1-BR-1
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Stutz Excavating, Inc. Low bidder | $4,611,184 | ||
| 2 | Keeley & Sons, Inc. | $6,337,170 | +37.4% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Stutz Excavatin… | #2 Keeley & Sons, … |
|---|---|---|---|---|---|---|---|
| 1 | X4401981 | CONC BAR BASE REMOVAL | 537 | SQ FT | $7.50 | $21.45 | |
| 2 | X5017311 | REM EX PROTEC SHIELD | 2,250 | SQ YD | $33.50 | $25.50 | |
| 3 | X5030250 | BR DECK GROOVING LONG | 2,310 | SQ YD | $12.15 | $11.52 | |
| 4 | X5030353 | CONC WEAR SURF 5.25 | 417 | SQ YD | $180.00 | $67.45 | |
| 5 | X5040100 | PREC BRIDGE APP SLAB | 3,775 | SQ FT | $58.00 | $84.15 | |
| 6 | X5051206 | STRUCT STEEL REPAIR | 5,400 | POUND | $16.75 | $21.45 | |
| 7 | X5080530 | BAR TERMINATORS | 388 | EACH | $25.00 | $32.59 | |
| 8 | X5230176 | DRAINAGE SCUPPR DS-12 | 6 | EACH | $3,215.00 | $3,568.25 | |
| 9 | X6061300 | CONC MED TSB6.06 DOW | 370 | SQ FT | $22.00 | $26.45 | |
| 10 | X6430120 | REM IMP ATTEN NO SALV | 1 | EACH | $1,320.00 | $2,968.52 | |
| 11 | X6431110 | REM ATTEN BASE | 1 | EACH | $775.00 | $3,257.42 | |
| 12 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $12,595.00 | $45,985.25 | |
| 13 | X7200201 | WIDTH RESTRICT SIGN | 1 | L SUM | $5,720.00 | $4,500.00 | |
| 14 | X7830050 | RRPM REFLECTOR REMOVL | 50 | EACH | $15.00 | $15.75 | |
| 15 | Z0001899 | JACK & REM EX BEARING | 48 | EACH | $603.00 | $835.55 | |
| 16 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $93,000.00 | $42,500.00 | |
| 17 | Z0024475 | TUBULAR MARKER | 3 | EACH | $143.00 | $840.00 | |
| 18 | Z0029090 | DIAMOND GRIND BR SEC | 2,609 | SQ YD | $15.85 | $11.00 | |
| 19 | Z0076600 | TRAINEES | 3,000 | HOUR | $0.8000 | $0.8000 | |
| 20 | Z0076604 | TRAINEES TPG | 3,000 | HOUR | $15.00 | $15.00 | |
| 21 | 20200100 | EARTH EXCAVATION | 110 | CU YD | $112.00 | $42.56 | |
| 22 | 20700220 | POROUS GRAN EMBANK | 21 | CU YD | $275.00 | $129.85 | |
| 23 | 25000200 | SEEDING CL 2 | 0.25 | ACRE | $10,300.00 | $21,000.00 | |
| 24 | 25000400 | NITROGEN FERT NUTR | 30 | POUND | $6.50 | $5.25 | |
| 25 | 25000500 | PHOSPHORUS FERT NUTR | 30 | POUND | $6.50 | $5.25 | |
| 26 | 25000600 | POTASSIUM FERT NUTR | 30 | POUND | $6.50 | $5.25 | |
| 27 | 25100115 | MULCH METHOD 2 | 0.25 | ACRE | $8,150.00 | $21,000.00 | |
| 28 | 25100630 | EROSION CONTR BLANKET | 136 | SQ YD | $11.75 | $5.25 | |
| 29 | 28000400 | PERIMETER EROS BAR | 782 | FOOT | $4.00 | $5.25 | |
| 30 | 28000500 | INLET & PIPE PROTECT | 4 | EACH | $265.00 | $1,575.00 | |
| 31 | 31102100 | SUB GRAN MAT C 4 | 522 | SQ YD | $17.75 | $47.04 | |
| 32 | 40600290 | BIT MATLS TACK CT | 1,221 | POUND | $6.00 | $2.15 | |
| 33 | 40600982 | HMA SURF REM BUTT JT | 1,548 | SQ YD | $11.50 | $36.81 | |
| 34 | 40602975 | HMA BC IL-9.5FG N90 | 107 | TON | $336.00 | $347.73 | |
| 35 | 40604164 | P HMA SC IL-9.5 D N90 | 128 | TON | $325.00 | $343.62 | |
| 36 | 42000080 | PVT CON PCC BR APP SL | 686 | SQ YD | $138.50 | $429.68 | |
| 37 | 42001300 | PROTECTIVE COAT | 2,344 | SQ YD | $2.10 | $5.15 | |
| 38 | 44000100 | PAVEMENT REM | 871 | SQ YD | $40.00 | $25.45 | |
| 39 | 44000500 | COMB CURB GUTTER REM | 617 | FOOT | $11.50 | $21.46 | |
| 40 | 44001980 | CONC BARRIER REMOV | 135 | FOOT | $68.00 | $34.51 | |
| 41 | 44003100 | MEDIAN REMOVAL | 3,515 | SQ FT | $7.00 | $2.45 | |
| 42 | 44004250 | PAVED SHLD REMOVAL | 466 | SQ YD | $14.40 | $18.24 | |
| 43 | 48102100 | AGG WEDGE SHLD TYPE B | 111 | TON | $53.00 | $172.33 | |
| 44 | 48203029 | HMA SHOULDERS 8 | 432 | SQ YD | $85.50 | $132.08 | |
| 45 | 50102400 | CONC REM | 53.8 | CU YD | $368.00 | $1,152.14 | |
| 46 | 50104650 | SLOPE WALL REMOV | 121 | SQ YD | $25.00 | $65.87 | |
| 47 | 50104720 | REM EXIST CONC DECK | 1 | EACH | $192,000.00 | $348,512.49 | |
| 48 | 50157300 | PROTECTIVE SHIELD | 1,454 | SQ YD | $53.40 | $55.00 | |
| 49 | 50200100 | STRUCTURE EXCAVATION | 302 | CU YD | $62.00 | $34.89 | |
| 50 | 50300225 | CONC STRUCT | 64 | CU YD | $1,016.00 | $1,452.75 | |
| 51 | 50300255 | CONC SUP-STR | 904.5 | CU YD | $1,375.00 | $2,154.87 | |
| 52 | 50300300 | PROTECTIVE COAT | 3,352 | SQ YD | $2.10 | $4.98 | |
| 53 | 50500405 | F & E STRUCT STEEL | 14,920 | POUND | $8.21 | $8.90 | |
| 54 | 50500505 | STUD SHEAR CONNECTORS | 10,188 | EACH | $4.65 | $4.95 | |
| 55 | 50800205 | REINF BARS, EPOXY CTD | 215,270 | POUND | $1.80 | $2.15 | |
| 56 | 50800515 | BAR SPLICERS | 2,478 | EACH | $34.75 | $49.98 | |
| 57 | 51100100 | SLOPE WALL 4 | 121 | SQ YD | $177.25 | $212.98 | |
| 58 | 51500100 | NAME PLATES | 1 | EACH | $1,612.00 | $1,750.00 | |
| 59 | 52000110 | PREF JT STRIP SEAL | 182 | FOOT | $262.30 | $487.55 | |
| 60 | 52100010 | ELAST BEARING ASSY T1 | 48 | EACH | $2,250.00 | $2,746.85 | |
| 61 | 52100510 | ANCHOR BOLTS 3/4 | 96 | EACH | $110.00 | $98.52 | |
| 62 | 52100530 | ANCHOR BOLTS 1 1/4 | 48 | EACH | $175.00 | $148.70 | |
| 63 | 52200010 | TEMP SHT PILING | 841 | SQ FT | $78.00 | $69.52 | |
| 64 | 53212754 | STR REP CON DP = < 5 | 167 | SQ FT | $153.00 | $193.45 | |
| 65 | 54210182 | PIPE ELBOW 12 | 2 | EACH | $580.00 | $879.80 | |
| 66 | 54262712 | METAL FL END SEC 12" | 2 | EACH | $750.00 | $665.00 | |
| 67 | 58600101 | GRANULAR BACKFILL STR | 280 | CU YD | $81.00 | $79.52 | |
| 68 | 59000200 | EPOXY CRACK INJECTION | 219 | FOOT | $79.00 | $111.20 | |
| 69 | 59100100 | GEOCOMPOSITE WALL DR | 153 | SQ YD | $49.00 | $49.89 | |
| 70 | 60100945 | PIPE DRAINS 12 | 18 | FOOT | $208.00 | $94.52 | |
| 71 | 60146304 | P UNDR FOR STRUCT 4 | 266 | FOOT | $43.50 | $15.55 | |
| 72 | 60619200 | CONC MED TSB6.06 | 3,185 | SQ FT | $21.40 | $17.85 | |
| 73 | 61000050 | CONC THRUST BLOCKS | 2 | EACH | $600.00 | $1,498.47 | |
| 74 | 61000335 | TY G INLET BOX 610001 | 2 | EACH | $5,250.00 | $7,216.25 | |
| 75 | 63000001 | SPBGR TY A 6FT POSTS | 100 | FOOT | $36.00 | $34.65 | |
| 76 | 63000003 | SPBGR TY A 9FT POSTS | 600 | FOOT | $43.20 | $41.22 | |
| 77 | 63100045 | TRAF BAR TERM T2 | 2 | EACH | $2,200.00 | $2,100.00 | |
| 78 | 63100085 | TRAF BAR TERM T6 | 4 | EACH | $4,150.00 | $3,963.75 | |
| 79 | 63100167 | TR BAR TRM T1 SPL TAN | 1 | EACH | $3,740.00 | $3,570.00 | |
| 80 | 63200310 | GUARDRAIL REMOV | 983 | FOOT | $8.25 | $12.41 | |
| 81 | 63700280 | CONC BAR 2F 44HT | 64 | FOOT | $254.00 | $498.52 | |
| 82 | 63700805 | CONC BAR TRANS | 10 | FOOT | $535.00 | $741.25 | |
| 83 | 63700900 | CONC BARRIER BASE | 74 | FOOT | $91.00 | $42.15 | |
| 84 | 64300260 | IMP ATTEN FRD NAR TL3 | 1 | EACH | $22,275.00 | $21,026.25 | |
| 85 | 64301090 | ATTENUATOR BASE | 10 | SQ YD | $214.00 | $298.46 | |
| 86 | 66201120 | CONC SHLD CURB | 560 | FOOT | $41.00 | $46.58 | |
| 87 | 67000400 | ENGR FIELD OFFICE A | 12 | CAL MO | $2,420.00 | $4,250.00 | |
| 88 | 67100100 | MOBILIZATION | 1 | L SUM | $240,000.00 | $378,985.24 | |
| 89 | 70100325 | TRAF CONT-PROT 701423 | 1 | EACH | $43,425.00 | $33,495.00 | |
| 90 | 70100420 | TRAF CONT-PROT 701411 | 1 | EACH | $2,640.00 | $682.50 | |
| 91 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $6,050.00 | $5,775.00 | |
| 92 | 70103815 | TR CONT SURVEILLANCE | 90 | CAL DA | $360.00 | $25.00 | |
| 93 | 70107025 | CHANGEABLE MESSAGE SN | 280 | CAL DA | $43.00 | $63.00 | |
| 94 | 70200100 | NIGHT WORK ZONE LIGHT | 1 | L SUM | $2,750.00 | $7,500.00 | |
| 95 | 70300100 | SHORT TERM PAVT MKING | 2,292 | FOOT | $2.50 | $4.95 | |
| 96 | 70300150 | SHRT TRM PAVT MK REM | 908 | SQ FT | $3.85 | $2.50 | |
| 97 | 70307120 | TEMP PVT MK L4 T4 TAPE | 18,598 | FOOT | $2.42 | $1.89 | |
| 98 | 70307140 | TEMP PVT MK L8 T4 TAPE | 4,321 | FOOT | $3.65 | $3.78 | |
| 99 | 70400100 | TEMP CONC BARRIER | 1,962.5 | FOOT | $48.40 | $52.14 | |
| 100 | 70400125 | PIN TEMP CONC BARRIER | 483 | EACH | $24.75 | $95.85 | |
| 101 | 70400200 | REL TEMP CONC BARRIER | 1,862.5 | FOOT | $4.45 | $16.85 | |
| 102 | 70600260 | IMP ATTN TEMP FRN TL3 | 2 | EACH | $14,900.00 | $35,498.00 | |
| 103 | 70600332 | IMP ATTN REL FRN TL3 | 2 | EACH | $1,870.00 | $5,500.00 | |
| 104 | 72000100 | SIGN PANEL T1 | 5 | SQ FT | $50.00 | $375.00 | |
| 105 | 72400100 | REMOV SIN PAN ASSY TA | 1 | EACH | $125.00 | $1,950.25 | |
| 106 | 72400600 | RELOC SIN PAN ASSY TB | 1 | EACH | $650.00 | $2,498.47 | |
| 107 | 72501000 | TERMINAL MARKER - DA | 1 | EACH | $46.00 | $44.36 | |
| 108 | 72800100 | TELES STL SIN SUPPORT | 10 | FOOT | $50.00 | $359.48 | |
| 109 | 73100100 | BASE TEL STL SIN SUPP | 1 | EACH | $500.00 | $1,970.00 | |
| 110 | 78000100 | THPL PVT MK LTR & SYM | 18 | SQ FT | $11.00 | $43.58 | |
| 111 | 78000400 | THPL PVT MK LINE 6 | 8,375 | FOOT | $1.85 | $2.10 | |
| 112 | 78000500 | THPL PVT MK LINE 8 | 2,009 | FOOT | $2.95 | $2.89 | |
| 113 | 78009006 | MOD URETH PM LINE 6 | 2,385 | FOOT | $5.50 | $3.78 | |
| 114 | 78100100 | RAISED REFL PAVT MKR | 22 | EACH | $220.00 | $210.00 | |
| 115 | 78100300 | REPLACEMENT REFLECTOR | 50 | EACH | $42.90 | $40.95 | |
| 116 | 78200005 | GRDRAIL REF TYPE A | 13 | EACH | $12.00 | $12.60 | |
| 117 | 78200011 | BARR WALL REF TYPE C | 34 | EACH | $16.50 | $25.00 | |
| 118 | 78200020 | CURB REFLECTORS | 45 | EACH | $16.50 | $15.75 | |
| 119 | 78300200 | RAISED REF PVT MK REM | 22 | EACH | $75.00 | $23.10 | |
| 120 | 78300202 | PVT MKG REM WTR BLAST | 4,932 | SQ FT | $1.40 | $3.42 |