$106.26Avg low bid / EACH
$111.42Avg of all bids
—Avg engineer's estimate
463Jobs · 10,445 EACH
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2026 | 43 | 1,071 | $124.32 | $133.68 |
| 2025 | 63 | 1,125 | $131.62 | $128.07 |
| 2024 | 65 | 1,208 | $119.89 | $124.10 |
| 2023 | 53 | 1,011 | $119.35 | $131.95 |
| 2022 | 41 | 867 | $106.79 | $110.65 |
| 2021 | 42 | 681 | $116.33 | $108.35 |
| 2020 | 44 | 1,584 | $75.54 | $96.57 |
| 2019 | 57 | 1,496 | $94.28 | $100.60 |
| 2018 | 55 | 1,402 | $93.17 | $89.67 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Sep 18, 2026 | 61M68 | KaneDistrict 1 | 16 EACH | $93.50 | D. Construction, Inc. |
| Sep 18, 2026 | 61L85 | MchenryDistrict 1 | 12 EACH | $150.00 | ICC Group Inc. |
| Sep 18, 2026 | 61M10 | Kane, DupageDistrict 1 | 12 EACH | $119.76 | K-Five Construction Corporation |
| Jul 31, 2026 | 61M40 | DupageDistrict 1 | 1 EACH | $550.00 | Home Towne Electric, Inc. |
| Jul 31, 2026 | 61K85 | CookDistrict 1 | 41 EACH | $85.00 | Plote Construction, Inc. |
| Jul 31, 2026 | 61M13 | KaneDistrict 1 | 50 EACH | $90.00 | Dunnet Bay Construction Company |
| Jun 12, 2026 | 61M51 | CookDistrict 1 | 78 EACH | $55.00 | Martam Construction Incorporated |
| Jun 12, 2026 | 61M53 | CookDistrict 1 | 21 EACH | $175.00 | Builders Paving, LLC |
| Jun 12, 2026 | 64V40 | Rock IslandDistrict 2 | 10 EACH | $125.00 | Valley Construction Co. |
| Jun 12, 2026 | 80B28 | CookDistrict 1 | 14 EACH | $85.00 | K-Five Construction Corporation |
| Jun 12, 2026 | 61M44 | KaneDistrict 1 | 11 EACH | $165.00 | Geske and Sons, Inc. |
| Jun 12, 2026 | 61M46 | CookDistrict 1 | 11 EACH | $300.00 | Builders Paving, LLC |
| Apr 24, 2026 | 61M37 | DupageDistrict 1 | 10 EACH | $105.00 | R. W. Dunteman Company |
| Apr 24, 2026 | 80B39 | CookDistrict 1 | 10 EACH | $88.20 | K-Five Construction Corporation |
| Apr 24, 2026 | 61M41 | LakeDistrict 1 | 28 EACH | $250.00 | Alliance Contractors, Inc. |
| Apr 24, 2026 | 61L86 | MchenryDistrict 1 | 6 EACH | $300.00 | Dunnet Bay Construction Company |
| Apr 24, 2026 | 61M36 | DupageDistrict 1 | 2 EACH | $100.00 | Builders Paving, LLC |
| Apr 24, 2026 | 61L54 | CookDistrict 1 | 59 EACH | $93.50 | Martam Construction Incorporated |
| Apr 24, 2026 | 61M17 | KaneDistrict 1 | 5 EACH | $300.00 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. |
| Apr 24, 2026 | 61M11 | AuroraDistrict 1 | 1 EACH | $1,500.00 | Alliance Contractors, Inc. |
| Feb 27, 2026 | 61M18 | CookDistrict 1 | 10 EACH | $12.00 | Gallagher Asphalt Corporation |
| Feb 27, 2026 | 61M27 | CookDistrict 1 | 43 EACH | $150.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 61M32 | CookDistrict 1 | 12 EACH | $175.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 61M28 | CookDistrict 1 | 71 EACH | $150.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 61L93 | CookDistrict 1 | 40 EACH | $105.00 | K-Five Construction Corporation |
| Feb 27, 2026 | 61M31 | CookDistrict 1 | 9 EACH | $250.00 | A Lamp Concrete Contractors, Inc. |
| Feb 27, 2026 | 61M05 | CookDistrict 1 | 4 EACH | $300.00 | K-Five Construction Corporation |
| Feb 27, 2026 | 61L66 | KaneDistrict 1 | 1 EACH | $120.00 | Schroeder Asphalt Services, Inc. |
| Feb 27, 2026 | 61M25 | WillDistrict 1 | 2 EACH | $600.00 | D. Construction, Inc. |
| Feb 27, 2026 | 61L87 | CookDistrict 1 | 4 EACH | $760.00 | Gallagher Asphalt Corporation |
| Feb 27, 2026 | 61M26 | CookDistrict 1 | 208 EACH | $115.00 | A Lamp Concrete Contractors, Inc. |
| Jan 16, 2026 | 60R94 | CookDistrict 1 | 10 EACH | $250.00 | OHLA Central, Inc. |
| Jan 16, 2026 | 61L36 | DupageDistrict 1 | 5 EACH | $110.00 | Acura Inc. |
| Jan 16, 2026 | 61L75 | CookDistrict 1 | 8 EACH | $50.00 | A Lamp Concrete Contractors, Inc. |
| Jan 16, 2026 | 61L90 | CookDistrict 1 | 48 EACH | $50.00 | A Lamp Concrete Contractors, Inc. |
| Jan 16, 2026 | 61M01 | WillDistrict 1 | 22 EACH | $125.00 | Austin Tyler Construction, Inc. |
| Jan 16, 2026 | 61J01 | DupageDistrict 1 | 20 EACH | $125.00 | R. W. Dunteman Company |
| Jan 16, 2026 | 61L89 | CookDistrict 1 | 10 EACH | $124.00 | Builders Paving, LLC |
| Jan 16, 2026 | 61M08 | LakeDistrict 1 | 74 EACH | $110.00 | Campanella and Sons, Inc. |
| Jan 16, 2026 | 61L42 | LakeDistrict 1 | 18 EACH | $121.00 | D'Land Construction, LLC |
| Jan 16, 2026 | 61M09 | CookDistrict 1 | 19 EACH | $140.00 | Martam Construction Incorporated |
| Jan 16, 2026 | 62W33 | CookDistrict 1 | 5 EACH | $207.50 | Iroquois Paving Corporation |
| Jan 16, 2026 | 62F94 | WillDistrict 1 | 30 EACH | $110.00 | D. Construction, Inc. |
| Nov 7, 2025 | 85785 | Rock IslandDistrict 2 | 10 EACH | $220.00 | Gensini Excavating, Inc. |
| Nov 7, 2025 | 61L78 | DupageDistrict 1 | 62 EACH | $120.00 | A Lamp Concrete Contractors, Inc. |
| Nov 7, 2025 | 61L98 | CookDistrict 1 | 6 EACH | $124.00 | PirTano Construction Co., LLC |
| Nov 7, 2025 | 61L79 | DupageDistrict 1 | 25 EACH | $94.19 | K-Five Construction Corporation |
| Nov 7, 2025 | 61J54 | DupageDistrict 1 | 20 EACH | $124.00 | Lorig Construction Company |
| Nov 7, 2025 | 61L80 | DupageDistrict 1 | 8 EACH | $76.00 | Schroeder Asphalt Services, Inc. |
| Nov 7, 2025 | 61L92 | CookDistrict 1 | 15 EACH | $150.00 | Capitol Cement Co., Inc. |
| Nov 7, 2025 | 61L88 | MchenryDistrict 1 | 1 EACH | $350.00 | Dunnet Bay Construction Company |
| Nov 7, 2025 | 61J94 | CookDistrict 1 | 32 EACH | $90.00 | A Lamp Concrete Contractors, Inc. |
| Nov 7, 2025 | 61L77 | CookDistrict 1 | 23 EACH | $105.00 | Triggi Construction, Inc. |
| Nov 7, 2025 | 61L57 | DupageDistrict 1 | 42 EACH | $125.00 | K-Five Construction Corporation |
| Sep 19, 2025 | 61L69 | DupageDistrict 1 | 41 EACH | $71.50 | D. Construction, Inc. |
| Sep 19, 2025 | 62L15 | CookDistrict 1 | 20 EACH | $198.00 | D. Construction, Inc. |
| Sep 19, 2025 | 61K93 | CookDistrict 1 | 14 EACH | $134.40 | Lima Contractors |
| Sep 19, 2025 | 62Y06 | VariousDistrict 1 | 7 EACH | $100.00 | Homer Tree Service, Inc. |
| Sep 19, 2025 | 61L71 | CookDistrict 1 | 15 EACH | $200.00 | Builders Paving, LLC |
| Sep 19, 2025 | 61K52 | LakeDistrict 1 | 2 EACH | $124.00 | Dunnet Bay Construction Company |
| Sep 19, 2025 | 61L70 | CookDistrict 1 | 15 EACH | $105.00 | Triggi Construction, Inc. |
| Sep 19, 2025 | 61L28 | KaneDistrict 1 | 25 EACH | $131.44 | Martam Construction Incorporated |
| Sep 19, 2025 | 61L74 | KaneDistrict 1 | 13 EACH | $110.00 | Triggi Construction, Inc. |
| Sep 19, 2025 | 61L72 | CookDistrict 1 | 15 EACH | $0.0100 | P. T. Ferro Construction Co. |
| Aug 1, 2025 | 61K77 | DupageDistrict 1 | 3 EACH | $250.00 | R. W. Dunteman Company |
| Aug 1, 2025 | 61L47 | DupageDistrict 1 | 10 EACH | $140.00 | Everlast Blacktop Inc. |
| Aug 1, 2025 | 61L37 | CookDistrict 1 | 44 EACH | $57.00 | Plote Construction, Inc. |
| Aug 1, 2025 | 61L38 | CookDistrict 1 | 42 EACH | $57.00 | Plote Construction, Inc. |
| Jun 13, 2025 | 68J63 | TazewellDistrict 4 | 1 EACH | $440.00 | R. A. Cullinan and Son, a div of UCM, Inc. |
| Jun 13, 2025 | 61L34 | CookDistrict 1 | 65 EACH | $100.00 | Alliance Contractors, Inc. |
| Jun 13, 2025 | 61L53 | CookDistrict 1 | 25 EACH | $130.00 | Peter Baker & Son Co. |
| Jun 13, 2025 | 60R76 | WillDistrict 1 | 2 EACH | $1,100.00 | D. Construction, Inc. |
| Jun 13, 2025 | 61L40 | KaneDistrict 1 | 20 EACH | $118.00 | Schroeder Asphalt Services, Inc. |
| Jun 13, 2025 | 61L52 | LakeDistrict 1 | 53 EACH | $125.00 | Alliance Contractors, Inc. |
| Apr 25, 2025 | 62X94 | MchenryDistrict 1 | 18 EACH | $150.00 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. |
| Apr 25, 2025 | 61L18 | MchenryDistrict 1 | 8 EACH | $75.00 | PirTano Construction Co., LLC |
| Apr 25, 2025 | 89852 | TazewellDistrict 4 | 1 EACH | $230.00 | Stark Excavating, Inc. |
| Apr 25, 2025 | 61L32 | LakeDistrict 1 | 5 EACH | $75.00 | Peter Baker & Son Co. |
| Apr 25, 2025 | 61L29 | DupageDistrict 1 | 25 EACH | $100.00 | Builders Paving, LLC |
| Apr 25, 2025 | 61L33 | CookDistrict 1 | 30 EACH | $75.00 | Peter Baker & Son Co. |
| Apr 25, 2025 | 61G79 | DupageDistrict 1 | 23 EACH | $100.00 | OHLA Central, Inc. |
| Apr 25, 2025 | 61L41 | CookDistrict 1 | 3 EACH | $250.00 | Triggi Construction, Inc. |
| Apr 25, 2025 | 61K95 | DupageDistrict 1 | 18 EACH | $130.00 | R. W. Dunteman Company |
| Apr 25, 2025 | 62R62 | CookDistrict 1 | 7 EACH | $100.00 | Areatha Construction Co., Inc. |
| Apr 25, 2025 | 61L06 | CookDistrict 1 | 21 EACH | $143.00 | D. Construction, Inc. |
| Mar 7, 2025 | 91628 | McleanDistrict 5 | 8 EACH | $2,000.00 | Phoenix Corporation of the Quad Cities |
| Mar 7, 2025 | 61L16 | LakeDistrict 1 | 17 EACH | $121.00 | D'Land Construction, LLC |
| Mar 7, 2025 | 61L27 | CookDistrict 1 | 3 EACH | $175.00 | Gallagher Asphalt Corporation |
| Mar 7, 2025 | 87875 | DekalbDistrict 3 | 20 EACH | $130.00 | Fischer Excavating, Inc. |
| Mar 7, 2025 | 61L14 | CookDistrict 1 | 13 EACH | $121.00 | D. Construction, Inc. |
| Mar 7, 2025 | 61L25 | CookDistrict 1 | 16 EACH | $330.00 | D. Construction, Inc. |
| Mar 7, 2025 | 61L23 | CookDistrict 1 | 14 EACH | $50.00 | A Lamp Concrete Contractors, Inc. |
| Mar 7, 2025 | 61J84 | KaneDistrict 1 | 15 EACH | $100.00 | R. W. Dunteman Company |
| Mar 7, 2025 | 61L12 | CookDistrict 1 | 2 EACH | $217.25 | Gallagher Asphalt Corporation |
| Jan 17, 2025 | 61K87 | CookDistrict 1 | 40 EACH | $120.00 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. |
| Jan 17, 2025 | 61K07 | CookDistrict 1 | 7 EACH | $300.00 | Schroeder Asphalt Services, Inc. |
| Jan 17, 2025 | 61K98 | KaneDistrict 1 | 27 EACH | $100.00 | Triggi Construction, Inc. |
| Jan 17, 2025 | 61J91 | KaneDistrict 1 | 17 EACH | $150.00 | Geneva Construction Company |
| Jan 17, 2025 | 61K86 | CookDistrict 1 | 8 EACH | $210.00 | Schroeder Asphalt Services, Inc. |
| Jan 17, 2025 | 61L04 | DupageDistrict 1 | 32 EACH | $110.00 | K-Five Construction Corporation |
| Jan 17, 2025 | 61K68 | KaneDistrict 1 | 8 EACH | $93.60 | Martam Construction Incorporated |
| Jan 17, 2025 | 61L08 | CookDistrict 1 | 2 EACH | $750.00 | Plote Construction, Inc. |
| Jan 17, 2025 | 61K81 | WillDistrict 1 | 34 EACH | $75.00 | Austin Tyler Construction, Inc. |
| Jan 17, 2025 | 85772 | Rock IslandDistrict 2 | 2 EACH | $250.00 | Valley Construction Co. |
| Jan 17, 2025 | 61K84 | WillDistrict 1 | 2 EACH | $165.00 | D. Construction, Inc. |
| Jan 17, 2025 | 61J63 | CookDistrict 1 | 3 EACH | $90.00 | Martam Construction Incorporated |
| Dec 13, 2024 | 62T04 | WillDistrict 1 | 15 EACH | $148.50 | D. Construction, Inc. |
| Nov 8, 2024 | 61K66 | KaneDistrict 1 | 5 EACH | $100.00 | Geneva Construction Company |
| Nov 8, 2024 | 61K59 | CookDistrict 1 | 40 EACH | $125.00 | A Lamp Concrete Contractors, Inc. |
| Nov 8, 2024 | 61J87 | LakeDistrict 1 | 43 EACH | $90.00 | IHC Construction Companies LLC and Curran Contracting Company JV |
| Nov 8, 2024 | 61K80 | MchenryDistrict 1 | 4 EACH | $125.00 | Sjostrom & Sons, Inc. |
| Nov 8, 2024 | 62G18 | CookDistrict 1 | 7 EACH | $100.00 | K-Five Construction Corporation |
| Nov 8, 2024 | 62X13 | KaneDistrict 1 | 8 EACH | $225.00 | Areatha Construction Co., Inc. |
| Nov 8, 2024 | 87870 | GrundyDistrict 3 | 20 EACH | $165.00 | Gallagher Asphalt Corporation |
| Nov 8, 2024 | 61J90 | CookDistrict 1 | 5 EACH | $220.00 | A Lamp Concrete Contractors, Inc. |
| Nov 8, 2024 | 61K69 | CookDistrict 1 | 13 EACH | $200.00 | K-Five Construction Corporation |
| Nov 8, 2024 | 61K48 | CookDistrict 1 | 10 EACH | $110.00 | D. Construction, Inc. |
| Nov 8, 2024 | 61H32 | WillDistrict 1 | 24 EACH | $110.00 | D. Construction, Inc. |
| Nov 8, 2024 | 61K74 | LakeDistrict 1 | 79 EACH | $50.00 | A Lamp Concrete Contractors, Inc. |
| Nov 8, 2024 | 61K58 | CookDistrict 1 | 10 EACH | $100.00 | Triggi Construction, Inc. |
| Nov 8, 2024 | 61K21 | CookDistrict 1 | 3 EACH | $200.00 | Martam Construction Incorporated |
| Nov 8, 2024 | 61K83 | CookDistrict 1 | 60 EACH | $50.00 | A Lamp Concrete Contractors, Inc. |
| Sep 20, 2024 | 61K72 | CookDistrict 1 | 14 EACH | $90.00 | R. W. Dunteman Company |
| Sep 20, 2024 | 62T94 | CookDistrict 1 | 1 EACH | $132.00 | D. Construction, Inc. |
| Sep 20, 2024 | 61J71 | MchenryDistrict 1 | 17 EACH | $90.00 | Alliance Contractors, Inc. |
| Sep 20, 2024 | 62R25 | WillDistrict 1 | 46 EACH | $75.00 | Walsh Construction Company II, LLC |
| Sep 20, 2024 | 61J74 | CookDistrict 1 | 9 EACH | $250.00 | Alliance Contractors, Inc. |
| Sep 20, 2024 | 61K63 | CookDistrict 1 | 24 EACH | $90.00 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. |
| Sep 20, 2024 | 61K60 | CookDistrict 1 | 21 EACH | $50.00 | Capitol Cement Co., Inc. |
| Sep 20, 2024 | 61K70 | CookDistrict 1 | 3 EACH | $200.00 | A Lamp Concrete Contractors, Inc. |
| Sep 20, 2024 | 62R26 | WillDistrict 1 | 2 EACH | $99.00 | D. Construction, Inc. |
| Sep 20, 2024 | 61G80 | DupageDistrict 1 | 3 EACH | $200.00 | Martam Construction Incorporated |
| Aug 2, 2024 | 61J93 | MchenryDistrict 1 | 3 EACH | $100.00 | Plote Construction Inc. and Dunnet Bay Construction Company JV |
| Jun 14, 2024 | 61H55 | CookDistrict 1 | 3 EACH | $200.00 | K-Five Construction Corporation |
| Jun 14, 2024 | 61J28 | KaneDistrict 1 | 7 EACH | $300.00 | Plote Construction, Inc. |
| Jun 14, 2024 | 62J23 | CookDistrict 1 | 116 EACH | $80.00 | IHC Construction Companies, L.L.C. |
| Jun 14, 2024 | 62W48 | CookDistrict 1 | 11 EACH | $200.00 | ICC Group Inc. |
| Jun 14, 2024 | 87832 | DekalbDistrict 3 | 6 EACH | $450.00 | Elliott and Wood, Inc. |
| Apr 26, 2024 | 62380 | WillDistrict 1 | 20 EACH | $330.00 | D. Construction, Inc. |
| Apr 26, 2024 | 61K13 | DupageDistrict 1 | 21 EACH | $100.00 | R. W. Dunteman Company |
| Apr 26, 2024 | 62P50 | CookDistrict 1 | 6 EACH | $175.00 | R. W. Dunteman Company |
| Apr 26, 2024 | 61K15 | KaneDistrict 1 | 1 EACH | $275.00 | D. Construction, Inc. |
| Apr 26, 2024 | 61K34 | LakeDistrict 1 | 10 EACH | $171.00 | Lenny Hoffman Excavating, Inc. |
| Apr 26, 2024 | 61K31 | CookDistrict 1 | 8 EACH | $25.00 | Davis Concrete Construction Co. |
| Apr 26, 2024 | 60P75 | DupageDistrict 1 | 15 EACH | $100.00 | R. W. Dunteman Company |
| Apr 26, 2024 | 61K33 | DupageDistrict 1 | 5 EACH | $100.00 | K-Five Construction Corporation |
| Apr 26, 2024 | 61J08 | WillDistrict 1 | 5 EACH | $330.00 | Austin Tyler Construction, Inc. |
| Apr 26, 2024 | 61K42 | MchenryDistrict 1 | 1 EACH | $345.64 | H & H Electric Co. |
| Apr 26, 2024 | 61K00 | DupageDistrict 1 | 10 EACH | $100.00 | R. W. Dunteman Company |
| Mar 8, 2024 | 61K22 | DupageDistrict 1 | 35 EACH | $110.00 | Builders Paving, LLC |