2024-1031-RS
- Let date
- Friday, June 13, 2025
- Contract
- 62X69 · job page
- District
- District 1
- County
- Kane
- Highway
- Limits
- (1.79-Mile) SMART and Designed Overlay, ADA Improvements, New Shoulders Improvements include curb and gutter spot repairs (remove and replace), sidewalk removal and replacement for curb ramps for sidewalks (ADA), (HMA) surface removal and replacement, (cold milling and inlay), full-depth patches (Class D), drainage structures adjustment and cleaning, pavement marking, pedestrian signals (APS) improvements and detector loops. Location: IL 56 (Butterfield Road), from East of IL 25 River Road to We
- Classification
- ·
- Project number
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Geneva Construction Company LLC. Low bidder | $2,713,457 | ||
| 2 | R. W. Dunteman Company | $2,971,000 | +9.5% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Geneva Construc… | #2 R. W. Dunteman … |
|---|---|---|---|---|---|---|---|
| 1 | X0320050 | CONSTRUCTN LAYOUT SPL | 1 | L SUM | $4,000.00 | $25,000.00 | |
| 2 | X0324599 | ROD AND CLEAN EX COND | 203 | FOOT | $2.53 | $0.0100 | |
| 3 | X1400450 | REBLD EX HD HANDHOLE | 1 | EACH | $5,268.81 | $4,035.66 | |
| 4 | X4060995 | TEMPORARY RAMP SPL | 532 | SQ YD | $8.00 | $22.40 | |
| 5 | X4400501 | CC&G RMVL REPL < = 10 | 95 | FOOT | $88.00 | $130.45 | |
| 6 | X4400503 | CC&G RMVL REPL > 10FT | 250 | FOOT | $79.00 | $123.15 | |
| 7 | X5537800 | SS CLEANED 12 | 75 | FOOT | $6.60 | $30.00 | |
| 8 | X6030310 | FR & LIDS ADJUST SPL | 5 | EACH | $1,550.00 | $1,500.00 | |
| 9 | X6700407 | ENGRS FLD OFC TY A D1 | 12 | CAL MO | $4,000.00 | $3,000.00 | |
| 10 | X7200061 | TEMP INFO SIGNING | 52 | SQ FT | $20.00 | $20.00 | |
| 11 | X8760200 | ACCESSIBLE PED SIGNAL | 2 | EACH | $3,528.55 | $3,771.54 | |
| 12 | Z0018500 | DRAINAGE STR CLEANED | 5 | EACH | $525.00 | $800.00 | |
| 13 | Z0033044 | RE-OPTIMIZE TR SIG SYS 1 | 1 | EACH | $420.00 | $576.00 | |
| 14 | 20101400 | NITROGEN FERT NUTR | 3 | POUND | $3.00 | $5.00 | |
| 15 | 20101500 | PHOSPHORUS FERT NUTR | 3 | POUND | $3.00 | $5.00 | |
| 16 | 20101600 | POTASSIUM FERT NUTR | 3 | POUND | $3.00 | $5.00 | |
| 17 | 20200100 | EARTH EXCAVATION | 4,890 | CU YD | $33.00 | $31.30 | |
| 18 | 21001000 | GEOTECH FAB F/GR STAB | 880 | SQ YD | $1.15 | $3.30 | |
| 19 | 21101615 | TOPSOIL F & P 4 | 7 | SQ YD | $5.12 | $195.00 | |
| 20 | 25000115 | SEEDING CL 1B | 0.1 | ACRE | $4,500.00 | $9,000.00 | |
| 21 | 25200110 | SODDING SALT TOLERANT | 7 | SQ YD | $1,000.00 | $620.00 | |
| 22 | 25200200 | SUPPLE WATERING | 2 | UNIT | $0.0100 | $50.00 | |
| 23 | 28000250 | TEMP EROS CONTR SEED | 2 | POUND | $3.31 | $10.00 | |
| 24 | 28000510 | INLET FILTERS | 2 | EACH | $225.00 | $525.00 | |
| 25 | 30300001 | AGG SUBGRADE IMPROVE | 295 | CU YD | $40.00 | $45.25 | |
| 26 | 30300112 | AGG SUBGRADE IMPR 12 | 8,789 | SQ YD | $22.00 | $14.70 | |
| 27 | 35101400 | AGG BASE CSE B | 32 | TON | $20.00 | $55.00 | |
| 28 | 40600290 | BIT MATLS TACK CT | 28,240 | POUND | $0.0100 | $0.0100 | |
| 29 | 40600370 | LONG JOINT SEALANT | 28,284 | FOOT | $3.35 | $3.13 | |
| 30 | 40600400 | MIX CR JTS FLANGEWYS | 76 | TON | $250.00 | $361.30 | |
| 31 | 40600982 | HMA SURF REM BUTT JT | 536 | SQ YD | $18.00 | $21.90 | |
| 32 | 40602985 | HMA BC IL-9.5 N70 | 2,824 | TON | $78.00 | $99.30 | |
| 33 | 40604062 | HMA SC IL-9.5 D N70 | 4,915 | TON | $78.00 | $99.85 | |
| 34 | 42001300 | PROTECTIVE COAT | 260 | SQ YD | $1.00 | $3.00 | |
| 35 | 42400200 | PC CONC SIDEWALK 5 | 1,997 | SQ FT | $14.50 | $16.20 | |
| 36 | 42400800 | DETECTABLE WARNINGS | 130 | SQ FT | $36.50 | $60.00 | |
| 37 | 44000156 | HMA SURF REM 1 3/4 | 24,946 | SQ YD | $2.25 | $3.20 | |
| 38 | 44000164 | HMA SURF REM 3 3/4 | 25,208 | SQ YD | $3.10 | $5.95 | |
| 39 | 44000600 | SIDEWALK REM | 1,986 | SQ FT | $4.75 | $5.60 | |
| 40 | 44201737 | CL D PATCH T1 8 | 7 | SQ YD | $165.00 | $200.00 | |
| 41 | 44201741 | CL D PATCH T2 8 | 97 | SQ YD | $140.00 | $90.00 | |
| 42 | 44201745 | CL D PATCH T3 8 | 58 | SQ YD | $110.00 | $90.00 | |
| 43 | 44201747 | CL D PATCH T4 8 | 39 | SQ YD | $110.00 | $90.00 | |
| 44 | 44201761 | CL D PATCH T1 10 | 7 | SQ YD | $180.00 | $200.00 | |
| 45 | 44201765 | CL D PATCH T2 10 | 96 | SQ YD | $160.00 | $110.00 | |
| 46 | 44201769 | CL D PATCH T3 10 | 58 | SQ YD | $150.00 | $110.00 | |
| 47 | 44201771 | CL D PATCH T4 10 | 39 | SQ YD | $140.00 | $110.00 | |
| 48 | 48102100 | AGG WEDGE SHLD TYPE B | 1,465 | TON | $34.00 | $36.20 | |
| 49 | 48203029 | HMA SHOULDERS 8 | 8,789 | SQ YD | $44.00 | $42.35 | |
| 50 | 56109210 | WATER VALVES ADJUST | 1 | EACH | $800.00 | $1,200.00 | |
| 51 | 60300305 | FR & LIDS ADJUST | 1 | EACH | $800.00 | $1,000.00 | |
| 52 | 60406100 | FR & LIDS T1 CL | 1 | EACH | $450.00 | $700.00 | |
| 53 | 66900200 | NON SPL WASTE DISPOSL | 4,890 | CU YD | $92.00 | $86.60 | |
| 54 | 66900530 | SOIL DISPOSAL ANALY | 7 | EACH | $1,010.00 | $1,010.00 | |
| 55 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $6,200.00 | $6,200.00 | |
| 56 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $500.00 | $500.00 | |
| 57 | 66901006 | REG SUB MON | 14 | CAL DA | $700.00 | $700.00 | |
| 58 | 67100100 | MOBILIZATION | 1 | L SUM | $162,000.00 | $181,503.42 | |
| 59 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $100.00 | $37,600.00 | |
| 60 | 70102622 | TR CONT & PROT 701502 | 1 | L SUM | $15,575.00 | $15,575.00 | |
| 61 | 70102632 | TR CONT & PROT 701602 | 1 | L SUM | $100.00 | $100.00 | |
| 62 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $100.00 | $100.00 | |
| 63 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $100.00 | $100.00 | |
| 64 | 70300100 | SHORT TERM PAVT MKING | 13,715 | FOOT | $1.00 | $1.30 | |
| 65 | 70300150 | SHRT TRM PAVT MK REM | 4,572 | SQ FT | $1.00 | $1.55 | |
| 66 | 70300211 | TEMP PVT MK LTR & SYM PAINT | 1,190 | SQ FT | $1.35 | $1.35 | |
| 67 | 70300221 | TEMP PVT MK LINE 4 - PAINT | 45,488 | FOOT | $0.4500 | $0.4500 | |
| 68 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 5,519 | FOOT | $0.7000 | $0.7000 | |
| 69 | 70300261 | TEMP PVT MK LINE 12 - PAINT | 733 | FOOT | $1.35 | $1.35 | |
| 70 | 70300281 | TEMP PVT MK LINE 24 - PAINT | 346 | FOOT | $2.70 | $2.70 | |
| 71 | 78000100 | THPL PVT MK LTR & SYM | 1,190 | SQ FT | $4.00 | $5.15 | |
| 72 | 78000200 | THPL PVT MK LINE 4 | 45,488 | FOOT | $0.7600 | $0.7100 | |
| 73 | 78000400 | THPL PVT MK LINE 6 | 5,519 | FOOT | $1.18 | $1.15 | |
| 74 | 78000500 | THPL PVT MK LINE 8 | 470 | FOOT | $1.57 | $1.50 | |
| 75 | 78000600 | THPL PVT MK LINE 12 | 733 | FOOT | $2.36 | $2.25 | |
| 76 | 78000650 | THPL PVT MK LINE 24 | 346 | FOOT | $4.71 | $5.15 | |
| 77 | 78100100 | RAISED REFL PAVT MKR | 723 | EACH | $43.15 | $40.00 | |
| 78 | 78300200 | RAISED REF PVT MK REM | 723 | EACH | $7.50 | $14.90 | |
| 79 | 85000200 | MAIN EX TR SIG INSTAL | 2 | EACH | $525.00 | $1,979.44 | |
| 80 | 87301215 | ELCBL C SIGNAL 14 2C | 261 | FOOT | $2.93 | $10.11 | |
| 81 | 88600100 | DET LOOP T1 | 1,326 | FOOT | $31.34 | $29.49 | |
| 82 | 89502375 | REMOV EX TS EQUIP | 1 | EACH | $511.80 | $65.03 |