FAP 0311 22 BJ
- Let date
- Friday, January 17, 2025
- Contract
- 62R99 · job page
- District
- District 1
- County
- Cook
- Highway
- Limits
- (1576.49-Ft) The proposed improvement consists of bridge deck overlay, joint replacement, approach slab repairs and substructure repairs of the bridge located on US/ Ogden Avenue over IHB RR in the Village of LaGrange, Cook County
- Classification
- Bridge deck overlay, joint replacement, approach slab repairs and substructure repairs of the bridge located o ·
- Project number
Bidders 5
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Martam Construction Incorporated Low bidder | $1,945,196 | ||
| 2 | Rausch Infrastructure, LLC | $2,155,853 | +10.8% | |
| 3 | Areatha Construction Co., Inc. | $2,167,078 | +11.4% | |
| 4 | D. Construction, Inc. | $2,169,326 | +11.5% | |
| 5 | Lorig Construction Company | $2,284,093 | +17.4% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Martam Construc… | #2 Rausch Infrastr… | #3 Areatha Constru… | #4 D. Construction… | #5 Lorig Construct… |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | X0325748 | ACRYLIC COATING | 34.1 | SQ YD | $98.00 | $78.00 | $70.00 | $110.00 | $85.00 | |
| 2 | X0325749 | FIBER WRAP | 307 | SQ FT | $85.00 | $84.00 | $75.00 | $77.00 | $80.00 | |
| 3 | X0326862 | STRUCTURE ADJ | 5 | EACH | $800.00 | $1,000.00 | $1,393.75 | $0.0100 | $2,200.00 | |
| 4 | X4400501 | CC&G RMVL REPL < = 10 | 100 | FOOT | $85.00 | $130.00 | $70.00 | $50.00 | $180.00 | |
| 5 | X4400503 | CC&G RMVL REPL > 10FT | 100 | FOOT | $72.00 | $125.00 | $70.00 | $50.00 | $150.00 | |
| 6 | X4421768 | CL D PATCH T4 10 SPL | 749 | SQ YD | $115.00 | $94.00 | $30.00 | $112.00 | $89.00 | |
| 7 | X5030250 | BR DECK GROOVING LONG | 4,120 | SQ YD | $4.20 | $4.00 | $3.70 | $4.50 | $4.00 | |
| 8 | X6700407 | ENGRS FLD OFC TY A D1 | 12 | CAL MO | $3,200.00 | $5,500.00 | $2,500.00 | $5,000.00 | $3,500.00 | |
| 9 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $112,000.00 | $38,000.00 | $25,500.00 | $55,000.00 | $300,000.00 | |
| 10 | X7830050 | RRPM REFLECTOR REMOVL | 40 | EACH | $20.00 | $14.00 | $12.50 | $10.00 | $13.00 | |
| 11 | X7830052 | RRPM REFLECTOR REPLAC | 40 | EACH | $20.00 | $16.00 | $15.00 | $16.50 | $25.00 | |
| 12 | X8860105 | DET LOOP REPL | 140 | FOOT | $30.00 | $31.00 | $111.20 | $31.15 | $38.00 | |
| 13 | Z0006016 | BR DK LTX C OLY 2 3/4 | 4,542 | SQ YD | $114.00 | $98.00 | $131.10 | $107.00 | $105.00 | |
| 14 | Z0010605 | CLEAN DRAINAGE SYSTEM | 1 | L SUM | $6,000.00 | $32,000.00 | $7,145.80 | $15,000.00 | $100.00 | |
| 15 | Z0012130 | BR DECK SCAR 3/4 | 4,542 | SQ YD | $44.00 | $38.00 | $73.30 | $45.00 | $62.00 | |
| 16 | Z0012754 | STR REP CON DP = < 5 | 153 | SQ FT | $200.00 | $213.00 | $192.60 | $165.00 | $225.00 | |
| 17 | Z0012755 | STR REP CON DP OVER 5 | 41 | SQ FT | $209.00 | $223.00 | $208.75 | $200.00 | $300.00 | |
| 18 | Z0016001 | DECK SLAB REP (FD-T1) | 7 | SQ YD | $3,200.00 | $3,900.00 | $1,613.45 | $2,500.00 | $4,500.00 | |
| 19 | Z0016002 | DECK SLAB REP (FD-T2) | 1 | SQ YD | $3,000.00 | $18,000.00 | $1,611.55 | $5,000.00 | $4,000.00 | |
| 20 | Z0018051 | DRAINAGE SCUPPERS ADJ | 8 | EACH | $1,200.00 | $1,100.00 | $1,011.70 | $800.00 | $1,000.00 | |
| 21 | Z0029090 | DIAMOND GRIND BR SEC | 4,206 | SQ YD | $6.60 | $6.00 | $7.55 | $7.00 | $6.25 | |
| 22 | Z0030850 | TEMP INFO SIGNING | 58 | SQ FT | $20.00 | $22.00 | $20.00 | $25.00 | $22.00 | |
| 23 | Z0041895 | POLYMER CONCRETE | 10 | CU FT | $950.00 | $1,200.00 | $1,657.10 | $1,750.00 | $2,200.00 | |
| 24 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $8,000.00 | $27,000.00 | $50,000.00 | $7,500.00 | $12,000.00 | |
| 25 | Z0073200 | TEMP SHORING & CRIB | 5 | EACH | $9,800.00 | $9,500.00 | $5,500.00 | $10,000.00 | $5,000.00 | |
| 26 | Z0073510 | TEMP TR SIGNAL TIMING | 2 | EACH | $900.00 | $675.00 | $600.00 | $910.80 | $1,000.00 | |
| 27 | 40600290 | BIT MATLS TACK CT | 198 | POUND | $0.1000 | $0.0100 | $10.00 | $0.0100 | $0.1000 | |
| 28 | 40600400 | MIX CR JTS FLANGEWYS | 20 | TON | $250.00 | $268.00 | $635.00 | $0.0100 | $250.00 | |
| 29 | 40600985 | PCC SURF REM BUTT JT | 525 | SQ YD | $12.00 | $21.00 | $11.30 | $0.0100 | $20.00 | |
| 30 | 40604172 | P HMA SC IL-9.5 E N70 | 387 | TON | $156.00 | $157.00 | $132.00 | $170.00 | $145.00 | |
| 31 | 44201765 | CL D PATCH T2 10 | 64 | SQ YD | $120.00 | $109.00 | $77.00 | $175.00 | $105.00 | |
| 32 | 50102400 | CONC REM | 60.1 | CU YD | $1,800.00 | $2,200.00 | $2,159.00 | $2,500.00 | $2,600.00 | |
| 33 | 50157300 | PROTECTIVE SHIELD | 1,767 | SQ YD | $32.00 | $102.00 | $5.00 | $85.00 | $45.00 | |
| 34 | 50300255 | CONC SUP-STR | 67.1 | CU YD | $2,100.00 | $3,300.00 | $3,442.00 | $3,000.00 | $2,000.00 | |
| 35 | 50300300 | PROTECTIVE COAT | 5,332 | SQ YD | $1.00 | $5.00 | $1.75 | $3.00 | $1.65 | |
| 36 | 50800205 | REINF BARS, EPOXY CTD | 9,460 | POUND | $3.00 | $2.00 | $3.25 | $3.00 | $2.75 | |
| 37 | 50800515 | BAR SPLICERS | 84 | EACH | $63.00 | $139.00 | $37.40 | $45.00 | $90.00 | |
| 38 | 52000025 | PREF JOINT SEAL 2 | 42 | FOOT | $95.00 | $487.00 | $89.00 | $120.00 | $115.00 | |
| 39 | 52000110 | PREF JT STRIP SEAL | 349 | FOOT | $235.00 | $286.00 | $414.65 | $250.00 | $310.00 | |
| 40 | 58700300 | CONCRETE SEALER | 1,955 | SQ FT | $2.00 | $2.00 | $3.40 | $3.00 | $4.00 | |
| 41 | 59000200 | EPOXY CRACK INJECTION | 111 | FOOT | $66.00 | $67.00 | $60.00 | $100.00 | $54.00 | |
| 42 | 67100100 | MOBILIZATION | 1 | L SUM | $110,000.00 | $129,000.00 | $131,100.00 | $122,750.00 | $110,000.00 | |
| 43 | 70107025 | CHANGEABLE MESSAGE SN | 84 | CAL DA | $35.00 | $56.00 | $50.00 | $85.00 | $55.00 | |
| 44 | 70307100 | TEMP PVT MK LTR & SYM T4 TAPE | 73 | SQ FT | $11.00 | $8.10 | $7.20 | $5.00 | $7.50 | |
| 45 | 70307120 | TEMP PVT MK L4 T4 TAPE | 12,636 | FOOT | $1.30 | $1.30 | $1.20 | $3.00 | $1.20 | |
| 46 | 70307130 | TEMP PVT MK L6 T4 TAPE | 38 | FOOT | $7.00 | $2.00 | $1.80 | $4.00 | $2.00 | |
| 47 | 70307210 | TEMP PVT MK L24 T4 TAPE | 13 | FOOT | $22.00 | $8.10 | $7.20 | $6.00 | $8.00 | |
| 48 | 70400100 | TEMP CONC BARRIER | 1,000 | FOOT | $22.00 | $29.00 | $33.95 | $30.00 | $27.00 | |
| 49 | 70400200 | REL TEMP CONC BARRIER | 1,000 | FOOT | $8.00 | $4.00 | $6.25 | $15.00 | $6.00 | |
| 50 | 70600235 | IMP ATTN TEMP FRD TL2 | 2 | EACH | $4,800.00 | $4,900.00 | $4,368.00 | $6,500.00 | $6,500.00 | |
| 51 | 70600322 | IMP ATTN REL FRN TL2 | 2 | EACH | $2,200.00 | $2,200.00 | $1,988.00 | $2,000.00 | $5,000.00 | |
| 52 | 78000100 | THPL PVT MK LTR & SYM | 73 | SQ FT | $9.00 | $5.90 | $5.25 | $5.78 | $7.20 | |
| 53 | 78000200 | THPL PVT MK LINE 4 | 6,272 | FOOT | $1.30 | $0.8000 | $0.8000 | $0.8600 | $1.20 | |
| 54 | 78000400 | THPL PVT MK LINE 6 | 514 | FOOT | $2.20 | $1.50 | $1.35 | $1.49 | $1.80 | |
| 55 | 78000600 | THPL PVT MK LINE 12 | 165 | FOOT | $4.40 | $2.90 | $2.65 | $2.92 | $7.20 | |
| 56 | 78004635 | PREF PL PM TD STD L 7 | 388 | FOOT | $16.00 | $12.90 | $11.50 | $12.65 | $10.00 | |
| 57 | 78009004 | MOD URETH PM LINE 4 | 4,376 | FOOT | $2.20 | $1.50 | $1.40 | $1.54 | $2.00 | |
| 58 | 78009012 | MOD URETH PM LINE 12 | 112 | FOOT | $7.00 | $4.70 | $4.20 | $4.62 | $6.10 | |
| 59 | 78011040 | GRV RCSD PVT MRKG 8 | 388 | FOOT | $8.00 | $7.80 | $7.00 | $7.70 | $9.20 | |
| 60 | 78100100 | RAISED REFL PAVT MKR | 16 | EACH | $260.00 | $300.00 | $270.00 | $297.00 | $235.00 | |
| 61 | 78300200 | RAISED REF PVT MK REM | 16 | EACH | $30.00 | $11.20 | $15.00 | $10.00 | $25.00 | |
| 62 | 78300202 | PVT MKG REM WTR BLAST | 7,994 | SQ FT | $1.30 | $1.10 | $1.00 | $5.00 | $1.00 |