavement marking, landscaping, ADA curb ramps, APS improvements, curb and gutter removal and replacement, median removal and replacement, guardrail removal and replacement, impact attenuator installation, bridge pier crash wall repairs. Located on W. Peterson Road from west of IL 137 to US 45 in the Village of Libertyville in Lake County. — Executed Nov 25 New Peter Baker & Son Co. $2,084,785 ·
Jun 12, 2026 80C89 CookLakeDistrict 1 This work includes mast arm and pole replacement, installation of LED signal heads, installation of accessible pedestrian signals, controller replacement and all incidental and collateral work necessary to complete the project. This project is located in Lake and Cook Counties in District 1. — Executed Nov 25 New H & H Electric Co. $2,718,198 ·
Jun 12, 2026 80D46 LakeDistrict 1 The scope of work for this improvement includes a new 5x3 culvert under US 41 with associated pavement removal and patching, ditch grading, pavement removal and patching, temporary concrete barriers, curb and gutter, barrier median and landscaping. Located in the Village of Lake Bluff and Shields Township in Lake County. — Executed Nov 25 New Curran Contracting Company $1,087,000 ·
Jul 31, 2026 62V79 LakeDistrict 1 5,203-Ft) Crack and Joint Sealant improvement consisting of routing, cleaning, and sealing of longitudinal cracks and joints within the hot-mix asphalt pavement, grading and shaping shoulders, restriping with modified urethane pavement marking is located within the Villages of Island Lake and Wauconda in Lake County. — Executed Nov 25 New Denler, Inc. $190,610 ·
Sep 18, 2026 61K62 LakeDistrict 1 Reconstruction of Deerfield Rd. from Milwaukee Ave. to Saunders Rd. in the villages of Buffalo Grove, Riverwoods and Deerfield. Work includes full-depth HMA pavement, curb and gutter, drainage improvements, precast box culverts, bridge deck replacement, sidewalk, multi-use path, traffic signal modernization and other required work. — Active Nov 25 New
Sep 18, 2026 62Y03 LakeDistrict 1 The placement of bridge deck concrete sealer upon the entire top surface of the bridge deck, sidewalks, top of This Improvement consists of the placement of bridge deck concrete sealer upon the entire top surface of the bridge deck, sidewalks, top of inside vertical faces of the parapets, face of curbs and inside and outside of dividing walls along walkways of the structure, both faces of parapet where parapet separates roadway from sidewalk. These improvements are located on various routes/ structures within the Lake County limits. — Executed Nov 25 New M & M Concrete, Inc. $262,641 ·
1–46 of 46

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.