2020-043-RS&SW
- Let date
- Friday, September 19, 2025
- Contract
- 62L15 · job page
- District
- District 1
- County
- Cook
- Highway
- Limits
- (2.23-Mile) Designed Overlay and ADA Improvements consisting of asphalt surface removal, pavement patching, hot-mix asphalt resurfacing, detector loop replacement, concrete curb and gutter replacement, curb ramps for sidewalks (ADA) improvements and new thermoplastic pavement marking on Lincoln Avenue from 138th Street to IL 83 (Sibley Boulevard) within the Village of Dolton, in in Cook County.
- Classification
- ·
- Project number
Bidders 4
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | D. Construction, Inc. Low bidder | $2,190,770 | ||
| 2 | Iroquois Paving Corporation | $2,559,093 | +16.8% | |
| 3 | Gallagher Asphalt Corporation | $2,591,627 | +18.3% | |
| 4 | K-Five Construction Corporation | $2,772,672 | +26.6% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 D. Construction… | #2 Iroquois Paving… | #3 Gallagher Aspha… | #4 K-Five Construc… |
|---|---|---|---|---|---|---|---|---|---|
| 1 | K1004595 | PRUN SAFETY/EQUIP CLR | 1 | L SUM | $16,500.00 | $22,565.00 | $1,500.00 | $15,000.00 | |
| 2 | X0320050 | CONSTRUCTN LAYOUT SPL | 1 | L SUM | $20,000.00 | $31,050.00 | $7,600.00 | $15,800.00 | |
| 3 | X2010516 | SELECTIVE CLEARING | 1 | UNIT | $1,760.00 | $1,295.00 | $1,500.00 | $1,600.00 | |
| 4 | X4400501 | CC&G RMVL REPL < = 10 | 2,380 | FOOT | $40.00 | $49.75 | $55.00 | $55.00 | |
| 5 | X4400503 | CC&G RMVL REPL > 10FT | 594 | FOOT | $40.00 | $72.50 | $70.00 | $50.00 | |
| 6 | X5537800 | SS CLEANED 12 | 1,388 | FOOT | $1.10 | $4.15 | $1.00 | $1.00 | |
| 7 | X6030310 | FR & LIDS ADJUST SPL | 58 | EACH | $950.00 | $1,035.00 | $1,078.00 | $1,100.00 | |
| 8 | X6700407 | ENGRS FLD OFC TY A D1 | 12 | CAL MO | $5,000.00 | $3,200.00 | $500.00 | $2,500.00 | |
| 9 | X7200061 | TEMP INFO SIGNING | 51.4 | SQ FT | $30.00 | $20.75 | $20.00 | $18.00 | |
| 10 | X8860105 | DET LOOP REPL | 1,326 | FOOT | $21.34 | $20.00 | $19.40 | $19.40 | |
| 11 | Z0018500 | DRAINAGE STR CLEANED | 111 | EACH | $380.00 | $0.0100 | $345.00 | $345.00 | |
| 12 | Z0018600 | DRAINAGE STR RECONST | 5 | EACH | $1,400.00 | $2,900.00 | $2,400.00 | $2,900.00 | |
| 13 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $8,000.00 | $0.0100 | $10,000.00 | $9,000.00 | |
| 14 | Z0076600 | TRAINEES | 500 | HOUR | $0.8000 | $0.8000 | $0.8000 | $0.8000 | |
| 15 | Z0076604 | TRAINEES TPG | 500 | HOUR | $15.00 | $15.00 | $15.00 | $15.00 | |
| 16 | 20100210 | TREE REMOV OVER 15 | 30 | UNIT | $132.00 | $50.75 | $55.00 | $120.00 | |
| 17 | 20101200 | TREE ROOT PRUNING | 20 | EACH | $198.00 | $93.25 | $250.00 | $180.00 | |
| 18 | 20200100 | EARTH EXCAVATION | 115 | CU YD | $50.00 | $0.0100 | $75.00 | $75.00 | |
| 19 | 21101615 | TOPSOIL F & P 4 | 496 | SQ YD | $12.05 | $15.50 | $10.00 | $10.95 | |
| 20 | 25000400 | NITROGEN FERT NUTR | 2 | POUND | $5.50 | $10.00 | $10.00 | $5.00 | |
| 21 | 25000500 | PHOSPHORUS FERT NUTR | 2 | POUND | $5.50 | $10.00 | $10.00 | $5.00 | |
| 22 | 25000600 | POTASSIUM FERT NUTR | 2 | POUND | $5.50 | $10.00 | $10.00 | $5.00 | |
| 23 | 25200110 | SODDING SALT TOLERANT | 596 | SQ YD | $22.00 | $0.0100 | $20.00 | $20.00 | |
| 24 | 25200200 | SUPPLE WATERING | 25 | UNIT | $44.00 | $0.0100 | $246.00 | $40.00 | |
| 25 | 40600290 | BIT MATLS TACK CT | 37,194 | POUND | $0.0100 | $0.0100 | $0.0100 | $0.0100 | |
| 26 | 40600370 | LONG JOINT SEALANT | 36,315 | FOOT | $3.21 | $3.10 | $3.60 | $3.10 | |
| 27 | 40600400 | MIX CR JTS FLANGEWYS | 83 | TON | $0.0100 | $0.0100 | $0.0100 | $100.00 | |
| 28 | 40600982 | HMA SURF REM BUTT JT | 867 | SQ YD | $0.0100 | $0.0100 | $0.0100 | $13.50 | |
| 29 | 40601005 | HMA REPL OVER PATCH | 306 | TON | $0.0100 | $125.50 | $75.00 | $62.00 | |
| 30 | 40602985 | HMA BC IL-9.5 N70 | 6,172 | TON | $69.00 | $95.00 | $100.00 | $93.25 | |
| 31 | 40604062 | HMA SC IL-9.5 D N70 | 5,400 | TON | $73.00 | $97.00 | $106.00 | $101.16 | |
| 32 | 42001300 | PROTECTIVE COAT | 1,071 | SQ YD | $1.00 | $0.0100 | $2.00 | $0.0100 | |
| 33 | 42400200 | PC CONC SIDEWALK 5 | 4,658 | SQ FT | $9.25 | $10.35 | $12.50 | $12.00 | |
| 34 | 42400800 | DETECTABLE WARNINGS | 305 | SQ FT | $40.00 | $46.50 | $32.00 | $30.00 | |
| 35 | 44000164 | HMA SURF REM 3 3/4 | 55,102 | SQ YD | $3.00 | $4.95 | $5.50 | $6.63 | |
| 36 | 44000600 | SIDEWALK REM | 4,429 | SQ FT | $3.00 | $2.05 | $3.30 | $3.00 | |
| 37 | 44002214 | HMA RM OV PATCH 3 1/2 | 1,585 | SQ YD | $0.0100 | $7.50 | $5.00 | $6.90 | |
| 38 | 44201803 | CL D PATCH T2 13 | 880 | SQ YD | $125.00 | $150.00 | $83.00 | $176.00 | |
| 39 | 44201807 | CL D PATCH T3 13 | 385 | SQ YD | $125.00 | $140.00 | $68.00 | $174.00 | |
| 40 | 44201809 | CL D PATCH T4 13 | 275 | SQ YD | $125.00 | $134.00 | $68.00 | $172.00 | |
| 41 | 60265700 | VV ADJUST | 11 | EACH | $800.00 | $675.00 | $1,390.00 | $850.00 | |
| 42 | 60266600 | VALVE BOX ADJ | 5 | EACH | $500.00 | $310.00 | $225.00 | $750.00 | |
| 43 | 60300105 | FR & GRATES ADJUST | 7 | EACH | $450.00 | $570.00 | $500.00 | $850.00 | |
| 44 | 60300305 | FR & LIDS ADJUST | 37 | EACH | $450.00 | $465.00 | $500.00 | $800.00 | |
| 45 | 66900200 | NON SPL WASTE DISPOSL | 115 | CU YD | $100.00 | $0.0100 | $140.00 | $140.00 | |
| 46 | 66900530 | SOIL DISPOSAL ANALY | 1 | EACH | $1,750.00 | $2,075.00 | $2,200.00 | $1,993.99 | |
| 47 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,250.00 | $3,105.00 | $3,300.00 | $3,766.43 | |
| 48 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,250.00 | $2,800.00 | $2,900.00 | $553.89 | |
| 49 | 66901006 | REG SUB MON | 20 | CAL DA | $950.00 | $1,025.00 | $1,000.00 | $600.00 | |
| 50 | 67100100 | MOBILIZATION | 1 | L SUM | $84,250.00 | $153,000.00 | $155,000.00 | $160,500.00 | |
| 51 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $0.0100 | $2,075.00 | $2,300.00 | $6,793.32 | |
| 52 | 70102625 | TR CONT & PROT 701606 | 1 | L SUM | $184,500.00 | $5,175.00 | $5,600.00 | $6,793.32 | |
| 53 | 70102630 | TR CONT & PROT 701601 | 1 | L SUM | $0.0100 | $10,355.00 | $11,000.00 | $6,793.32 | |
| 54 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $0.0100 | $10,355.00 | $11,000.00 | $6,793.32 | |
| 55 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $0.0100 | $1,555.00 | $1,600.00 | $6,793.32 | |
| 56 | 70300100 | SHORT TERM PAVT MKING | 7,362 | FOOT | $0.0100 | $0.0100 | $0.0100 | $0.0100 | |
| 57 | 70300150 | SHRT TRM PAVT MK REM | 1,227 | SQ FT | $0.0100 | $11.95 | $0.0100 | $0.0100 | |
| 58 | 70300211 | TEMP PVT MK LTR & SYM PAINT | 3,156 | SQ FT | $0.0100 | $0.0100 | $0.0100 | $0.0100 | |
| 59 | 70300221 | TEMP PVT MK LINE 4 - PAINT | 76,170 | FOOT | $0.0100 | $0.0100 | $0.0100 | $0.0100 | |
| 60 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 1,536 | FOOT | $0.0100 | $0.0100 | $0.0100 | $0.0100 | |
| 61 | 70300251 | TEMP PVT MK LINE 8 - PAINT | 273 | FOOT | $0.0100 | $0.0100 | $0.0100 | $0.0100 | |
| 62 | 70300261 | TEMP PVT MK LINE 12 - PAINT | 7,767 | FOOT | $0.0100 | $0.0100 | $0.0100 | $0.0100 | |
| 63 | 70300281 | TEMP PVT MK LINE 24 - PAINT | 1,965 | FOOT | $0.0100 | $0.0100 | $0.0100 | $0.0100 | |
| 64 | 70307120 | TEMP PVT MK L4 T4 TAPE | 3,681 | FOOT | $0.0100 | $0.0100 | $0.0100 | $0.0100 | |
| 65 | 78000100 | THPL PVT MK LTR & SYM | 1,052 | SQ FT | $6.55 | $5.95 | $5.75 | $5.75 | |
| 66 | 78000200 | THPL PVT MK LINE 4 | 25,390 | FOOT | $0.7500 | $0.8500 | $0.8000 | $0.8000 | |
| 67 | 78000400 | THPL PVT MK LINE 6 | 512 | FOOT | $1.10 | $1.15 | $1.10 | $1.10 | |
| 68 | 78000500 | THPL PVT MK LINE 8 | 91 | FOOT | $1.65 | $2.00 | $1.95 | $1.95 | |
| 69 | 78000600 | THPL PVT MK LINE 12 | 2,589 | FOOT | $3.25 | $3.30 | $3.20 | $3.20 | |
| 70 | 78000650 | THPL PVT MK LINE 24 | 655 | FOOT | $6.60 | $5.95 | $5.75 | $5.75 | |
| 71 | 78100100 | RAISED REFL PAVT MKR | 644 | EACH | $44.00 | $42.50 | $41.00 | $33.50 | |
| 72 | 78300200 | RAISED REF PVT MK REM | 580 | EACH | $10.00 | $0.0100 | $0.0100 | $10.00 | |
| 73 | 89502376 | REBUILD EX HANDHOLE | 4 | EACH | $3,117.79 | $2,935.00 | $3,000.00 | $2,835.00 |