2020-250-BY
Bidders 5
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | P. T. Ferro Construction Co. Low bidder | $4,699,500 | ||
| 2 | D. Construction, Inc. | $4,779,272 | +1.7% | |
| 3 | Lorig Construction Company | $5,145,948 | +9.5% | |
| 4 | F. H. Paschen, S.N. Nielsen & Associates LLC | $5,635,420 | +19.9% | |
| 5 | Herlihy Mid-Continent Company | $5,737,061 | +22.1% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 P. T. Ferro Con… | #2 D. Construction… | #3 Lorig Construct… | #4 F. H. Paschen, … | #5 Herlihy Mid-Con… |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | K1005418 | TEMPORARY SEEDING | 1 | ACRE | $2,012.00 | $660.00 | $2,025.00 | $1,625.00 | $800.00 | |
| 2 | X0320070 | PROTCT SHIELD REMOVAL | 1 | L SUM | $50,000.00 | $10,000.00 | $100.00 | $48,379.31 | $25,000.00 | |
| 3 | X0325201 | SHOULDER RUM STRIP RM | 460 | SQ YD | $58.00 | $70.00 | $70.00 | $68.50 | $74.93 | |
| 4 | X0327120 | WEED CTRL NTV LSCP EN | 1.7 | ACRE | $1,210.00 | $3,300.00 | $1,225.00 | $2,800.00 | $2,500.00 | |
| 5 | X1400378 | PED SIGNAL POST 5 FT | 3 | EACH | $1,373.50 | $1,510.85 | $1,400.00 | $1,200.00 | $1,373.50 | |
| 6 | X2010350 | TREE REMOV ACRES SPL | 0.25 | ACRE | $20,000.00 | $22,000.00 | $20,000.00 | $20,000.00 | $11,200.00 | |
| 7 | X4201410 | BR APPR PAVT CONN SPL | 40 | SQ YD | $155.00 | $200.00 | $180.00 | $160.00 | $120.00 | |
| 8 | X6700407 | ENGR FLD OFF A D1 | 12 | CAL MO | $3,500.00 | $5,000.00 | $2,800.00 | $3,500.00 | $3,500.00 | |
| 9 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $40,000.00 | $0.0100 | $100,000.00 | $40,000.00 | $400.00 | |
| 10 | X7010410 | SPEED DISPLAY TRAILER | 8 | CAL MO | $700.00 | $2,000.00 | $700.00 | $700.00 | $700.00 | |
| 11 | X7011015 | TR C-PROT EXPRESSWAYS | 1 | L SUM | $104,000.00 | $166,800.00 | $125,000.00 | $104,000.00 | $231,000.00 | |
| 12 | X7013820 | TR CONT SURVEIL EXPWY | 210 | CAL DA | $10.00 | $0.0100 | $10.00 | $10.00 | $10.00 | |
| 13 | X7030005 | TEMP PAVT MKING REMOV | 4,138 | SQ FT | $0.5000 | $3.00 | $0.5000 | $0.5000 | $0.5000 | |
| 14 | X8570226 | FAC T4 CAB SPL | 1 | EACH | $30,394.34 | $33,433.77 | $31,000.00 | $28,000.00 | $30,394.34 | |
| 15 | X8710024 | FOCC62.5/125 MM12SM24 | 2,780 | FOOT | $3.18 | $3.50 | $3.25 | $4.00 | $3.18 | |
| 16 | X8760200 | ACCESSIBLE PED SIGNAL | 8 | EACH | $1,169.56 | $1,286.52 | $1,200.00 | $1,150.00 | $1,169.56 | |
| 17 | X8780012 | CONC FDN TY A 12D | 12 | FOOT | $752.41 | $827.65 | $775.00 | $200.00 | $752.41 | |
| 18 | Z0004552 | APPROACH SLAB REM | 98 | SQ YD | $150.00 | $30.00 | $50.00 | $50.00 | $50.00 | |
| 19 | Z0012754 | STR REP CON DP = < 5 | 125 | SQ FT | $105.00 | $120.00 | $275.00 | $180.49 | $256.19 | |
| 20 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $50,000.00 | $40,000.00 | $75,000.00 | $450,000.00 | $42,000.00 | |
| 21 | Z0022800 | FENCE REMOVAL | 94 | FOOT | $10.00 | $12.86 | $10.00 | $11.70 | $6.00 | |
| 22 | Z0029604 | HEADWALL REMOVAL | 4 | EACH | $250.00 | $500.00 | $305.00 | $305.00 | $305.00 | |
| 23 | Z0030850 | TEMP INFO SIGNING | 200 | SQ FT | $18.00 | $25.00 | $18.00 | $18.00 | $18.00 | |
| 24 | Z0033046 | RE-OPTIMIZE SIG SYS 2 | 1 | EACH | $1,312.50 | $1,443.75 | $1,325.00 | $3,500.00 | $1,312.50 | |
| 25 | Z0064600 | SELECTIVE CLEARING | 1.4 | ACRE | $14,000.00 | $15,400.00 | $14,000.00 | $14,000.00 | $9,200.00 | |
| 26 | Z0073510 | TEMP TR SIGNAL TIMING | 1 | EACH | $892.50 | $981.75 | $900.00 | $2,700.00 | $892.50 | |
| 27 | Z0076600 | TRAINEES | 500 | HOUR | $0.8000 | $0.8000 | $0.8000 | $0.8000 | $0.8000 | |
| 28 | Z0076604 | TRAINEES TPG | 500 | HOUR | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | |
| 29 | 20100110 | TREE REMOV 6-15 | 150 | UNIT | $22.00 | $24.20 | $22.00 | $22.00 | $16.75 | |
| 30 | 20100210 | TREE REMOV OVER 15 | 25 | UNIT | $28.00 | $30.80 | $28.00 | $28.00 | $19.00 | |
| 31 | 20101000 | TEMPORARY FENCE | 100 | FOOT | $3.00 | $6.60 | $3.00 | $2.65 | $6.00 | |
| 32 | 20200100 | EARTH EXCAVATION | 383 | CU YD | $28.00 | $32.00 | $37.00 | $30.71 | $25.00 | |
| 33 | 20400800 | FURNISHED EXCAVATION | 6,106 | CU YD | $0.0100 | $25.00 | $23.00 | $0.0100 | $35.00 | |
| 34 | 20800150 | TRENCH BACKFILL | 242 | CU YD | $35.00 | $45.00 | $54.00 | $52.10 | $52.10 | |
| 35 | 21101505 | TOPSOIL EXC & PLAC | 824 | CU YD | $29.00 | $20.00 | $35.00 | $16.36 | $25.00 | |
| 36 | 21101615 | TOPSOIL F & P 4 | 5,883 | SQ YD | $5.50 | $3.85 | $5.50 | $5.60 | $5.24 | |
| 37 | 25000210 | SEEDING CL 2A | 0.5 | ACRE | $3,324.00 | $1,331.00 | $3,350.00 | $2,535.00 | $2,500.00 | |
| 38 | 25000400 | NITROGEN FERT NUTR | 46 | POUND | $3.00 | $2.20 | $3.00 | $3.00 | $2.00 | |
| 39 | 25000600 | POTASSIUM FERT NUTR | 46 | POUND | $3.00 | $2.20 | $3.00 | $3.00 | $2.00 | |
| 40 | 25003210 | INTERSEED CL 2A | 1 | ACRE | $1,616.00 | $1,331.00 | $1,625.00 | $2,535.00 | $1,500.00 | |
| 41 | 25100125 | MULCH METHOD 3 | 1 | ACRE | $1,800.00 | $3,993.00 | $1,800.00 | $3,995.00 | $3,150.00 | |
| 42 | 25100635 | HD EROS CONTR BLANKET | 2,473 | SQ YD | $2.00 | $1.65 | $2.00 | $1.65 | $2.67 | |
| 43 | 28000305 | TEMP DITCH CHECKS | 275 | FOOT | $4.20 | $15.40 | $4.20 | $11.65 | $4.00 | |
| 44 | 28000400 | PERIMETER EROS BAR | 1,584 | FOOT | $2.00 | $2.20 | $2.00 | $3.05 | $2.48 | |
| 45 | 28000500 | INLET & PIPE PROTECT | 3 | EACH | $64.00 | $154.00 | $64.00 | $95.00 | $250.00 | |
| 46 | 31200500 | STAB SUBBASE HMA 4 | 118 | SQ YD | $60.00 | $32.00 | $44.00 | $40.30 | $134.93 | |
| 47 | 35101600 | AGG BASE CSE B 4 | 3,795 | SQ YD | $0.0100 | $6.25 | $8.50 | $8.00 | $14.00 | |
| 48 | 35501308 | HMA BASE CSE 6 | 40 | SQ YD | $75.00 | $45.00 | $96.00 | $90.50 | $161.37 | |
| 49 | 40600290 | BIT MATLS TACK CT | 1,853 | POUND | $0.0100 | $0.0100 | $0.0100 | $0.0100 | $1.06 | |
| 50 | 40600400 | MIX CR JTS FLANGEWYS | 5 | TON | $600.00 | $0.0100 | $650.00 | $645.90 | $1,684.78 | |
| 51 | 40600982 | HMA SURF REM BUTT JT | 170 | SQ YD | $0.0100 | $0.0100 | $15.00 | $14.10 | $3.59 | |
| 52 | 40603085 | HMA BC IL-19.0 N70 | 529 | TON | $85.00 | $83.00 | $105.00 | $103.00 | $96.96 | |
| 53 | 40604060 | HMA SC IL-9.5 D N50 | 5 | TON | $250.00 | $100.00 | $620.00 | $610.50 | $489.00 | |
| 54 | 40604062 | HMA SC IL-9.5 D N70 | 353 | TON | $93.00 | $87.00 | $135.00 | $128.80 | $111.00 | |
| 55 | 42000060 | WELDED WIRE REINF | 147 | SQ YD | $30.00 | $20.00 | $27.00 | $60.00 | $20.00 | |
| 56 | 42000080 | PVT CON PCC BR APP SL | 147 | SQ YD | $140.00 | $145.00 | $155.00 | $135.00 | $120.00 | |
| 57 | 42001300 | PROTECTIVE COAT | 4,195 | SQ YD | $0.0100 | $1.00 | $0.2500 | $0.0100 | $1.75 | |
| 58 | 42400200 | PC CONC SIDEWALK 5 | 34,155 | SQ FT | $0.0100 | $7.00 | $6.50 | $5.49 | $6.55 | |
| 59 | 42400800 | DETECTABLE WARNINGS | 200 | SQ FT | $25.00 | $35.00 | $50.00 | $35.11 | $41.00 | |
| 60 | 44000100 | PAVEMENT REM | 297 | SQ YD | $31.00 | $25.00 | $22.00 | $13.70 | $20.00 | |
| 61 | 44000164 | HMA SURF REM 3 3/4 | 3,821 | SQ YD | $4.00 | $4.35 | $6.50 | $6.40 | $6.74 | |
| 62 | 44000500 | COMB CURB GUTTER REM | 75 | FOOT | $15.00 | $10.00 | $11.00 | $9.17 | $15.00 | |
| 63 | 44000600 | SIDEWALK REM | 200 | SQ FT | $5.00 | $4.00 | $4.00 | $2.00 | $3.00 | |
| 64 | 44001980 | CONC BARRIER REMOV | 99 | FOOT | $200.00 | $50.00 | $40.00 | $47.84 | $85.00 | |
| 65 | 44004250 | PAVED SHLD REMOVAL | 2,148 | SQ YD | $11.50 | $15.00 | $12.00 | $10.79 | $13.00 | |
| 66 | 44200970 | CL B PATCH T2 10 | 9 | SQ YD | $250.00 | $300.00 | $275.00 | $350.00 | $145.00 | |
| 67 | 44200974 | CL B PATCH T3 10 | 528 | SQ YD | $100.00 | $160.00 | $135.00 | $125.00 | $145.00 | |
| 68 | 44200976 | CL B PATCH T4 10 | 50 | SQ YD | $100.00 | $160.00 | $125.00 | $150.00 | $145.00 | |
| 69 | 44201299 | DOWEL BARS 1 1/2 | 1,452 | EACH | $20.00 | $20.00 | $22.00 | $16.69 | $20.00 | |
| 70 | 44201765 | CL D PATCH T2 10 | 500 | SQ YD | $95.00 | $100.00 | $83.00 | $80.30 | $101.80 | |
| 71 | 44201769 | CL D PATCH T3 10 | 100 | SQ YD | $85.00 | $95.00 | $83.00 | $60.30 | $101.80 | |
| 72 | 44201771 | CL D PATCH T4 10 | 125 | SQ YD | $75.00 | $90.00 | $83.00 | $80.30 | $101.80 | |
| 73 | 44213200 | SAW CUTS | 4,476 | FOOT | $0.0100 | $3.00 | $3.50 | $1.71 | $5.00 | |
| 74 | 48101620 | AGGREGATE SHLDS B 10 | 436 | SQ YD | $20.00 | $14.75 | $22.00 | $14.27 | $20.00 | |
| 75 | 48203029 | HMA SHOULDERS 8 | 1,897 | SQ YD | $43.00 | $40.25 | $55.00 | $52.20 | $44.50 | |
| 76 | 48300705 | PCC SHOULDERS 12 1/4 | 23 | SQ YD | $250.00 | $300.00 | $235.00 | $130.00 | $300.00 | |
| 77 | 50101500 | REM EXIST SUP-STR | 1 | EACH | $327,000.00 | $210,000.00 | $225,000.00 | $300,000.00 | $350,000.00 | |
| 78 | 50102400 | CONC REM | 33.2 | CU YD | $770.00 | $650.00 | $400.00 | $375.00 | $175.00 | |
| 79 | 50104650 | SLOPE WALL REMOV | 370 | SQ YD | $44.00 | $25.00 | $25.00 | $18.00 | $25.00 | |
| 80 | 50157300 | PROTECTIVE SHIELD | 598 | SQ YD | $250.00 | $75.00 | $1.00 | $75.00 | $49.00 | |
| 81 | 50200100 | STRUCTURE EXCAVATION | 226 | CU YD | $28.00 | $30.00 | $70.00 | $35.00 | $90.00 | |
| 82 | 50300225 | CONC STRUCT | 195.3 | CU YD | $1,400.00 | $900.00 | $1,000.00 | $1,000.00 | $850.00 | |
| 83 | 50300255 | CONC SUP-STR | 379.9 | CU YD | $950.00 | $1,000.00 | $1,050.00 | $1,500.00 | $1,100.00 | |
| 84 | 50300260 | BR DECK GROOVING | 941 | SQ YD | $7.75 | $6.48 | $6.50 | $6.30 | $6.92 | |
| 85 | 50300300 | PROTECTIVE COAT | 1,771 | SQ YD | $1.50 | $1.00 | $0.2500 | $6.58 | $1.75 | |
| 86 | 50301350 | CONC SUPSTR APP SLAB | 125.8 | CU YD | $410.00 | $400.00 | $500.00 | $300.00 | $375.00 | |
| 87 | 50500105 | F & E STRUCT STEEL | 1 | L SUM | $667,450.00 | $600,000.00 | $950,000.00 | $1,037,000.00 | $1,104,479.18 | |
| 88 | 50500505 | STUD SHEAR CONNECTORS | 9,891 | EACH | $4.50 | $5.00 | $3.50 | $3.80 | $3.80 | |
| 89 | 50800205 | REINF BARS, EPOXY CTD | 229,850 | POUND | $1.75 | $1.80 | $1.75 | $1.64 | $2.17 | |
| 90 | 50901730 | BRIDGE FENCE RAILING | 278 | FOOT | $242.00 | $293.11 | $245.00 | $242.00 | $239.90 | |
| 91 | 50901750 | PARAPET RAILING | 278 | FOOT | $90.00 | $148.43 | $90.00 | $90.00 | $107.40 | |
| 92 | 51100100 | SLOPE WALL 4 | 478 | SQ YD | $125.00 | $80.00 | $123.00 | $144.70 | $140.00 | |
| 93 | 51200957 | FUR M S PILE 12X0.250 | 135 | FOOT | $120.00 | $125.00 | $92.00 | $35.00 | $52.60 | |
| 94 | 51200963 | FUR M S PILE 16X0.375 | 1,272 | FOOT | $150.00 | $130.00 | $101.00 | $72.00 | $77.59 | |
| 95 | 51202305 | DRIVING PILES | 1,407 | FOOT | $0.0100 | $0.0100 | $1.00 | $1.00 | $1.00 | |
| 96 | 51203200 | TEST PILE MET SHELLS | 3 | EACH | $10,000.00 | $9,000.00 | $9,000.00 | $5,000.00 | $25,000.00 | |
| 97 | 51204650 | PILE SHOES | 28 | EACH | $375.00 | $200.00 | $375.00 | $350.00 | $358.57 | |
| 98 | 51500100 | NAME PLATES | 2 | EACH | $500.00 | $700.00 | $800.00 | $1,744.23 | $750.00 | |
| 99 | 52100010 | ELAST BEARING ASSY T1 | 28 | EACH | $1,600.00 | $2,000.00 | $1,800.00 | $1,487.50 | $2,022.49 | |
| 100 | 52100505 | ANCHOR BOLTS 5/8 | 28 | EACH | $135.00 | $70.00 | $175.00 | $150.27 | $238.37 | |
| 101 | 52100510 | ANCHOR BOLTS 3/4 | 42 | EACH | $135.00 | $75.00 | $180.00 | $153.25 | $241.37 | |
| 102 | 54213660 | PRC FLAR END SEC 15 | 5 | EACH | $900.00 | $850.00 | $975.00 | $957.00 | $957.00 | |
| 103 | 54213663 | PRC FLAR END SEC 18 | 3 | EACH | $975.00 | $1,000.00 | $1,050.00 | $1,032.00 | $1,032.00 | |
| 104 | 550A0070 | STORM SEW CL A 1 15 | 202 | FOOT | $70.00 | $71.00 | $49.00 | $48.25 | $48.25 | |
| 105 | 550A0090 | STORM SEW CL A 1 18 | 133 | FOOT | $75.00 | $76.50 | $62.00 | $60.60 | $60.60 | |
| 106 | 550A0120 | STORM SEW CL A 1 24 | 17 | FOOT | $100.00 | $90.00 | $125.00 | $124.90 | $124.90 | |
| 107 | 55100500 | STORM SEWER REM 12 | 50 | FOOT | $35.00 | $15.00 | $21.00 | $20.50 | $20.50 | |
| 108 | 55101200 | STORM SEWER REM 24 | 17 | FOOT | $50.00 | $25.00 | $40.00 | $40.00 | $40.00 | |
| 109 | 56400100 | FIRE HYDNTS TO BE MVD | 1 | EACH | $6,500.00 | $5,000.00 | $6,500.00 | $6,500.00 | $6,500.00 | |
| 110 | 58600101 | GRANULAR BACKFILL STR | 382 | CU YD | $67.00 | $52.50 | $81.00 | $75.00 | $55.00 | |
| 111 | 58700300 | CONCRETE SEALER | 1,603 | SQ FT | $2.75 | $3.58 | $3.25 | $3.25 | $3.25 | |
| 112 | 59000200 | EPOXY CRACK INJECTION | 4 | FOOT | $205.00 | $200.00 | $450.00 | $542.16 | $400.00 | |
| 113 | 59100100 | GEOCOMPOSITE WALL DR | 99 | SQ YD | $22.00 | $32.50 | $25.00 | $13.45 | $25.00 | |
| 114 | 60108206 | PIPE UNDERDR T 2 6 | 128 | FOOT | $30.00 | $25.00 | $35.00 | $34.70 | $34.70 | |
| 115 | 60146304 | P UNDR FOR STRUCT 4 | 136 | FOOT | $22.00 | $25.00 | $29.00 | $43.14 | $55.00 | |
| 116 | 60200805 | CB TA 4 DIA T8G | 1 | EACH | $2,400.00 | $3,000.00 | $2,500.00 | $2,450.00 | $2,450.00 | |
| 117 | 60201310 | CB TA 4 DIA T20F&G | 9 | EACH | $3,000.00 | $3,200.00 | $3,150.00 | $3,105.00 | $3,105.00 | |
| 118 | 60219510 | MAN TA 4 DIA T20F&G | 2 | EACH | $3,200.00 | $3,400.00 | $4,450.00 | $4,410.00 | $4,410.00 | |
| 119 | 60221100 | MAN TA 5 DIA T1F CL | 1 | EACH | $4,750.00 | $4,000.00 | $4,000.00 | $3,925.00 | $3,925.00 | |
| 120 | 60260100 | INLETS ADJUST | 2 | EACH | $300.00 | $800.00 | $300.00 | $300.00 | $300.00 | |
| 121 | 60500040 | REMOV MANHOLES | 1 | EACH | $400.00 | $1,000.00 | $1,550.00 | $1,545.00 | $1,545.00 | |
| 122 | 60500060 | REMOV INLETS | 16 | EACH | $240.00 | $500.00 | $170.00 | $163.00 | $163.00 | |
| 123 | 60605000 | COMB CC&G TB6.24 | 400 | FOOT | $37.00 | $35.00 | $53.00 | $48.06 | $48.75 | |
| 124 | 63000001 | SPBGR TY A 6FT POSTS | 1,172 | FOOT | $35.00 | $41.36 | $35.00 | $35.00 | $32.10 | |
| 125 | 63000035 | BCK SD PROT OF GRDRL | 586 | FOOT | $18.00 | $22.68 | $18.00 | $18.00 | $16.33 | |
| 126 | 63100085 | TRAF BAR TERM T6 | 4 | EACH | $4,500.00 | $4,796.55 | $4,500.00 | $4,500.00 | $3,819.00 | |
| 127 | 63100167 | TR BAR TRM T1 SPL TAN | 6 | EACH | $3,500.00 | $4,281.74 | $3,500.00 | $3,500.00 | $3,640.00 | |
| 128 | 63200310 | GUARDRAIL REMOV | 1,174 | FOOT | $4.50 | $8.24 | $4.50 | $4.50 | $6.80 | |
| 129 | 63700280 | CONC BAR 2F 44HT | 4 | FOOT | $1,000.00 | $400.00 | $300.00 | $385.00 | $275.00 | |
| 130 | 63700805 | CONC BAR TRANS | 64 | FOOT | $450.00 | $300.00 | $275.00 | $325.00 | $375.00 | |
| 131 | 64200116 | SHOULDER RUM STRIP 16 | 3,116 | FOOT | $4.00 | $2.00 | $2.00 | $1.72 | $1.72 | |
| 132 | 66400305 | CH LK FENCE 6 | 1,031 | FOOT | $35.00 | $46.61 | $35.00 | $35.00 | $36.72 | |
| 133 | 66900200 | NON SPL WASTE DISPOSL | 250 | CU YD | $80.00 | $80.00 | $85.00 | $75.00 | $85.00 | |
| 134 | 66900530 | SOIL DISPOSAL ANALY | 4 | EACH | $1,600.00 | $1,375.00 | $1,300.00 | $1,800.00 | $1,450.00 | |
| 135 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $3,800.00 | $2,475.00 | $2,500.00 | $2,950.00 | $3,300.00 | |
| 136 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $500.00 | $2,475.00 | $1,500.00 | $900.00 | $500.00 | |
| 137 | 66901006 | REG SUB MON | 20 | CAL DA | $675.00 | $880.00 | $1,000.00 | $760.00 | $675.00 | |
| 138 | 67100100 | MOBILIZATION | 1 | L SUM | $280,000.00 | $180,000.00 | $250,000.00 | $338,000.00 | $325,000.00 | |
| 139 | 70300150 | SHRT TRM PAVT MK REM | 4,172 | SQ FT | $0.5000 | $2.00 | $1.00 | $0.4000 | $3.00 | |
| 140 | 70307120 | TEMP PVT MK L4 T4 TAPE | 8,649 | FOOT | $1.15 | $3.00 | $1.15 | $1.15 | $1.15 | |
| 141 | 70307130 | TEMP PVT MK L6 T4 TAPE | 2,577 | FOOT | $1.00 | $5.00 | $1.00 | $1.00 | $1.00 | |
| 142 | 70400100 | TEMP CONC BARRIER | 1,200 | FOOT | $30.00 | $30.00 | $25.00 | $30.00 | $25.00 | |
| 143 | 70400200 | REL TEMP CONC BARRIER | 1,200 | FOOT | $11.50 | $15.00 | $4.00 | $12.00 | $15.00 | |
| 144 | 70600250 | IMP ATTN TEMP NRD TL3 | 2 | EACH | $4,000.00 | $5,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | |
| 145 | 70600350 | IMP ATTN REL NRD TL3 | 2 | EACH | $650.00 | $1,500.00 | $650.00 | $650.00 | $650.00 | |
| 146 | 72000100 | SIGN PANEL T1 | 64 | SQ FT | $20.00 | $27.50 | $20.00 | $20.00 | $20.00 | |
| 147 | 72000200 | SIGN PANEL T2 | 24 | SQ FT | $40.00 | $33.00 | $40.00 | $40.00 | $40.00 | |
| 148 | 72400100 | REMOV SIN PAN ASSY TA | 11 | EACH | $40.00 | $55.00 | $40.00 | $40.00 | $40.00 | |
| 149 | 72400310 | REMOV SIGN PANEL T1 | 72 | SQ FT | $8.00 | $11.00 | $8.00 | $8.00 | $8.00 | |
| 150 | 72400320 | REMOV SIGN PANEL T2 | 48 | SQ FT | $12.00 | $11.00 | $12.00 | $12.00 | $12.00 | |
| 151 | 72500300 | OBJECT MARKER T3 | 4 | EACH | $125.00 | $275.00 | $150.00 | $125.00 | $125.00 | |
| 152 | 72501000 | TERMINAL MARKER - DA | 4 | EACH | $50.00 | $48.94 | $50.00 | $50.00 | $30.00 | |
| 153 | 72800100 | TELES STL SIN SUPPORT | 200 | FOOT | $13.00 | $16.50 | $13.00 | $13.00 | $13.00 | |
| 154 | 72900100 | METAL POST TY A | 28 | FOOT | $25.00 | $13.75 | $20.00 | $16.00 | $16.00 | |
| 155 | 78000100 | THPL PVT MK LTR & SYM | 37 | SQ FT | $6.00 | $6.60 | $6.00 | $6.00 | $6.00 | |
| 156 | 78000200 | THPL PVT MK LINE 4 | 6,686 | FOOT | $1.50 | $0.8800 | $0.8000 | $0.8000 | $0.8000 | |
| 157 | 78000400 | THPL PVT MK LINE 6 | 12,000 | FOOT | $0.0100 | $1.32 | $1.20 | $1.20 | $1.20 | |
| 158 | 78000600 | THPL PVT MK LINE 12 | 500 | FOOT | $6.00 | $2.64 | $2.40 | $2.40 | $2.40 | |
| 159 | 78000650 | THPL PVT MK LINE 24 | 41 | FOOT | $10.00 | $6.60 | $6.00 | $6.00 | $6.00 | |
| 160 | 78004630 | PREF PL PM TD L 6 | 5,830 | FOOT | $5.60 | $6.16 | $5.60 | $5.60 | $5.60 | |
| 161 | 78004645 | PREF PL PM TD L 9 | 1,561 | FOOT | $9.50 | $10.45 | $9.50 | $9.50 | $9.50 | |
| 162 | 78009004 | MOD URETH PM LINE 4 | 1,248 | FOOT | $2.41 | $2.65 | $2.50 | $2.41 | $2.41 | |
| 163 | 78011035 | GRV RCSD PVT MRKG 7 | 5,830 | FOOT | $1.00 | $1.10 | $1.00 | $1.00 | $1.00 | |
| 164 | 78011050 | GRV RCSD PVT MRKG 10 | 1,561 | FOOT | $1.50 | $1.65 | $1.50 | $1.50 | $1.50 | |
| 165 | 78100100 | RAISED REFL PAVT MKR | 50 | EACH | $60.00 | $55.00 | $50.00 | $150.00 | $50.00 | |
| 166 | 78200005 | GRDRAIL REF TYPE A | 19 | EACH | $10.00 | $13.89 | $10.00 | $15.00 | $10.00 | |
| 167 | 78200011 | BARR WALL REF TYPE C | 50 | EACH | $10.00 | $15.00 | $10.00 | $10.00 | $10.00 | |
| 168 | 78300200 | RAISED REF PVT MK REM | 50 | EACH | $0.0100 | $25.00 | $25.00 | $21.00 | $25.00 | |
| 169 | 78300202 | PAVMT MRKG REM WTR BL | 9,000 | SQ FT | $1.20 | $2.75 | $1.20 | $1.20 | $1.20 | |
| 170 | 81028200 | UNDRGRD C GALVS 2 | 1,960 | FOOT | $26.27 | $28.90 | $26.50 | $27.00 | $26.27 | |
| 171 | 81200230 | CON EMB STR 2 PVC | 282 | FOOT | $9.98 | $10.98 | $10.00 | $15.00 | $9.98 | |
| 172 | 81301290 | JUN BX SS ES 12X12X6 | 2 | EACH | $1,586.36 | $1,745.00 | $1,600.00 | $2,000.00 | $1,586.36 | |
| 173 | 81400100 | HANDHOLE | 2 | EACH | $2,939.18 | $3,233.10 | $3,000.00 | $2,200.00 | $2,939.18 | |
| 174 | 81400200 | HD HANDHOLE | 2 | EACH | $3,060.01 | $3,366.01 | $3,100.00 | $3,000.00 | $3,060.01 | |
| 175 | 85000200 | MAIN EX TR SIG INSTAL | 2 | EACH | $750.00 | $825.00 | $750.00 | $6,500.00 | $750.00 | |
| 176 | 86400100 | TRANSCEIVER - FIB OPT | 1 | EACH | $4,885.91 | $5,374.54 | $5,000.00 | $6,000.00 | $4,885.91 | |
| 177 | 87300925 | ELCBL C TRACER 14 1C | 2,750 | FOOT | $0.7700 | $0.8500 | $0.8000 | $0.8000 | $0.7700 | |
| 178 | 87301215 | ELCBL C SIGNAL 14 2C | 480 | FOOT | $8.20 | $9.02 | $8.25 | $5.00 | $8.20 | |
| 179 | 87301900 | ELCBL C EGRDC 6 1C | 110 | FOOT | $8.74 | $9.61 | $8.75 | $8.00 | $8.74 | |
| 180 | 87900200 | DRILL EX HANDHOLE | 5 | EACH | $576.13 | $633.74 | $600.00 | $750.00 | $576.16 | |
| 181 | 88102717 | PED SH LED 1F BM CDT | 8 | EACH | $654.34 | $719.77 | $675.00 | $700.00 | $654.34 | |
| 182 | 88500100 | INDUCTIVE LOOP DETECT | 11 | EACH | $211.18 | $232.30 | $215.00 | $350.00 | $211.18 | |
| 183 | 88600100 | DET LOOP T1 | 50 | FOOT | $42.71 | $46.98 | $45.00 | $40.00 | $42.72 | |
| 184 | 89501410 | REL EM VEH PR SYS P U | 1 | EACH | $105.45 | $116.00 | $105.00 | $350.00 | $105.45 | |
| 185 | 89502375 | REMOV EX TS EQUIP | 1 | EACH | $806.24 | $886.86 | $825.00 | $3,500.00 | $806.25 |