Limits
This project consists of bridge replacement (Ex SN 049-0185, Pr SN 049-0400) and other misc repairs at Illinois Beach State Park in Lake County, IL.
Classification
Bridge replacement (Ex SN 049-0185, Pr SN 049-0400) and other misc repairs at Illinois Beach State Park in Lak ·
Project number

Bidders 5

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate—
1 Alliance Contractors, Inc. Low bidder $578,450
2 Foundation Mechanics $589,847 +2.0%
3 Lorig Construction Company $677,264 +17.1%
4 MYS, Incorporated $778,960 +34.7%
5 Michels Construction, Inc. $977,997 +69.1%

Bid tab: unit prices 37 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Alliance Contra…#2 Foundation Mech…#3 Lorig Construct…#4 MYS, Incorporat…#5 Michels Constru…
1K1005421 SEEDING SPL0.18ACRE $14,520.00 $5,000.00 $15,000.00 $11,768.87 $14,391.00
2X0326806 WASHOUT BASIN1L SUM $750.00 $500.00 $250.00 $2,183.51 $328.85
3X2511630 EROS CONT BLANKET SPL745SQ YD $10.50 $2.00 $11.00 $2.80 $3.43
4X6310164 TRAF BAR TERM TY 14EACH $2,600.00 $2,600.00 $2,600.00 $2,822.28 $3,563.49
5X6640300 CH LK FENCE REMOV200FOOT $15.00 $4.50 $10.00 $13.91 $13.71
6X7010216 TRAF CONT & PROT SPL1L SUM $4,925.00 $2,500.00 $22,000.00 $8,939.56 $6,852.86
7X8301801 WOOD POLE REMOVAL2EACH $500.00 $500.00 $1,500.00 $674.12 $685.29
8Z0013798 CONSTRUCTION LAYOUT1L SUM $9,500.00 $5,000.00 $20,000.00 $10,648.03 $16,789.51
920100110 TREE REMOV 6-1575UNIT $32.00 $32.00 $32.00 $35.87 $43.86
1020100210 TREE REMOV OVER 15102UNIT $42.00 $42.00 $42.00 $53.80 $57.56
1120200100 EARTH EXCAVATION178CU YD $10.00 $100.00 $60.00 $113.42 $500.00
1220300100 CHANNEL EXCAVATION117CU YD $15.00 $100.00 $105.00 $123.35 $270.20
1320700110 POROUS GRAN EMBANK41.1TON $210.00 $100.00 $165.00 $105.33 $434.00
1421101615 TOPSOIL F & P 4745SQ YD $0.1000 $10.00 $0.1000 $11.77 $50.06
1528000400 PERIMETER EROS BAR860FOOT $3.50 $1.00 $3.50 $4.76 $13.43
1628100807 STONE DUMP RIP CL A4182TON $175.00 $100.00 $190.00 $92.15 $275.51
1728200200 FILTER FABRIC263SQ YD $1.00 $2.00 $5.00 $5.24 $28.05
1835101100 AGG BASE CSE A 12610SQ YD $55.00 $30.00 $46.00 $37.42 $80.44
1940600275 BIT MATLS PR CT1,419POUND $0.0100 $2.00 $0.0100 $0.1900 $0.1400
2040600290 BIT MATLS TACK CT548POUND $0.0100 $2.00 $0.0100 $0.1900 $0.1400
2140600982 HMA SURF REM BUTT JT19SQ YD $195.00 $50.00 $200.00 $183.56 $130.20
2240602978 HMA BC IL-9.5 N5047TON $180.00 $200.00 $275.00 $376.78 $267.26
2340604000 HMA SC IL-9.5FG C N5049TON $181.00 $200.00 $190.00 $376.78 $267.26
2450100100 REM EXIST STRUCT1EACH $28,000.00 $78,850.00 $125,000.00 $68,607.44 $80,962.71
2550200100 STRUCTURE EXCAVATION68CU YD $15.00 $100.00 $75.00 $243.76 $388.22
2650300225 CONC STRUCT21CU YD $3,855.00 $2,000.00 $3,700.00 $6,164.65 $3,330.72
2750300280 CONCRETE ENCASEMENT4.4CU YD $1,500.00 $500.00 $1,000.00 $2,465.86 $2,898.15
2850400405 P P CONC DK BM 21 DP1,069SQ FT $144.00 $174.00 $150.00 $157.93 $160.00
2950800205 REINF BARS, EPOXY CTD3,570POUND $2.85 $3.00 $4.25 $7.76 $2.57
3050900205 STEEL RAILING TY S192FOOT $205.00 $205.00 $210.00 $210.28 $280.97
3151200958 FUR M S PILE 14X0.250117FOOT $725.00 $500.00 $155.00 $52.16 $61.50
3251202305 DRIVING PILES117FOOT $1.00 $1.00 $1.00 $637.57 $250.00
3351203200 TEST PILE MET SHELLS2EACH $750.00 $2,500.00 $7,000.00 $10,433.01 $47,747.54
3451500100 NAME PLATES1EACH $1,000.00 $5,000.00 $1,100.00 $950.98 $1,486.92
3563000001 SPBGR TY A 6FT POSTS100FOOT $28.00 $28.00 $28.00 $38.24 $38.38
3663100075 TRAF BAR TERM T5A4EACH $1,400.00 $1,400.00 $1,500.00 $1,531.08 $1,918.80
3767100100 MOBILIZATION1L SUM $34,400.00 $35,000.00 $30,000.00 $42,737.00 $58,000.00