2025-2069-RS
- Let date
- Friday, January 16, 2026
- Contract
- 80B50 · job page
- District
- District 1
- County
- Lake
- Highway
- Limits
- (1.08-Mile) Standard Overlay and ADA Improvements: curb and gutter spot repairs (remove and replace), sidewalk removal and replacement for curb ramps for sidewalks (ADA), hot-mix asphalt (HMA) surface removal and replacement (cold milling and inlay), full-depth patches (Class D), drainage structures adjustments and cleaning, new thermoplastic pavement markings raised reflective pavement markers, accessible pedestrian signals (APS) improvements and detector loops. Location: US 45 (Lake Street), f
- Classification
- ·
- Project number
Bidders 5
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Builders Paving, LLC Low bidder | $1,797,808 | ||
| 2 | Peter Baker & Son Co. | $1,855,847 | +3.2% | |
| 3 | Everlast Blacktop Inc. | $2,093,204 | +16.4% | |
| 4 | A Lamp Concrete Contractors, Inc. | $2,239,665 | +24.6% | |
| 5 | Curran Contracting Company | $2,377,927 | +32.3% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Builders Paving… | #2 Peter Baker & S… | #3 Everlast Blackt… | #4 A Lamp Concrete… | #5 Curran Contract… |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | X0320050 | CONSTRUCTN LAYOUT SPL | 1 | L SUM | $16,000.00 | $3,500.00 | $10,000.00 | $9,500.00 | $50,000.00 | |
| 2 | X0327611 | REM & REIN BRIC PAVER | 143 | SQ FT | $25.00 | $15.00 | $20.00 | $30.00 | $15.00 | |
| 3 | X1400367 | PED SIGNAL POST 10 FT | 1 | EACH | $1,339.86 | $1,699.66 | $1,600.00 | $2,390.50 | $1,339.86 | |
| 4 | X1400378 | PED SIGNAL POST 5 FT | 10 | EACH | $1,095.44 | $1,237.90 | $1,250.00 | $2,145.50 | $1,095.44 | |
| 5 | X4400501 | CC&G RMVL REPL < = 10 | 110 | FOOT | $85.00 | $75.00 | $96.00 | $95.25 | $63.00 | |
| 6 | X4400503 | CC&G RMVL REPL > 10FT | 1,257 | FOOT | $57.50 | $60.00 | $57.00 | $62.75 | $63.00 | |
| 7 | X5537800 | SS CLEANED 12 | 400 | FOOT | $2.00 | $1.00 | $8.00 | $1.00 | $5.00 | |
| 8 | X6030310 | FR & LIDS ADJUST SPL | 51 | EACH | $1,025.00 | $1,150.00 | $1,250.00 | $650.00 | $1,250.00 | |
| 9 | X6700407 | ENGRS FLD OFC TY A D1 | 12 | CAL MO | $3,000.00 | $500.00 | $3,500.00 | $2,000.00 | $3,250.00 | |
| 10 | X7200061 | TEMP INFO SIGNING | 154 | SQ FT | $20.00 | $20.00 | $22.00 | $25.00 | $20.00 | |
| 11 | X8500110 | MAIN EX FL BEACON INS | 1 | EACH | $302.06 | $1,599.31 | $350.00 | $1,200.00 | $302.06 | |
| 12 | X8760200 | ACCESSIBLE PED SIGNAL | 32 | EACH | $1,105.06 | $1,308.83 | $1,250.00 | $1,772.38 | $1,105.06 | |
| 13 | X8780012 | CONC FDN TY A 12D | 44 | FOOT | $312.22 | $304.55 | $350.00 | $585.00 | $312.22 | |
| 14 | Z0018500 | DRAINAGE STR CLEANED | 20 | EACH | $325.00 | $325.00 | $500.00 | $325.00 | $350.00 | |
| 15 | Z0033044 | RE-OPTIMIZE TR SIG SYS 1 | 4 | EACH | $576.00 | $886.55 | $750.00 | $420.00 | $576.00 | |
| 16 | 20200100 | EARTH EXCAVATION | 25 | CU YD | $60.00 | $75.00 | $15.00 | $60.00 | $65.00 | |
| 17 | 21101615 | TOPSOIL F & P 4 | 175 | SQ YD | $12.00 | $0.1000 | $8.00 | $9.25 | $0.1000 | |
| 18 | 25200110 | SODDING SALT TOLERANT | 175 | SQ YD | $40.00 | $75.00 | $40.00 | $16.50 | $75.00 | |
| 19 | 25200200 | SUPPLE WATERING | 5 | UNIT | $40.00 | $0.1000 | $1.00 | $1.00 | $0.1000 | |
| 20 | 40600290 | BIT MATLS TACK CT | 27,868 | POUND | $0.0100 | $0.0100 | $0.0100 | $0.0100 | $1.30 | |
| 21 | 40600370 | LONG JOINT SEALANT | 17,091 | FOOT | $2.69 | $3.38 | $2.65 | $2.39 | $3.15 | |
| 22 | 40600400 | MIX CR JTS FLANGEWYS | 62 | TON | $550.00 | $150.00 | $496.00 | $150.00 | $450.00 | |
| 23 | 40600982 | HMA SURF REM BUTT JT | 390 | SQ YD | $5.00 | $1.00 | $34.00 | $15.25 | $25.00 | |
| 24 | 40603200 | P HMA BC IL-4.75 N50 | 1,704 | TON | $100.00 | $108.00 | $125.41 | $130.00 | $135.00 | |
| 25 | 40604172 | P HMA SC IL-9.5 E N70 | 4,085 | TON | $95.00 | $102.00 | $109.00 | $140.00 | $115.00 | |
| 26 | 42001300 | PROTECTIVE COAT | 825 | SQ YD | $0.0100 | $1.00 | $4.00 | $0.0100 | $0.0100 | |
| 27 | 42400200 | PC CONC SIDEWALK 5 | 5,406 | SQ FT | $18.85 | $12.50 | $15.00 | $9.50 | $12.00 | |
| 28 | 42400800 | DETECTABLE WARNINGS | 415 | SQ FT | $28.50 | $45.00 | $70.00 | $35.00 | $40.00 | |
| 29 | 44000155 | HMA SURF REM 1 1/2 | 19 | SQ YD | $265.00 | $10.00 | $421.00 | $60.00 | $35.00 | |
| 30 | 44000159 | HMA SURF REM 2 1/2 | 41,676 | SQ YD | $3.50 | $4.88 | $2.81 | $3.50 | $5.00 | |
| 31 | 44000600 | SIDEWALK REM | 5,362 | SQ FT | $2.15 | $2.50 | $2.00 | $2.00 | $6.00 | |
| 32 | 44201773 | CL D PATCH T1 11 | 100 | SQ YD | $60.00 | $75.00 | $200.00 | $105.00 | $300.00 | |
| 33 | 44201777 | CL D PATCH T2 11 | 1,000 | SQ YD | $50.00 | $75.00 | $109.00 | $95.00 | $120.00 | |
| 34 | 44201781 | CL D PATCH T3 11 | 500 | SQ YD | $40.00 | $75.00 | $115.00 | $91.00 | $100.00 | |
| 35 | 44201783 | CL D PATCH T4 11 | 400 | SQ YD | $30.00 | $75.00 | $115.00 | $91.00 | $80.00 | |
| 36 | 60252800 | CB RECONST | 1 | EACH | $1,250.00 | $3,100.00 | $1,400.00 | $3,000.00 | $1,450.00 | |
| 37 | 60257900 | MAN RECONST | 1 | EACH | $1,450.00 | $3,100.00 | $2,000.00 | $3,000.00 | $1,650.00 | |
| 38 | 60260100 | INLETS ADJUST | 5 | EACH | $400.00 | $515.00 | $950.00 | $585.00 | $450.00 | |
| 39 | 60266600 | VALVE BOX ADJ | 4 | EACH | $385.00 | $575.00 | $950.00 | $575.00 | $385.00 | |
| 40 | 60300105 | FR & GRATES ADJUST | 9 | EACH | $400.00 | $515.00 | $950.00 | $585.00 | $450.00 | |
| 41 | 60300305 | FR & LIDS ADJUST | 3 | EACH | $550.00 | $515.00 | $950.00 | $600.00 | $550.00 | |
| 42 | 60604400 | COMB CC&G TB6.18 | 807 | FOOT | $46.00 | $60.00 | $48.00 | $59.50 | $50.00 | |
| 43 | 60920012 | PIPE CULV CLEANED 12 | 200 | FOOT | $3.00 | $4.00 | $11.00 | $1.00 | $5.00 | |
| 44 | 60920018 | PIPE CULV CLEANED 18 | 200 | FOOT | $3.00 | $6.00 | $12.00 | $1.50 | $5.00 | |
| 45 | 60920024 | PIPE CULV CLEANED 24 | 200 | FOOT | $10.00 | $8.00 | $18.00 | $2.00 | $10.00 | |
| 46 | 66900200 | NON SPL WASTE DISPOSL | 25 | CU YD | $125.00 | $120.00 | $200.00 | $55.00 | $135.00 | |
| 47 | 66900530 | SOIL DISPOSAL ANALY | 1 | EACH | $1,450.00 | $1,875.00 | $2,000.00 | $1,875.00 | $1,500.00 | |
| 48 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $3,100.00 | $3,400.00 | $4,000.00 | $3,400.00 | $4,200.00 | |
| 49 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $1,200.00 | $500.00 | $3,000.00 | $500.00 | $500.00 | |
| 50 | 66901006 | REG SUB MON | 15 | CAL DA | $680.00 | $715.00 | $1,300.00 | $715.00 | $750.00 | |
| 51 | 67100100 | MOBILIZATION | 1 | L SUM | $104,577.41 | $111,312.00 | $75,406.53 | $134,000.00 | $315,000.00 | |
| 52 | 70102625 | TR CONT & PROT 701606 | 1 | L SUM | $110,000.00 | $44,320.00 | $10.00 | $222,000.00 | $30,000.00 | |
| 53 | 70102632 | TR CONT & PROT 701602 | 1 | L SUM | $1.00 | $1.00 | $132,634.18 | $1.00 | $30,000.00 | |
| 54 | 70102634 | TR CONT & PROT 701611 | 1 | L SUM | $1.00 | $1.00 | $10.00 | $1.00 | $1.00 | |
| 55 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $57,999.00 | $1.00 | $10.00 | $1.00 | $1.00 | |
| 56 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $1.00 | $1.00 | $10.00 | $1.00 | $1.00 | |
| 57 | 70300100 | SHORT TERM PAVT MKING | 12,308 | FOOT | $0.0100 | $0.7000 | $0.8000 | $0.0100 | $0.5000 | |
| 58 | 70300150 | SHRT TRM PAVT MK REM | 3,077 | SQ FT | $0.0100 | $0.0100 | $0.6000 | $0.0100 | $0.5000 | |
| 59 | 70300211 | TEMP PVT MK LTR & SYM PAINT | 849 | SQ FT | $0.0100 | $1.25 | $1.90 | $0.0100 | $1.25 | |
| 60 | 70300221 | TEMP PVT MK LINE 4 - PAINT | 18,095 | FOOT | $0.0100 | $0.2800 | $0.4000 | $0.0100 | $0.2800 | |
| 61 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 4,725 | FOOT | $0.0100 | $0.4200 | $0.7500 | $0.0100 | $0.4200 | |
| 62 | 70300261 | TEMP PVT MK LINE 12 - PAINT | 1,540 | FOOT | $0.0100 | $1.00 | $1.25 | $0.0100 | $1.00 | |
| 63 | 70300281 | TEMP PVT MK LINE 24 - PAINT | 658 | FOOT | $0.0100 | $2.00 | $2.40 | $0.0100 | $2.00 | |
| 64 | 70307120 | TEMP PVT MK L4 T4 TAPE | 3,077 | FOOT | $0.0100 | $1.20 | $1.40 | $0.0100 | $1.20 | |
| 65 | 78000100 | THPL PVT MK LTR & SYM | 849 | SQ FT | $6.50 | $6.50 | $7.00 | $5.75 | $6.50 | |
| 66 | 78000200 | THPL PVT MK LINE 4 | 18,095 | FOOT | $0.8300 | $0.8300 | $1.10 | $0.8500 | $0.8300 | |
| 67 | 78000400 | THPL PVT MK LINE 6 | 4,725 | FOOT | $1.15 | $1.15 | $2.00 | $0.9500 | $1.15 | |
| 68 | 78000600 | THPL PVT MK LINE 12 | 1,540 | FOOT | $2.75 | $2.75 | $3.00 | $3.32 | $2.75 | |
| 69 | 78000650 | THPL PVT MK LINE 24 | 658 | FOOT | $5.50 | $5.50 | $7.00 | $5.75 | $5.50 | |
| 70 | 78100100 | RAISED REFL PAVT MKR | 721 | EACH | $33.50 | $33.50 | $38.00 | $36.00 | $33.50 | |
| 71 | 78300200 | RAISED REF PVT MK REM | 721 | EACH | $5.00 | $12.00 | $40.00 | $20.00 | $25.00 | |
| 72 | 81028200 | UNDRGRD C GALVS 2 | 185 | FOOT | $93.79 | $48.18 | $99.00 | $40.34 | $93.79 | |
| 73 | 85000200 | MAIN EX TR SIG INSTAL | 4 | EACH | $2,041.31 | $5,731.04 | $2,300.00 | $1,200.00 | $2,041.31 | |
| 74 | 87301215 | ELCBL C SIGNAL 14 2C | 1,656 | FOOT | $6.07 | $2.70 | $6.60 | $3.43 | $6.07 | |
| 75 | 87301225 | ELCBL C SIGNAL 14 3C | 71 | FOOT | $6.25 | $4.17 | $6.60 | $3.61 | $6.25 | |
| 76 | 87301900 | ELCBL C EGRDC 6 1C | 244 | FOOT | $6.79 | $5.65 | $7.00 | $4.09 | $6.79 | |
| 77 | 87900200 | DRILL EX HANDHOLE | 10 | EACH | $465.11 | $709.66 | $500.00 | $1,050.00 | $465.11 | |
| 78 | 88102717 | PED SH LED 1F BM CDT | 1 | EACH | $648.84 | $1,012.06 | $700.00 | $910.00 | $648.84 | |
| 79 | 88600100 | DET LOOP T1 | 2,366 | FOOT | $25.94 | $38.92 | $27.00 | $55.00 | $25.94 | |
| 80 | 89502300 | REM ELCBL FR CON | 203 | FOOT | $5.56 | $2.27 | $6.00 | $1.60 | $5.56 | |
| 81 | 89502375 | REMOV EX TS EQUIP | 4 | EACH | $180.28 | $369.83 | $200.00 | $2,000.00 | $180.28 | |
| 82 | 89502376 | REBUILD EX HANDHOLE | 2 | EACH | $3,259.03 | $2,712.42 | $3,550.00 | $4,000.00 | $3,259.03 |