20-00335-00-FL
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Alliance Contractors, Inc. Low bidder | $214,945 | ||
| 2 | A Lamp Concrete Contractors, Inc. | $364,964 | +69.8% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Alliance Contra… | #2 A Lamp Concrete… |
|---|---|---|---|---|---|---|---|
| 1 | XX007278 | PARKWAY RESTORATION | 188 | SQ YD | $23.50 | $35.00 | |
| 2 | X4240800 | DETECTABLE WARN SPL | 40 | SQ FT | $219.00 | $35.00 | |
| 3 | X6060714 | CONC MEDIAN SPL | 270 | SQ FT | $80.00 | $73.00 | |
| 4 | X6350108 | FLEX DELINEATORS | 7 | EACH | $125.00 | $2,000.00 | |
| 5 | X6350120 | DELINEATOR REMOVAL | 2 | EACH | $50.00 | $1,375.00 | |
| 6 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $28,500.00 | $131,500.00 | |
| 7 | X7200061 | TEMP INFO SIGNING | 52 | SQ FT | $24.00 | $50.00 | |
| 8 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $6,000.00 | $10,000.00 | |
| 9 | Z0019600 | DUST CONTROL WATERING | 5 | UNIT | $1.00 | $25.00 | |
| 10 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $5,000.00 | $20,000.00 | |
| 11 | 20101100 | TREE TRUNK PROTECTION | 1 | EACH | $750.00 | $250.00 | |
| 12 | 20101200 | TREE ROOT PRUNING | 1 | EACH | $1,500.00 | $750.00 | |
| 13 | 20101350 | TREE PRUN OVER 10 | 1 | EACH | $500.00 | $1,000.00 | |
| 14 | 20200100 | EARTH EXCAVATION | 17 | CU YD | $125.00 | $163.00 | |
| 15 | 20201200 | REM & DISP UNS MATL | 9 | CU YD | $100.00 | $100.00 | |
| 16 | 20400800 | FURNISHED EXCAVATION | 12 | CU YD | $40.00 | $200.00 | |
| 17 | 21001000 | GEOTECH FAB F/GR STAB | 210 | SQ YD | $1.00 | $5.00 | |
| 18 | 28000400 | PERIMETER EROS BAR | 190 | FOOT | $10.00 | $10.00 | |
| 19 | 30300001 | AGG SUBGRADE IMPROVE | 40 | CU YD | $60.00 | $120.00 | |
| 20 | 35101600 | AGG BASE CSE B 4 | 33 | SQ YD | $14.75 | $28.00 | |
| 21 | 35101800 | AGG BASE CSE B 6 | 208 | SQ YD | $17.00 | $29.00 | |
| 22 | 35800100 | PREPARATION OF BASE | 33 | SQ YD | $1.00 | $12.75 | |
| 23 | 40200900 | AGG SURF CSE B | 8 | CU YD | $41.50 | $180.00 | |
| 24 | 40600275 | BIT MATLS PR CT | 1,332 | POUND | $0.0100 | $0.0100 | |
| 25 | 40600290 | BIT MATLS TACK CT | 180 | POUND | $0.0100 | $0.0100 | |
| 26 | 40600982 | HMA SURF REM BUTT JT | 25 | SQ YD | $63.84 | $50.00 | |
| 27 | 40604060 | HMA SC IL-9.5 D N50 | 113 | TON | $238.17 | $285.00 | |
| 28 | 44000100 | PAVEMENT REM | 39 | SQ YD | $100.00 | $120.00 | |
| 29 | 44000157 | HMA SURF REM 2 | 592 | SQ YD | $26.40 | $19.00 | |
| 30 | 44000500 | COMB CURB GUTTER REM | 36 | FOOT | $60.00 | $39.50 | |
| 31 | 44201713 | CL D PATCH T1 6 | 30 | SQ YD | $255.00 | $125.00 | |
| 32 | 44201717 | CL D PATCH T2 6 | 30 | SQ YD | $255.00 | $105.00 | |
| 33 | 44201721 | CL D PATCH T3 6 | 30 | SQ YD | $255.00 | $100.00 | |
| 34 | 44201723 | CL D PATCH T4 6 | 30 | SQ YD | $255.00 | $60.00 | |
| 35 | 48101500 | AGGREGATE SHLDS B 6 | 104 | SQ YD | $29.50 | $40.00 | |
| 36 | 60603800 | COMB CC&G TB6.12 | 27 | FOOT | $70.00 | $223.00 | |
| 37 | 66900200 | NON SPL WASTE DISPOSL | 9 | CU YD | $65.00 | $150.00 | |
| 38 | 66900530 | SOIL DISPOSAL ANALY | 5 | EACH | $900.00 | $700.00 | |
| 39 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $4,500.00 | $6,555.00 | |
| 40 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $500.00 | $1,000.00 | |
| 41 | 66901006 | REG SUB MON | 10 | CAL DA | $750.00 | $725.00 | |
| 42 | 67100100 | MOBILIZATION | 1 | L SUM | $8,000.00 | $21,850.00 | |
| 43 | 72000100 | SIGN PANEL T1 | 126 | SQ FT | $24.00 | $50.00 | |
| 44 | 72400100 | REMOV SIN PAN ASSY TA | 1 | EACH | $200.00 | $250.00 | |
| 45 | 72400205 | REM & REL SIGN PANEL ASMBLY TA | 2 | EACH | $200.00 | $500.00 | |
| 46 | 72800100 | TELES STL SIN SUPPORT | 142 | FOOT | $18.00 | $50.00 | |
| 47 | 78000100 | THPL PVT MK LTR & SYM | 119 | SQ FT | $11.50 | $9.00 | |
| 48 | 78000200 | THPL PVT MK LINE 4 | 509 | FOOT | $7.00 | $2.50 | |
| 49 | 78000400 | THPL PVT MK LINE 6 | 42 | FOOT | $8.00 | $3.00 | |
| 50 | 78000650 | THPL PVT MK LINE 24 | 42 | FOOT | $11.50 | $8.00 |