IDOT Jobs

All dates · 49 jobs · —
★ My Jobs

Filtered by: County: Kane Clear all

49 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 17, 2025 61J91 KaneDistrict 1 Resurfacing and traffic signal modifications at various intersections on Indian Trail from Edgelawn Drive to Highland Avenue in Aurora — Executed Nov 25 New Geneva Construction Company $4,562,538 ·
Jan 17, 2025 61K68 KaneDistrict 1 HMA resurfacing, curb and gutter, sidewalks, ADA ramps, traffic signals, lighting and pavement markings on Dundee Avenue between Enterprise Street and Page Street in Elgin. — Executed Nov 25 New Martam Construction Incorporated $9,964,717 ·
Jan 17, 2025 61K98 KaneDistrict 1 Construciton of PPC Sidewalks, ADA Ramps, pavement markings and landscaping at various locations in Batavia. — Executed Nov 25 New Triggi Construction, Inc. $414,112 ·
Jan 17, 2025 61L03 KaneDistrict 1 Installation of Recessed Reflective Pavement Markers and pavement marking at various locations in Kane County. — Executed Nov 25 New Precision Pavement Markings Inc. $545,288 ·
Mar 7, 2025 61J84 KaneDistrict 1 Reconstruct IL 38 from Fox River Bridge to Kirk Road in Geneva. — Executed Nov 25 New R. W. Dunteman Company $30,162,688 ·
Mar 7, 2025 61L26 KaneDistrict 1 Resurfacing on Prairie Street from Randall Road to South 13th Street in St. Charles. — Rejected Nov 25 New
Apr 25, 2025 61K26 KaneDistrict 1 Replace the bridge carrying TR 2110 over the CN Railroad, 0.5 mile north of Bowes Road. — Executed Nov 25 New Rausch Infrastructure, LLC $3,894,087 ·
Apr 25, 2025 62J72 KaneDistrict 1 (5,107-Ft) Designed Overlay and ADA Improvements: HMA surface removal and replacement, Class D patches, sidewalk and curb removal and replacement, drainage structures adjustments, minor traffic signal (APS) improvements, detector loops replacement, pavement markings. Located along ILL 31/ ILL 56 (State Street) from I-88 to North River Road within the Village of North Aurora — Executed Nov 25 New Geneva Construction Company LLC. $1,373,951 ·
Apr 25, 2025 62V37 KaneDistrict 1 (2.08-Mile). Smart HMA surface removal and overlay, pavement widening, ADA curb ramp improvements, APS improvements, pavement widening, pavement markings, This project is located along IL 64 (Main Street) and begins just west of 13th Avenue and extends in an easterly direction to Kautz Road/Smith Road. This project is located within the City of St. Charles in Kane County. — Executed Nov 25 New Plote Construction, Inc. $3,811,382 ·
Apr 25, 2025 62W69 KaneDistrict 1 Pavement patching, hot-mix asphalt pavement removal and replacement combination curb and gutter removal and re (3.37-Mile) This is a standard overlay and ADA improvement. This project consists of pavement patching, hot-mix asphalt pavement removal and replacement combination curb and gutter removal and replacement, ADA pedestrian ramp improvements, thermoplastic pavement marking, sidewalk removal and replacement. This improvement is on FAU 2503: IL-25, US 30 (Aurora Avenue) within the City of Aurora in Kane County. — Executed Nov 25 New Geneva Construction Company LLC. $4,184,234 ·
Jun 13, 2025 61L40 KaneDistrict 1 Resurfacing and the construction of a multi-use path on Sleepy Hollow Road from Huntley Road to IL-72 in West Dendee. — Executed Nov 25 New Schroeder Asphalt Services, Inc. $1,348,856 ·
Jun 13, 2025 61L59 KaneDistrict 1 HMA resurfacing on State Street from Hampshire Creek to Allen Road in Hampshire. Includes pavement patching, curb and gutter, and drainage structure adjustments. — Executed Nov 25 New Curran Contracting Company $308,598 ·
Jun 13, 2025 61L60 KaneDistrict 1 HMA resurfacing on South Elgin Boulevard from East Main Street to the north village limits of South Elgin. Includes curb and gutter, drainage structures, and parkway restoration. — Executed Nov 25 New Plote Construction, Inc. $1,197,423 ·
Jun 13, 2025 62X33 KaneDistrict 1 Hot-mix asphalt surface removal, pavement patching, resurfacing with asphalt binder course and asphalt surface (6.70-Mile) Design overlay consists of hot-mix asphalt surface removal, pavement patching, resurfacing with asphalt binder course and asphalt surface course, placement of thermoplastic pavement markings. Located on Illinois Rte. FAP 567, IL 38, from Dekalb County Line to IL 47 (Main Street) within the Village of Elburn in Kane County. — Rejected Nov 25 New Builders Paving, LLC $4,414,888 ·
Jun 13, 2025 62X59 KaneDistrict 1 (1.12-Mile) Designed Overlay, Traffic Signal Modernization, ADA Improvement consists asphalt surface removal, pavement patching, (HMA) binder and surface course, concrete curb and gutter removal and replacement, pedestrian curb ramps (ADA) improvements, traffic signal modernization, accessible pedestrian signal improvements, detector loop replacement, raised reflective pavement markers, pavement marking. Located within the City of Elgin in Kane County. — Executed Nov 25 New Plote Construction, Inc. $2,838,180 ·
Jun 13, 2025 62X61 KaneDistrict 1 Hot-mix asphalt pavement removal and replacement, combination curb and gutter removal and replacement, thermop (2,955-Ft) Design Overlay and ADA improvements consist of hot-mix asphalt pavement removal and replacement, combination curb and gutter removal and replacement, thermoplastic pavement marking, sidewalk removal and replacement. Project is located in the Cities of Highwood and Highland Park, Lake County. — Executed Nov 25 New Peter Baker & Son Co. $922,469 ·
Jun 13, 2025 62X67 KaneDistrict 1 Asphalt surface removal, placement of (HMA) surface course, pavement patching, pavement markings SMART Overlay and Standard Overlay improvement project consists of asphalt surface removal, placement of (HMA) surface course, pavement patching, pavement markings. The project is located in the villages of Hampshire and Pingree Grove within Kane County. — Executed Nov 25 New Curran Contracting Company $2,654,662 ·
Jun 13, 2025 62X69 KaneDistrict 1 (1.79-Mile) SMART and Designed Overlay, ADA Improvements, New Shoulders Improvements include curb and gutter spot repairs (remove and replace), sidewalk removal and replacement for curb ramps for sidewalks (ADA), (HMA) surface removal and replacement, (cold milling and inlay), full-depth patches (Class D), drainage structures adjustment and cleaning, pavement marking, pedestrian signals (APS) improvements and detector loops. Location: IL 56 (Butterfield Road), from East of IL 25 River Road to We — Executed Nov 25 New Geneva Construction Company LLC. $2,713,457 ·
Jun 13, 2025 62Y02 CookKaneDistrict 1 Cleaning and painting steel surfaces as designated on the plans and any incidental and collateral work (0.01-Mile) This is a bridge painting project consists of cleaning and painting steel surfaces as designated on the plans and any incidental and collateral work. This project has two locations: (SN 045-0037 and SN 047-0029) 1) Galena Blvd over IL-56 in the Village of Sugar Grove. 2) US 30 over Blackberry Creek in the Village of Montgomery. — Executed Nov 25 New Capital Industrial Services, LLC $499,333 ·
Aug 1, 2025 61L58 KaneDistrict 1 Reconstruction and resurfacing of L.W. Besinger Drive from Lake Marian Road to IL 25 in Carpentersville. — Executed Nov 25 New Plote Construction, Inc. $5,096,305 ·
Aug 1, 2025 61L61 KaneDistrict 1 Resurfacing on Merrill Road from the Village limits to Bliss Road in Sugar Grove. — Executed Nov 25 New Builders Paving, LLC $448,788 ·
Aug 1, 2025 61L67 KaneDistrict 1 Reconstruction of Wheeler Road from Dugan Road to Esker Drive in Sugar Grove. — Executed Nov 25 New D. Construction, Inc. $472,933 ·
Aug 1, 2025 62X45 CookKaneKendallDistrict 1 Bridge deck concrete sealer entire top surface of bridge deck, sidewalks, top of inside vertical faces of the This improvement consists of bridge deck concrete sealer entire top surface of bridge deck, sidewalks, top of inside vertical faces of the parapets, face of curbs, and inside and outside of dividing walls along walkways of the structure placement of modified urethane pavement markings. Located throughout Cook, Kane and Kendall Counties. — Executed Nov 25 New Mosley Construction 1, LLC $1,455,444 ·
Sep 19, 2025 61L28 KaneDistrict 1 Construction of additonal through lanes on each side of Randall Road at the intersection of IL 72, widening to 3 NB and SB lanes. Includes HMA multi- use patch, curb and gutter, drainage improvements, traffic signal modifications, and lighting. — Executed Nov 25 New Martam Construction Incorporated $11,987,774 ·
Sep 19, 2025 61L74 KaneDistrict 1 Construction of PCC Sidewalk along various routes in Hampshire. Includes; HMA an PCC Driveways and pavement markings. — Executed Nov 25 New Triggi Construction, Inc. $354,811 ·
Sep 19, 2025 62K78 KaneDistrict 1 Cold milling existing (HMA) surface, full-depth patches (Class D), resurfacing (inlay) with HMA binder and sur (2.54-Mile) Designed Overlay, New Shoulders, and ADA Improvements: The proposed consists of cold milling existing (HMA) surface, full-depth patches (Class D), resurfacing (inlay) with HMA binder and surface course, longitudinal joint sealing, replacement of curb and gutter, sidewalk removal and replacement for for sidewalks (ADA), replacement of existing aggregate shoulders with HMA, drainage structures adjustments and cleaning, pavement markings and raised reflective Location: IL 25 (Saint Char — Executed Nov 25 New Plote Construction, Inc. $4,318,000 ·
Nov 7, 2025 61L97 KaneDistrict 1 HMA resurfacing on Spruce and E. Main Street from Gilbert Street to Kenyon Road in South Elgin. Includes; curb and gutter, drainage, parkway restoration, patching, replacment of pedestrian push buttons and detector loops. — Executed Nov 25 New Everlast Blacktop Inc. $763,936 ·
Jan 16, 2026 61L56 KaneDistrict 1 Resurfacing Molitor Road from Elizebeth Lane to Felton Road, Diehl Road from Felton Road to Eola Road, Molitor Road from Diehl Road to Eola Road in Aurora. — Executed Nov 25 New K-Five Construction Corporation $2,502,456 ·
Jan 16, 2026 61L95 KaneDistrict 1 Resurfacing various routes and locations in Aurora. — Executed Nov 25 New Geneva Construction Company LLC. $3,133,675 ·
Jan 16, 2026 61M02 KaneDistrict 1 Traffic signals improvements at various locations on Kimball Street between Grove Avenue to Dundee Avenue in Elgin. — Executed Nov 25 New H & H Electric Co. $584,382 ·
Feb 27, 2026 61L39 KaneDistrict 1 Pavement widening and traffic signal improvements from Orchard Rd. to Randall Rd. in North Aurora. — Executed Nov 25 New Geneva Construction Company LLC. $2,691,498 ·
Feb 27, 2026 61L66 KaneDistrict 1 Resurfacing Barrington Avenue from IL 68 to Van Buren Street in the village of East Dundee. — Executed Nov 25 New Schroeder Asphalt Services, Inc. $393,716 ·
Feb 27, 2026 62V43 KaneDistrict 1 Pavement patching, HMA overlay of p (1.54-Mile) Project consists of pavement patching, HMA overlay of p.c.c pavement, resurfacing with polymerized hot-mix asphalt surface course, binder course and curb and gutter replacement, thermoplastic pavement marking located in the Village of Huntley and Rutland Township in Kane County. — Executed Nov 25 New Builders Paving, LLC $2,670,318 ·
Apr 24, 2026 61M11 KaneDistrict 1 Construct an HMA path adjacent to South Edgelawn Drive at the BNSF Railroad tracks between Jericho Road and Kingsway Drive. — Executed Nov 25 New Alliance Contractors, Inc. $214,945 ·
Apr 24, 2026 61M17 KaneDistrict 1 Reconstruction of TR 245 (Boyer Road) from Longmeadow Parkway to County Line Road in the Village of Algonquin. Work includes HMA pavement, sidewalk, pipe and culverts. — Executed Nov 25 New Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $3,694,062 ·
Apr 24, 2026 61M33 KaneDistrict 1 Construction of a single-lane roundabout intersection at the intersection of Highland Ave. and Lyle Ave. in the City of Elgin. Work includes HMA pavement reconstruction, curb and gutter, sidewalks, storm sewer, lighting and other required work. — Rejected Nov 25 New
Jun 12, 2026 61L30 KaneDistrict 1 Full-depth reclamation and HMA surfacing of Brown Road, Campton Hills Road, Denker Road and Town Hall Road in the village of Campton Hills. — Executed Nov 25 New Builders Paving, LLC $2,893,888 ·
Jun 12, 2026 61M10 KaneDistrict 1 Traffic signal modernization along Indian Trail Road between Ohio Street and Pennsbury Lane in the city of Aurora. — Rejected Nov 25 New K-Five Construction Corporation $5,028,975 ·
Jun 12, 2026 61M42 KaneDistrict 1 Resurfacing Wheeler Road from Esker Drive to IL 47 in the village of Sugar Grove. — Executed Nov 25 New D. Construction, Inc. $654,874 ·
Jun 12, 2026 61M43 KaneDistrict 1 Resurfacing Dugan Road from North Wheeler Road to south of Fays Lane in the village of Sugar Grove. — Executed Nov 25 New D. Construction, Inc. $692,262 ·
Jun 12, 2026 61M44 KaneDistrict 1 Resurfacing 1st Street from IL 72 to Dunning Avenue in the village of West Dundee. — Executed Nov 25 New Geske and Sons, Inc. $754,807 ·
Jun 12, 2026 62M71 KaneKendallDistrict 1 Earth excavation, embankment, structure removal, portland cement concrete (PCC) pavement, hot-mix asphalt pave (3.59-Mile) Roadway Reconstruction project on a new shifted alignment consists of earth excavation, embankment, structure removal, portland cement concrete (PCC) pavement, hot-mix asphalt pavement, hot-mix asphalt binder and surface courses, pavement removal, PCC shoulder, hot-mix asphalt shoulder, combination concrete curb and gutter, concrete median, PCC sidewalk, drainage improvements, sheet pile retaining wall, cast in place box culverts, traffic signal installation, water main relocation, l — Executed Nov 25 New D. Construction, Inc. $52,733,996 ·
Jun 12, 2026 62V08 CookDuPageKaneDistrict 1 Ditch regrading, culvert replacement, and various other drainage improvements The work on this project consists of ditch regrading, culvert replacement, and various other drainage improvements. This project is in DuPage County, This project is in DuPage County, Cook County and Kane County. — Executed Nov 25 New D. Construction, Inc. $1,863,322 ·
Jun 12, 2026 62V78 DuPageKaneDistrict 1 (1.31-Mile) This is a crack and joint sealant improvement consisting of routing cleaning, and sealing of longitudinal cracks and joints within concrete pavement, concrete patching, grading and shaping shoulders, some guardrail replacement, modified urethane pavement marking. This improvement is located within the City of Geneva and West Chicago in Kane and DuPage Counties. — Executed Nov 25 New Mosley Construction 1, LLC $850,529 ·
Jun 12, 2026 80B23 KaneDistrict 1 Pavement patching, milling of existing HMA surface, placing HMA surface course, placement of pavement markings (2.81-Mile) SMART Overlay and Shoulder Repair consist of pavement patching, milling of existing HMA surface, placing HMA surface course, placement of pavement markings, shoulder work, rumble strips. The improvement is in the Villages of Gilberts and Pingree Grove in Kane County. — Executed Nov 25 New Plote Construction, Inc. $3,171,166 ·
Jul 31, 2026 61K67 KaneDistrict 1 Resurfacing Prairie St. from the west city limit to Randall Rd. in the city of Aurora. — Executed Nov 25 New Builders Paving, LLC $1,538,538 ·
Jul 31, 2026 61M13 KaneDistrict 1 Demolition of existing 18-span bridge and construction of three PPC beam single span bridges carrying Kirk Rd. over Reed Rd., UPRR and White's Creek. — Executed Nov 25 New Dunnet Bay Construction Company $36,611,206 ·
Sep 18, 2026 61M67 KaneDistrict 1 HMA resurfacing on various routes in Aurora. Includes recessed pavement markings, sidewalk, curb and gutter. — Awarded Nov 25 New
Sep 18, 2026 61M68 KaneDistrict 1 HMA resurfacing n Douglas Avenue/Douglas Road from US 30 to Ashland Avenue in Montgomery. Includes curb and gutter, sidewalk, drainage improvements, and detector loop replacement. — Executed Nov 25 New D. Construction, Inc. $1,466,728 ·
1–49 of 49

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.