2025-2023-PP
- Let date
- Friday, April 24, 2026
- Contract
- 80B68 · job page
- District
- District 1
- County
- Dupage
- Highway
- Limits
- (13,313-Ft) This work consists of concrete surface removal, placement of HMA binder and surface courses, pavement patching, placement of pavement markings, ADA improvements. The project is located along FAP Route 338 (IL 59) and extends from McCoy drive to Artesian Road in DuPage County Illinois.
- Classification
- Concrete surface removal, placement of HMA binder and surface courses, pavement patching, placement of pavemen ·
- Project number
Bidders 3
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | D. Construction, Inc. Low bidder | $4,613,164 | ||
| 2 | K-Five Construction Corporation | $4,705,556 | +2.0% | |
| 3 | Plote Construction, Inc. | $5,811,544 | +26.0% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 D. Construction… | #2 K-Five Construc… | #3 Plote Construct… |
|---|---|---|---|---|---|---|---|---|
| 1 | X0320050 | CONSTRUCTN LAYOUT SPL | 1 | L SUM | $132,000.00 | $5,600.00 | $9,900.00 | |
| 2 | X1400367 | PED SIGNAL POST 10 FT | 1 | EACH | $1,462.53 | $1,329.57 | $1,329.57 | |
| 3 | X1400378 | PED SIGNAL POST 5 FT | 8 | EACH | $1,193.57 | $1,085.06 | $1,085.06 | |
| 4 | X1400450 | REBLD EX HD HANDHOLE | 9 | EACH | $3,409.36 | $3,099.42 | $3,099.42 | |
| 5 | X4400100 | PCC SURF REM VAR DP | 35,429 | SQ YD | $2.00 | $2.25 | $3.50 | |
| 6 | X4400501 | CC&G RMVL REPL < = 10 | 1,106 | FOOT | $45.00 | $57.00 | $94.00 | |
| 7 | X4400503 | CC&G RMVL REPL > 10FT | 3,293 | FOOT | $40.00 | $55.00 | $83.00 | |
| 8 | X5537800 | SS CLEANED 12 | 1,000 | FOOT | $16.50 | $2.00 | $1.00 | |
| 9 | X6030310 | FR & LIDS ADJUST SPL | 16 | EACH | $850.00 | $1,250.00 | $1,250.00 | |
| 10 | X7200061 | TEMP INFO SIGNING | 189 | SQ FT | $30.00 | $15.00 | $15.00 | |
| 11 | X8140238 | REBLD EX DBL HANDHOLE | 1 | EACH | $4,334.74 | $3,940.67 | $3,940.67 | |
| 12 | X8760200 | ACCESSIBLE PED SIGNAL | 26 | EACH | $2,677.31 | $2,433.92 | $2,433.92 | |
| 13 | X8780012 | CONC FDN TY A 12D | 40 | FOOT | $400.55 | $364.14 | $364.14 | |
| 14 | X8860105 | DET LOOP REPL | 6,209 | FOOT | $28.82 | $26.20 | $26.20 | |
| 15 | Z0018500 | DRAINAGE STR CLEANED | 198 | EACH | $605.00 | $340.00 | $325.00 | |
| 16 | Z0033044 | RE-OPTIMIZE TR SIG SYS 1 | 5 | EACH | $792.00 | $720.00 | $720.00 | |
| 17 | Z0076604 | TRAINEES TPG | 500 | HOUR | $15.00 | $15.00 | $15.00 | |
| 18 | 20200100 | EARTH EXCAVATION | 95 | CU YD | $100.00 | $63.00 | $70.00 | |
| 19 | 21101615 | TOPSOIL F & P 4 | 1,129 | SQ YD | $0.1100 | $9.15 | $9.15 | |
| 20 | 25200110 | SODDING SALT TOLERANT | 1,129 | SQ YD | $26.79 | $14.05 | $14.05 | |
| 21 | 25200200 | SUPPLE WATERING | 61 | UNIT | $27.50 | $1.00 | $1.00 | |
| 22 | 28000400 | PERIMETER EROS BAR | 825 | FOOT | $3.85 | $4.00 | $4.00 | |
| 23 | 28000510 | INLET FILTERS | 237 | EACH | $275.00 | $200.00 | $200.00 | |
| 24 | 31101200 | SUB GRAN MAT B 4 | 6 | SQ YD | $100.00 | $50.00 | $110.00 | |
| 25 | 35400500 | PCC BASE CSE W 10 | 6 | SQ YD | $500.00 | $200.00 | $250.00 | |
| 26 | 40600290 | BIT MATLS TACK CT | 77,751 | POUND | $0.0100 | $1.00 | $0.0100 | |
| 27 | 40600370 | LONG JOINT SEALANT | 72,606 | FOOT | $2.60 | $2.53 | $1.75 | |
| 28 | 40600400 | MIX CR JTS FLANGEWYS | 218 | TON | $0.0100 | $50.00 | $80.00 | |
| 29 | 40600982 | HMA SURF REM BUTT JT | 514 | SQ YD | $0.0100 | $0.0100 | $20.00 | |
| 30 | 40600985 | PCC SURF REM BUTT JT | 3,110 | SQ YD | $0.0100 | $0.0100 | $22.00 | |
| 31 | 40603200 | P HMA BC IL-4.75 N50 | 5,006 | TON | $104.16 | $125.00 | $145.00 | |
| 32 | 40605026 | P HMA SC SMA 9.5 F N80 | 12,481 | TON | $122.00 | $128.00 | $130.00 | |
| 33 | 42001300 | PROTECTIVE COAT | 2,334 | SQ YD | $1.00 | $1.50 | $0.0100 | |
| 34 | 42400200 | PC CONC SIDEWALK 5 | 7,616 | SQ FT | $10.00 | $10.00 | $13.00 | |
| 35 | 42400800 | DETECTABLE WARNINGS | 498 | SQ FT | $30.00 | $36.00 | $38.00 | |
| 36 | 44000160 | HMA SURF REM 2 3/4 | 538 | SQ YD | $10.00 | $5.00 | $19.00 | |
| 37 | 44000500 | COMB CURB GUTTER REM | 891 | FOOT | $12.00 | $10.00 | $7.00 | |
| 38 | 44000600 | SIDEWALK REM | 7,200 | SQ FT | $3.00 | $2.50 | $3.50 | |
| 39 | 44003100 | MEDIAN REMOVAL | 316 | SQ FT | $3.50 | $30.00 | $5.80 | |
| 40 | 44003510 | MEDIAN REMOVAL (PD) | 2,584 | SQ FT | $4.00 | $0.6000 | $17.00 | |
| 41 | 44201761 | CL D PATCH T1 10 | 640 | SQ YD | $110.00 | $29.00 | $165.00 | |
| 42 | 44201765 | CL D PATCH T2 10 | 1,277 | SQ YD | $105.00 | $29.00 | $160.00 | |
| 43 | 44201769 | CL D PATCH T3 10 | 1,912 | SQ YD | $100.00 | $29.00 | $155.00 | |
| 44 | 44201771 | CL D PATCH T4 10 | 2,550 | SQ YD | $95.00 | $29.00 | $155.00 | |
| 45 | 60257900 | MAN RECONST | 3 | EACH | $2,500.00 | $1,250.00 | $1,250.00 | |
| 46 | 60262700 | INLETS RECONST | 16 | EACH | $2,000.00 | $850.00 | $850.00 | |
| 47 | 60300105 | FR & GRATES ADJUST | 10 | EACH | $500.00 | $450.00 | $450.00 | |
| 48 | 60300305 | FR & LIDS ADJUST | 10 | EACH | $500.00 | $550.00 | $550.00 | |
| 49 | 60404950 | FR & GRATES T24 | 10 | EACH | $600.00 | $485.00 | $485.00 | |
| 50 | 60406000 | FR & LIDS T1 OL | 5 | EACH | $600.00 | $450.00 | $450.00 | |
| 51 | 60406100 | FR & LIDS T1 CL | 5 | EACH | $600.00 | $450.00 | $450.00 | |
| 52 | 60603800 | COMB CC&G TB6.12 | 299 | FOOT | $40.00 | $42.00 | $65.00 | |
| 53 | 60605000 | COMB CC&G TY B-6.24 | 592 | FOOT | $40.00 | $48.00 | $66.00 | |
| 54 | 60618300 | CONC MEDIAN SURF 4 | 673 | SQ FT | $12.00 | $15.00 | $12.00 | |
| 55 | 60620000 | CONC MED TSB6.24 | 221 | SQ FT | $30.00 | $25.00 | $44.00 | |
| 56 | 66900200 | NON SPL WASTE DISPOSL | 95 | CU YD | $100.00 | $93.66 | $85.00 | |
| 57 | 66900530 | SOIL DISPOSAL ANALY | 3 | EACH | $1,750.00 | $800.00 | $1,280.00 | |
| 58 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,250.00 | $5,600.00 | $3,500.00 | |
| 59 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,250.00 | $500.00 | $1,000.00 | |
| 60 | 66901006 | REG SUB MON | 3 | CAL DA | $1,000.00 | $715.00 | $1,200.00 | |
| 61 | 67100100 | MOBILIZATION | 1 | L SUM | $140,000.00 | $293,000.00 | $228,000.00 | |
| 62 | 70102630 | TR CONT & PROT 701601 | 1 | L SUM | $81,500.00 | $371,357.26 | $360,000.00 | |
| 63 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $0.0100 | $6,422.00 | $9,000.00 | |
| 64 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $0.0100 | $6,422.00 | $9,000.00 | |
| 65 | 70300100 | SHORT TERM PAVT MKING | 27,022 | FOOT | $0.0100 | $0.0100 | $1.20 | |
| 66 | 70300150 | SHRT TRM PAVT MK REM | 9,008 | SQ FT | $0.0100 | $0.0100 | $3.80 | |
| 67 | 70300211 | TEMP PVT MK LTR & SYM PAINT | 4,809 | SQ FT | $0.0100 | $1.75 | $0.0100 | |
| 68 | 70300221 | TEMP PVT MK LINE 4 - PAINT | 25,049 | FOOT | $0.0100 | $0.3500 | $0.0100 | |
| 69 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 18,809 | FOOT | $0.0100 | $0.5300 | $0.0100 | |
| 70 | 70300251 | TEMP PVT MK LINE 8 - PAINT | 10,411 | FOOT | $0.0100 | $0.7000 | $0.0100 | |
| 71 | 70300261 | TEMP PVT MK LINE 12 - PAINT | 9,951 | FOOT | $0.0100 | $1.06 | $0.0100 | |
| 72 | 70300281 | TEMP PVT MK LINE 24 - PAINT | 2,862 | FOOT | $0.0100 | $1.60 | $0.0100 | |
| 73 | 70307120 | TEMP PVT MK L4 T4 TAPE | 2,703 | FOOT | $0.0100 | $1.20 | $3.00 | |
| 74 | 78000100 | THPL PVT MK LTR & SYM | 2,405 | SQ FT | $5.94 | $5.05 | $6.00 | |
| 75 | 78000200 | THPL PVT MK LINE 4 | 2,073 | FOOT | $0.9900 | $0.9800 | $0.7500 | |
| 76 | 78000400 | THPL PVT MK LINE 6 | 9,208 | FOOT | $1.49 | $1.30 | $1.00 | |
| 77 | 78000500 | THPL PVT MK LINE 8 | 5,206 | FOOT | $1.98 | $1.60 | $2.00 | |
| 78 | 78000600 | THPL PVT MK LINE 12 | 4,976 | FOOT | $2.97 | $2.51 | $3.00 | |
| 79 | 78000650 | THPL PVT MK LINE 24 | 1,431 | FOOT | $5.94 | $5.05 | $6.00 | |
| 80 | 78004630 | PREF PL PM TD STD L 6 | 10,452 | FOOT | $7.21 | $6.50 | $6.00 | |
| 81 | 78011035 | GRV RCSD PVT MRKG 7 | 10,452 | FOOT | $0.6100 | $0.7500 | $1.00 | |
| 82 | 78100100 | RAISED REFL PAVT MKR | 313 | EACH | $46.48 | $40.50 | $40.00 | |
| 83 | 78300200 | RAISED REF PVT MK REM | 313 | EACH | $10.00 | $22.08 | $0.0100 | |
| 84 | 81028200 | UNDRGRD C GALVS 2 | 92 | FOOT | $168.87 | $153.52 | $153.52 | |
| 85 | 85000200 | MAIN EX TR SIG INSTAL | 7 | EACH | $1,770.09 | $1,609.17 | $1,609.17 | |
| 86 | 87301215 | ELCBL C SIGNAL 14 2C | 2,347 | FOOT | $3.77 | $3.43 | $3.43 | |
| 87 | 87301225 | ELCBL C SIGNAL 14 3C | 1,693 | FOOT | $3.99 | $3.63 | $3.63 | |
| 88 | 87301305 | ELCBL C LEAD 14 1PR | 5,417 | FOOT | $3.98 | $3.62 | $3.62 | |
| 89 | 87301900 | ELCBL C EGRDC 6 1C | 197 | FOOT | $4.66 | $4.24 | $4.24 | |
| 90 | 87900200 | DRILL EX HANDHOLE | 10 | EACH | $490.11 | $445.55 | $445.55 | |
| 91 | 88102717 | PED SH LED 1F BM CDT | 8 | EACH | $688.33 | $625.75 | $625.75 | |
| 92 | 88500100 | INDUCTIVE LOOP DETECT | 12 | EACH | $235.40 | $214.00 | $214.00 | |
| 93 | 89501150 | RELOC EX TS POST | 1 | EACH | $296.10 | $269.18 | $269.18 | |
| 94 | 89502300 | REM ELCBL FR CON | 1,331 | FOOT | $0.1500 | $0.1400 | $0.1400 | |
| 95 | 89502375 | REMOV EX TS EQUIP | 6 | EACH | $99.29 | $90.26 | $90.26 | |
| 96 | 89502376 | REBUILD EX HANDHOLE | 1 | EACH | $2,467.30 | $2,243.60 | $2,243.60 | |
| 97 | 89502378 | REBLD EX HH TO HD HH | 6 | EACH | $3,409.36 | $3,099.42 | $3,099.42 | |
| 98 | 89502385 | REMOV EX CONC FDN | 1 | EACH | $495.42 | $450.38 | $450.38 |