IDOT Jobs

All dates · 50 jobs · — Sign up free
★ My Jobs

Filtered by: County: Kendall Clear all

50 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Apr 27, 2018 62C61 KendallDistrict 1 Resurfacing on IL 31 and East Frontage Road in the Village of Oswego. — Executed Nov 26 New D. Construction, Inc. $295,006 ·
Jun 15, 2018 46491 DeKalbKendallLaSalleDistrict 3 Remove and replace raised reflective pavement markers and reflectors on various routes in District 3. — Executed Nov 26 New Countryman, Inc. $129,404 ·
Jun 15, 2018 66838 KendallDistrict 3 14,902 feet of milling and resurfacing on IL 25 from Kane County line to Waubon see Creek in Oswego. Includes mailbox turnouts, entrances, ADA improvements, and incidental HMA. — Executed Nov 26 New D. Construction, Inc. $706,092 ·
Jun 15, 2018 66D24 KendallDistrict 3 Reconstruct IL 71 to 4 lanes with a 22' median from IL 47 to IL 126 (1.7 miles) includes replacement of all drainage structures, installation of traffic signals and relocation of water main and sanitary sewer. — Executed Nov 26 New D. Construction, Inc. $12,531,371 ·
Jun 15, 2018 66E52 KendallDistrict 3 8,997 feet of 3P milling and resurfacing on IL 31, including sideroads, entrances and ADA work, 0.9 miles south of the Kane county line to US 34 in Oswego. — Executed Nov 26 New D. Construction, Inc. $891,868 ·
Jun 15, 2018 66H68 DeKalbKendallDistrict 3 Guardrail end section replacement on various routes in DeKalb and Kendall Counties. — Rejected Nov 26 New Curran Contracting Company $1,677,677 ·
Nov 9, 2018 62D43 KaneKendallDistrict 1 Bridge repair and overlay at IL 31 over BNSF railroad structure. Work includes deck scarification, concrete joint repair and construction, structural repair of concrete and approach slab replacement. — Executed Nov 26 New D. Construction, Inc. $2,429,071 ·
Nov 9, 2018 87665 KendallDistrict 3 Replace the bridge carrying East Main Street over Big Rock Creek, located 0.20 miles north of US 34 in the City of Plano. — Executed Nov 26 New Riber Construction, Inc. $1,162,974 ·
Jan 18, 2019 62B68 KendallDistrict 1 Realignment and widening project on US 30 at the intersections with Harvey Rd. and Treasure Drive, includes intersection improvement and traffic signals. — Executed Nov 26 New D. Construction, Inc. $786,115 ·
Mar 8, 2019 66J61 KendallDistrict 3 Adding aggregate shoulders to US-52 from LaSalle County Line to Will County Line. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $175,911 ·
Mar 8, 2019 66J75 KendallLaSalleDistrict 3 Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders — Executed Nov 26 New H & H Electric Co. $46,600 ·
Apr 26, 2019 62H13 KendallWillDistrict 1 Clean and paint SN 099-0083 carrying US 52 over Hickory Creek in Joliet, and SN 047-0006 carrying IL 31 over BNSF RR in Oswego. — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $279,700 ·
Jun 14, 2019 66J56 KendallDistrict 3 2.39 MILES OF 3P MILLING AND RESURFACING OF 2.25" FOR MAINLINE PAVEMENT AND SHOULDER FROM S OF GALENA RD TO S KENNEDY DR IN YORKVILLE. — Executed Nov 26 New D. Construction, Inc. $1,160,355 ·
Aug 2, 2019 66H92 KendallDistrict 3 Installation of flashing red and yellow beacons at each approach to the intersection of US 52 and Grove Road. — Executed Nov 26 New Van-Mack Electric Co. $59,096 ·
Apr 24, 2020 87702 KendallDistrict 3 Resurfacing and sidewalk replacement on Lew Street from Church Street to Main Street in the city of Plano. — Executed Nov 26 New Geneva Construction Company $645,500 ·
Jul 31, 2020 66K22 KendallDistrict 3 5.92 miles of shoulder widening and rumble strip installation on US 52 from Townhouse Rd (South leg) to 0.17 mile W of IL 47. — Executed Nov 26 New D. Construction, Inc. $1,043,916 ·
Jul 31, 2020 66K96 KendallDistrict 3 Pavement patching and striping on FAP 311 (US 34) beginning at the intersection of US 34 and Boulder Hill Pass Rd and ending at the S intersection of US 30 in Kendall County. — Executed Nov 26 New Triggi Construction, Inc. $195,788 ·
Nov 6, 2020 87731 KendallDistrict 3 Extension of Eldamain Road on new alignment from River Road to West Highpoint Road (south of IL 71), includes a new bridge over Fox River and a roundabout at the new Eldamain and Fox Road. Project is 2.0 miles west of IL 47 between River Road and West Highpoint Road in Yorkville. — Executed Nov 26 New Plote Construction Inc. & Dunnet Bay Construction Company__DO NOT USE $34,558,327 ·
Apr 23, 2021 66L61 KendallLaSalleDistrict 3 The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Kendall and LaSalle Counties. — Executed Nov 26 New H & H Electric Co. $49,983 ·
Jun 11, 2021 66D51 KendallDistrict 3 3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement on FAP 607 (US 52) from Townhouse road north to IL 47. — Executed Nov 26 New D. Construction, Inc. $2,440,250 ·
Jun 11, 2021 66L31 KendallDistrict 3 This project consists of 3.94 miles of shoulder widening and rumble strip installation on_US 52 from 0.16 miles East of IL 17 to Grove Rd in Kendall County. — Executed Nov 26 New D. Construction, Inc. $688,542 ·
Jun 11, 2021 66L78 DeKalbKendallDistrict 3 Class B pavement patching and pavement striping on FAP 591 (US 34) within the City limits of Sandwich beginning at Pearl St. in Dekalb County and ending at Duvick Ave. in Kendall County. — Executed Nov 26 New Scanlon Excavating & Concrete, Inc. $226,114 ·
Jul 30, 2021 46584 GrundyKendallDistrict 3 Removing and replacing existing centerline striping on FAI 80 (I-80) in Grundy County, FAP 591 (US 34) and FAP 311 (US 34 and IL 71) in Kendall County. — Executed Nov 26 New Maintenance Coatings Co. $264,008 ·
Jul 30, 2021 62G10 KendallWillDistrict 1 (1700-Ft) Traffic Signal Installation, Channelization. Roadway Reconstruction. Location: IL 126 at County Line Road in the Na-Au-Say and Plainfield Townships in Will and Kendall Counties. — Executed Nov 26 New P. T. Ferro Construction Co. $1,259,611 ·
Jul 30, 2021 66L21 KendallDistrict 3 Removing and replacing 6' of the culvert barrel and wing walls on on both ends of the culverts and guardrail r This work is located on FAP Route 607 (US 52) at Sta. 398+51 approximately 7.5 miles East of IL 47 (1.6 miles West of Will County Line). This project consists of removing and replacing 6' of the culvert barrel and wing walls on on both ends of the culverts and guardrail removal and replacement, also including other related construction items. — Executed Nov 26 New Riber Construction, Inc. $220,993 ·
Apr 29, 2022 66M41 KendallDistrict 3 Work begin at US 30/IL 47 intersection and ends 0.3 mile North of Waterpark Way in Yorkville. The project is an interim improvement to address poor pavement condition which include milling 2.25" and replacing in kind. — Executed Nov 26 New D. Construction, Inc. $725,559 ·
Jun 17, 2022 66J71 KendallDistrict 3 Milling and resurfacing 3 3/4" (designed overlay), shoulder work, guardrail replacement, pavement marking, rai LaSalle County Line to 0.2 MI W of IL 47 in Yorkville. This work consists of milling and resurfacing 3 3/4" (designed overlay), shoulder work, guardrail replacement, pavement marking, raised reflectors, and ADA ramps. — Executed Nov 26 New D. Construction, Inc. $4,944,149 ·
Jun 17, 2022 66L58 DeKalbKendallDistrict 3 5.41 miles, Milling and Resurfacing (Designed Overlay) and ADA 0.2 miles East of Somonauk Rd in Somonauk to Chilton Way in Plano. — Executed Nov 26 New D. Construction, Inc. $6,075,158 ·
Jun 17, 2022 87786 KendallDistrict 3 Resurface Bristol Ridge Road from Kennedy Road to US 34 in Yorkville. — Executed Nov 26 New D. Construction, Inc. $446,274 ·
Sep 23, 2022 66D26 KendallDistrict 3 The reconstruction of IL 71 from 0 Project consists of the reconstruction of IL 71 from 0.16 mi. E of IL 126 to W of Orchard Rd_in Kendall County. Additional work involves several structure replacements within project limits, construction of shared-use path, tree removal, traffic signal and lighting upgrades. Length of the job is 3.8 miles. The job will be staged. — Executed Nov 26 New D. Construction, Inc. $32,993,337 ·
Nov 18, 2022 66E96 KendallDistrict 3 .01 mi culvert replacement SN 047-2517 Stream 0.4 mi N of Chicago Rd. — Executed Nov 26 New D. Construction, Inc. $676,579 ·
Jan 20, 2023 87783 KendallDistrict 3 Convert 4-way intersection to HMA roundabout with drainage improvements, lighting and a multi-use path with ADA ramps. — Executed Nov 26 New Lake County Grading Company, LLC $10,257,420 ·
Mar 10, 2023 66M72 KendallDistrict 3 This project is located on FAU 2503 68 (IL 25) and FAP 860 (IL 31). — Executed Nov 26 New SKC Construction, Inc. $47,368 ·
Mar 10, 2023 87795 KendallDistrict 3 Replace existing box culvert with a triple-barrel box culvert with approaches to Schlapp Road and Walker Road at East Aux Sable Creek, 2 miles south of IL 126. — Executed Nov 26 New Riber Construction, Inc. $1,047,965 ·
Mar 10, 2023 87800 KendallDistrict 3 Extend Collins Road on a new alignment from Miknles Road to Grove Road, and the construction of Minkler Road from IL 71 to collins Road, in Oswego. — Executed Nov 26 New D. Construction, Inc. $12,117,223 ·
Apr 28, 2023 61J46 KendallDistrict 1 Resurfacing on Concord Drive from Gordon Road to Galena Road in Montgomery. — Executed Nov 26 New Builders Paving, LLC $1,005,000 ·
Sep 20, 2024 66P11 KendallLaSalleDistrict 3 5.62 miles of milling and resurfacing on US 52 from east of the IL-71 intersection to the north leg of Townhouse Road. — Executed Nov 26 New D. Construction, Inc. $2,515,676 ·
Nov 8, 2024 87868 KendallDistrict 3 Replace the bridge carrying Minkler Road over Morgan Creek, 1.7 miles south of IL 71 in Oswego. — Executed Nov 26 New D. Construction, Inc. $2,509,615 ·
Nov 8, 2024 87869 KendallDistrict 3 HMA Resurfacing, pavement patching, PCC sidewalk, curb and gutter, drainage improvements, pavement markings, and signage on East Van Emmon Street from IL 47 to the Yorkville City Limit. — Executed Nov 26 New D. Construction, Inc. $382,160 ·
Jan 17, 2025 66P60 KendallDistrict 3 Approximately 6.1 miles of centerline joint repair, pavement marking improvements and intermediate resurfacing of approximately 22,000 sq yds on IL 126 from 80 ft east of Wing Street to 500 ft west of County Line Road in Kendall County. — Executed Nov 25 New Austin Tyler Construction, Inc. $776,365 ·
Jan 17, 2025 87873 KendallDistrict 3 HMA rsurfacing and reconstruct portions of Hale Street from E. Dearborn St. to Larson Street in Plano. Reconstruciton includes cross slope and crown correction, curb and gutter, ADA ramps and a shared-use path. — Executed Nov 25 New Geneva Construction Company $1,060,850 ·
Apr 25, 2025 66R13 KendallDistrict 3 Pavement patching along F.A.P. Route 326 extending from IL Route 47/71 intersection (L.M. 0.00) to IL Route 47/US 34 Intersection (L.M. 2.80), 2.8 miles gross length. — Executed Nov 25 New D. Construction, Inc. $186,398 ·
Apr 25, 2025 66R14 KendallDistrict 3 Roadway resurfacing along IL 47 in Kendall county and extends from Sta6811 +72.00 to STA 6852+22.00, 0.757 miles gross length. — Executed Nov 25 New D. Construction, Inc. $457,951 ·
Apr 25, 2025 66R26 GrundyKendallDistrict 3 Over 70,000 feet of pavement marking in various locations in District 3. — Executed Nov 25 New Precision Pavement Markings Inc. $847,344 ·
Aug 1, 2025 62X45 CookKaneKendallDistrict 1 Bridge deck concrete sealer entire top surface of bridge deck, sidewalks, top of inside vertical faces of the This improvement consists of bridge deck concrete sealer entire top surface of bridge deck, sidewalks, top of inside vertical faces of the parapets, face of curbs, and inside and outside of dividing walls along walkways of the structure placement of modified urethane pavement markings. Located throughout Cook, Kane and Kendall Counties. — Executed Nov 25 New Mosley Construction 1, LLC $1,455,444 ·
Sep 19, 2025 87846 KendallDistrict 3 Convert the intersecton of Wolf's Crossing Road and Douglas Road to a roundabout. Includes; full depth HMA paving, drainage improvements, detention pond grading, culverts, multi-use path and sidewalks. — Executed Nov 25 New D. Construction, Inc. $10,727,441 ·
Jan 16, 2026 66R89 KendallDistrict 3 Cleaning and painting steel bridge, pavement striping, and traffic control at SN 047-0052 carrying US Route 52 over Roods Creek in Kendall County. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $118,285 ·
Feb 27, 2026 66N22 KendallDistrict 3 Plug and abandon existing culvert (SN 047-2514) carrying IL 71 over a stream located 0.1 miles SW of Fennel Rd in Newark, IL and replace nearby side road culvert, culvert lining, and ditch re-grading. — Executed Nov 25 New D. Construction, Inc. $199,416 ·
Apr 24, 2026 87899 KendallDistrict 3 Reconstruction of Ridge Road to an HMA four-lane from Holt Road to Black Road. Includes; curb and gutter, raised median, driveways, drainage improvements, traffic signals, and a shared-use path. — Executed Nov 25 New Austin Tyler Construction, Inc. $32,828,299 ·
Jun 12, 2026 62M71 KaneKendallDistrict 1 Earth excavation, embankment, structure removal, portland cement concrete (PCC) pavement, hot-mix asphalt pave (3.59-Mile) Roadway Reconstruction project on a new shifted alignment consists of earth excavation, embankment, structure removal, portland cement concrete (PCC) pavement, hot-mix asphalt pavement, hot-mix asphalt binder and surface courses, pavement removal, PCC shoulder, hot-mix asphalt shoulder, combination concrete curb and gutter, concrete median, PCC sidewalk, drainage improvements, sheet pile retaining wall, cast in place box culverts, traffic signal installation, water main relocation, l — Executed Nov 25 New D. Construction, Inc. $52,733,996 ·
1–50 of 50

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.