(57-18,9-1,57-5,57-19)RS
- Let date
- Friday, March 7, 2025
- Contract
- 70D55 · job page
- District
- District 5
- County
- Mclean
- Highway
- Limits
- 10.76 miles of pavement rehab - Designed Overlay Resurfacing (INT-3rd), underdrains, patching, paving and low speed weigh in motion scale from 0.3 mile west of TR 90 (725 E Rd) south of Carlock to I-55 north of Normal (including ramps and Carlock weigh stations).
- Classification
- ·
- Project number
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Rowe Construction, a div of UCM, Inc. Low bidder | $36,874,418 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Rowe Constructi… |
|---|---|---|---|---|---|---|
| 1 | X0322278 | RODENT SHIELDS | 308 | EACH | $32.34 | |
| 2 | X0325110 | BIAXIAL GEOGRID | 8,668 | SQ YD | $4.40 | |
| 3 | X1400273 | REM TWR LMNR NO SLVG | 128 | EACH | $736.89 | |
| 4 | X3110102 | COARSE AGR BACKFIL SPL | 431 | CU YD | $643.39 | |
| 5 | X4420519 | CL A PATCH T2 7 SPL | 147 | SQ YD | $214.50 | |
| 6 | X4420634 | CL A PATCH T4 15 SPL | 2,534 | SQ YD | $286.00 | |
| 7 | X4422152 | CL A PATCH T2 15.5 SPL | 120 | SQ YD | $308.00 | |
| 8 | X6015000 | REM CONC HDWL P DRNS | 317 | EACH | $200.00 | |
| 9 | X6050222 | FILL INLETS TEMPORARY | 1 | EACH | $2,865.46 | |
| 10 | X6060101 | CL SI CONC PIPE UD OL | 463 | CU YD | $1,911.72 | |
| 11 | X6431110 | REM ATTEN BASE | 5 | EACH | $2,233.02 | |
| 12 | X6431120 | REM IMP ATTEN SM | 16 | EACH | $2,412.52 | |
| 13 | X6440130 | REP HTC (GIBRALTAR) | 32,487 | FOOT | $19.56 | |
| 14 | X7010118 | TEMP RUMBLE STRIPS SP | 30 | EACH | $3,183.59 | |
| 15 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $1,329,611.04 | |
| 16 | X7011854 | REAL-TIME TR CONT CBU | 12 | CAL MO | $2,497.00 | |
| 17 | X7011860 | REAL-TIME TR CON W SGN | 114 | CAL MO | $544.50 | |
| 18 | X7011862 | REAL-TIME TR MON SU | 228 | CAL MO | $275.00 | |
| 19 | X7200201 | WIDTH RESTRICT SIGN | 1 | L SUM | $8,778.00 | |
| 20 | X8110105 | REMOV COND ATT TO STR | 175 | FOOT | $90.44 | |
| 21 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $65,000.00 | |
| 22 | Z0016702 | DETOUR SIGNING | 1 | L SUM | $15,000.00 | |
| 23 | Z0026290 | F&I WEIGH-IN-MOT COMP | 1 | L SUM | $646,345.18 | |
| 24 | Z0040530 | PIPE UNDERDRAIN REMOV | 189,773 | FOOT | $4.50 | |
| 25 | Z0076600 | TRAINEES | 2,500 | HOUR | $0.8000 | |
| 26 | Z0076604 | TRAINEES TPG | 2,500 | HOUR | $15.00 | |
| 27 | Z0076870 | UNDR CONNECT TO STR | 36 | EACH | $880.00 | |
| 28 | 20400800 | FURNISHED EXCAVATION | 658 | CU YD | $107.51 | |
| 29 | 21400100 | GRADING & SHAP DITCH | 6,660 | FOOT | $8.00 | |
| 30 | 25000210 | SEEDING CL 2A | 2.5 | ACRE | $43,616.20 | |
| 31 | 25000400 | NITROGEN FERT NUTR | 225 | POUND | $5.23 | |
| 32 | 25000500 | PHOSPHORUS FERT NUTR | 225 | POUND | $5.23 | |
| 33 | 25000600 | POTASSIUM FERT NUTR | 225 | POUND | $5.23 | |
| 34 | 25100115 | MULCH METHOD 2 | 2.5 | ACRE | $0.0100 | |
| 35 | 25100630 | EROSION CONTR BLANKET | 8,596 | SQ YD | $12.33 | |
| 36 | 28000250 | TEMP EROS CONTR SEED | 1,200 | POUND | $5.37 | |
| 37 | 28100207 | STONE RIPRAP CL A4 | 150 | TON | $194.25 | |
| 38 | 30300112 | AGG SUBGRADE IMPR 12 | 8,000 | SQ YD | $56.82 | |
| 39 | 40600275 | BIT MATLS PR CT | 18,000 | POUND | $1.14 | |
| 40 | 40600290 | BIT MATLS TACK CT | 251,729 | POUND | $1.57 | |
| 41 | 40600372 | LNG JNT SLNT HALF WD | 131,688 | FOOT | $2.00 | |
| 42 | 40600405 | MATL TRANSFER DEVICE | 58,735 | TON | $4.53 | |
| 43 | 40600982 | HMA SURF REM BUTT JT | 1,367 | SQ YD | $31.73 | |
| 44 | 40600985 | PCC SURF REM BUTT JT | 3,600 | SQ YD | $18.75 | |
| 45 | 40600990 | TEMPORARY RAMP | 211 | SQ YD | $58.69 | |
| 46 | 40601005 | HMA REPL OVER PATCH | 20 | TON | $367.84 | |
| 47 | 40603219 | P HMA BC IL-9.5FG N90 | 2,046 | TON | $198.00 | |
| 48 | 40603240 | P HMA BC IL19.0 N90 | 41,966 | TON | $153.25 | |
| 49 | 40604174 | P HMA SC IL-9.5 E N90 | 3,001 | TON | $220.00 | |
| 50 | 40605034 | P SC SMA 12.5 E N80 | 23,713 | TON | $198.50 | |
| 51 | 40800029 | BIT MATLS TACK CT | 717 | POUND | $7.58 | |
| 52 | 40800050 | INCIDENTAL HMA SURF | 134 | TON | $350.00 | |
| 53 | 44000100 | PAVEMENT REM | 8,000 | SQ YD | $111.14 | |
| 54 | 44000155 | HMA SURF REM 1 1/2 | 84,227 | SQ YD | $4.75 | |
| 55 | 44000157 | HMA SURF REM 2 | 86,253 | SQ YD | $5.25 | |
| 56 | 44000162 | HMA SURF REM 3 1/4 | 20,871 | SQ YD | $7.50 | |
| 57 | 44000164 | HMA SURF REM 3 3/4 | 55,971 | SQ YD | $7.50 | |
| 58 | 44000184 | HMA SURF REM 8 1/2 | 82,570 | SQ YD | $13.09 | |
| 59 | 44002234 | HMA RM OV PATCH 8 1/2 | 42 | SQ YD | $185.01 | |
| 60 | 44201007 | CL B PATCH T2 13 | 22 | SQ YD | $313.50 | |
| 61 | 44201063 | CL B PATCH T2 18 | 489 | SQ YD | $357.50 | |
| 62 | 44201299 | DOWEL BARS 1 1/2 | 1,136 | EACH | $28.60 | |
| 63 | 44201765 | CL D PATCH T2 10 | 420 | SQ YD | $274.84 | |
| 64 | 44201769 | CL D PATCH T3 10 | 36 | SQ YD | $268.97 | |
| 65 | 44201771 | CL D PATCH T4 10 | 1,707 | SQ YD | $219.93 | |
| 66 | 44213000 | PATCH REINFORCEMENT | 2,921 | SQ YD | $77.00 | |
| 67 | 44213200 | SAW CUTS | 6,699 | FOOT | $9.90 | |
| 68 | 44213204 | TIE BARS 3/4 | 1,514 | EACH | $19.80 | |
| 69 | 48102100 | AGG WEDGE SHLD TYPE B | 6,561 | TON | $55.00 | |
| 70 | 48203100 | HMA SHOULDERS | 24,221 | TON | $142.00 | |
| 71 | 50800105 | REINFORCEMENT BARS | 10,965 | POUND | $5.34 | |
| 72 | 60100070 | SHOULDER REM & REPL | 185,796 | FOOT | $9.50 | |
| 73 | 60108100 | PIPE UNDERDRAIN 4 SP | 6,076 | FOOT | $14.03 | |
| 74 | 60108501 | PIPE UNDERDR T 3 | 183,484 | FOOT | $10.37 | |
| 75 | 60240220 | INLETS TB T3F&G | 2 | EACH | $3,622.95 | |
| 76 | 63000001 | SPBGR TY A 6FT POSTS | 75 | FOOT | $46.20 | |
| 77 | 63100045 | TRAF BAR TERM T2 | 2 | EACH | $2,640.00 | |
| 78 | 63100167 | TR BAR TRM T1 SPL TAN | 2 | EACH | $4,950.00 | |
| 79 | 63200310 | GUARDRAIL REMOV | 305 | FOOT | $27.50 | |
| 80 | 63400105 | GUARD POSTS | 4 | EACH | $191.67 | |
| 81 | 64200116 | SHOULDER RUM STRIP 16 | 121,468 | FOOT | $0.2800 | |
| 82 | 64300450 | IMP ATTEN NRD TL3 | 16 | EACH | $7,469.00 | |
| 83 | 64301090 | ATTENUATOR BASE | 123 | SQ YD | $250.10 | |
| 84 | 67000500 | ENGR FIELD OFFICE B | 15 | CAL MO | $8,460.47 | |
| 85 | 67100100 | MOBILIZATION | 1 | L SUM | $1,995,000.00 | |
| 86 | 70103815 | TR CONT SURVEILLANCE | 130 | CAL DA | $200.00 | |
| 87 | 70107006 | PAVT MK BLKOUT TAPE 6 | 41,388 | FOOT | $4.00 | |
| 88 | 70107025 | CHANGEABLE MESSAGE SN | 300 | CAL DA | $88.00 | |
| 89 | 70200100 | NIGHT WORK ZONE LIGHT | 1 | L SUM | $65,000.00 | |
| 90 | 70300100 | SHORT TERM PAVT MKING | 15,348 | FOOT | $3.98 | |
| 91 | 70300150 | SHRT TRM PAVT MK REM | 5,122 | SQ FT | $2.17 | |
| 92 | 70300211 | TEMP PVT MK LTR & SYM PAINT | 143 | SQ FT | $11.00 | |
| 93 | 70300221 | TEMP PVT MK LINE 4 - PAINT | 190,148 | FOOT | $0.2600 | |
| 94 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 201,988 | FOOT | $0.4000 | |
| 95 | 70300251 | TEMP PVT MK LINE 8 - PAINT | 11,820 | FOOT | $0.8300 | |
| 96 | 70300261 | TEMP PVT MK LINE 12 - PAINT | 1,581 | FOOT | $2.20 | |
| 97 | 70300281 | TEMP PVT MK LINE 24 - PAINT | 132 | FOOT | $11.00 | |
| 98 | 70307130 | TEMP PVT MK L6 T4 TAPE | 1,388 | FOOT | $5.50 | |
| 99 | 70400100 | TEMP CONC BARRIER | 5,876 | FOOT | $44.00 | |
| 100 | 70400125 | PIN TEMP CONC BARRIER | 1,560 | EACH | $16.50 | |
| 101 | 70400200 | REL TEMP CONC BARRIER | 5,876 | FOOT | $6.88 | |
| 102 | 70600250 | IMP ATTN TEMP NRD TL3 | 10 | EACH | $4,901.66 | |
| 103 | 70600350 | IMP ATTN REL NRD TL3 | 10 | EACH | $996.66 | |
| 104 | 72501000 | TERMINAL MARKER - DA | 2 | EACH | $44.00 | |
| 105 | 78000100 | THPL PVT MK LTR & SYM | 143 | SQ FT | $22.00 | |
| 106 | 78000400 | THPL PVT MK LINE 6 | 201,988 | FOOT | $1.22 | |
| 107 | 78000500 | THPL PVT MK LINE 8 | 11,820 | FOOT | $2.75 | |
| 108 | 78000600 | THPL PVT MK LINE 12 | 1,581 | FOOT | $9.35 | |
| 109 | 78000650 | THPL PVT MK LINE 24 | 132 | FOOT | $22.00 | |
| 110 | 78011000 | GRV RCSD PM LTR & SYM | 143 | SQ FT | $22.00 | |
| 111 | 78011035 | GRV RCSD PVT MRKG 7 | 201,988 | FOOT | $0.8300 | |
| 112 | 78011045 | GRV RCSD PVT MRKG 9 | 11,820 | FOOT | $1.10 | |
| 113 | 78011065 | GRV RCSD PVT MRKG 13 | 1,581 | FOOT | $7.93 | |
| 114 | 78011125 | GRV RCSD PVT MRKG 25 | 132 | FOOT | $22.00 | |
| 115 | 78100100 | RAISED REFL PAVT MKR | 1,993 | EACH | $37.59 | |
| 116 | 78200011 | BARR WALL REF TYPE C | 470 | EACH | $39.30 | |
| 117 | 78200021 | HT CBL MED BAR REF | 482 | EACH | $11.00 | |
| 118 | 78300200 | RAISED REF PVT MK REM | 1,930 | EACH | $13.72 | |
| 119 | 78300201 | PVT MKG REM GRINDING | 43,342 | SQ FT | $0.7200 | |
| 120 | 78300202 | PVT MKG REM WTR BLAST | 87,492 | SQ FT | $0.0100 | |
| 121 | 81028750 | UNDRGRD C CNC 2 | 200 | FOOT | $40.19 | |
| 122 | 81100300 | CON AT ST 1 GALVS | 400 | FOOT | $117.24 | |
| 123 | 81300220 | JUN BX SS AS 6X6X4 | 3 | EACH | $3,081.54 | |
| 124 | 81300530 | JUN BX SS AS 12X10X6 | 1 | EACH | $3,684.45 | |
| 125 | 81603040 | UD 2#6 #8G XLPUSE 1 | 1,000 | FOOT | $69.33 | |
| 126 | 81702110 | EC C XLP USE 1C 10 | 1,200 | FOOT | $5.32 | |
| 127 | 82110016 | LUM LED HGHMST I | 128 | EACH | $3,617.46 | |
| 128 | 82110024 | LUM LED UP WM B | 8 | EACH | $5,493.18 | |
| 129 | 84200600 | REM LT U NO SALV | 8 | EACH | $1,065.14 |