23-00049-00-PV
- Let date
- Friday, March 7, 2025
- Contract
- 87875 · job page
- District
- District 3
- County
- Dekalb
- Highway
- Limits
- Reconstruction of Main Street between BNSF Railroad and Knights Road in Sandwich. Work includes fulldepth pavement reclamation, PCC and HMA Pavement, sidewalks, curb and gutter, and storm sewers.
- Classification
- ·
- Project number
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Fischer Excavating, Inc. Low bidder | $4,466,099 | ||
| 2 | Performance Construction and Engineering, LLC | $4,798,213 | +7.4% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Fischer Excavat… | #2 Performance Con… |
|---|---|---|---|---|---|---|---|
| 1 | XX008662 | REM EXIST LIGHT POLE | 3 | EACH | $1,450.00 | $1,210.00 | |
| 2 | XX009077 | FD RECLAMATION CEMENT | 18,301 | SQ YD | $3.60 | $6.00 | |
| 3 | X0323760 | SAN SEW SER 6 PVC CMP | 13 | EACH | $2,500.00 | $5,000.00 | |
| 4 | X0324585 | SAN SEW SERV REM/REPL | 17 | EACH | $3,250.00 | $200.00 | |
| 5 | X0325207 | TV INSPECT OF SEWER | 660 | FOOT | $5.00 | $5.00 | |
| 6 | X0326806 | WASHOUT BASIN | 1 | L SUM | $3,500.00 | $4,000.00 | |
| 7 | X1200288 | SAN SEW BYPASS PUMP | 1 | L SUM | $20,000.00 | $500.00 | |
| 8 | X2080250 | TRENCH BACKFILL SPL | 3,608 | CU YD | $0.0100 | $50.00 | |
| 9 | X2130010 | EXPLOR TRENCH SPL | 300 | FOOT | $75.00 | $20.00 | |
| 10 | X4021000 | TEMP ACCESS- PRIV ENT | 43 | EACH | $800.00 | $700.00 | |
| 11 | X4022000 | TEMP ACCESS- COM ENT | 9 | EACH | $1,200.00 | $1,100.00 | |
| 12 | X4023000 | TEMP ACCESS- ROAD | 15 | EACH | $1,200.00 | $2,000.00 | |
| 13 | X4240430 | PC CONC SIDEWALK 5 SP | 2,356 | SQ FT | $12.00 | $12.00 | |
| 14 | X4401198 | HMA SURF REM VAR DP | 18,301 | SQ YD | $4.50 | $11.00 | |
| 15 | X5510011 | PRO SS CONN TO EX MAN | 1 | EACH | $2,550.00 | $1,600.00 | |
| 16 | X5510308 | SAN SEW REMOV 8 | 660 | FOOT | $3.00 | $6.00 | |
| 17 | X5610020 | WATER MAIN ENCASEMEMT | 225 | FOOT | $205.00 | $85.00 | |
| 18 | X5610026 | DI WM 10 DIA RESTR JT | 225 | FOOT | $155.00 | $190.00 | |
| 19 | X5610744 | WM LINE STOP 4 | 5 | EACH | $4,500.00 | $8,500.00 | |
| 20 | X5610746 | WM LINE STOP 6 | 1 | EACH | $7,100.00 | $8,800.00 | |
| 21 | X5610748 | WM LINE STOP 8 | 2 | EACH | $8,500.00 | $9,000.00 | |
| 22 | X5610752 | WM LINE STOP 12 | 1 | EACH | $14,600.00 | $16,000.00 | |
| 23 | X5610804 | NON-PRES CONN EX WM | 9 | EACH | $4,600.00 | $3,800.00 | |
| 24 | X5620116 | WATER SER CONN (SHRT) | 24 | EACH | $3,000.00 | $2,600.00 | |
| 25 | X5620118 | WATER SER CONN (LONG) | 28 | EACH | $4,400.00 | $4,400.00 | |
| 26 | X5630004 | CUT & CAP EX 4 WM | 5 | EACH | $1,350.00 | $1,200.00 | |
| 27 | X5630006 | CUT & CAP EX 6 WM | 1 | EACH | $1,000.00 | $1,500.00 | |
| 28 | X5630008 | CUT & CAP EX 8 WM | 2 | EACH | $1,050.00 | $1,600.00 | |
| 29 | X5630012 | CUT & CAP EX 12 WM | 1 | EACH | $1,200.00 | $1,700.00 | |
| 30 | X5640175 | FIRE HYDRANT COMPLETE | 8 | EACH | $8,500.00 | $8,500.00 | |
| 31 | X6020399 | CONNECT EX MANHOLE | 4 | EACH | $2,350.00 | $1,000.00 | |
| 32 | X6026623 | VALVE BOX | 16 | EACH | $1,100.00 | $350.00 | |
| 33 | X6026632 | VALVE BOX REMOVED | 11 | EACH | $450.00 | $150.00 | |
| 34 | X6030310 | FR & LIDS ADJUST SPL | 21 | EACH | $1,100.00 | $1,000.00 | |
| 35 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $43,000.00 | $225,000.00 | |
| 36 | X7200061 | TEMP INFO SIGNING | 84 | SQ FT | $14.00 | $30.00 | |
| 37 | X8100105 | CONDUIT SPLICE | 1 | EACH | $100.00 | $1,100.00 | |
| 38 | X8300001 | LIGHT POLE SPECIAL | 6 | EACH | $17,850.00 | $20,000.00 | |
| 39 | X8951011 | REM AERIAL CABLE | 255 | FOOT | $3.00 | $3.24 | |
| 40 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $40,000.00 | $120,000.00 | |
| 41 | Z0033024 | MAINT EX LTG SYS | 1 | L SUM | $2,500.00 | $16,550.00 | |
| 42 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $6,500.00 | $8,977.00 | |
| 43 | Z0056800 | SAN SEW 6 | 565 | FOOT | $120.00 | $30.00 | |
| 44 | Z0056900 | SAN SEW 8 | 660 | FOOT | $140.00 | $85.00 | |
| 45 | Z0076600 | TRAINEES | 2,000 | HOUR | $0.8000 | $0.8000 | |
| 46 | Z0076604 | TRAINEES TPG | 2,000 | HOUR | $15.00 | $15.00 | |
| 47 | 20101200 | TREE ROOT PRUNING | 20 | EACH | $130.00 | $100.00 | |
| 48 | 20101300 | TREE PRUN 1-10 | 5 | EACH | $125.00 | $50.00 | |
| 49 | 20101350 | TREE PRUN OVER 10 | 5 | EACH | $250.00 | $50.00 | |
| 50 | 20200100 | EARTH EXCAVATION | 409 | CU YD | $32.00 | $50.00 | |
| 51 | 20800150 | TRENCH BACKFILL | 887 | CU YD | $0.0100 | $50.00 | |
| 52 | 21101625 | TOPSOIL F & P 6 | 1,613 | SQ YD | $45.00 | $9.00 | |
| 53 | 25000210 | SEEDING CL 2A | 0.3 | ACRE | $10,000.00 | $3,200.00 | |
| 54 | 25000400 | NITROGEN FERT NUTR | 30 | POUND | $3.00 | $2.00 | |
| 55 | 25000500 | PHOSPHORUS FERT NUTR | 30 | POUND | $3.00 | $2.00 | |
| 56 | 25000600 | POTASSIUM FERT NUTR | 30 | POUND | $3.00 | $2.00 | |
| 57 | 25100630 | EROSION CONTR BLANKET | 1,613 | SQ YD | $3.00 | $2.00 | |
| 58 | 28000510 | INLET FILTERS | 67 | EACH | $215.00 | $250.00 | |
| 59 | 30201700 | PORTLAND CEMENT | 753 | TON | $201.00 | $225.00 | |
| 60 | 31101000 | SUB GRAN MAT B | 20 | TON | $32.00 | $50.00 | |
| 61 | 31101200 | SUB GRAN MAT B 4 | 3,165 | SQ YD | $22.00 | $8.00 | |
| 62 | 31101400 | SUB GRAN MAT B 6 | 1,164 | SQ YD | $14.00 | $10.00 | |
| 63 | 40600275 | BIT MATLS PR CT | 4,110 | POUND | $1.10 | $1.10 | |
| 64 | 40600290 | BIT MATLS TACK CT | 4,110 | POUND | $1.05 | $1.05 | |
| 65 | 40600370 | LONG JOINT SEALANT | 4,193 | FOOT | $5.00 | $4.60 | |
| 66 | 40603080 | HMA BC IL-19.0 N50 | 2,517 | TON | $83.00 | $83.00 | |
| 67 | 40604060 | HMA SC IL-9.5 D N50 | 1,719 | TON | $90.00 | $90.00 | |
| 68 | 42000301 | PCC PVT 8 JOINTED | 3,323 | SQ YD | $81.00 | $79.00 | |
| 69 | 42300200 | PCC DRIVEWAY PAVT 6 | 1,031 | SQ YD | $90.00 | $84.00 | |
| 70 | 42400200 | PC CONC SIDEWALK 5 | 12,158 | SQ FT | $9.00 | $9.00 | |
| 71 | 42400300 | PC CONC SIDEWALK 6 | 6,438 | SQ FT | $10.00 | $10.00 | |
| 72 | 42400800 | DETECTABLE WARNINGS | 272 | SQ FT | $31.00 | $31.00 | |
| 73 | 44000157 | HMA SURF REM 2 | 358 | SQ YD | $8.00 | $7.60 | |
| 74 | 44000200 | DRIVE PAVEMENT REM | 984 | SQ YD | $10.00 | $10.00 | |
| 75 | 44000500 | COMB CURB GUTTER REM | 3,618 | FOOT | $8.00 | $9.00 | |
| 76 | 44000600 | SIDEWALK REM | 19,745 | SQ FT | $6.00 | $3.00 | |
| 77 | 44201672 | CL D PATCH T2 2 | 332 | SQ YD | $90.00 | $50.00 | |
| 78 | 44201674 | CL D PATCH T3 2 | 308 | SQ YD | $65.00 | $50.00 | |
| 79 | 44201676 | CL D PATCH T4 2 | 285 | SQ YD | $40.00 | $50.00 | |
| 80 | 44201725 | CL D PATCH T1 7 | 6 | SQ YD | $460.00 | $300.00 | |
| 81 | 48101200 | AGGREGATE SHLDS B | 100 | TON | $44.00 | $58.00 | |
| 82 | 550A0050 | STORM SEW CL A 1 12 | 570 | FOOT | $72.00 | $80.00 | |
| 83 | 550A0070 | STORM SEW CL A 1 15 | 22 | FOOT | $80.00 | $85.00 | |
| 84 | 550A2320 | SS RG CL A 1 12 | 1,838 | FOOT | $72.00 | $70.00 | |
| 85 | 550A2330 | SS RG CL A 1 15 | 315 | FOOT | $80.00 | $85.00 | |
| 86 | 55100200 | STORM SEWER REM 6 | 4 | FOOT | $30.00 | $6.00 | |
| 87 | 55100300 | STORM SEWER REM 8 | 119 | FOOT | $20.00 | $6.00 | |
| 88 | 55100400 | STORM SEWER REM 10 | 42 | FOOT | $20.00 | $6.00 | |
| 89 | 55100500 | STORM SEWER REM 12 | 425 | FOOT | $20.00 | $6.00 | |
| 90 | 56102900 | D I WATER MAIN 4 | 26 | FOOT | $275.00 | $145.00 | |
| 91 | 56103100 | D I WATER MAIN 8 | 285 | FOOT | $140.00 | $160.00 | |
| 92 | 56103200 | D I WATER MAIN 10 | 2,795 | FOOT | $150.00 | $180.00 | |
| 93 | 56103300 | D I WATER MAIN 12 | 14 | FOOT | $200.00 | $200.00 | |
| 94 | 56104800 | WATER VALVES 4 | 1 | EACH | $1,700.00 | $2,500.00 | |
| 95 | 56105000 | WATER VALVES 8 | 7 | EACH | $2,500.00 | $3,000.00 | |
| 96 | 56105100 | WATER VALVES 10 | 7 | EACH | $3,900.00 | $4,600.00 | |
| 97 | 56105200 | WATER VALVES 12 | 1 | EACH | $5,000.00 | $5,200.00 | |
| 98 | 56109000 | TAP VALVE & SLEEVE 10 | 2 | EACH | $13,350.00 | $11,000.00 | |
| 99 | 56300300 | ADJ WATER SERV LINES | 100 | FOOT | $90.00 | $20.00 | |
| 100 | 56400500 | FIRE HYDNTS TO BE REM | 5 | EACH | $530.00 | $500.00 | |
| 101 | 56500600 | DOM WAT SER BOX ADJ | 5 | EACH | $315.00 | $225.00 | |
| 102 | 56500700 | DOM WAT SER BOX REM | 3 | EACH | $230.00 | $60.00 | |
| 103 | 56500800 | DOM WAT SER BOX | 3 | EACH | $400.00 | $250.00 | |
| 104 | 60200105 | CB TA 4 DIA T1F OL | 1 | EACH | $4,200.00 | $2,800.00 | |
| 105 | 60200805 | CB TA 4 DIA T8G | 1 | EACH | $4,000.00 | $2,750.00 | |
| 106 | 60201105 | CB TA 4 DIA T11F&G | 7 | EACH | $4,200.00 | $3,100.00 | |
| 107 | 60206905 | CB TC T1F OL | 1 | EACH | $3,300.00 | $1,700.00 | |
| 108 | 60207605 | CB TC T8G | 4 | EACH | $3,300.00 | $1,600.00 | |
| 109 | 60207905 | CB TC T11F&G | 3 | EACH | $3,300.00 | $1,900.00 | |
| 110 | 60218400 | MAN TA 4 DIA T1F CL | 21 | EACH | $4,200.00 | $3,200.00 | |
| 111 | 60221100 | MAN TA 5 DIA T1F CL | 3 | EACH | $5,500.00 | $5,000.00 | |
| 112 | 60236800 | INLETS TA T11F&G | 25 | EACH | $3,200.00 | $1,700.00 | |
| 113 | 60248900 | VV TA 5 DIA T1F CL | 2 | EACH | $4,760.00 | $3,700.00 | |
| 114 | 60253800 | CB RECON NEW T8G | 1 | EACH | $2,175.00 | $1,400.00 | |
| 115 | 60260100 | INLETS ADJUST | 12 | EACH | $1,075.00 | $650.00 | |
| 116 | 60266600 | VALVE BOX ADJ | 6 | EACH | $725.00 | $650.00 | |
| 117 | 60500040 | REMOV MANHOLES | 5 | EACH | $475.00 | $650.00 | |
| 118 | 60500050 | REMOV CATCH BAS | 8 | EACH | $475.00 | $650.00 | |
| 119 | 60500060 | REMOV INLETS | 2 | EACH | $475.00 | $400.00 | |
| 120 | 60604400 | COMB CC&G TB6.18 | 3,510 | FOOT | $49.00 | $48.00 | |
| 121 | 60606800 | COMB CC&G TB9.18 | 108 | FOOT | $64.00 | $62.00 | |
| 122 | 66900200 | NON SPL WASTE DISPOSL | 231 | CU YD | $115.00 | $60.00 | |
| 123 | 66900530 | SOIL DISPOSAL ANALY | 1 | EACH | $1,600.00 | $1,200.00 | |
| 124 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $4,000.00 | $1,500.00 | |
| 125 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $800.00 | $750.00 | |
| 126 | 66901006 | REG SUB MON | 10 | CAL DA | $900.00 | $1,500.00 | |
| 127 | 67000400 | ENGR FIELD OFFICE A | 15 | CAL MO | $2,000.00 | $2,000.00 | |
| 128 | 67100100 | MOBILIZATION | 1 | L SUM | $265,000.00 | $287,000.00 | |
| 129 | 70300100 | SHORT TERM PAVT MKING | 4,193 | FOOT | $0.6200 | $0.6500 | |
| 130 | 70300150 | SHRT TRM PAVT MK REM | 466 | SQ FT | $3.00 | $2.00 | |
| 131 | 78000200 | THPL PVT MK LINE 4 | 886 | FOOT | $2.00 | $2.00 | |
| 132 | 78000400 | THPL PVT MK LINE 6 | 539 | FOOT | $3.10 | $3.10 | |
| 133 | 78000600 | THPL PVT MK LINE 12 | 678 | FOOT | $6.20 | $6.20 | |
| 134 | 78000650 | THPL PVT MK LINE 24 | 169 | FOOT | $12.40 | $12.40 | |
| 135 | 78008200 | POLYUREA PM T1 LTR-SY | 62 | SQ FT | $15.00 | $15.00 | |
| 136 | 78008210 | POLYUREA PM T1 LN 4 | 598 | FOOT | $4.90 | $5.00 | |
| 137 | 78008230 | POLYUREA PM T1 LN 6 | 420 | FOOT | $7.75 | $8.00 | |
| 138 | 78008250 | POLYUREA PM T1 LN 12 | 72 | FOOT | $15.50 | $15.50 | |
| 139 | 78008266 | POLYUREA PM T1 LN 18 | 18 | FOOT | $23.25 | $24.00 | |
| 140 | 78008270 | POLYUREA PM T1 LN 24 | 55 | FOOT | $31.00 | $32.00 | |
| 141 | 78011025 | GRV RCSD PVT MRKG 5 | 886 | FOOT | $0.7300 | $0.7500 | |
| 142 | 78011035 | GRV RCSD PVT MRKG 7 | 539 | FOOT | $1.10 | $1.10 | |
| 143 | 78011065 | GRV RCSD PVT MRKG 13 | 678 | FOOT | $2.19 | $2.20 | |
| 144 | 78011125 | GRV RCSD PVT MRKG 25 | 169 | FOOT | $4.38 | $4.40 | |
| 145 | 81028360 | UNDRGRD C PVC 2 1/2 | 477 | FOOT | $26.00 | $12.20 | |
| 146 | 81028390 | UNDRGRD C PVC 4 | 144 | FOOT | $30.00 | $59.00 | |
| 147 | 81400100 | HANDHOLE | 1 | EACH | $4,950.00 | $2,270.00 | |
| 148 | 81702130 | EC C XLP USE 1C 6 | 722 | FOOT | $3.50 | $2.80 | |
| 149 | 81702140 | EC C XLP USE 1C 4 | 1,444 | FOOT | $4.50 | $3.30 | |
| 150 | 81702150 | EC C XLP USE 1C 2 | 1,444 | FOOT | $5.00 | $4.15 | |
| 151 | 83600200 | LIGHT POLE FDN 24D | 30 | FOOT | $560.00 | $460.00 | |
| 152 | 84200804 | REM POLE FDN | 3 | EACH | $100.00 | $1,453.00 |