$80.68Avg low bid / SQ YD
$84.90Avg of all bids
—Avg engineer's estimate
267Jobs · 146,691 SQ YD
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2026 | 42 | 22,410 | $106.34 | $113.31 |
| 2025 | 37 | 22,134 | $95.89 | $102.08 |
| 2024 | 20 | 10,247 | $118.74 | $102.92 |
| 2023 | 22 | 3,859 | $87.85 | $87.25 |
| 2022 | 25 | 20,769 | $57.47 | $65.29 |
| 2021 | 29 | 15,102 | $73.80 | $66.78 |
| 2020 | 33 | 17,306 | $72.24 | $86.25 |
| 2019 | 39 | 21,512 | $72.07 | $82.90 |
| 2018 | 20 | 13,352 | $49.76 | $62.27 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Sep 18, 2026 | 62W73 | CookDistrict 1 | 197 SQ YD | $175.00 | Peter Baker & Son Co. |
| Sep 18, 2026 | 62X33 | KaneDistrict 1 | 838 SQ YD | $50.00 | Builders Paving, LLC |
| Sep 18, 2026 | 62X84 | CookDistrict 1 | 2,079 SQ YD | $117.00 | K-Five Construction Corporation |
| Jul 31, 2026 | 80C87 | CookDistrict 1 | 40 SQ YD | $176.00 | Gallagher Asphalt Corporation |
| Jul 31, 2026 | 62J64 | CookDistrict 1 | 157 SQ YD | $75.00 | Peter Baker & Son Co. |
| Jul 31, 2026 | 80B44 | CookDistrict 1 | 256 SQ YD | $105.00 | D. Construction, Inc. |
| Jun 12, 2026 | 80B87 | CookDistrict 1 | 800 SQ YD | $80.00 | Builders Paving, LLC |
| Jun 12, 2026 | 61M44 | KaneDistrict 1 | 211 SQ YD | $97.75 | Geske and Sons, Inc. |
| Jun 12, 2026 | 80C45 | MchenryDistrict 1 | 27 SQ YD | $70.00 | Peter Baker & Son Co. |
| Jun 12, 2026 | 80B17 | WillDistrict 1 | 150 SQ YD | $0.0100 | Iroquois Paving Corporation |
| Jun 12, 2026 | 80B22 | CookDistrict 1 | 2,059 SQ YD | $45.00 | K-Five Construction Corporation |
| Jun 12, 2026 | 80B28 | CookDistrict 1 | 254 SQ YD | $45.00 | K-Five Construction Corporation |
| Jun 12, 2026 | 80B35 | CookDistrict 1 | 492 SQ YD | $29.00 | K-Five Construction Corporation |
| Apr 24, 2026 | 80B09 | CookDistrict 1 | 1,738 SQ YD | $133.00 | Builders Paving, LLC |
| Apr 24, 2026 | 80B27 | CookDistrict 1 | 1,266 SQ YD | $120.00 | Plote Construction, Inc. |
| Apr 24, 2026 | 80B26 | CookDistrict 1 | 868 SQ YD | $60.00 | Gallagher Asphalt Corporation |
| Apr 24, 2026 | 80B31 | WillDistrict 1 | 150 SQ YD | $125.00 | P. T. Ferro Construction Co. |
| Apr 24, 2026 | 80B39 | CookDistrict 1 | 1,038 SQ YD | $49.00 | K-Five Construction Corporation |
| Apr 24, 2026 | 61L84 | DupageDistrict 1 | 179 SQ YD | $40.00 | K-Five Construction Corporation |
| Apr 24, 2026 | 80B68 | DupageDistrict 1 | 1,277 SQ YD | $105.00 | D. Construction, Inc. |
| Apr 24, 2026 | 62P51 | CookDistrict 1 | 162 SQ YD | $166.68 | Martam Construction Incorporated |
| Apr 24, 2026 | 70E14 | McleanDistrict 5 | 445 SQ YD | $291.59 | Rowe Construction, a div of UCM, Inc. |
| Apr 24, 2026 | 80B21 | CookDistrict 1 | 650 SQ YD | $100.00 | K-Five Construction Corporation |
| Feb 27, 2026 | 62V43 | KaneDistrict 1 | 2,228 SQ YD | $80.00 | Builders Paving, LLC |
| Feb 27, 2026 | 61L39 | KaneDistrict 1 | 250 SQ YD | $20.00 | Geneva Construction Company LLC. |
| Feb 27, 2026 | 68474 | PeoriaDistrict 4 | 679 SQ YD | $292.95 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Feb 27, 2026 | 80B13 | WillDistrict 1 | 621 SQ YD | $40.00 | P. T. Ferro Construction Co. |
| Feb 27, 2026 | 80B25 | DupageDistrict 1 | 160 SQ YD | $34.00 | R. W. Dunteman Company |
| Jan 16, 2026 | 80B36 | WillDistrict 1 | 467 SQ YD | $110.00 | D. Construction, Inc. |
| Jan 16, 2026 | 62321 | CookDistrict 1 | 370 SQ YD | $108.00 | MAT Construction Leasing, Inc. |
| Jan 16, 2026 | 80B18 | CookDistrict 1 | 299 SQ YD | $103.90 | Everlast Blacktop Inc. |
| Jan 16, 2026 | 62K64 | CookDistrict 1 | 30 SQ YD | $220.00 | F. H. Paschen, S.N. Nielsen & Associates LLC |
| Jan 16, 2026 | 61L42 | LakeDistrict 1 | 72 SQ YD | $84.00 | D'Land Construction, LLC |
| Jan 16, 2026 | 97871 | St. ClairDistrict 8 | 200 SQ YD | $228.00 | The Kilian Corporation |
| Jan 16, 2026 | 62K65 | CookDistrict 1 | 70 SQ YD | $123.93 | F. H. Paschen, S.N. Nielsen & Associates LLC |
| Jan 16, 2026 | 62W33 | CookDistrict 1 | 287 SQ YD | $155.00 | Iroquois Paving Corporation |
| Jan 16, 2026 | 61L44 | DupageDistrict 1 | 299 SQ YD | $50.00 | Builders Paving, LLC |
| Jan 16, 2026 | 74893 | EffinghamDistrict 7 | 575 SQ YD | $405.00 | William Charles Construction Company, LLC |
| Jan 16, 2026 | 61L81 | WillDistrict 1 | 5 SQ YD | $20.00 | K-Five Construction Corporation |
| Jan 16, 2026 | 61L89 | CookDistrict 1 | 275 SQ YD | $90.00 | Builders Paving, LLC |
| Jan 16, 2026 | 80B34 | WillDistrict 1 | 10 SQ YD | $197.00 | Gallagher Asphalt Corporation |
| Jan 16, 2026 | 61M09 | CookDistrict 1 | 180 SQ YD | $135.00 | Martam Construction Incorporated |
| Nov 7, 2025 | 70F19 | McleanDistrict 5 | 324 SQ YD | $300.00 | Rowe Construction, a div of UCM, Inc. |
| Sep 19, 2025 | 62X01 | WillDistrict 1 | 1,576 SQ YD | $132.00 | Iroquois Paving Corporation |
| Sep 19, 2025 | 62X87 | CookDistrict 1 | 300 SQ YD | $90.00 | D. Construction, Inc. |
| Aug 1, 2025 | 62V91 | CookDistrict 1 | 10 SQ YD | $170.00 | D. Construction, Inc. |
| Aug 1, 2025 | 61L58 | KaneDistrict 1 | 10 SQ YD | $300.00 | Plote Construction, Inc. |
| Jun 13, 2025 | 62X69 | KaneDistrict 1 | 96 SQ YD | $160.00 | Geneva Construction Company LLC. |
| Jun 13, 2025 | 62P73 | LakeDistrict 1 | 1,000 SQ YD | $175.00 | Curran Contracting Company |
| Jun 13, 2025 | 62X35 | MchenryDistrict 1 | 1,180 SQ YD | $65.00 | Plote Construction, Inc. |
| Jun 13, 2025 | 62X71 | CookDistrict 1 | 292 SQ YD | $40.00 | K-Five Construction Corporation |
| Jun 13, 2025 | 62U39 | WillDistrict 1 | 287 SQ YD | $90.00 | D. Construction, Inc. |
| Jun 13, 2025 | 64U24 | StephensonDistrict 2 | 202 SQ YD | $110.00 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Jun 13, 2025 | 62V58 | LakeDistrict 1 | 250 SQ YD | $40.00 | Peter Baker & Son Co. |
| Jun 13, 2025 | 61L62 | CookDistrict 1 | 44 SQ YD | $90.00 | Peter Baker & Son Co. |
| Jun 13, 2025 | 62X29 | CookDistrict 1 | 50 SQ YD | $243.57 | MYS, Incorporated |
| Jun 13, 2025 | 61L63 | CookDistrict 1 | 25 SQ YD | $90.00 | Peter Baker & Son Co. |
| Jun 13, 2025 | 62X59 | KaneDistrict 1 | 500 SQ YD | $140.00 | Plote Construction, Inc. |
| Jun 13, 2025 | 62L61 | MchenryDistrict 1 | 1,500 SQ YD | $125.00 | Curran Contracting Company |
| Jun 13, 2025 | 62V14 | CookDistrict 1 | 700 SQ YD | $107.00 | MAT Construction Leasing, Inc. |
| Apr 25, 2025 | 62X94 | MchenryDistrict 1 | 180 SQ YD | $1.00 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. |
| Apr 25, 2025 | 62V61 | CookDistrict 1 | 133 SQ YD | $80.00 | K-Five Construction Corporation |
| Apr 25, 2025 | 95975 | ColesDistrict 7 | 152 SQ YD | $225.00 | Ne-Co Asphalt Co., Inc. |
| Apr 25, 2025 | 62V89 | CookDistrict 1 | 2,604 SQ YD | $60.00 | Plote Construction, Inc. |
| Apr 25, 2025 | 61L31 | LakeDistrict 1 | 134 SQ YD | $30.00 | Peter Baker & Son Co. |
| Apr 25, 2025 | 62W50 | CookDistrict 1 | 105 SQ YD | $98.00 | Schroeder Asphalt Services, Inc. |
| Apr 25, 2025 | 62J72 | KaneDistrict 1 | 300 SQ YD | $150.00 | Geneva Construction Company LLC. |
| Apr 25, 2025 | 62W87 | CookDistrict 1 | 1,165 SQ YD | $172.00 | Lorig Construction Company |
| Apr 25, 2025 | 62T20 | CookDistrict 1 | 1,552 SQ YD | $25.00 | Iroquois Paving Corporation |
| Apr 25, 2025 | 62X32 | LakeDistrict 1 | 3,300 SQ YD | $70.00 | Peter Baker & Son Co. |
| Apr 25, 2025 | 62V56 | CookDistrict 1 | 2,328 SQ YD | $45.00 | K-Five Construction Corporation |
| Mar 7, 2025 | 61L14 | CookDistrict 1 | 20 SQ YD | $200.00 | D. Construction, Inc. |
| Mar 7, 2025 | 70D55 | McleanDistrict 5 | 420 SQ YD | $274.84 | Rowe Construction, a div of UCM, Inc. |
| Mar 7, 2025 | 70F98 | EdgarDistrict 5 | 240 SQ YD | $331.00 | Evergreen Roadworks, LLC |
| Jan 17, 2025 | 61L07 | CookDistrict 1 | 100 SQ YD | $100.00 | Plote Construction, Inc. |
| Jan 17, 2025 | 62R99 | CookDistrict 1 | 64 SQ YD | $120.00 | Martam Construction Incorporated |
| Jan 17, 2025 | 62W71 | CookDistrict 1 | 381 SQ YD | $50.00 | A Lamp Concrete Contractors, Inc. |
| Jan 17, 2025 | 62X15 | CookDistrict 1 | 205 SQ YD | $32.50 | K-Five Construction Corporation |
| Jan 17, 2025 | 61K91 | LakeDistrict 1 | 405 SQ YD | $50.00 | Peter Baker & Son Co. |
| Dec 13, 2024 | 78633 | WilliamsonDistrict 9 | 15 SQ YD | $745.32 | E. T. Simonds Construction Company |
| Nov 8, 2024 | 62T10 | DupageDistrict 1 | 575 SQ YD | $80.00 | Plote Construction, Inc. |
| Sep 20, 2024 | 78A66 | JacksonDistrict 9 | 68 SQ YD | $150.43 | E. T. Simonds Construction Company |
| Sep 20, 2024 | 97838 | MadisonDistrict 8 | 25 SQ YD | $110.00 | Stutz Excavating, Inc. |
| Sep 20, 2024 | 62T11 | CookDistrict 1 | 82 SQ YD | $140.00 | Builders Paving, LLC |
| Jun 14, 2024 | 62W74 | CookDistrict 1 | 30 SQ YD | $500.00 | Mosley Construction 1, LLC |
| Jun 14, 2024 | 64T17 | Carroll, OgleDistrict 2 | 564 SQ YD | $100.00 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Jun 14, 2024 | 62U10 | CookDistrict 1 | 600 SQ YD | $31.00 | K-Five Construction Corporation |
| Jun 14, 2024 | 61H55 | CookDistrict 1 | 294 SQ YD | $30.00 | K-Five Construction Corporation |
| Jun 14, 2024 | 62V20 | CookDistrict 1 | 308 SQ YD | $350.00 | Gallagher Asphalt Corporation |
| Apr 26, 2024 | 62P34 | CookDistrict 1 | 1,427 SQ YD | $60.00 | Plote Construction, Inc. |
| Apr 26, 2024 | 62V97 | DupageDistrict 1 | 50 SQ YD | $30.00 | K-Five Construction Corporation |
| Apr 26, 2024 | 64P27 | WinnebagoDistrict 2 | 294 SQ YD | $150.00 | Curran Contracting Company |
| Apr 26, 2024 | 74986 | ColesDistrict 7 | 2,360 SQ YD | $203.97 | Howell Paving, Inc. |
| Apr 26, 2024 | 61K00 | DupageDistrict 1 | 708 SQ YD | $7.77 | R. W. Dunteman Company |
| Apr 26, 2024 | 61K29 | CookDistrict 1 | 1,200 SQ YD | $100.00 | Builders Paving, LLC |
| Mar 8, 2024 | 70855 | McleanDistrict 5 | 118 SQ YD | $231.71 | Rowe Construction, a div of UCM, Inc. |
| Mar 8, 2024 | 62T63 | MchenryDistrict 1 | 1,320 SQ YD | $98.00 | Schroeder Asphalt Services, Inc. |
| Mar 8, 2024 | 74903 | ColesDistrict 7 | 129 SQ YD | $180.78 | Howell Paving, Inc. |
| Jan 19, 2024 | 61J97 | WillDistrict 1 | 80 SQ YD | $130.00 | P. T. Ferro Construction Co. |
| Nov 17, 2023 | 68C00 | TazewellDistrict 4 | 36 SQ YD | $145.00 | ICC Group Inc. |
| Nov 17, 2023 | 61J80 | WillDistrict 1 | 107 SQ YD | $20.00 | K-Five Construction Corporation |
| Sep 22, 2023 | 68886 | PeoriaDistrict 4 | 185 SQ YD | $300.00 | Stark Excavating, Inc. |
| Aug 4, 2023 | 62R18 | LakeDistrict 1 | 200 SQ YD | $50.00 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. |
| Aug 4, 2023 | 62T35 | WillDistrict 1 | 260 SQ YD | $105.00 | Austin Tyler Construction, Inc. |
| Aug 4, 2023 | 62T73 | CookDistrict 1 | 269 SQ YD | $35.00 | Iroquois Paving Corporation |
| Jun 16, 2023 | 61J61 | WillDistrict 1 | 7 SQ YD | $122.00 | Austin Tyler Construction, Inc. |
| Jun 16, 2023 | 61J62 | WillDistrict 1 | 7 SQ YD | $123.00 | Austin Tyler Construction, Inc. |
| Jun 16, 2023 | 99698 | PulaskiDistrict 9 | 58 SQ YD | $338.54 | E. T. Simonds Construction Company |
| Jun 16, 2023 | 61H85 | KaneDistrict 1 | 155 SQ YD | $90.94 | R. W. Dunteman Company |
| Jun 16, 2023 | 61J59 | CookDistrict 1 | 211 SQ YD | $40.00 | Builders Paving, LLC |
| Jun 16, 2023 | 62H82 | CookDistrict 1 | 95 SQ YD | $150.00 | Judlau Contracting, Inc. |
| Jun 16, 2023 | 61J60 | WillDistrict 1 | 12 SQ YD | $250.00 | Gallagher Asphalt Corporation |
| Apr 28, 2023 | 89805 | TazewellDistrict 4 | 15 SQ YD | $197.90 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Mar 10, 2023 | 74574 | WayneDistrict 7 | 59 SQ YD | $319.73 | Howell Paving, Inc. |
| Mar 10, 2023 | 61H65 | CookDistrict 1 | 299 SQ YD | $82.00 | A Lamp Concrete Contractors, Inc. |
| Mar 10, 2023 | 61J15 | LakeDistrict 1 | 204 SQ YD | $100.00 | Alliance Contractors, Inc. |
| Mar 10, 2023 | 62J30 | CookDistrict 1 | 200 SQ YD | $98.21 | R. W. Dunteman Company |
| Mar 10, 2023 | 62M65 | Cook, LakeDistrict 1 | 450 SQ YD | $50.00 | Plote Construction, Inc. |
| Jan 20, 2023 | 61J17 | CookDistrict 1 | 230 SQ YD | $20.00 | J. A. Johnson Paving Company |
| Jan 20, 2023 | 62N69 | LakeDistrict 1 | 700 SQ YD | $40.00 | Peter Baker & Son Co. |
| Jan 20, 2023 | 97794 | St. ClairDistrict 8 | 100 SQ YD | $268.00 | The Kilian Corporation |
| Nov 18, 2022 | 61H89 | CookDistrict 1 | 29 SQ YD | $105.00 | Iroquois Paving Corporation |
| Nov 18, 2022 | 62N53 | CookDistrict 1 | 396 SQ YD | $31.00 | Arrow Road Construction Co. |
| Aug 5, 2022 | 62N81 | CookDistrict 1 | 83 SQ YD | $100.00 | K-Five Construction Corporation |
| Jun 17, 2022 | 61H75 | WillDistrict 1 | 25 SQ YD | $100.00 | Iroquois Paving Corporation |
| Jun 17, 2022 | 61H76 | WillDistrict 1 | 5 SQ YD | $150.00 | Austin Tyler Construction, Inc. |
| Jun 17, 2022 | 61H77 | CookDistrict 1 | 252 SQ YD | $40.00 | R. W. Dunteman Company |
| Jun 17, 2022 | 62P59 | CookDistrict 1 | 50 SQ YD | $50.00 | Gallagher Asphalt Corporation |
| Apr 29, 2022 | 62P32 | CookDistrict 1 | 2,409 SQ YD | $52.00 | Builders Paving, LLC |
| Apr 29, 2022 | 62L68 | LakeDistrict 1 | 1,233 SQ YD | $182.90 | Peter Baker & Son Co. |
| Apr 29, 2022 | 70B04 | ChampaignDistrict 5 | 48 SQ YD | $221.60 | Open Road Paving Company LLC |
| Apr 29, 2022 | 62M46 | CookDistrict 1 | 1,550 SQ YD | $31.00 | Arrow Road Construction Co. |
| Apr 29, 2022 | 74797 | EffinghamDistrict 7 | 440 SQ YD | $193.46 | Howell Paving, Inc. |
| Apr 29, 2022 | 62M48 | CookDistrict 1 | 670 SQ YD | $125.00 | Plote Construction, Inc. |
| Apr 29, 2022 | 62N20 | WillDistrict 1 | 500 SQ YD | $95.00 | P. T. Ferro Construction Co. |
| Apr 29, 2022 | 62N99 | CookDistrict 1 | 1,365 SQ YD | $30.00 | K-Five Construction Corporation |
| Mar 11, 2022 | 62L90 | KaneDistrict 1 | 304 SQ YD | $115.00 | Curran Contracting Company |
| Mar 11, 2022 | 62N45 | MchenryDistrict 1 | 5,500 SQ YD | $35.00 | Plote Construction, Inc. |
| Mar 11, 2022 | 62N74 | CookDistrict 1 | 897 SQ YD | $29.00 | Arrow Road Construction Co. |
| Mar 11, 2022 | 61H45 | LakeDistrict 1 | 7 SQ YD | $60.00 | A Lamp Concrete Contractors, Inc. |
| Mar 11, 2022 | 62N78 | CookDistrict 1 | 1,507 SQ YD | $20.00 | K-Five Construction Corporation |
| Mar 11, 2022 | 61H46 | DupageDistrict 1 | 190 SQ YD | $93.00 | R. W. Dunteman Company |
| Mar 11, 2022 | 90868 | ChampaignDistrict 5 | 162 SQ YD | $386.45 | Open Road Paving Company LLC |
| Mar 11, 2022 | 62J65 | CookDistrict 1 | 197 SQ YD | $140.00 | MAT Construction Leasing, Inc. |
| Jan 21, 2022 | 62P16 | CookDistrict 1 | 300 SQ YD | $80.00 | D. Construction, Inc. |
| Jan 21, 2022 | 62P18 | CookDistrict 1 | 2,650 SQ YD | $27.00 | Arrow Road Construction Co. |
| Nov 5, 2021 | 61H27 | MchenryDistrict 1 | 477 SQ YD | $119.00 | Pir Tano Construction Company, Inc. |
| Nov 5, 2021 | 87782 | GrundyDistrict 3 | 182 SQ YD | $80.00 | D. Construction, Inc. |
| Sep 17, 2021 | 62L67 | CookDistrict 1 | 248 SQ YD | $87.00 | MAT Construction Leasing, Inc. |
| Sep 17, 2021 | 62K02 | CookDistrict 1 | 129 SQ YD | $115.00 | Alliance Contractors, Inc. |