| Sep 18, 2026 | 61M10 |
Kane, DupageDistrict 1 | 48 FOOT |
$85.54 | K-Five Construction Corporation |
| Sep 18, 2026 | 62V90 |
CookDistrict 1 | 1,136 FOOT |
$35.75 | K-Five Construction Corporation |
| Sep 18, 2026 | 62V55 |
CookDistrict 1 | 5,761 FOOT |
$27.78 | Gallagher Asphalt Corporation |
| Sep 18, 2026 | 62L58 |
CookDistrict 1 | 1,393 FOOT |
$32.00 | Builders Paving, LLC |
| Sep 18, 2026 | 62W73 |
CookDistrict 1 | 3,306 FOOT |
$27.34 | Peter Baker & Son Co. |
| Sep 18, 2026 | 80D33 |
CookDistrict 1 | 4,281 FOOT |
$27.66 | K-Five Construction Corporation |
| Sep 18, 2026 | 74636 |
MaconDistrict 7 | 3,805 FOOT |
$79.39 | Illinois Valley Paving, a div of UCM, Inc. |
| Sep 18, 2026 | 97894 |
St. ClairDistrict 8 | 1,368 FOOT |
$36.75 | Hank's Excavating & Landscaping, Inc. |
| Sep 18, 2026 | 80C95 |
WillDistrict 1 | 1,286 FOOT |
$32.00 | Gallagher Asphalt Corporation |
| Jul 31, 2026 | 74829 |
MoultrieDistrict 7 | 595 FOOT |
$30.00 | Howell Paving, Inc. |
| Jul 31, 2026 | 62W91 |
CookDistrict 1 | 81 FOOT |
$25.56 | H & H Electric Co. |
| Jul 31, 2026 | 61M40 |
DupageDistrict 1 | 103 FOOT |
$43.30 | Home Towne Electric, Inc. |
| Jul 31, 2026 | 61K19 |
CookDistrict 1 | 470 FOOT |
$30.60 | R. W. Dunteman Company |
| Jul 31, 2026 | 61K85 |
CookDistrict 1 | 287 FOOT |
$35.00 | Plote Construction, Inc. |
| Jul 31, 2026 | 62J64 |
CookDistrict 1 | 1,962 FOOT |
$23.40 | Peter Baker & Son Co. |
| Jun 12, 2026 | 80C89 |
Cook, LakeDistrict 1 | 1,554 FOOT |
$23.45 | H & H Electric Co. |
| Jun 12, 2026 | 78C20 |
VariousDistrict 9 | 60 FOOT |
$1.42 | F. W. Electric, Inc. |
| Jun 12, 2026 | 62M71 |
Kane, KendallDistrict 1 | 2,370 FOOT |
$24.50 | D. Construction, Inc. |
| Jun 12, 2026 | 80D00 |
CookDistrict 1 | 1,433 FOOT |
$31.50 | Plote Construction, Inc. |
| Jun 12, 2026 | 80B22 |
CookDistrict 1 | 6,684 FOOT |
$25.60 | K-Five Construction Corporation |
| Jun 12, 2026 | 62M71 |
Kane, KendallDistrict 1 | 3,958 FOOT |
$24.50 | D. Construction, Inc. |
| Jun 12, 2026 | 97827 |
St. ClairDistrict 8 | 397 FOOT |
$39.90 | Hank's Excavating & Landscaping, Inc. |
| Jun 12, 2026 | 80B28 |
CookDistrict 1 | 2,209 FOOT |
$22.33 | K-Five Construction Corporation |
| Jun 12, 2026 | 62U72 |
MchenryDistrict 1 | 320 FOOT |
$22.35 | Martam Construction Incorporated |
| Jun 12, 2026 | 80B35 |
CookDistrict 1 | 3,195 FOOT |
$50.70 | K-Five Construction Corporation |
| Jun 12, 2026 | 66C06 |
GrundyDistrict 3 | 2,066 FOOT |
$38.50 | D. Construction, Inc. |
| Jun 12, 2026 | 80C45 |
MchenryDistrict 1 | 2,203 FOOT |
$40.00 | Peter Baker & Son Co. |
| Jun 12, 2026 | 76U38 |
Madison, St.clairDistrict 8 | 10,656 FOOT |
$28.00 | Gerstner Electric, Inc. |
| Apr 24, 2026 | 62P51 |
CookDistrict 1 | 1,364 FOOT |
$21.86 | Martam Construction Incorporated |
| Apr 24, 2026 | 61L54 |
CookDistrict 1 | 1,497 FOOT |
$78.24 | Martam Construction Incorporated |
| Apr 24, 2026 | 66T17 |
KankakeeDistrict 3 | 975 FOOT |
$24.25 | Kankakee Valley Construction Company, Inc. |
| Apr 24, 2026 | 80B30 |
CookDistrict 1 | 165 FOOT |
$25.94 | K-Five Construction Corporation |
| Apr 24, 2026 | 80B20 |
MchenryDistrict 1 | 3,440 FOOT |
$45.75 | Triggi Construction, Inc. |
| Apr 24, 2026 | 62V71 |
WillDistrict 1 | 3,624 FOOT |
$45.10 | D. Construction, Inc. |
| Apr 24, 2026 | 74E19 |
MaconDistrict 7 | 300 FOOT |
$61.00 | Beniach Construction Co., Inc. |
| Apr 24, 2026 | 80B39 |
CookDistrict 1 | 4,267 FOOT |
$26.92 | K-Five Construction Corporation |
| Apr 24, 2026 | 74E18 |
MaconDistrict 7 | 2,066 FOOT |
$99.14 | Illinois Valley Paving, a div of UCM, Inc. |
| Apr 24, 2026 | 74E31 |
VariousDistrict 7 | 325 FOOT |
$90.00 | Bodine Electric of Decatur |
| Apr 24, 2026 | 80C49 |
CookDistrict 1 | 2,857 FOOT |
$27.44 | K-Five Construction Corporation |
| Apr 24, 2026 | 80B05 |
WillDistrict 1 | 770 FOOT |
$36.60 | D. Construction, Inc. |
| Apr 24, 2026 | 62K33 |
CookDistrict 1 | 1,909 FOOT |
$21.62 | Plote Construction, Inc. |
| Apr 24, 2026 | 80B09 |
CookDistrict 1 | 3,105 FOOT |
$24.91 | Builders Paving, LLC |
| Apr 24, 2026 | 80C85 |
MchenryDistrict 1 | 273 FOOT |
$22.83 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. |
| Apr 24, 2026 | 80B21 |
CookDistrict 1 | 1,991 FOOT |
$39.00 | K-Five Construction Corporation |
| Apr 24, 2026 | 62L85 |
CookDistrict 1 | 1,583 FOOT |
$29.94 | K-Five Construction Corporation |
| Apr 24, 2026 | 80B26 |
CookDistrict 1 | 2,274 FOOT |
$43.75 | Gallagher Asphalt Corporation |
| Apr 24, 2026 | 87899 |
KendallDistrict 3 | 2,383 FOOT |
$22.00 | Austin Tyler Construction, Inc. |
| Apr 24, 2026 | 80B27 |
CookDistrict 1 | 1,892 FOOT |
$26.98 | Plote Construction, Inc. |
| Feb 27, 2026 | 62V09 |
CookDistrict 1 | 1,060 FOOT |
$34.90 | Plote Construction, Inc. |
| Feb 27, 2026 | 62X88 |
CookDistrict 1 | 2,146 FOOT |
$33.82 | Peter Baker & Son Co. |
| Feb 27, 2026 | 62V43 |
KaneDistrict 1 | 475 FOOT |
$23.65 | Builders Paving, LLC |
| Feb 27, 2026 | 78B52 |
JeffersonDistrict 9 | 490 FOOT |
$29.70 | E. T. Simonds Construction Company |
| Feb 27, 2026 | 61L93 |
CookDistrict 1 | 1,806 FOOT |
$60.00 | K-Five Construction Corporation |
| Feb 27, 2026 | 80B08 |
DupageDistrict 1 | 2,195 FOOT |
$28.00 | Builders Paving, LLC |
| Feb 27, 2026 | 80B15 |
DupageDistrict 1 | 372 FOOT |
$29.91 | R. W. Dunteman Company |
| Feb 27, 2026 | 61M16 |
CookDistrict 1 | 536 FOOT |
$29.76 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 97872 |
St. ClairDistrict 8 | 1,376 FOOT |
$16.90 | DMS Contracting, Inc. |
| Feb 27, 2026 | 80B25 |
DupageDistrict 1 | 1,468 FOOT |
$31.78 | R. W. Dunteman Company |
| Feb 27, 2026 | 61M26 |
CookDistrict 1 | 183 FOOT |
$60.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 80B75 |
LakeDistrict 1 | 2,471 FOOT |
$30.30 | Peter Baker & Son Co. |
| Feb 27, 2026 | 62W92 |
VariousDistrict 1 | 216 FOOT |
$53.69 | Helm Electric Facility Solutions, Inc. d/b/a Helm Electric |
| Jan 16, 2026 | 61L90 |
CookDistrict 1 | 100 FOOT |
$42.42 | A Lamp Concrete Contractors, Inc. |
| Jan 16, 2026 | 61L94 |
MchenryDistrict 1 | 588 FOOT |
$36.84 | Geske and Sons, Inc. |
| Jan 16, 2026 | 74B61 |
EffinghamDistrict 7 | 2,624 FOOT |
$85.00 | Howell Paving, Inc. |
| Jan 16, 2026 | 62F94 |
WillDistrict 1 | 2,100 FOOT |
$38.50 | D. Construction, Inc. |
| Jan 16, 2026 | 61K16 |
CookDistrict 1 | 1,035 FOOT |
$32.40 | Alliance Contractors, Inc. |
| Jan 16, 2026 | 76A46 |
MadisonDistrict 8 | 688 FOOT |
$21.15 | Keller Construction, Inc. |
| Jan 16, 2026 | 76N65 |
St.clairDistrict 8 | 265 FOOT |
$24.35 | Plocher Construction Company, Inc. |
| Jan 16, 2026 | 62P93 |
CookDistrict 1 | 1,398 FOOT |
$45.00 | Triggi Construction, Inc. |
| Jan 16, 2026 | 80B50 |
LakeDistrict 1 | 2,366 FOOT |
$25.94 | Builders Paving, LLC |
| Jan 16, 2026 | 78B63 |
UnionDistrict 9 | 317 FOOT |
$40.00 | E. T. Simonds Construction Company |
| Jan 16, 2026 | 80B19 |
CookDistrict 1 | 1,205 FOOT |
$31.00 | Gallagher Asphalt Corporation |
| Jan 16, 2026 | 62W47 |
CookDistrict 1 | 2,981 FOOT |
$53.08 | D. Construction, Inc. |
| Jan 16, 2026 | 80B11 |
WillDistrict 1 | 1,063 FOOT |
$33.00 | Iroquois Paving Corporation |
| Jan 16, 2026 | 80B34 |
WillDistrict 1 | 590 FOOT |
$21.50 | Gallagher Asphalt Corporation |
| Jan 16, 2026 | 64U84 |
BooneDistrict 2 | 170 FOOT |
$35.50 | Rock Road Companies, Inc. |
| Jan 16, 2026 | 60R94 |
CookDistrict 1 | 202 FOOT |
$44.25 | OHLA Central, Inc. |
| Jan 16, 2026 | 80B36 |
WillDistrict 1 | 2,238 FOOT |
$37.57 | D. Construction, Inc. |
| Jan 16, 2026 | 61L42 |
LakeDistrict 1 | 380 FOOT |
$42.33 | D'Land Construction, LLC |
| Jan 16, 2026 | 68F92 |
TazewellDistrict 4 | 1,799 FOOT |
$44.51 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Jan 16, 2026 | 62D34 |
CookDistrict 1 | 317 FOOT |
$38.50 | Lorig Construction Company |
| Nov 7, 2025 | 62R51 |
WillDistrict 1 | 1,538 FOOT |
$31.00 | Iroquois Paving Corporation |
| Nov 7, 2025 | 61L92 |
CookDistrict 1 | 149 FOOT |
$38.50 | Capitol Cement Co., Inc. |
| Nov 7, 2025 | 61L21 |
CookDistrict 1 | 1,713 FOOT |
$24.66 | H & H Electric Co. |
| Nov 7, 2025 | 62R63 |
CookDistrict 1 | 924 FOOT |
$36.00 | Dunnet Bay Construction Company |
| Nov 7, 2025 | 61L97 |
KaneDistrict 1 | 480 FOOT |
$38.00 | Everlast Blacktop Inc. |
| Nov 7, 2025 | 61K01 |
DupageDistrict 1 | 255 FOOT |
$43.51 | Martam Construction Incorporated |
| Nov 7, 2025 | 61L98 |
CookDistrict 1 | 556 FOOT |
$33.00 | PirTano Construction Co., LLC |
| Sep 19, 2025 | 62K78 |
KaneDistrict 1 | 919 FOOT |
$31.00 | Plote Construction, Inc. |
| Sep 19, 2025 | 62R22 |
WillDistrict 1 | 677 FOOT |
$39.60 | D. Construction, Inc. |
| Sep 19, 2025 | 62W89 |
VariousDistrict 1 | 194 FOOT |
$40.42 | Meade Inc. |
| Sep 19, 2025 | 62W62 |
Cook, Dupage, WillDistrict 1 | 1,133 FOOT |
$27.00 | John Burns Construction Company |
| Sep 19, 2025 | 62B64 |
CookDistrict 1 | 232 FOOT |
$39.60 | R. W. Dunteman Company |
| Aug 1, 2025 | 76M55 |
St.clairDistrict 8 | 1,240 FOOT |
$35.70 | Keeley & Sons, Inc. |
| Aug 1, 2025 | 97860 |
St. ClairDistrict 8 | 2,400 FOOT |
$32.55 | Hank's Excavating & Landscaping, Inc. |
| Aug 1, 2025 | 78B40 |
VariousDistrict 9 | 60 FOOT |
$0.9500 | F. W. Electric, Inc. |
| Aug 1, 2025 | 61L58 |
KaneDistrict 1 | 244 FOOT |
$56.29 | Plote Construction, Inc. |
| Aug 1, 2025 | 61L37 |
CookDistrict 1 | 108 FOOT |
$57.00 | Plote Construction, Inc. |
| Aug 1, 2025 | 87864 |
DekalbDistrict 3 | 108 FOOT |
$55.58 | Helm Electric Facility Solutions, Inc. d/b/a Helm Electric |
| Aug 1, 2025 | 61L38 |
CookDistrict 1 | 716 FOOT |
$34.90 | Plote Construction, Inc. |
| Aug 1, 2025 | 62N97 |
CookDistrict 1 | 2,005 FOOT |
$37.00 | Everlast Blacktop Inc. |
| Aug 1, 2025 | 62V91 |
CookDistrict 1 | 418 FOOT |
$46.55 | D. Construction, Inc. |
| Aug 1, 2025 | 62W57 |
CookDistrict 1 | 1,417 FOOT |
$40.00 | Hecker and Company, Inc. |
| Jun 13, 2025 | 62X67 |
KaneDistrict 1 | 66 FOOT |
$34.45 | Curran Contracting Company |
| Jun 13, 2025 | 62V58 |
LakeDistrict 1 | 1,620 FOOT |
$40.20 | Peter Baker & Son Co. |
| Jun 13, 2025 | 76K74 |
St.clairDistrict 8 | 4,431 FOOT |
$27.00 | Keeley & Sons, Inc. Keller Construction Inc. |
| Jun 13, 2025 | 62X69 |
KaneDistrict 1 | 1,326 FOOT |
$31.34 | Geneva Construction Company LLC. |
| Jun 13, 2025 | 62V88 |
DupageDistrict 1 | 580 FOOT |
$29.77 | R. W. Dunteman Company |
| Jun 13, 2025 | 76T77 |
MadisonDistrict 8 | 2,094 FOOT |
$21.50 | Gerstner Electric, Inc. |
| Jun 13, 2025 | 62X71 |
CookDistrict 1 | 1,669 FOOT |
$27.11 | K-Five Construction Corporation |
| Jun 13, 2025 | 62X34 |
WillDistrict 1 | 1,442 FOOT |
$30.00 | Iroquois Paving Corporation |
| Jun 13, 2025 | 61L34 |
CookDistrict 1 | 895 FOOT |
$64.70 | Alliance Contractors, Inc. |
| Jun 13, 2025 | 66P53 |
LasalleDistrict 3 | 1,008 FOOT |
$33.00 | D. Construction, Inc. |
| Jun 13, 2025 | 62X42 |
CookDistrict 1 | 246 FOOT |
$52.50 | Hecker and Company, Inc. |
| Jun 13, 2025 | 62X62 |
CookDistrict 1 | 1,750 FOOT |
$42.60 | Peter Baker & Son Co. |
| Jun 13, 2025 | 78B31 |
WilliamsonDistrict 9 | 364 FOOT |
$30.91 | E. T. Simonds Construction Company |
| Jun 13, 2025 | 62X59 |
KaneDistrict 1 | 1,017 FOOT |
$30.00 | Plote Construction, Inc. |
| Jun 13, 2025 | 62N39 |
Dupage, CookDistrict 1 | 1,904 FOOT |
$43.10 | Meade Inc. |
| Jun 13, 2025 | 74D29 |
EffinghamDistrict 7 | 841 FOOT |
$88.00 | Kinney Contractors, Inc. |
| Apr 25, 2025 | 95940 |
ShelbyDistrict 7 | 691 FOOT |
$50.00 | Kinney Contractors, Inc. |
| Apr 25, 2025 | 62R02 |
CookDistrict 1 | 700 FOOT |
$50.00 | Triggi Construction, Inc. |
| Apr 25, 2025 | 66R14 |
KendallDistrict 3 | 1,347 FOOT |
$33.00 | D. Construction, Inc. |
| Apr 25, 2025 | 61L31 |
LakeDistrict 1 | 536 FOOT |
$32.70 | Peter Baker & Son Co. |
| Apr 25, 2025 | 62V86 |
DupageDistrict 1 | 3,935 FOOT |
$24.59 | K-Five Construction Corporation |
| Apr 25, 2025 | 62V35 |
WillDistrict 1 | 272 FOOT |
$30.00 | Builders Paving, LLC |
| Apr 25, 2025 | 62T20 |
CookDistrict 1 | 1,796 FOOT |
$30.50 | Iroquois Paving Corporation |
| Apr 25, 2025 | 68J18 |
PeoriaDistrict 4 | 1,224 FOOT |
$46.00 | Advanced Asphalt Company |
| Apr 25, 2025 | 61L33 |
CookDistrict 1 | 1,509 FOOT |
$31.00 | Peter Baker & Son Co. |
| Apr 25, 2025 | 62V89 |
CookDistrict 1 | 2,615 FOOT |
$27.63 | Plote Construction, Inc. |
| Apr 25, 2025 | 62V54 |
CookDistrict 1 | 2,882 FOOT |
$40.20 | Builders Paving, LLC |
| Apr 25, 2025 | 62V36 |
CookDistrict 1 | 7,115 FOOT |
$26.00 | Iroquois Paving Corporation |
| Apr 25, 2025 | 74D44 |
VariousDistrict 7 | 325 FOOT |
$80.00 | Bodine Electric of Decatur |
| Apr 25, 2025 | 62J72 |
KaneDistrict 1 | 1,094 FOOT |
$32.43 | Geneva Construction Company LLC. |
| Apr 25, 2025 | 62W59 |
LakeDistrict 1 | 144 FOOT |
$18.67 | H & H Electric Co. |
| Apr 25, 2025 | 62V56 |
CookDistrict 1 | 951 FOOT |
$50.32 | K-Five Construction Corporation |
| Apr 25, 2025 | 70991 |
ChampaignDistrict 5 | 3,662 FOOT |
$40.00 | Cross Construction, Inc. |
| Apr 25, 2025 | 62J79 |
CookDistrict 1 | 1,806 FOOT |
$20.32 | Plote Construction, Inc. |
| Apr 25, 2025 | 62W69 |
KaneDistrict 1 | 1,143 FOOT |
$45.10 | Geneva Construction Company LLC. |
| Apr 25, 2025 | 99727 |
JacksonDistrict 9 | 1,171 FOOT |
$26.10 | Samron Midwest Contracting, Inc. |
| Apr 25, 2025 | 62V61 |
CookDistrict 1 | 6,064 FOOT |
$32.69 | K-Five Construction Corporation |
| Apr 25, 2025 | 74759 |
ColesDistrict 7 | 10,402 FOOT |
$25.00 | Howell Paving, Inc. |
| Apr 25, 2025 | 62N33 |
DupageDistrict 1 | 1,111 FOOT |
$80.00 | John Burns Construction Company |
| Apr 25, 2025 | 62X94 |
MchenryDistrict 1 | 2,584 FOOT |
$17.33 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. |
| Apr 25, 2025 | 61G79 |
DupageDistrict 1 | 216 FOOT |
$39.47 | OHLA Central, Inc. |
| Apr 25, 2025 | 62V75 |
LakeDistrict 1 | 691 FOOT |
$31.20 | Peter Baker & Son Co. |
| Mar 7, 2025 | 70H33 |
ChampaignDistrict 5 | 438 FOOT |
$37.80 | A. C. Pavement Striping Co. |
| Mar 7, 2025 | 62R58 |
Cook, DupageDistrict 1 | 3,863 FOOT |
$25.07 | R. W. Dunteman Company |
| Mar 7, 2025 | 97793 |
MadisonDistrict 8 | 1,301 FOOT |
$29.00 | Keller Construction, Inc. |
| Mar 7, 2025 | 62W60 |
Cook, DupageDistrict 1 | 1,706 FOOT |
$19.18 | H & H Electric Co. |
| Mar 7, 2025 | 61K89 |
CookDistrict 1 | 1,328 FOOT |
$38.50 | D. Construction, Inc. |