FAP 0338 22 RS
- Let date
- Friday, November 8, 2024
- Contract
- 62T10 · job page
- District
- District 1
- County
- Dupage
- Highway
- Limits
- (5.78-Mile) SMART Overlay and ADA Improvements: HMA surface removal and replacement, Class D patches, detector loops replacement, pavement markings, sidewalk and curb removal and replacement, drainage structures adjustments, minor traffic signal (APS) improvements. Located along IL 59 (Neltnor Boulevard ) from South of Heritage Woods Drive to North of Batavia Road within the City of West Chicago and the Village of Warrenville.
Bidders 3
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Plote Construction, Inc. Low bidder | $5,630,000 | ||
| 2 | K-Five Construction Corporation | $5,733,781 | +1.8% | |
| 3 | Geneva Construction Company | $6,202,585 | +10.2% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Plote Construct… | #2 K-Five Construc… | #3 Geneva Construc… |
|---|---|---|---|---|---|---|---|---|
| 1 | X0320050 | CONSTRUCTN LAYOUT SPL | 1 | L SUM | $6,200.00 | $6,100.00 | $12,000.00 | |
| 2 | X1400367 | PED SIGNAL POST 10 FT | 2 | EACH | $1,236.15 | $1,236.00 | $1,236.15 | |
| 3 | X1400378 | PED SIGNAL POST 5 FT | 5 | EACH | $1,009.35 | $1,010.00 | $1,009.35 | |
| 4 | X2010516 | SELECTIVE CLEARING | 4 | UNIT | $600.00 | $250.00 | $250.00 | |
| 5 | X2020110 | GRADING & SHAP SHLDRS | 175 | UNIT | $90.00 | $50.00 | $90.00 | |
| 6 | X4400501 | CC&G RMVL REPL < = 10 | 3,000 | FOOT | $57.00 | $60.00 | $70.00 | |
| 7 | X4400503 | CC&G RMVL REPL > 10FT | 4,550 | FOOT | $49.00 | $60.00 | $60.00 | |
| 8 | X5537800 | SS CLEANED 12 | 275 | FOOT | $3.00 | $3.00 | $3.00 | |
| 9 | X6030310 | FR & LIDS ADJUST SPL | 75 | EACH | $1,250.00 | $1,250.00 | $1,250.00 | |
| 10 | X6700407 | ENGRS FLD OFC TY A D1 | 12 | CAL MO | $4,500.00 | $3,300.00 | $4,000.00 | |
| 11 | X8760200 | ACCESSIBLE PED SIGNAL | 30 | EACH | $1,666.89 | $1,667.00 | $1,666.89 | |
| 12 | X8780012 | CONC FDN TY A 12D | 28 | FOOT | $326.98 | $327.00 | $326.98 | |
| 13 | X8860105 | DET LOOP REPL | 1,712 | FOOT | $18.54 | $18.55 | $18.54 | |
| 14 | Z0018500 | DRAINAGE STR CLEANED | 275 | EACH | $325.00 | $325.00 | $325.00 | |
| 15 | Z0030850 | TEMP INFO SIGNING | 51.4 | SQ FT | $16.00 | $18.00 | $18.00 | |
| 16 | Z0033044 | RE-OPTIMIZE TR SIG SYS 1 | 5 | EACH | $824.40 | $825.00 | $824.40 | |
| 17 | Z0076600 | TRAINEES | 500 | HOUR | $0.8000 | $0.8000 | $0.8000 | |
| 18 | Z0076604 | TRAINEES TPG | 500 | HOUR | $15.00 | $15.00 | $15.00 | |
| 19 | 20100110 | TREE REMOV 6-15 | 10 | UNIT | $90.00 | $40.00 | $40.00 | |
| 20 | 20101300 | TREE PRUN 1-10 | 10 | EACH | $100.00 | $50.00 | $50.00 | |
| 21 | 20101350 | TREE PRUN OVER 10 | 15 | EACH | $150.00 | $90.00 | $90.00 | |
| 22 | 20200100 | EARTH EXCAVATION | 375 | CU YD | $70.00 | $138.00 | $100.00 | |
| 23 | 21101615 | TOPSOIL F & P 4 | 420 | SQ YD | $7.00 | $7.00 | $6.00 | |
| 24 | 25200110 | SODDING SALT TOLERANT | 420 | SQ YD | $20.00 | $20.00 | $20.00 | |
| 25 | 25200200 | SUPPLE WATERING | 15 | UNIT | $0.0100 | $0.0100 | $100.00 | |
| 26 | 30300112 | AGG SUBGRADE IMPR 12 | 523 | SQ YD | $50.00 | $15.00 | $33.00 | |
| 27 | 35600717 | HMA BC WID 10 1/4 | 523 | SQ YD | $92.00 | $149.00 | $70.00 | |
| 28 | 40600290 | BIT MATLS TACK CT | 95,237 | POUND | $0.0100 | $0.0100 | $0.0100 | |
| 29 | 40600370 | LONG JOINT SEALANT | 110,360 | FOOT | $2.34 | $2.45 | $2.50 | |
| 30 | 40600400 | MIX CR JTS FLANGEWYS | 318 | TON | $100.00 | $50.00 | $225.00 | |
| 31 | 40600982 | HMA SURF REM BUTT JT | 813 | SQ YD | $35.00 | $0.0100 | $25.00 | |
| 32 | 40601005 | HMA REPL OVER PATCH | 595 | TON | $150.00 | $65.00 | $140.00 | |
| 33 | 40604062 | HMA SC IL-9.5 D N70 | 1,540 | TON | $98.00 | $100.00 | $110.00 | |
| 34 | 40605026 | P HMA SC SMA 9.5 F N80 | 19,201 | TON | $110.00 | $135.00 | $135.00 | |
| 35 | 42001300 | PROTECTIVE COAT | 445 | SQ YD | $5.00 | $5.00 | $1.00 | |
| 36 | 42400200 | PC CONC SIDEWALK 5 | 1,600 | SQ FT | $18.90 | $20.00 | $20.00 | |
| 37 | 42400800 | DETECTABLE WARNINGS | 200 | SQ FT | $80.00 | $45.00 | $42.00 | |
| 38 | 44000156 | HMA SURF REM 1 3/4 | 211,638 | SQ YD | $2.00 | $2.65 | $2.50 | |
| 39 | 44000600 | SIDEWALK REM | 1,600 | SQ FT | $2.00 | $3.00 | $20.00 | |
| 40 | 44002216 | HMA RM OV PATCH 4 | 2,715 | SQ YD | $1.00 | $1.00 | $11.00 | |
| 41 | 44003100 | MEDIAN REMOVAL | 3,330 | SQ FT | $6.00 | $3.80 | $4.90 | |
| 42 | 44201765 | CL D PATCH T2 10 | 575 | SQ YD | $80.00 | $35.00 | $140.00 | |
| 43 | 44201769 | CL D PATCH T3 10 | 175 | SQ YD | $80.00 | $35.00 | $130.00 | |
| 44 | 44201771 | CL D PATCH T4 10 | 2,298 | SQ YD | $80.00 | $35.00 | $100.00 | |
| 45 | 48102100 | AGG WEDGE SHLD TYPE B | 640 | TON | $60.00 | $45.00 | $60.00 | |
| 46 | 60252800 | CB RECONST | 5 | EACH | $1,650.00 | $1,650.00 | $1,650.00 | |
| 47 | 60257900 | MAN RECONST | 5 | EACH | $1,950.00 | $1,950.00 | $1,950.00 | |
| 48 | 60300305 | FR & LIDS ADJUST | 10 | EACH | $650.00 | $650.00 | $650.00 | |
| 49 | 60404950 | FR & GRATES T24 | 10 | EACH | $525.00 | $525.00 | $525.00 | |
| 50 | 66900200 | NON SPL WASTE DISPOSL | 375 | CU YD | $40.00 | $50.00 | $110.00 | |
| 51 | 66900530 | SOIL DISPOSAL ANALY | 5 | EACH | $1,100.00 | $1,100.00 | $1,100.00 | |
| 52 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $4,900.00 | $4,900.00 | $4,900.00 | |
| 53 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $500.00 | $500.00 | $500.00 | |
| 54 | 66901006 | REG SUB MON | 15 | CAL DA | $700.00 | $700.00 | $700.00 | |
| 55 | 67100100 | MOBILIZATION | 1 | L SUM | $337,000.00 | $344,000.00 | $373,000.00 | |
| 56 | 70100310 | TRAF CONT-PROT 701421 | 1 | L SUM | $1.00 | $1.00 | $9,351.00 | |
| 57 | 70102625 | TR CONT & PROT 701606 | 1 | L SUM | $427,921.80 | $12,500.00 | $9,351.00 | |
| 58 | 70102630 | TR CONT & PROT 701601 | 1 | L SUM | $1.00 | $10,000.00 | $9,351.00 | |
| 59 | 70102632 | TR CONT & PROT 701602 | 1 | L SUM | $1.00 | $10,000.00 | $9,351.00 | |
| 60 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $1.00 | $5,000.00 | $9,351.00 | |
| 61 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $1.00 | $3,800.00 | $9,351.00 | |
| 62 | 70300100 | SHORT TERM PAVT MKING | 22,671 | FOOT | $0.0100 | $1.00 | $1.50 | |
| 63 | 70300150 | SHRT TRM PAVT MK REM | 7,557 | SQ FT | $0.0100 | $2.00 | $1.50 | |
| 64 | 70300211 | TEMP PVT MK LTR & SYM PAINT | 3,745 | SQ FT | $1.25 | $1.50 | $1.75 | |
| 65 | 70300221 | TEMP PVT MK LINE 4 - PAINT | 97,137 | FOOT | $0.3200 | $0.2200 | $0.3500 | |
| 66 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 6,750 | FOOT | $0.3700 | $0.3500 | $0.5300 | |
| 67 | 70300251 | TEMP PVT MK LINE 8 - PAINT | 650 | FOOT | $0.7000 | $0.4500 | $0.7000 | |
| 68 | 70300261 | TEMP PVT MK LINE 12 - PAINT | 1,625 | FOOT | $1.00 | $0.7500 | $1.06 | |
| 69 | 70300281 | TEMP PVT MK LINE 24 - PAINT | 2,675 | FOOT | $1.50 | $1.50 | $1.60 | |
| 70 | 70303100 | TEMP PVT MK LTR & SYM MU | 21 | SQ FT | $37.00 | $37.00 | $20.65 | |
| 71 | 70303120 | TEMP PVT MK L4 MU | 335 | FOOT | $6.25 | $6.25 | $3.05 | |
| 72 | 70303130 | TEMP PVT MK L6 MU | 145 | FOOT | $9.50 | $9.50 | $4.45 | |
| 73 | 70303160 | TEMP PVT MK L12 MU | 22 | FOOT | $18.75 | $18.75 | $8.65 | |
| 74 | 78000100 | THPL PVT MK LTR & SYM | 3,745 | SQ FT | $5.75 | $5.75 | $5.75 | |
| 75 | 78000200 | THPL PVT MK LINE 4 | 97,137 | FOOT | $0.6200 | $0.6200 | $0.6200 | |
| 76 | 78000400 | THPL PVT MK LINE 6 | 6,750 | FOOT | $0.7800 | $0.7800 | $0.7800 | |
| 77 | 78000500 | THPL PVT MK LINE 8 | 650 | FOOT | $1.95 | $1.95 | $1.95 | |
| 78 | 78000600 | THPL PVT MK LINE 12 | 1,625 | FOOT | $3.05 | $3.05 | $3.05 | |
| 79 | 78000650 | THPL PVT MK LINE 24 | 2,675 | FOOT | $5.00 | $5.00 | $5.00 | |
| 80 | 78004635 | PREF PL PM TD STD L 7 | 84 | FOOT | $23.00 | $23.00 | $30.00 | |
| 81 | 78009000 | MOD URETH PM LTR-SYM | 21 | SQ FT | $20.65 | $20.65 | $20.65 | |
| 82 | 78009004 | MOD URETH PM LINE 4 | 885 | FOOT | $3.05 | $3.05 | $3.05 | |
| 83 | 78009006 | MOD URETH PM LINE 6 | 145 | FOOT | $4.45 | $4.45 | $4.45 | |
| 84 | 78009012 | MOD URETH PM LINE 12 | 22 | FOOT | $8.65 | $8.65 | $8.65 | |
| 85 | 78011040 | GRV RCSD PVT MRKG 8 | 84 | FOOT | $0.9500 | $0.9500 | $0.9500 | |
| 86 | 78100100 | RAISED REFL PAVT MKR | 3,352 | EACH | $30.00 | $30.00 | $30.00 | |
| 87 | 78300200 | RAISED REF PVT MK REM | 3,054 | EACH | $13.00 | $13.00 | $4.34 | |
| 88 | 81028200 | UNDRGRD C GALVS 2 | 143 | FOOT | $49.82 | $49.82 | $49.82 | |
| 89 | 85000200 | MAIN EX TR SIG INSTAL | 5 | EACH | $2,193.81 | $2,200.00 | $2,193.81 | |
| 90 | 87301215 | ELCBL C SIGNAL 14 2C | 1,530 | FOOT | $3.39 | $3.39 | $3.39 | |
| 91 | 87301225 | ELCBL C SIGNAL 14 3C | 472 | FOOT | $3.53 | $3.53 | $3.53 | |
| 92 | 87301900 | ELCBL C EGRDC 6 1C | 233 | FOOT | $3.95 | $3.95 | $3.95 | |
| 93 | 87900200 | DRILL EX HANDHOLE | 7 | EACH | $410.54 | $411.00 | $410.54 | |
| 94 | 88102717 | PED SH LED 1F BM CDT | 2 | EACH | $662.43 | $663.00 | $662.43 | |
| 95 | 88600100 | DET LOOP T1 | 6,688 | FOOT | $18.54 | $18.55 | $18.54 | |
| 96 | 89502200 | MOD EX CONTR | 1 | EACH | $1,736.45 | $1,737.00 | $1,736.45 | |
| 97 | 89502300 | REM ELCBL FR CON | 524 | FOOT | $2.95 | $2.95 | $2.95 | |
| 98 | 89502375 | REMOV EX TS EQUIP | 5 | EACH | $208.05 | $209.00 | $208.05 | |
| 99 | 89502376 | REBUILD EX HANDHOLE | 1 | EACH | $3,229.22 | $3,230.00 | $3,229.22 |