(X1-8,X1-7-1,X1-7,X1-6-1)R-2
- Let date
- Friday, December 13, 2024
- Contract
- 78798 · job page
- District
- District 9
- County
- Williamson
- Highway
- Limits
- 8 miles of earthwork, HMA pavement, HMA resurfacing, drainage and guardrail in order to add a lane in each direction of I-57 from Westminster Drive in Marion to just south of the I-24 interchange.
- Classification
- ·
- Project number
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Samron Midwest Contracting, Inc. Low bidder | $41,665,230 | ||
| 2 | E. T. Simonds Construction Company | $44,982,683 | +8.0% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Samron Midwest … | #2 E. T. Simonds C… |
|---|---|---|---|---|---|---|---|
| 1 | X0322278 | RODENT SHIELDS | 148 | EACH | $175.00 | $161.90 | |
| 2 | X0322329 | TIMBER CURB REMOVAL | 783 | FOOT | $4.50 | $5.01 | |
| 3 | X2503100 | MOWING | 3,365 | UNIT | $0.0100 | $15.84 | |
| 4 | X2810844 | REMOVE EXIST RIPRAP | 99 | SQ YD | $8.00 | $35.84 | |
| 5 | X3110100 | COARSE AGGREGATE | 55 | TON | $35.00 | $53.09 | |
| 6 | X4401198 | HMA SURF REM VAR DP | 4,698 | SQ YD | $4.00 | $3.22 | |
| 7 | X4401983 | CONC BAR REMOVAL DF | 51 | FOOT | $100.00 | $92.76 | |
| 8 | X4406630 | PART DEP REM T4 3 | 223 | SQ YD | $50.00 | $32.40 | |
| 9 | X4421000 | PARTIAL DEPTH PATCH | 38 | TON | $400.00 | $245.66 | |
| 10 | X5030250 | BR DECK GROOVING LONG | 1,094 | SQ YD | $15.00 | $11.76 | |
| 11 | X5420002 | CONC COLLAR SPECIAL | 1.3 | CU YD | $3,500.00 | $2,019.05 | |
| 12 | X6024242 | INLETS SPL N1 | 6 | EACH | $9,000.00 | $7,101.41 | |
| 13 | X6024244 | INLETS SPL N2 | 1 | EACH | $12,000.00 | $9,710.84 | |
| 14 | X6026800 | INLETS RECONST SPL | 8 | EACH | $6,800.00 | $8,358.98 | |
| 15 | X6050310 | FILL INLETS SPL | 12 | EACH | $1,000.00 | $1,759.24 | |
| 16 | X6100230 | TF INLT BX 610001 SPL | 3 | EACH | $6,000.00 | $6,348.11 | |
| 17 | X6350120 | DELINEATOR REMOVAL | 25 | EACH | $50.00 | $21.00 | |
| 18 | X6420112 | CENTERLN RUM STRIP 8 | 46,691 | FOOT | $0.4500 | $0.8900 | |
| 19 | X6430120 | REM IMP ATTEN NO SALV | 1 | EACH | $750.00 | $735.00 | |
| 20 | X6431120 | REM IMP ATTEN SM | 8 | EACH | $1,650.00 | $1,163.28 | |
| 21 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $2,050,000.00 | $3,004,827.72 | |
| 22 | X7240502 | RELOCATE SIGN SPL | 1 | EACH | $12,000.00 | $11,178.30 | |
| 23 | X7800700 | PREF THPL PM SHIELD | 6 | EACH | $5,000.00 | $4,612.00 | |
| 24 | Z0006018 | BR DK LTX C OLY 3 | 1,747 | SQ YD | $180.00 | $150.50 | |
| 25 | Z0012102 | CONC BR DECK SCAR 3/8 | 4,825 | SQ YD | $6.00 | $8.99 | |
| 26 | Z0012146 | BR DECK SCAR 2 3/4 | 1,747 | SQ YD | $55.00 | $59.83 | |
| 27 | Z0012193 | BR DK TH POLY OVL 3/8 | 4,825 | SQ YD | $53.00 | $52.35 | |
| 28 | Z0012754 | STR REP CON DP = < 5 | 107 | SQ FT | $108.00 | $268.43 | |
| 29 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $150,000.00 | $266,963.06 | |
| 30 | Z0016002 | DECK SLAB REP (FD-T2) | 6.6 | SQ YD | $2,800.00 | $1,139.92 | |
| 31 | Z0026290 | F&I WEIGH-IN-MOT COMP | 1 | L SUM | $740,000.00 | $688,768.73 | |
| 32 | Z0029090 | DIAMOND GRIND BR SEC | 1,846 | SQ YD | $15.00 | $13.75 | |
| 33 | Z0034105 | MATL TRANSFER DEVICE | 214,485 | TON | $0.0100 | $2.31 | |
| 34 | Z0040530 | PIPE UNDERDRAIN REMOV | 89,234 | FOOT | $1.50 | $1.58 | |
| 35 | Z0051200 | REM & REPL EXPAN JT | 288 | FOOT | $90.00 | $132.00 | |
| 36 | Z0054517 | ROCK FILL - FOUNDATN | 23 | TON | $95.00 | $74.05 | |
| 37 | Z0065730 | SLOPEWALL SLUR PUMPNG | 5 | CU YD | $1,100.00 | $739.71 | |
| 38 | Z0076600 | TRAINEES | 2,000 | HOUR | $0.8000 | $0.8000 | |
| 39 | Z0076604 | TRAINEES TPG | 2,000 | HOUR | $15.00 | $15.00 | |
| 40 | Z0076870 | UNDR CONNECT TO STR | 86 | EACH | $800.00 | $764.55 | |
| 41 | 20200100 | EARTH EXCAVATION | 78,200 | CU YD | $15.00 | $17.34 | |
| 42 | 20700220 | POROUS GRAN EMBANK | 113 | CU YD | $28.00 | $59.08 | |
| 43 | 20800150 | TRENCH BACKFILL | 825 | CU YD | $50.00 | $55.23 | |
| 44 | 25000210 | SEEDING CL 2A | 38.25 | ACRE | $1,450.00 | $1,365.00 | |
| 45 | 25000400 | NITROGEN FERT NUTR | 3,435 | POUND | $1.60 | $1.52 | |
| 46 | 25000500 | PHOSPHORUS FERT NUTR | 3,435 | POUND | $1.60 | $1.52 | |
| 47 | 25000600 | POTASSIUM FERT NUTR | 3,435 | POUND | $1.60 | $1.52 | |
| 48 | 25000700 | AGR GROUND LIMESTONE | 77 | TON | $275.00 | $252.00 | |
| 49 | 25100115 | MULCH METHOD 2 | 28.75 | ACRE | $1,350.00 | $1,260.00 | |
| 50 | 25100630 | EROSION CONTR BLANKET | 45,151 | SQ YD | $1.60 | $1.47 | |
| 51 | 28000250 | TEMP EROS CONTR SEED | 19,080 | POUND | $2.25 | $2.63 | |
| 52 | 28000305 | TEMP DITCH CHECKS | 6,600 | FOOT | $9.50 | $26.25 | |
| 53 | 28000400 | PERIMETER EROS BAR | 3,297 | FOOT | $5.00 | $5.51 | |
| 54 | 28000500 | INLET & PIPE PROTECT | 114 | EACH | $140.00 | $256.96 | |
| 55 | 28100107 | STONE RIPRAP CL A4 | 873 | SQ YD | $35.00 | $48.69 | |
| 56 | 28100109 | STONE RIPRAP CL A5 | 23 | SQ YD | $115.00 | $65.05 | |
| 57 | 28200200 | FILTER FABRIC | 23 | SQ YD | $2.50 | $7.43 | |
| 58 | 30201500 | LIME | 265 | TON | $240.00 | $262.21 | |
| 59 | 31100300 | SUB GRAN MAT A 4 | 1,341 | SQ YD | $9.00 | $15.33 | |
| 60 | 31100910 | SUB GRAN MAT A 12 | 242,905 | SQ YD | $14.50 | $16.70 | |
| 61 | 31102200 | SUB GRAN MAT C 5 | 122,559 | SQ YD | $6.00 | $7.62 | |
| 62 | 40600275 | BIT MATLS PR CT | 521,376 | POUND | $0.0100 | $0.0100 | |
| 63 | 40600290 | BIT MATLS TACK CT | 342,255 | POUND | $0.0100 | $0.0100 | |
| 64 | 40600372 | LNG JNT SLNT HALF WD | 397,778 | FOOT | $2.10 | $1.79 | |
| 65 | 40603240 | P HMA BC IL19.0 N90 | 3,279 | TON | $105.00 | $90.85 | |
| 66 | 40605034 | P SC SMA 12.5 E N80 | 31,834 | TON | $130.00 | $138.29 | |
| 67 | 40701986 | HMA PAVT FD 15 1/4 | 115,351 | SQ YD | $68.00 | $72.45 | |
| 68 | 40800050 | INCIDENTAL HMA SURF | 245 | TON | $275.00 | $217.82 | |
| 69 | 42001300 | PROTECTIVE COAT | 2,561 | SQ YD | $0.0100 | $0.0100 | |
| 70 | 44000100 | PAVEMENT REM | 1,215 | SQ YD | $17.00 | $24.35 | |
| 71 | 44000157 | HMA SURF REM 2 | 381,559 | SQ YD | $2.25 | $2.28 | |
| 72 | 44000166 | HMA SURF REM 4 1/4 | 13,613 | SQ YD | $4.00 | $4.33 | |
| 73 | 44004250 | PAVED SHLD REMOVAL | 62,183 | SQ YD | $14.00 | $15.34 | |
| 74 | 44200050 | WELDED WIRE REINF | 4,214 | SQ YD | $10.00 | $5.83 | |
| 75 | 44200977 | CL B PATCH T4 10 1/2 | 3,867 | SQ YD | $165.00 | $121.38 | |
| 76 | 44201000 | CL B PATCH T4 12 | 347 | SQ YD | $160.00 | $196.20 | |
| 77 | 44201299 | DOWEL BARS 1 1/2 | 556 | EACH | $25.00 | $8.95 | |
| 78 | 44213200 | SAW CUTS | 8,706 | FOOT | $6.00 | $6.58 | |
| 79 | 44213204 | TIE BARS 3/4 | 1,500 | EACH | $20.00 | $4.54 | |
| 80 | 48101500 | AGGREGATE SHLDS B 6 | 682 | SQ YD | $25.00 | $22.31 | |
| 81 | 48203037 | HMA SHOULDERS 10 | 116,796 | SQ YD | $45.00 | $42.41 | |
| 82 | 48203100 | HMA SHOULDERS | 15,212 | TON | $85.00 | $78.39 | |
| 83 | 48300500 | PCC SHOULDERS 10 | 1,096 | SQ YD | $85.00 | $80.45 | |
| 84 | 50102400 | CONC REM | 30.9 | CU YD | $3,500.00 | $2,559.39 | |
| 85 | 50105220 | PIPE CULVERT REMOV | 1,282 | FOOT | $12.00 | $24.15 | |
| 86 | 50157300 | PROTECTIVE SHIELD | 818 | SQ YD | $150.00 | $108.84 | |
| 87 | 50200450 | REM/DISP UNS MATL-STR | 17 | CU YD | $100.00 | $47.36 | |
| 88 | 50300255 | CONC SUP-STR | 84.9 | CU YD | $1,300.00 | $1,877.75 | |
| 89 | 50300300 | PROTECTIVE COAT | 7,040 | SQ YD | $0.0100 | $1.32 | |
| 90 | 50500505 | STUD SHEAR CONNECTORS | 252 | EACH | $5.00 | $5.25 | |
| 91 | 50800105 | REINFORCEMENT BARS | 5,650 | POUND | $1.85 | $2.21 | |
| 92 | 50800205 | REINF BARS, EPOXY CTD | 21,300 | POUND | $2.00 | $2.24 | |
| 93 | 50800515 | BAR SPLICERS | 56 | EACH | $100.00 | $76.02 | |
| 94 | 52000110 | PREF JT STRIP SEAL | 127 | FOOT | $260.00 | $370.44 | |
| 95 | 54002020 | EXPAN BOLTS 3/4 | 30 | EACH | $100.00 | $64.99 | |
| 96 | 54003000 | CONC BOX CUL | 32 | CU YD | $1,500.00 | $2,559.74 | |
| 97 | 54244405 | FL INLT BX MED 542546 | 33 | EACH | $3,500.00 | $4,339.17 | |
| 98 | 54248510 | CONCRETE COLLAR | 15.1 | CU YD | $1,600.00 | $1,343.80 | |
| 99 | 54262718 | METAL FL END SEC 18" | 1 | EACH | $750.00 | $543.38 | |
| 100 | 550A0090 | STORM SEW CL A 1 18 | 435 | FOOT | $70.00 | $99.82 | |
| 101 | 550A0380 | STORM SEW CL A 2 18 | 1,700 | FOOT | $70.00 | $103.15 | |
| 102 | 550A0410 | STORM SEW CL A 2 24 | 741 | FOOT | $90.00 | $141.70 | |
| 103 | 550A0450 | STORM SEW CL A 2 36 | 196 | FOOT | $150.00 | $210.39 | |
| 104 | 550A0480 | STORM SEW CL A 2 48 | 49 | FOOT | $270.00 | $324.18 | |
| 105 | 60100060 | CONC HDWL FOR P DRAIN | 148 | EACH | $560.00 | $523.47 | |
| 106 | 60100965 | PIPE DRAINS 18 | 23 | FOOT | $75.00 | $139.16 | |
| 107 | 60108100 | PIPE UNDERDRAIN 4 SP | 4,821 | FOOT | $8.00 | $10.15 | |
| 108 | 60108204 | PIPE UNDERDR T 2 4 | 87,225 | FOOT | $6.00 | $6.13 | |
| 109 | 60218400 | MAN TA 4 DIA T1F CL | 7 | EACH | $3,500.00 | $4,309.14 | |
| 110 | 60270050 | DR STR T4 W/2 T20F&G | 4 | EACH | $7,400.00 | $9,158.41 | |
| 111 | 60500060 | REMOV INLETS | 51 | EACH | $540.00 | $824.05 | |
| 112 | 61000050 | CONC THRUST BLOCKS | 2 | EACH | $1,225.00 | $824.34 | |
| 113 | 63000001 | SPBGR TY A 6FT POSTS | 9,700 | FOOT | $40.00 | $40.95 | |
| 114 | 63000370 | LSG OVER CUL 25' SPAN | 100 | FOOT | $53.00 | $57.75 | |
| 115 | 63100045 | TRAF BAR TERM T2 | 24 | EACH | $2,500.00 | $1,890.00 | |
| 116 | 63100085 | TRAF BAR TERM T6 | 4 | EACH | $5,700.00 | $5,250.00 | |
| 117 | 63100089 | TRAF BAR TERM T6B | 6 | EACH | $5,800.00 | $5,880.00 | |
| 118 | 63100167 | TR BAR TRM T1 SPL TAN | 34 | EACH | $4,100.00 | $4,725.00 | |
| 119 | 63200310 | GUARDRAIL REMOV | 13,343 | FOOT | $6.50 | $4.83 | |
| 120 | 63201100 | HT CBL MEDIAN BARRIER REM | 15,553 | FOOT | $4.00 | $7.11 | |
| 121 | 63500105 | DELINEATORS | 51 | EACH | $130.00 | $131.25 | |
| 122 | 63700380 | CONC BAR VX 44HT | 1,140 | FOOT | $225.00 | $195.50 | |
| 123 | 63700805 | CONC BAR TRANS | 10 | FOOT | $650.00 | $764.24 | |
| 124 | 64200116 | SHOULDER RUM STRIP 16 | 185,599 | FOOT | $0.2200 | $0.2600 | |
| 125 | 64300260 | IMP ATTEN FRD NAR TL3 | 1 | EACH | $25,000.00 | $47,925.00 | |
| 126 | 64401100 | HT CBL MEDIAN BARRIER | 43,789 | FOOT | $23.00 | $24.93 | |
| 127 | 64401300 | HT CBL MED BAR TERM | 24 | EACH | $12,000.00 | $13,650.00 | |
| 128 | 66201120 | CONC SHLD CURB | 760 | FOOT | $23.00 | $34.78 | |
| 129 | 66900200 | NON SPL WASTE DISPOSL | 4,455 | CU YD | $65.00 | $83.74 | |
| 130 | 66900530 | SOIL DISPOSAL ANALY | 3 | EACH | $1,900.00 | $1,785.00 | |
| 131 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,450.00 | $2,310.00 | |
| 132 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,450.00 | $2,310.00 | |
| 133 | 66901006 | REG SUB MON | 12 | CAL DA | $1,150.00 | $1,050.00 | |
| 134 | 67000400 | ENGR FIELD OFFICE A | 38 | CAL MO | $1,800.00 | $1,950.00 | |
| 135 | 67000600 | ENGR FIELD LAB | 38 | CAL MO | $1,800.00 | $1,800.00 | |
| 136 | 67100100 | MOBILIZATION | 1 | L SUM | $2,500,000.00 | $2,664,710.28 | |
| 137 | 70103815 | TR CONT SURVEILLANCE | 1,095 | CAL DA | $0.0100 | $0.0100 | |
| 138 | 70107025 | CHANGEABLE MESSAGE SN | 105 | CAL DA | $115.00 | $40.13 | |
| 139 | 70200100 | NIGHT WORK ZONE LIGHT | 1 | L SUM | $124,000.00 | $70,400.00 | |
| 140 | 70300100 | SHORT TERM PAVT MKING | 23,147 | FOOT | $0.0100 | $0.0100 | |
| 141 | 70300150 | SHRT TRM PAVT MK REM | 7,716 | SQ FT | $0.0100 | $0.0100 | |
| 142 | 70300211 | TEMP PVT MK LTR & SYM PAINT | 30 | SQ FT | $0.0100 | $0.0100 | |
| 143 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 258,235 | FOOT | $0.0100 | $0.0100 | |
| 144 | 70300251 | TEMP PVT MK LINE 8 - PAINT | 12,638 | FOOT | $0.0100 | $0.0100 | |
| 145 | 70300261 | TEMP PVT MK LINE 12 - PAINT | 2,143 | FOOT | $0.0100 | $0.0100 | |
| 146 | 70400100 | TEMP CONC BARRIER | 2,251 | FOOT | $0.0100 | $23.45 | |
| 147 | 70400200 | REL TEMP CONC BARRIER | 2,251 | FOOT | $10.00 | $7.64 | |
| 148 | 70600305 | IMP ATTN TEMP FRR TL3 | 5 | EACH | $0.0100 | $7,994.13 | |
| 149 | 70600330 | IMP ATTN REL FRD TL3 | 5 | EACH | $1,000.00 | $2,292.33 | |
| 150 | 72000100 | SIGN PANEL T1 | 684 | SQ FT | $16.00 | $24.23 | |
| 151 | 72000300 | SIGN PANEL T3 | 1,751 | SQ FT | $31.00 | $29.00 | |
| 152 | 72400100 | REMOV SIN PAN ASSY TA | 20 | EACH | $500.00 | $473.57 | |
| 153 | 72400200 | REMOV SIN PAN ASSY TB | 2 | EACH | $500.00 | $473.57 | |
| 154 | 72400330 | REMOV SIGN PANEL T3 | 114 | SQ FT | $2.75 | $2.71 | |
| 155 | 72400600 | RELOC SIN PAN ASSY TB | 12 | EACH | $200.00 | $657.87 | |
| 156 | 72501000 | TERMINAL MARKER - DA | 34 | EACH | $48.00 | $52.50 | |
| 157 | 72700100 | STR STL SIN SUP BA | 1,182 | POUND | $7.00 | $6.98 | |
| 158 | 72800100 | TELES STL SIN SUPPORT | 968 | FOOT | $18.00 | $34.88 | |
| 159 | 73000100 | WOOD SIN SUPPORT | 95 | FOOT | $26.00 | $60.40 | |
| 160 | 73100100 | BASE TEL STL SIN SUPP | 88 | EACH | $300.00 | $210.58 | |
| 161 | 73300100 | OVHD SIN STR-SPAN T1A | 234 | FOOT | $1,100.00 | $1,223.67 | |
| 162 | 73300200 | OVHD SIN STR-SPAN T2A | 102 | FOOT | $1,200.00 | $1,405.26 | |
| 163 | 73301810 | OSS WALKWAY TY A | 20 | FOOT | $575.00 | $615.27 | |
| 164 | 73302160 | OSS CANT 2CA 2-6X5-6 | 30 | FOOT | $2,100.00 | $2,209.06 | |
| 165 | 73304000 | OVHD SIN STR BR MT | 26 | FOOT | $1,500.00 | $1,735.57 | |
| 166 | 73400100 | CONC FOUNDATION | 2.8 | CU YD | $2,800.00 | $2,250.34 | |
| 167 | 73400200 | DRILL SHAFT CONC FDN | 88.6 | CU YD | $3,500.00 | $2,525.28 | |
| 168 | 73600100 | REMOV OH SIN STR-SPAN | 4 | EACH | $5,900.00 | $11,346.12 | |
| 169 | 73602000 | REM OVHD SN STR-BR MT | 2 | EACH | $1,000.00 | $6,420.31 | |
| 170 | 73700100 | REM GR MT SIN SUPPORT | 4 | EACH | $265.00 | $802.54 | |
| 171 | 73700200 | REM CONC FDN-GR MT | 4 | EACH | $1,330.00 | $254.25 | |
| 172 | 73700300 | REM CONC FDN-OVHD | 16 | EACH | $2,650.00 | $1,525.50 | |
| 173 | 78000100 | THPL PVT MK LTR & SYM | 484 | SQ FT | $8.50 | $8.40 | |
| 174 | 78000400 | THPL PVT MK LINE 6 | 250,038 | FOOT | $0.8100 | $0.7600 | |
| 175 | 78000500 | THPL PVT MK LINE 8 | 12,638 | FOOT | $1.10 | $1.05 | |
| 176 | 78000600 | THPL PVT MK LINE 12 | 2,143 | FOOT | $8.50 | $8.40 | |
| 177 | 78008330 | POLYUREA PM T2 LN 6 | 8,709 | FOOT | $2.00 | $2.00 | |
| 178 | 78011000 | GRV RCSD PM LTR & SYM | 1,024 | SQ FT | $4.25 | $4.20 | |
| 179 | 78011035 | GRV RCSD PVT MRKG 7 | 250,038 | FOOT | $0.5000 | $0.4200 | |
| 180 | 78011045 | GRV RCSD PVT MRKG 9 | 12,638 | FOOT | $0.6000 | $0.5800 | |
| 181 | 78011065 | GRV RCSD PVT MRKG 13 | 2,143 | FOOT | $4.00 | $4.20 | |
| 182 | 78100100 | RAISED REFL PAVT MKR | 5,102 | EACH | $50.00 | $38.83 | |
| 183 | 78112000 | RAISED REFL PAVT MKR BRDG | 43 | EACH | $45.00 | $38.83 | |
| 184 | 78200005 | GRDRAIL REF TYPE A | 158 | EACH | $13.00 | $10.50 | |
| 185 | 78200011 | BARR WALL REF TYPE C | 7 | EACH | $50.00 | $10.70 | |
| 186 | 78200021 | HT CBL MED BAR REF | 156 | EACH | $0.0100 | $10.50 | |
| 187 | 78300200 | RAISED REF PVT MK REM | 1,527 | EACH | $20.00 | $5.36 | |
| 188 | 78300201 | PVT MKG REM GRINDING | 188,520 | SQ FT | $0.0100 | $0.0100 |