$135.98Avg low bid / EACH
$121.03Avg of all bids
—Avg engineer's estimate
141Jobs · 2,455 EACH
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2026 | 63 | 955 | $145.30 | $129.62 |
| 2025 | 75 | 1,477 | $124.61 | $109.36 |
| 2024 | 3 | 23 | $479.46 | $423.73 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Sep 18, 2026 | 97894 | St. ClairDistrict 8 | 21 EACH | $65.50 | Hank's Excavating & Landscaping, Inc. |
| Sep 18, 2026 | 80C95 | WillDistrict 1 | 1 EACH | $250.00 | Gallagher Asphalt Corporation |
| Sep 18, 2026 | 97892 | St. ClairDistrict 8 | 2 EACH | $100.00 | Plocher Construction Company, Inc. |
| Sep 18, 2026 | 66926 | LasalleDistrict 3 | 1 EACH | $93.50 | D. Construction, Inc. |
| Jul 31, 2026 | 92621 | SangamonDistrict 6 | 9 EACH | $535.96 | Illinois Valley Paving, a div of UCM, Inc. |
| Jul 31, 2026 | 66P22 | BureauDistrict 3 | 2 EACH | $200.00 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Jul 31, 2026 | 61K85 | CookDistrict 1 | 6 EACH | $110.00 | Plote Construction, Inc. |
| Jul 31, 2026 | 46951 | VermilionDistrict 5 | 15 EACH | $200.00 | Feutz Contractors, Inc. |
| Jul 31, 2026 | 66M85 | LivingstonDistrict 3 | 4 EACH | $150.00 | ICC Group Inc. |
| Jun 12, 2026 | 72J41 | AdamsDistrict 6 | 1 EACH | $500.00 | W. L. Miller Company |
| Jun 12, 2026 | 76R32 | MadisonDistrict 8 | 1 EACH | $125.00 | Stutz Excavating, Inc. |
| Jun 12, 2026 | 62M71 | Kane, KendallDistrict 1 | 12 EACH | $86.63 | D. Construction, Inc. |
| Jun 12, 2026 | 46952 | CookDistrict 1 | 30 EACH | $150.00 | K-Five Construction Corporation |
| Jun 12, 2026 | 62R61 | CookDistrict 1 | 22 EACH | $76.92 | OHLA Central, Inc. |
| Jun 12, 2026 | 97899 | St. ClairDistrict 8 | 12 EACH | $151.00 | Hank's Excavating & Landscaping, Inc. |
| Jun 12, 2026 | 62U72 | MchenryDistrict 1 | 27 EACH | $80.00 | Martam Construction Incorporated |
| Jun 12, 2026 | 68J15 | TazewellDistrict 4 | 7 EACH | $248.18 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Apr 24, 2026 | 87899 | KendallDistrict 3 | 65 EACH | $250.00 | Austin Tyler Construction, Inc. |
| Apr 24, 2026 | 62K33 | CookDistrict 1 | 33 EACH | $80.00 | Plote Construction, Inc. |
| Apr 24, 2026 | 61L48 | Kane, MchenryDistrict 1 | 33 EACH | $162.83 | William Charles Construction Company, LLC |
| Apr 24, 2026 | 62P51 | CookDistrict 1 | 18 EACH | $78.00 | Martam Construction Incorporated |
| Apr 24, 2026 | 61L54 | CookDistrict 1 | 21 EACH | $137.50 | Martam Construction Incorporated |
| Apr 24, 2026 | 66M55 | LasalleDistrict 3 | 8 EACH | $118.80 | D. Construction, Inc. |
| Apr 24, 2026 | 78B79 | VariousDistrict 9 | 14 EACH | $75.00 | Samron Midwest Contracting, Inc. |
| Apr 24, 2026 | 66R64 | LasalleDistrict 3 | 2 EACH | $104.50 | D. Construction, Inc. |
| Apr 24, 2026 | 46948 | MaconDistrict 7 | 31 EACH | $227.83 | Illinois Valley Paving, a div of UCM, Inc. |
| Apr 24, 2026 | 97887 | St. ClairDistrict 8 | 2 EACH | $250.00 | KRB Excavating, Inc. |
| Apr 24, 2026 | 80C85 | MchenryDistrict 1 | 52 EACH | $80.00 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. |
| Apr 24, 2026 | 61M11 | AuroraDistrict 1 | 1 EACH | $200.00 | Alliance Contractors, Inc. |
| Feb 27, 2026 | 61L39 | KaneDistrict 1 | 13 EACH | $105.00 | Geneva Construction Company LLC. |
| Feb 27, 2026 | 61M32 | CookDistrict 1 | 105 EACH | $100.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 66N22 | KendallDistrict 3 | 2 EACH | $93.50 | D. Construction, Inc. |
| Feb 27, 2026 | 61M16 | CookDistrict 1 | 3 EACH | $150.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 80B75 | LakeDistrict 1 | 1 EACH | $500.00 | Peter Baker & Son Co. |
| Feb 27, 2026 | 61M26 | CookDistrict 1 | 32 EACH | $200.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 62V09 | CookDistrict 1 | 2 EACH | $50.00 | Plote Construction, Inc. |
| Feb 27, 2026 | 61M27 | CookDistrict 1 | 20 EACH | $110.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 61M19 | MchenryDistrict 1 | 22 EACH | $105.00 | Geske and Sons, Inc. |
| Feb 27, 2026 | 61M28 | CookDistrict 1 | 23 EACH | $110.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 97872 | St. ClairDistrict 8 | 3 EACH | $595.00 | DMS Contracting, Inc. |
| Feb 27, 2026 | 62R23 | WillDistrict 1 | 4 EACH | $800.00 | D. Construction, Inc. & Kraemer North America, LLC JV |
| Jan 16, 2026 | 61L90 | CookDistrict 1 | 12 EACH | $100.00 | A Lamp Concrete Contractors, Inc. |
| Jan 16, 2026 | 61M09 | CookDistrict 1 | 2 EACH | $165.00 | Martam Construction Incorporated |
| Jan 16, 2026 | 99763 | JacksonDistrict 9 | 4 EACH | $100.00 | Samron Midwest Contracting, Inc. |
| Jan 16, 2026 | 62K65 | CookDistrict 1 | 3 EACH | $416.00 | F. H. Paschen, S.N. Nielsen & Associates LLC |
| Jan 16, 2026 | 61K16 | CookDistrict 1 | 38 EACH | $125.00 | Alliance Contractors, Inc. |
| Jan 16, 2026 | 62321 | CookDistrict 1 | 1 EACH | $50.00 | MAT Construction Leasing, Inc. |
| Jan 16, 2026 | 89873 | PeoriaDistrict 4 | 3 EACH | $187.65 | Otto Baum Company, Inc. |
| Jan 16, 2026 | 99758 | UnionDistrict 9 | 8 EACH | $22.81 | E. T. Simonds Construction Company |
| Jan 16, 2026 | 76E84 | Madison, St.clairDistrict 8 | 43 EACH | $127.00 | The Kilian Corporation & Christ Brothers Asphalt & Keeley & Sons, Inc. tri-venture |
| Jan 16, 2026 | 62D34 | CookDistrict 1 | 1 EACH | $100.00 | Lorig Construction Company |
| Jan 16, 2026 | 97851 | MadisonDistrict 8 | 18 EACH | $375.00 | The Kilian Corporation |
| Jan 16, 2026 | 61L19 | LakeDistrict 1 | 8 EACH | $100.00 | Dunnet Bay Construction Company |
| Jan 16, 2026 | 91642 | ChampaignDistrict 5 | 4 EACH | $251.00 | William Charles Construction Company, LLC |
| Jan 16, 2026 | 62F94 | WillDistrict 1 | 14 EACH | $220.00 | D. Construction, Inc. |
| Jan 16, 2026 | 97871 | St. ClairDistrict 8 | 42 EACH | $142.00 | The Kilian Corporation |
| Jan 16, 2026 | 76A46 | MadisonDistrict 8 | 21 EACH | $26.25 | Keller Construction, Inc. |
| Jan 16, 2026 | 97883 | MadisonDistrict 8 | 2 EACH | $85.00 | Stutz Excavating, Inc. |
| Jan 16, 2026 | 62K62 | CookDistrict 1 | 17 EACH | $150.00 | F. H. Paschen, S.N. Nielsen & Associates LLC |
| Jan 16, 2026 | 61L36 | DupageDistrict 1 | 2 EACH | $110.00 | Acura Inc. |
| Jan 16, 2026 | 61M08 | LakeDistrict 1 | 19 EACH | $75.00 | Campanella and Sons, Inc. |
| Jan 16, 2026 | 99718 | JacksonDistrict 9 | 2 EACH | $150.00 | Samron Midwest Contracting, Inc. |
| Jan 16, 2026 | 62K64 | CookDistrict 1 | 8 EACH | $310.00 | F. H. Paschen, S.N. Nielsen & Associates LLC |
| Nov 7, 2025 | 85779 | WhitesideDistrict 2 | 2 EACH | $125.00 | Martin & Company Excavating |
| Nov 7, 2025 | 61L43 | CookDistrict 1 | 14 EACH | $105.00 | K-Five Construction Corporation |
| Nov 7, 2025 | 61L88 | MchenryDistrict 1 | 5 EACH | $200.00 | Dunnet Bay Construction Company |
| Nov 7, 2025 | 62R51 | WillDistrict 1 | 3 EACH | $155.00 | Iroquois Paving Corporation |
| Nov 7, 2025 | 62U41 | CookDistrict 1 | 8 EACH | $300.00 | Lorig Construction Company |
| Nov 7, 2025 | 61L83 | LakeDistrict 1 | 32 EACH | $40.00 | Peter Baker & Son Co. |
| Nov 7, 2025 | 62Y33 | VariousDistrict 1 | 300 EACH | $100.00 | ROADSAFE TRAFFIC SYSTEMS, INC. |
| Nov 7, 2025 | 61L92 | CookDistrict 1 | 38 EACH | $150.00 | Capitol Cement Co., Inc. |
| Nov 7, 2025 | 68F45 | WoodfordDistrict 4 | 2 EACH | $106.00 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Sep 19, 2025 | 64P02 | OgleDistrict 2 | 1 EACH | $593.25 | Stenstrom Excavation & Blacktop, Inc. |
| Sep 19, 2025 | 61L28 | KaneDistrict 1 | 4 EACH | $106.00 | Martam Construction Incorporated |
| Sep 19, 2025 | 99749 | PerryDistrict 9 | 3 EACH | $56.00 | Samron Midwest Contracting, Inc. |
| Sep 19, 2025 | 62R22 | WillDistrict 1 | 2 EACH | $220.00 | D. Construction, Inc. |
| Sep 19, 2025 | 76T17 | St.clairDistrict 8 | 5 EACH | $190.45 | Keeley & Sons, Inc. |
| Sep 19, 2025 | 74597 | CumberlandDistrict 7 | 7 EACH | $202.31 | William Charles Construction Company, LLC |
| Sep 19, 2025 | 61K93 | CookDistrict 1 | 3 EACH | $403.00 | Lima Contractors |
| Sep 19, 2025 | 87846 | KendallDistrict 3 | 11 EACH | $110.00 | D. Construction, Inc. |
| Sep 19, 2025 | 97833 | MadisonDistrict 8 | 7 EACH | $205.00 | Keller Construction, Inc. |
| Sep 19, 2025 | 61K52 | LakeDistrict 1 | 2 EACH | $75.00 | Dunnet Bay Construction Company |
| Aug 1, 2025 | 62N97 | CookDistrict 1 | 3 EACH | $110.00 | Everlast Blacktop Inc. |
| Aug 1, 2025 | 61L58 | KaneDistrict 1 | 3 EACH | $75.00 | Plote Construction, Inc. |
| Aug 1, 2025 | 61K77 | DupageDistrict 1 | 17 EACH | $75.00 | R. W. Dunteman Company |
| Aug 1, 2025 | 61L47 | DupageDistrict 1 | 3 EACH | $169.00 | Everlast Blacktop Inc. |
| Aug 1, 2025 | 68B70 | PeoriaDistrict 4 | 5 EACH | $186.45 | Otto Baum Company, Inc. |
| Jun 13, 2025 | 97834 | St. ClairDistrict 8 | 33 EACH | $42.50 | Stutz Excavating, Inc. |
| Jun 13, 2025 | 66R32 | BureauDistrict 3 | 38 EACH | $215.00 | Advanced Asphalt Company |
| Jun 13, 2025 | 72316 | LoganDistrict 6 | 5 EACH | $155.78 | Truman L. Flatt & Sons Co., Inc. |
| Jun 13, 2025 | 61L40 | KaneDistrict 1 | 1 EACH | $425.00 | Schroeder Asphalt Services, Inc. |
| Jun 13, 2025 | 61L53 | CookDistrict 1 | 15 EACH | $75.00 | Peter Baker & Son Co. |
| Jun 13, 2025 | 76K74 | St.clairDistrict 8 | 43 EACH | $153.00 | Keeley & Sons, Inc. Keller Construction Inc. |
| Jun 13, 2025 | 61L52 | LakeDistrict 1 | 8 EACH | $90.00 | Alliance Contractors, Inc. |
| Jun 13, 2025 | 66F94 | IroquoisDistrict 3 | 3 EACH | $82.00 | Iroquois Paving Corporation |
| Jun 13, 2025 | 64B40 | JodaviessDistrict 2 | 29 EACH | $127.00 | Civil Constructors, Inc. d/b/a Helm Civil and Fischer Excavating, Inc. J.V. |
| Jun 13, 2025 | 66K63 | DekalbDistrict 3 | 4 EACH | $100.00 | Civil Constructors, Inc. d/b/a/ Helm Civil |
| Jun 13, 2025 | 64S25 | WinnebagoDistrict 2 | 2 EACH | $80.00 | Martin & Company Excavating |
| Jun 13, 2025 | 66K71 | BureauDistrict 3 | 19 EACH | $275.00 | D. Construction, Inc. |
| Jun 13, 2025 | 66H59 | IroquoisDistrict 3 | 16 EACH | $95.00 | Iroquois Paving Corporation |
| Jun 13, 2025 | 66P54 | LasalleDistrict 3 | 1 EACH | $100.00 | Advanced Asphalt Company |
| Apr 25, 2025 | 64T85 | OgleDistrict 2 | 2 EACH | $280.00 | Countryman, Inc. |
| Apr 25, 2025 | 61K61 | WillDistrict 1 | 4 EACH | $330.00 | D. Construction, Inc. |
| Apr 25, 2025 | 97839 | MadisonDistrict 8 | 26 EACH | $129.33 | Charles E. Mahoney Co. |
| Apr 25, 2025 | 66M48 | BureauDistrict 3 | 4 EACH | $82.50 | D. Construction, Inc. |
| Apr 25, 2025 | 61L06 | CookDistrict 1 | 125 EACH | $82.50 | D. Construction, Inc. |
| Apr 25, 2025 | 95940 | ShelbyDistrict 7 | 4 EACH | $255.00 | Kinney Contractors, Inc. |
| Apr 25, 2025 | 66R35 | KankakeeDistrict 3 | 18 EACH | $75.00 | Kankakee Valley Construction Co., Inc. & Gallagher Asphalt Corporation |
| Apr 25, 2025 | 61L33 | CookDistrict 1 | 30 EACH | $100.00 | Peter Baker & Son Co. |
| Apr 25, 2025 | 61G79 | DupageDistrict 1 | 12 EACH | $162.00 | OHLA Central, Inc. |
| Apr 25, 2025 | 66R36 | LasalleDistrict 3 | 4 EACH | $200.00 | Advanced Asphalt Company |
| Apr 25, 2025 | 62X94 | MchenryDistrict 1 | 31 EACH | $150.00 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. |
| Apr 25, 2025 | 61K26 | KaneDistrict 1 | 6 EACH | $122.50 | Rausch Infrastructure, LLC |
| Apr 25, 2025 | 46940 | GrundyDistrict 3 | 4 EACH | $82.50 | D. Construction, Inc. |
| Apr 25, 2025 | 64N76 | HenryDistrict 2 | 14 EACH | $750.00 | Phoenix Corporation of the Quad Cities |
| Apr 25, 2025 | 61K44 | WillDistrict 1 | 2 EACH | $82.50 | D. Construction, Inc. |
| Apr 25, 2025 | 46945 | DouglasDistrict 5 | 53 EACH | $290.00 | Feutz Contractors, Inc. |
| Mar 7, 2025 | 76R99 | St. ClairDistrict 8 | 41 EACH | $164.00 | The Kilian Corporation and Christ Brothers Asphalt |
| Mar 7, 2025 | 61L12 | CookDistrict 1 | 4 EACH | $65.15 | Gallagher Asphalt Corporation |
| Mar 7, 2025 | 61L05 | LakeDistrict 1 | 8 EACH | $55.00 | D'Land Construction, LLC |
| Mar 7, 2025 | 61L15 | CookDistrict 1 | 20 EACH | $65.00 | P. T. Ferro Construction Co. |
| Mar 7, 2025 | 61J84 | KaneDistrict 1 | 158 EACH | $30.00 | R. W. Dunteman Company |
| Mar 7, 2025 | 61L17 | LakeDistrict 1 | 4 EACH | $25.00 | Peter Baker & Son Co. |
| Mar 7, 2025 | 61L20 | CookDistrict 1 | 8 EACH | $82.50 | D. Construction, Inc. |
| Mar 7, 2025 | 61L27 | CookDistrict 1 | 13 EACH | $80.00 | Gallagher Asphalt Corporation |
| Mar 7, 2025 | 61L23 | CookDistrict 1 | 4 EACH | $150.00 | A Lamp Concrete Contractors, Inc. |
| Mar 7, 2025 | 66R34 | IroquoisDistrict 3 | 10 EACH | $175.00 | Iroquois Paving Corporation |
| Mar 7, 2025 | 46946 | SalineDistrict 9 | 3 EACH | $250.00 | Illini Asphalt Corporation |
| Jan 17, 2025 | 61J25 | WillDistrict 1 | 15 EACH | $75.00 | P. T. Ferro Construction Co. |
| Jan 17, 2025 | 61K84 | WillDistrict 1 | 3 EACH | $82.50 | D. Construction, Inc. |
| Jan 17, 2025 | 93773 | SangamonDistrict 6 | 46 EACH | $138.93 | Freesen, a div of UCM, Inc. |
| Jan 17, 2025 | 61L08 | CookDistrict 1 | 8 EACH | $75.00 | Plote Construction, Inc. |
| Jan 17, 2025 | 78483 | JeffersonDistrict 9 | 23 EACH | $157.50 | E. T. Simonds Construction Company |
| Jan 17, 2025 | 46656 | VariousDistrict 0 | 5 EACH | $300.00 | ROADSAFE TRAFFIC SYSTEMS, INC. |
| Jan 17, 2025 | 78884 | Franklin, JeffersonDistrict 9 | 21 EACH | $300.96 | E. T. Simonds Construction Company |
| Jan 17, 2025 | 61K68 | KaneDistrict 1 | 16 EACH | $41.60 | Martam Construction Incorporated |
| Jan 17, 2025 | 97847 | MadisonDistrict 8 | 24 EACH | $180.21 | Charles E. Mahoney Co. |
| Jan 17, 2025 | 61K81 | WillDistrict 1 | 7 EACH | $80.00 | Austin Tyler Construction, Inc. |
| Dec 13, 2024 | 62T30 | DupageDistrict 1 | 1 EACH | $140.00 | Martam Construction Incorporated |
| Dec 13, 2024 | 72122 | SangamonDistrict 6 | 2 EACH | $443.74 | Illinois Valley Paving, a div of UCM, Inc. |
| Dec 13, 2024 | 78798 | WilliamsonDistrict 9 | 20 EACH | $500.00 | Samron Midwest Contracting, Inc. |