2025-2039-RS,SW
- Let date
- Friday, February 27, 2026
- Contract
- 80B75 · job page
- District
- District 1
- County
- Lake
- Highway
- Limits
- (4.21-Mile) Standard overlay and ADA curb ramp improvement project consists of asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian ramp improvements, pavement patching, placement of pavement markings, traffic signal modernization. Located on IL-59 from North of IL-132 (Grand Ave) to US-12, within the Villages of Fox Lake, Lake Villa and Unincorporated Ingleside in Lake County.
- Classification
- Asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian r ·
- Project number
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Peter Baker & Son Co. Low bidder | $3,291,674 | ||
| 2 | Payne & Dolan, Inc. | $3,721,570 | +13.1% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Peter Baker & S… | #2 Payne & Dolan, … |
|---|---|---|---|---|---|---|---|
| 1 | X0320050 | CONSTRUCTN LAYOUT SPL | 1 | L SUM | $3,600.00 | $6,000.00 | |
| 2 | X0324085 | EM VEH P S LSC 20 3C | 325 | FOOT | $1.50 | $1.50 | |
| 3 | X1400102 | OUTDR RTD NTWRK CABLE | 183 | FOOT | $4.40 | $4.40 | |
| 4 | X1400368 | REL EX PTZ CAMERA | 1 | EACH | $2,848.00 | $2,848.00 | |
| 5 | X1400378 | PED SIGNAL POST 5 FT | 2 | EACH | $752.00 | $752.00 | |
| 6 | X2010100 | TREE LIMB REM 4-10 | 5 | EACH | $400.00 | $250.00 | |
| 7 | X2010106 | TREE REM < 6 UNIT DIA | 14.4 | UNIT | $25.00 | $36.00 | |
| 8 | X2010200 | TREE LIMB REM OVER 10 | 1 | EACH | $720.00 | $400.00 | |
| 9 | X2010516 | SELECTIVE CLEARING | 3.95 | UNIT | $900.00 | $1,200.00 | |
| 10 | X2020110 | GRADING & SHAP SHLDRS | 217 | UNIT | $20.00 | $82.00 | |
| 11 | X2100002 | PRUN SAFETY/EQUIP CLR | 21.04 | UNIT | $520.00 | $1,000.00 | |
| 12 | X4400100 | PCC SURF REM VAR DP | 1,005 | SQ YD | $5.00 | $6.46 | |
| 13 | X4400501 | CC&G RMVL REPL < = 10 | 216 | FOOT | $85.00 | $110.00 | |
| 14 | X4400503 | CC&G RMVL REPL > 10FT | 777 | FOOT | $85.00 | $110.00 | |
| 15 | X4401198 | HMA SURF REM VAR DP | 73 | SQ YD | $5.00 | $20.25 | |
| 16 | X5537800 | SS CLEANED 12 | 375 | FOOT | $1.00 | $1.00 | |
| 17 | X6030310 | FR & LIDS ADJUST SPL | 15 | EACH | $1,410.00 | $1,125.00 | |
| 18 | X6700407 | ENGRS FLD OFC TY A D1 | 12 | CAL MO | $1,500.00 | $1,750.00 | |
| 19 | X7010808 | TRAF CONT-PROT TC8 | 2 | EACH | $1,000.00 | $1,000.00 | |
| 20 | X7200061 | TEMP INFO SIGNING | 105 | SQ FT | $18.00 | $18.00 | |
| 21 | X8140215 | HD HANDHOLE TO BE ADJ | 3 | EACH | $4,205.00 | $4,205.00 | |
| 22 | X8760200 | ACCESSIBLE PED SIGNAL | 4 | EACH | $3,518.00 | $3,518.00 | |
| 23 | X8780012 | CONC FDN TY A 12D | 8 | FOOT | $425.00 | $425.00 | |
| 24 | X8809005 | LED SF LENS COVER | 16 | EACH | $512.00 | $512.00 | |
| 25 | X8891009 | VID VEH DET SYS SN AP | 2 | EACH | $9,639.00 | $9,639.00 | |
| 26 | Z0018500 | DRAINAGE STR CLEANED | 25 | EACH | $325.00 | $325.00 | |
| 27 | Z0033044 | RE-OPTIMIZE TR SIG SYS 1 | 1 | EACH | $1,728.00 | $1,728.00 | |
| 28 | Z0076600 | TRAINEES | 500 | HOUR | $0.8000 | $0.8000 | |
| 29 | Z0076604 | TRAINEES TPG | 500 | HOUR | $15.00 | $15.00 | |
| 30 | 20100110 | TREE REMOV 6-15 | 85.3 | UNIT | $40.00 | $48.00 | |
| 31 | 20200100 | EARTH EXCAVATION | 21 | CU YD | $35.00 | $75.00 | |
| 32 | 21101815 | COMPOST F & P 4 | 160 | SQ YD | $3.00 | $15.00 | |
| 33 | 25000400 | NITROGEN FERT NUTR | 0.3 | POUND | $5.00 | $5.00 | |
| 34 | 25000500 | PHOSPHORUS FERT NUTR | 0.3 | POUND | $5.00 | $5.00 | |
| 35 | 25000600 | POTASSIUM FERT NUTR | 0.3 | POUND | $5.00 | $5.00 | |
| 36 | 25200110 | SODDING SALT TOLERANT | 160 | SQ YD | $45.00 | $34.00 | |
| 37 | 25200200 | SUPPLE WATERING | 0.3 | UNIT | $1.00 | $50.00 | |
| 38 | 35501308 | HMA BASE CSE 6 | 23 | SQ YD | $80.00 | $100.00 | |
| 39 | 35501316 | HMA BASE CSE 8 | 23 | SQ YD | $105.00 | $110.00 | |
| 40 | 40600290 | BIT MATLS TACK CT | 62,094 | POUND | $0.0100 | $0.1000 | |
| 41 | 40600370 | LONG JOINT SEALANT | 41,734 | FOOT | $3.30 | $2.50 | |
| 42 | 40600400 | MIX CR JTS FLANGEWYS | 138 | TON | $150.00 | $420.00 | |
| 43 | 40600982 | HMA SURF REM BUTT JT | 800 | SQ YD | $1.00 | $0.0100 | |
| 44 | 40600985 | PCC SURF REM BUTT JT | 52 | SQ YD | $1.00 | $0.1000 | |
| 45 | 40603200 | P HMA BC IL-4.75 N50 | 3,863 | TON | $100.00 | $114.00 | |
| 46 | 40604060 | HMA SC IL-9.5 D N50 | 5 | TON | $325.00 | $390.00 | |
| 47 | 40604062 | HMA SC IL-9.5 D N70 | 7,728 | TON | $83.00 | $79.00 | |
| 48 | 42001300 | PROTECTIVE COAT | 350 | SQ YD | $0.0100 | $1.00 | |
| 49 | 42400200 | PC CONC SIDEWALK 5 | 1,071 | SQ FT | $14.00 | $12.00 | |
| 50 | 42400800 | DETECTABLE WARNINGS | 54 | SQ FT | $40.00 | $55.00 | |
| 51 | 44000153 | HMA SURF REM 1 | 1,957 | SQ YD | $2.77 | $4.00 | |
| 52 | 44000158 | HMA SURF REM 2 1/4 | 87,074 | SQ YD | $4.15 | $4.00 | |
| 53 | 44000200 | DRIVE PAVEMENT REM | 45 | SQ YD | $20.00 | $50.00 | |
| 54 | 44000300 | CURB REM | 90 | FOOT | $12.50 | $15.00 | |
| 55 | 44000600 | SIDEWALK REM | 1,071 | SQ FT | $3.50 | $4.00 | |
| 56 | 44003100 | MEDIAN REMOVAL | 400 | SQ FT | $7.50 | $7.00 | |
| 57 | 44200970 | CL B PATCH T2 10 | 24 | SQ YD | $295.00 | $310.00 | |
| 58 | 44201299 | DOWEL BARS 1 1/2 | 60 | EACH | $25.00 | $20.00 | |
| 59 | 44201777 | CL D PATCH T2 11 | 250 | SQ YD | $70.00 | $105.00 | |
| 60 | 44201781 | CL D PATCH T3 11 | 250 | SQ YD | $70.00 | $105.00 | |
| 61 | 44201783 | CL D PATCH T4 11 | 300 | SQ YD | $70.00 | $105.00 | |
| 62 | 44201875 | CL D PATCH T2 19 | 1,000 | SQ YD | $130.00 | $185.00 | |
| 63 | 44201879 | CL D PATCH T3 19 | 900 | SQ YD | $130.00 | $185.00 | |
| 64 | 44201881 | CL D PATCH T4 19 | 950 | SQ YD | $130.00 | $185.00 | |
| 65 | 44213200 | SAW CUTS | 144 | FOOT | $5.00 | $24.25 | |
| 66 | 48102100 | AGG WEDGE SHLD TYPE B | 426 | TON | $57.00 | $117.50 | |
| 67 | 60250200 | CB ADJUST | 5 | EACH | $405.00 | $450.00 | |
| 68 | 60252800 | CB RECONST | 1 | EACH | $2,150.00 | $950.00 | |
| 69 | 60300105 | FR & GRATES ADJUST | 5 | EACH | $405.00 | $450.00 | |
| 70 | 60404950 | FR & GRATES T24 | 5 | EACH | $391.00 | $470.00 | |
| 71 | 60406100 | FR & LIDS T1 CL | 15 | EACH | $371.00 | $440.00 | |
| 72 | 60920012 | PIPE CULV CLEANED 12 | 500 | FOOT | $4.00 | $4.00 | |
| 73 | 60920018 | PIPE CULV CLEANED 18 | 500 | FOOT | $6.00 | $6.00 | |
| 74 | 63100167 | TR BAR TRM T1 SPL TAN | 8 | EACH | $3,785.00 | $3,785.00 | |
| 75 | 63200310 | GUARDRAIL REMOV | 400 | FOOT | $8.00 | $8.00 | |
| 76 | 63300575 | R&R RAIL ELEM EX GDRL | 155 | FOOT | $24.00 | $24.00 | |
| 77 | 66900200 | NON SPL WASTE DISPOSL | 21 | CU YD | $120.00 | $94.50 | |
| 78 | 66900530 | SOIL DISPOSAL ANALY | 2 | EACH | $865.00 | $1,500.00 | |
| 79 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $5,200.00 | $2,900.00 | |
| 80 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $500.00 | $800.00 | |
| 81 | 66901006 | REG SUB MON | 3 | CAL DA | $715.00 | $1,100.00 | |
| 82 | 67100100 | MOBILIZATION | 1 | L SUM | $196,503.00 | $473,706.82 | |
| 83 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $1.00 | $1.00 | |
| 84 | 70100600 | TRAF CONT-PROT 701336 | 1 | L SUM | $1.00 | $1.00 | |
| 85 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $73,405.00 | $22,500.00 | |
| 86 | 70102622 | TR CONT & PROT 701502 | 1 | L SUM | $43,200.00 | $1.00 | |
| 87 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $100.00 | $1.00 | |
| 88 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $14,120.00 | $500.00 | |
| 89 | 70200100 | NIGHT WORK ZONE LIGHT | 1 | L SUM | $3,200.00 | $3,350.00 | |
| 90 | 70300100 | SHORT TERM PAVT MKING | 26,765 | FOOT | $0.6500 | $0.1000 | |
| 91 | 70300150 | SHRT TRM PAVT MK REM | 2,231 | SQ FT | $0.0100 | $0.1000 | |
| 92 | 70300211 | TEMP PVT MK LTR & SYM PAINT | 2,126 | SQ FT | $0.0100 | $0.0100 | |
| 93 | 70300221 | TEMP PVT MK LINE 4 - PAINT | 162,172 | FOOT | $0.0100 | $0.0100 | |
| 94 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 7,494 | FOOT | $0.0100 | $0.0100 | |
| 95 | 70300251 | TEMP PVT MK LINE 8 - PAINT | 1,082 | FOOT | $0.0100 | $0.0100 | |
| 96 | 70300261 | TEMP PVT MK LINE 12 - PAINT | 8,072 | FOOT | $0.0100 | $0.0100 | |
| 97 | 70300281 | TEMP PVT MK LINE 24 - PAINT | 1,740 | FOOT | $0.0100 | $0.0100 | |
| 98 | 70307120 | TEMP PVT MK L4 T4 TAPE | 6,692 | FOOT | $1.16 | $0.0100 | |
| 99 | 72400100 | REMOV SIN PAN ASSY TA | 1 | EACH | $500.00 | $100.00 | |
| 100 | 72501000 | TERMINAL MARKER - DA | 8 | EACH | $50.00 | $50.00 | |
| 101 | 78000100 | THPL PVT MK LTR & SYM | 1,063 | SQ FT | $5.75 | $5.75 | |
| 102 | 78000200 | THPL PVT MK LINE 4 | 81,086 | FOOT | $0.6500 | $0.6500 | |
| 103 | 78000400 | THPL PVT MK LINE 6 | 3,747 | FOOT | $0.8500 | $0.8500 | |
| 104 | 78000500 | THPL PVT MK LINE 8 | 541 | FOOT | $1.95 | $1.95 | |
| 105 | 78000600 | THPL PVT MK LINE 12 | 4,090 | FOOT | $2.90 | $2.90 | |
| 106 | 78000650 | THPL PVT MK LINE 24 | 870 | FOOT | $5.75 | $5.75 | |
| 107 | 78009004 | MOD URETH PM LINE 4 | 3,020 | FOOT | $1.85 | $1.85 | |
| 108 | 78009006 | MOD URETH PM LINE 6 | 30 | FOOT | $5.00 | $5.00 | |
| 109 | 78009012 | MOD URETH PM LINE 12 | 100 | FOOT | $8.00 | $8.00 | |
| 110 | 78100100 | RAISED REFL PAVT MKR | 950 | EACH | $36.00 | $36.00 | |
| 111 | 78200005 | GRDRAIL REF TYPE A | 20 | EACH | $10.00 | $10.00 | |
| 112 | 78300200 | RAISED REF PVT MK REM | 950 | EACH | $12.00 | $3.62 | |
| 113 | 81028200 | UNDRGRD C GALVS 2 | 290 | FOOT | $39.90 | $39.90 | |
| 114 | 81028220 | UNDRGRD C GALVS 3 | 245 | FOOT | $52.50 | $52.50 | |
| 115 | 81028240 | UNDRGRD C GALVS 4 | 328 | FOOT | $98.00 | $98.00 | |
| 116 | 81400100 | HANDHOLE | 1 | EACH | $3,263.00 | $3,263.00 | |
| 117 | 81400200 | HD HANDHOLE | 7 | EACH | $4,205.00 | $4,205.00 | |
| 118 | 85000200 | MAIN EX TR SIG INSTAL | 4 | EACH | $12,120.00 | $12,120.00 | |
| 119 | 87301215 | ELCBL C SIGNAL 14 2C | 130 | FOOT | $1.90 | $1.90 | |
| 120 | 87301225 | ELCBL C SIGNAL 14 3C | 319 | FOOT | $2.30 | $2.30 | |
| 121 | 87301245 | ELCBL C SIGNAL 14 5C | 2,618 | FOOT | $2.80 | $2.80 | |
| 122 | 87301255 | ELCBL C SIGNAL 14 7C | 770 | FOOT | $3.60 | $3.60 | |
| 123 | 87301305 | ELCBL C LEAD 14 1PR | 1,678 | FOOT | $1.90 | $1.90 | |
| 124 | 87301900 | ELCBL C EGRDC 6 1C | 1,471 | FOOT | $3.10 | $3.10 | |
| 125 | 87501200 | TS POST 16 | 4 | EACH | $2,058.00 | $2,058.00 | |
| 126 | 87700190 | S MAA & P 30 | 1 | EACH | $15,525.00 | $15,525.00 | |
| 127 | 87700250 | S MAA & P 42 | 1 | EACH | $20,262.00 | $20,262.00 | |
| 128 | 87700408 | S MAA & P 64 | 1 | EACH | $31,081.00 | $31,081.00 | |
| 129 | 87702920 | STL COMB MAA&P 38 | 1 | EACH | $25,914.00 | $25,914.00 | |
| 130 | 87800100 | CONC FDN TY A | 16 | FOOT | $364.80 | $364.80 | |
| 131 | 87800400 | CONC FDN TY E 30D | 27 | FOOT | $322.90 | $322.90 | |
| 132 | 87800415 | CONC FDN TY E 36D | 13 | FOOT | $439.50 | $439.50 | |
| 133 | 87800420 | CONC FDN TY E 42D | 21 | FOOT | $646.30 | $646.30 | |
| 134 | 87900200 | DRILL EX HANDHOLE | 19 | EACH | $729.00 | $729.00 | |
| 135 | 88030020 | SH LED 1F 3S MAM | 6 | EACH | $1,084.00 | $1,084.00 | |
| 136 | 88030050 | SH LED 1F 3S BM | 8 | EACH | $933.00 | $933.00 | |
| 137 | 88030100 | SH LED 1F 5S BM | 2 | EACH | $1,365.00 | $1,365.00 | |
| 138 | 88030110 | SH LED 1F 5S MAM | 2 | EACH | $1,527.00 | $1,527.00 | |
| 139 | 88200410 | TS BACKPLATE L F PLAS | 8 | EACH | $332.00 | $332.00 | |
| 140 | 88600100 | DET LOOP T1 | 2,471 | FOOT | $30.30 | $30.30 | |
| 141 | 89501400 | REL EM VEH PR SYS D U | 2 | EACH | $620.00 | $620.00 | |
| 142 | 89502300 | REM ELCBL FR CON | 6,061 | FOOT | $0.7000 | $0.7000 | |
| 143 | 89502350 | REM & RE ELCBL FR CON | 108 | FOOT | $2.10 | $2.10 | |
| 144 | 89502375 | REMOV EX TS EQUIP | 2 | EACH | $2,848.00 | $2,848.00 | |
| 145 | 89502376 | REBUILD EX HANDHOLE | 3 | EACH | $3,975.00 | $3,975.00 | |
| 146 | 89502380 | REMOV EX HANDHOLE | 7 | EACH | $712.00 | $712.00 | |
| 147 | 89502382 | REMOV EX DBL HANDHOLE | 1 | EACH | $712.00 | $712.00 | |
| 148 | 89502385 | REMOV EX CONC FDN | 5 | EACH | $712.00 | $712.00 |