FAP 0880 23 SMART
- Let date
- Friday, June 13, 2025
- Contract
- 62V58 · job page
- District
- District 1
- County
- Lake
- Highway
- Limits
- (2.02-Mile) SMART Overlay, Shoulder Repair and ADA Improvements consists (HMA) removal, earth excavation, pavement patching, resurfacing with (HMA) asphalt, full depth hot-mix asphalt shoulder, placement of pavement markings, installation of raised reflective pavement markers, ADA ramps, traffic signals, detector loops. Project located on IL 131 (Green Bay Road) from IL 173 (Rosecrans Road) to Russell Road in the City of Zion.
- Classification
- ·
- Project number
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Peter Baker & Son Co. Low bidder | $3,524,201 | ||
| 2 | Payne & Dolan, Inc. | $4,562,141 | +29.5% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Peter Baker & S… | #2 Payne & Dolan, … |
|---|---|---|---|---|---|---|---|
| 1 | X0320050 | CONSTRUCTN LAYOUT SPL | 1 | L SUM | $2,500.00 | $3,250.00 | |
| 2 | X1400150 | SERV INSTL GR MT MTR | 2 | EACH | $11,215.00 | $11,215.00 | |
| 3 | X2010100 | TREE LIMB REM 4-10 | 5 | EACH | $95.00 | $200.00 | |
| 4 | X2010200 | TREE LIMB REM OVER 10 | 1 | EACH | $110.00 | $400.00 | |
| 5 | X2010350 | TREE REMOV ACRES SPL | 0.1 | ACRE | $15,000.00 | $36,000.00 | |
| 6 | X2010516 | SELECTIVE CLEARING | 3.3 | UNIT | $500.00 | $1,000.00 | |
| 7 | X2020110 | GRADING & SHAP SHLDRS | 5.5 | UNIT | $1,200.00 | $1,100.00 | |
| 8 | X4400501 | CC&G RMVL REPL < = 10 | 225 | FOOT | $110.00 | $160.00 | |
| 9 | X4400503 | CC&G RMVL REPL > 10FT | 220 | FOOT | $110.00 | $160.00 | |
| 10 | X5537800 | SS CLEANED 12 | 90 | FOOT | $10.00 | $1.00 | |
| 11 | X6030310 | FR & LIDS ADJUST SPL | 2 | EACH | $3,000.00 | $6,200.00 | |
| 12 | X6420114 | CENTERLN RUM STRIP 16 | 3,771 | FOOT | $1.05 | $1.35 | |
| 13 | X6700407 | ENGRS FLD OFC TY A D1 | 12 | CAL MO | $1,000.00 | $2,600.00 | |
| 14 | X7200061 | TEMP INFO SIGNING | 177 | SQ FT | $25.00 | $25.00 | |
| 15 | X7800815 | HS THPL PM LN 4 | 7,541 | FOOT | $0.9400 | $1.00 | |
| 16 | Z0018500 | DRAINAGE STR CLEANED | 6 | EACH | $375.00 | $450.00 | |
| 17 | 20100210 | TREE REMOV OVER 15 | 68 | UNIT | $45.00 | $70.00 | |
| 18 | 20200100 | EARTH EXCAVATION | 4,974 | CU YD | $111.35 | $124.00 | |
| 19 | 20201200 | REM & DISP UNS MATL | 498 | CU YD | $92.00 | $124.00 | |
| 20 | 21101615 | TOPSOIL F & P 4 | 701 | SQ YD | $6.00 | $12.00 | |
| 21 | 21400100 | GRADING & SHAP DITCH | 625 | FOOT | $56.00 | $28.00 | |
| 22 | 25100630 | EROSION CONTR BLANKET | 695 | SQ YD | $1.40 | $2.00 | |
| 23 | 25200110 | SODDING SALT TOLERANT | 701 | SQ YD | $22.00 | $20.00 | |
| 24 | 25200200 | SUPPLE WATERING | 35.1 | UNIT | $0.0100 | $1.00 | |
| 25 | 28000250 | TEMP EROS CONTR SEED | 196.1 | POUND | $5.00 | $5.00 | |
| 26 | 28000510 | INLET FILTERS | 2 | EACH | $221.00 | $225.00 | |
| 27 | 30300001 | AGG SUBGRADE IMPROVE | 541 | CU YD | $78.65 | $115.00 | |
| 28 | 30300112 | AGG SUBGRADE IMPR 12 | 9,877 | SQ YD | $57.00 | $45.00 | |
| 29 | 35101400 | AGG BASE CSE B | 2 | TON | $150.00 | $45.00 | |
| 30 | 35600709 | HMA BC WID 8 1/4 | 8,115 | SQ YD | $44.20 | $50.00 | |
| 31 | 40600275 | BIT MATLS PR CT | 18,275 | POUND | $0.0100 | $0.0100 | |
| 32 | 40600290 | BIT MATLS TACK CT | 24,564 | POUND | $0.0100 | $0.1000 | |
| 33 | 40600370 | LONG JOINT SEALANT | 19,033 | FOOT | $3.75 | $2.85 | |
| 34 | 40600400 | MIX CR JTS FLANGEWYS | 24 | TON | $825.00 | $430.00 | |
| 35 | 40600982 | HMA SURF REM BUTT JT | 319 | SQ YD | $1.00 | $0.1000 | |
| 36 | 40605026 | P HMA SC SMA 9.5 F N80 | 5,748 | TON | $120.00 | $145.00 | |
| 37 | 42001300 | PROTECTIVE COAT | 147 | SQ YD | $3.00 | $0.1000 | |
| 38 | 42400200 | PC CONC SIDEWALK 5 | 180 | SQ FT | $40.00 | $45.00 | |
| 39 | 42400800 | DETECTABLE WARNINGS | 20 | SQ FT | $75.00 | $90.00 | |
| 40 | 44000100 | PAVEMENT REM | 3,173 | SQ YD | $18.80 | $60.00 | |
| 41 | 44000156 | HMA SURF REM 1 3/4 | 50,530 | SQ YD | $2.70 | $3.96 | |
| 42 | 44000600 | SIDEWALK REM | 180 | SQ FT | $15.00 | $20.90 | |
| 43 | 44201761 | CL D PATCH T1 10 | 50 | SQ YD | $40.00 | $155.00 | |
| 44 | 44201765 | CL D PATCH T2 10 | 250 | SQ YD | $40.00 | $125.00 | |
| 45 | 44201769 | CL D PATCH T3 10 | 250 | SQ YD | $40.00 | $125.00 | |
| 46 | 44201771 | CL D PATCH T4 10 | 250 | SQ YD | $40.00 | $110.00 | |
| 47 | 48102100 | AGG WEDGE SHLD TYPE B | 1,570 | TON | $25.00 | $90.00 | |
| 48 | 60255500 | MAN ADJUST | 2 | EACH | $1,400.00 | $1,500.00 | |
| 49 | 60266600 | VALVE BOX ADJ | 1 | EACH | $1,300.00 | $1,500.00 | |
| 50 | 60920012 | PIPE CULV CLEANED 12 | 600 | FOOT | $5.50 | $5.00 | |
| 51 | 60920015 | PIPE CULV CLEANED 15 | 700 | FOOT | $5.50 | $6.00 | |
| 52 | 60920018 | PIPE CULV CLEANED 18 | 700 | FOOT | $6.00 | $7.00 | |
| 53 | 63301990 | REM RE-E T B TERM T1 | 1 | EACH | $5,206.15 | $5,900.00 | |
| 54 | 64200108 | SHOULDER RUM STRIP 8 | 11,563 | FOOT | $1.05 | $0.4500 | |
| 55 | 66900200 | NON SPL WASTE DISPOSL | 4,974 | CU YD | $0.0100 | $0.5500 | |
| 56 | 66900530 | SOIL DISPOSAL ANALY | 20 | EACH | $850.00 | $1,350.00 | |
| 57 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $7,000.00 | $3,350.00 | |
| 58 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $500.00 | $1,200.00 | |
| 59 | 66901006 | REG SUB MON | 20 | CAL DA | $750.00 | $700.00 | |
| 60 | 67100100 | MOBILIZATION | 1 | L SUM | $279,240.00 | $777,000.00 | |
| 61 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $100.00 | $100.00 | |
| 62 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $100.00 | $100.00 | |
| 63 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $100,100.00 | $100.00 | |
| 64 | 70102622 | TR CONT & PROT 701502 | 1 | L SUM | $100.00 | $100.00 | |
| 65 | 70102632 | TR CONT & PROT 701602 | 1 | L SUM | $32,400.00 | $18,300.00 | |
| 66 | 70102634 | TR CONT & PROT 701611 | 1 | L SUM | $100.00 | $100.00 | |
| 67 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $100.00 | $100.00 | |
| 68 | 70300100 | SHORT TERM PAVT MKING | 113,602 | FOOT | $0.0100 | $0.0100 | |
| 69 | 70300150 | SHRT TRM PAVT MK REM | 58,600 | SQ FT | $0.0100 | $0.0100 | |
| 70 | 70300211 | TEMP PVT MK LTR & SYM PAINT | 613 | SQ FT | $0.0100 | $1.35 | |
| 71 | 70300221 | TEMP PVT MK LINE 4 - PAINT | 52,853 | FOOT | $0.0100 | $0.4500 | |
| 72 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 2,413 | FOOT | $0.0100 | $0.7000 | |
| 73 | 70300251 | TEMP PVT MK LINE 8 - PAINT | 262 | FOOT | $0.0100 | $0.9000 | |
| 74 | 70300261 | TEMP PVT MK LINE 12 - PAINT | 1,048 | FOOT | $0.0100 | $1.35 | |
| 75 | 70300281 | TEMP PVT MK LINE 24 - PAINT | 226 | FOOT | $0.0100 | $2.70 | |
| 76 | 70307120 | TEMP PVT MK L4 T4 TAPE | 56,801 | FOOT | $0.0100 | $1.25 | |
| 77 | 72400735 | REM & REL SIGN PANEL T1 | 9 | SQ FT | $50.00 | $50.00 | |
| 78 | 72800100 | TELES STL SIN SUPPORT | 13 | FOOT | $18.00 | $18.00 | |
| 79 | 78000100 | THPL PVT MK LTR & SYM | 613 | SQ FT | $4.00 | $4.00 | |
| 80 | 78000200 | THPL PVT MK LINE 4 | 45,313 | FOOT | $0.8400 | $0.9000 | |
| 81 | 78000400 | THPL PVT MK LINE 6 | 2,413 | FOOT | $1.30 | $1.30 | |
| 82 | 78000500 | THPL PVT MK LINE 8 | 620 | FOOT | $1.75 | $1.75 | |
| 83 | 78000600 | THPL PVT MK LINE 12 | 1,048 | FOOT | $2.60 | $2.60 | |
| 84 | 78000650 | THPL PVT MK LINE 24 | 226 | FOOT | $5.20 | $5.20 | |
| 85 | 78100100 | RAISED REFL PAVT MKR | 426 | EACH | $46.95 | $46.95 | |
| 86 | 78300200 | RAISED REF PVT MK REM | 426 | EACH | $17.50 | $13.50 | |
| 87 | 85000200 | MAIN EX TR SIG INSTAL | 2 | EACH | $26,400.00 | $26,400.00 | |
| 88 | 87301305 | ELCBL C LEAD 14 1PR | 800 | FOOT | $7.90 | $7.90 | |
| 89 | 87301805 | ELCBL C SERV 6 2C | 55 | FOOT | $9.80 | $9.80 | |
| 90 | 87301900 | ELCBL C EGRDC 6 1C | 55 | FOOT | $8.40 | $8.40 | |
| 91 | 87800100 | CONC FDN TY A | 8 | FOOT | $757.80 | $757.80 | |
| 92 | 88500100 | INDUCTIVE LOOP DETECT | 2 | EACH | $1,455.00 | $1,455.00 | |
| 93 | 88600100 | DET LOOP T1 | 1,620 | FOOT | $40.20 | $40.20 | |
| 94 | 89502375 | REMOV EX TS EQUIP | 2 | EACH | $3,520.00 | $3,520.00 | |
| 95 | 89502376 | REBUILD EX HANDHOLE | 2 | EACH | $6,373.00 | $6,373.00 |