| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Apr 27, 2018 | 62C61 | KendallDistrict 1 | Resurfacing on IL 31 and East Frontage Road in the Village of Oswego. | — | Executed | D. Construction, Inc. $295,006 · | ||
| Jun 15, 2018 | 46491 | DeKalbKendallLaSalleDistrict 3 | Remove and replace raised reflective pavement markers and reflectors on various routes in District 3. | — | Executed | Countryman, Inc. $129,404 · | ||
| Jun 15, 2018 | 66838 | KendallDistrict 3 | 14,902 feet of milling and resurfacing on IL 25 from Kane County line to Waubon see Creek in Oswego. Includes mailbox turnouts, entrances, ADA improvements, and incidental HMA. | — | Executed | D. Construction, Inc. $706,092 · | ||
| Jun 15, 2018 | 66D24 | KendallDistrict 3 | Reconstruct IL 71 to 4 lanes with a 22' median from IL 47 to IL 126 (1.7 miles) includes replacement of all drainage structures, installation of traffic signals and relocation of water main and sanitary sewer. | — | Executed | D. Construction, Inc. $12,531,371 · | ||
| Jun 15, 2018 | 66E52 | KendallDistrict 3 | 8,997 feet of 3P milling and resurfacing on IL 31, including sideroads, entrances and ADA work, 0.9 miles south of the Kane county line to US 34 in Oswego. | — | Executed | D. Construction, Inc. $891,868 · | ||
| Jun 15, 2018 | 66H68 | DeKalbKendallDistrict 3 | Guardrail end section replacement on various routes in DeKalb and Kendall Counties. | — | Rejected | Curran Contracting Company $1,677,677 · | ||
| Nov 9, 2018 | 62D43 | KaneKendallDistrict 1 | Bridge repair and overlay at IL 31 over BNSF railroad structure. Work includes deck scarification, concrete joint repair and construction, structural repair of concrete and approach slab replacement. | — | Executed | D. Construction, Inc. $2,429,071 · | ||
| Nov 9, 2018 | 87665 | KendallDistrict 3 | Replace the bridge carrying East Main Street over Big Rock Creek, located 0.20 miles north of US 34 in the City of Plano. | — | Executed | Riber Construction, Inc. $1,162,974 · | ||
| Jan 18, 2019 | 62B68 | KendallDistrict 1 | Realignment and widening project on US 30 at the intersections with Harvey Rd. and Treasure Drive, includes intersection improvement and traffic signals. | — | Executed | D. Construction, Inc. $786,115 · | ||
| Mar 8, 2019 | 66J61 | KendallDistrict 3 | Adding aggregate shoulders to US-52 from LaSalle County Line to Will County Line. | — | Executed | Phoenix Corporation of the Quad Cities $175,911 · | ||
| Mar 8, 2019 | 66J75 | KendallLaSalleDistrict 3 | Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders | — | Executed | H & H Electric Co. $46,600 · | ||
| Apr 26, 2019 | 62H13 | KendallWillDistrict 1 | Clean and paint SN 099-0083 carrying US 52 over Hickory Creek in Joliet, and SN 047-0006 carrying IL 31 over BNSF RR in Oswego. | — | Executed | Eagle Painting & Maintenance Company, Inc. $279,700 · | ||
| Jun 14, 2019 | 66J56 | KendallDistrict 3 | 2.39 MILES OF 3P MILLING AND RESURFACING OF 2.25" FOR MAINLINE PAVEMENT AND SHOULDER FROM S OF GALENA RD TO S KENNEDY DR IN YORKVILLE. | — | Executed | D. Construction, Inc. $1,160,355 · | ||
| Aug 2, 2019 | 66H92 | KendallDistrict 3 | Installation of flashing red and yellow beacons at each approach to the intersection of US 52 and Grove Road. | — | Executed | Van-Mack Electric Co. $59,096 · | ||
| Apr 24, 2020 | 87702 | KendallDistrict 3 | Resurfacing and sidewalk replacement on Lew Street from Church Street to Main Street in the city of Plano. | — | Executed | Geneva Construction Company $645,500 · | ||
| Jul 31, 2020 | 66K22 | KendallDistrict 3 | 5.92 miles of shoulder widening and rumble strip installation on US 52 from Townhouse Rd (South leg) to 0.17 mile W of IL 47. | — | Executed | D. Construction, Inc. $1,043,916 · | ||
| Jul 31, 2020 | 66K96 | KendallDistrict 3 | Pavement patching and striping on FAP 311 (US 34) beginning at the intersection of US 34 and Boulder Hill Pass Rd and ending at the S intersection of US 30 in Kendall County. | — | Executed | Triggi Construction, Inc. $195,788 · | ||
| Nov 6, 2020 | 87731 | KendallDistrict 3 | Extension of Eldamain Road on new alignment from River Road to West Highpoint Road (south of IL 71), includes a new bridge over Fox River and a roundabout at the new Eldamain and Fox Road. Project is 2.0 miles west of IL 47 between River Road and West Highpoint Road in Yorkville. | — | Executed | Plote Construction Inc. & Dunnet Bay Construction Company__DO NOT USE $34,558,327 · | ||
| Apr 23, 2021 | 66L61 | KendallLaSalleDistrict 3 | The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Kendall and LaSalle Counties. | — | Executed | H & H Electric Co. $49,983 · | ||
| Jun 11, 2021 | 66D51 | KendallDistrict 3 | 3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement on FAP 607 (US 52) from Townhouse road north to IL 47. | — | Executed | D. Construction, Inc. $2,440,250 · | ||
| Jun 11, 2021 | 66L31 | KendallDistrict 3 | This project consists of 3.94 miles of shoulder widening and rumble strip installation on_US 52 from 0.16 miles East of IL 17 to Grove Rd in Kendall County. | — | Executed | D. Construction, Inc. $688,542 · | ||
| Jun 11, 2021 | 66L78 | DeKalbKendallDistrict 3 | Class B pavement patching and pavement striping on FAP 591 (US 34) within the City limits of Sandwich beginning at Pearl St. in Dekalb County and ending at Duvick Ave. in Kendall County. | — | Executed | Scanlon Excavating & Concrete, Inc. $226,114 · | ||
| Jul 30, 2021 | 46584 | GrundyKendallDistrict 3 | Removing and replacing existing centerline striping on FAI 80 (I-80) in Grundy County, FAP 591 (US 34) and FAP 311 (US 34 and IL 71) in Kendall County. | — | Executed | Maintenance Coatings Co. $264,008 · | ||
| Jul 30, 2021 | 62G10 | KendallWillDistrict 1 | (1700-Ft) Traffic Signal Installation, Channelization. Roadway Reconstruction. Location: IL 126 at County Line Road in the Na-Au-Say and Plainfield Townships in Will and Kendall Counties. | — | Executed | P. T. Ferro Construction Co. $1,259,611 · | ||
| Jul 30, 2021 | 66L21 | KendallDistrict 3 | Removing and replacing 6' of the culvert barrel and wing walls on on both ends of the culverts and guardrail r This work is located on FAP Route 607 (US 52) at Sta. 398+51 approximately 7.5 miles East of IL 47 (1.6 miles West of Will County Line). This project consists of removing and replacing 6' of the culvert barrel and wing walls on on both ends of the culverts and guardrail removal and replacement, also including other related construction items. | — | Executed | Riber Construction, Inc. $220,993 · | ||
| Apr 29, 2022 | 66M41 | KendallDistrict 3 | Work begin at US 30/IL 47 intersection and ends 0.3 mile North of Waterpark Way in Yorkville. The project is an interim improvement to address poor pavement condition which include milling 2.25" and replacing in kind. | — | Executed | D. Construction, Inc. $725,559 · | ||
| Jun 17, 2022 | 66J71 | KendallDistrict 3 | Milling and resurfacing 3 3/4" (designed overlay), shoulder work, guardrail replacement, pavement marking, rai LaSalle County Line to 0.2 MI W of IL 47 in Yorkville. This work consists of milling and resurfacing 3 3/4" (designed overlay), shoulder work, guardrail replacement, pavement marking, raised reflectors, and ADA ramps. | — | Executed | D. Construction, Inc. $4,944,149 · | ||
| Jun 17, 2022 | 66L58 | DeKalbKendallDistrict 3 | 5.41 miles, Milling and Resurfacing (Designed Overlay) and ADA 0.2 miles East of Somonauk Rd in Somonauk to Chilton Way in Plano. | — | Executed | D. Construction, Inc. $6,075,158 · | ||
| Jun 17, 2022 | 87786 | KendallDistrict 3 | Resurface Bristol Ridge Road from Kennedy Road to US 34 in Yorkville. | — | Executed | D. Construction, Inc. $446,274 · | ||
| Sep 23, 2022 | 66D26 | KendallDistrict 3 | The reconstruction of IL 71 from 0 Project consists of the reconstruction of IL 71 from 0.16 mi. E of IL 126 to W of Orchard Rd_in Kendall County. Additional work involves several structure replacements within project limits, construction of shared-use path, tree removal, traffic signal and lighting upgrades. Length of the job is 3.8 miles. The job will be staged. | — | Executed | D. Construction, Inc. $32,993,337 · | ||
| Nov 18, 2022 | 66E96 | KendallDistrict 3 | .01 mi culvert replacement SN 047-2517 Stream 0.4 mi N of Chicago Rd. | — | Executed | D. Construction, Inc. $676,579 · | ||
| Jan 20, 2023 | 87783 | KendallDistrict 3 | Convert 4-way intersection to HMA roundabout with drainage improvements, lighting and a multi-use path with ADA ramps. | — | Executed | Lake County Grading Company, LLC $10,257,420 · | ||
| Mar 10, 2023 | 66M72 | KendallDistrict 3 | This project is located on FAU 2503 68 (IL 25) and FAP 860 (IL 31). | — | Executed | SKC Construction, Inc. $47,368 · | ||
| Mar 10, 2023 | 87795 | KendallDistrict 3 | Replace existing box culvert with a triple-barrel box culvert with approaches to Schlapp Road and Walker Road at East Aux Sable Creek, 2 miles south of IL 126. | — | Executed | Riber Construction, Inc. $1,047,965 · | ||
| Mar 10, 2023 | 87800 | KendallDistrict 3 | Extend Collins Road on a new alignment from Miknles Road to Grove Road, and the construction of Minkler Road from IL 71 to collins Road, in Oswego. | — | Executed | D. Construction, Inc. $12,117,223 · | ||
| Apr 28, 2023 | 61J46 | KendallDistrict 1 | Resurfacing on Concord Drive from Gordon Road to Galena Road in Montgomery. | — | Executed | Builders Paving, LLC $1,005,000 · | ||
| Sep 20, 2024 | 66P11 | KendallLaSalleDistrict 3 | 5.62 miles of milling and resurfacing on US 52 from east of the IL-71 intersection to the north leg of Townhouse Road. | — | Executed | D. Construction, Inc. $2,515,676 · | ||
| Nov 8, 2024 | 87868 | KendallDistrict 3 | Replace the bridge carrying Minkler Road over Morgan Creek, 1.7 miles south of IL 71 in Oswego. | — | Executed | D. Construction, Inc. $2,509,615 · | ||
| Nov 8, 2024 | 87869 | KendallDistrict 3 | HMA Resurfacing, pavement patching, PCC sidewalk, curb and gutter, drainage improvements, pavement markings, and signage on East Van Emmon Street from IL 47 to the Yorkville City Limit. | — | Executed | D. Construction, Inc. $382,160 · | ||
| Jan 17, 2025 | 66P60 | KendallDistrict 3 | Approximately 6.1 miles of centerline joint repair, pavement marking improvements and intermediate resurfacing of approximately 22,000 sq yds on IL 126 from 80 ft east of Wing Street to 500 ft west of County Line Road in Kendall County. | — | Executed | Austin Tyler Construction, Inc. $776,365 · | ||
| Jan 17, 2025 | 87873 | KendallDistrict 3 | HMA rsurfacing and reconstruct portions of Hale Street from E. Dearborn St. to Larson Street in Plano. Reconstruciton includes cross slope and crown correction, curb and gutter, ADA ramps and a shared-use path. | — | Executed | Geneva Construction Company $1,060,850 · | ||
| Apr 25, 2025 | 66R13 | KendallDistrict 3 | Pavement patching along F.A.P. Route 326 extending from IL Route 47/71 intersection (L.M. 0.00) to IL Route 47/US 34 Intersection (L.M. 2.80), 2.8 miles gross length. | — | Executed | D. Construction, Inc. $186,398 · | ||
| Apr 25, 2025 | 66R14 | KendallDistrict 3 | Roadway resurfacing along IL 47 in Kendall county and extends from Sta6811 +72.00 to STA 6852+22.00, 0.757 miles gross length. | — | Executed | D. Construction, Inc. $457,951 · | ||
| Apr 25, 2025 | 66R26 | GrundyKendallDistrict 3 | Over 70,000 feet of pavement marking in various locations in District 3. | — | Executed | Precision Pavement Markings Inc. $847,344 · | ||
| Aug 1, 2025 | 62X45 | CookKaneKendallDistrict 1 | Bridge deck concrete sealer entire top surface of bridge deck, sidewalks, top of inside vertical faces of the This improvement consists of bridge deck concrete sealer entire top surface of bridge deck, sidewalks, top of inside vertical faces of the parapets, face of curbs, and inside and outside of dividing walls along walkways of the structure placement of modified urethane pavement markings. Located throughout Cook, Kane and Kendall Counties. | — | Executed | Mosley Construction 1, LLC $1,455,444 · | ||
| Sep 19, 2025 | 87846 | KendallDistrict 3 | Convert the intersecton of Wolf's Crossing Road and Douglas Road to a roundabout. Includes; full depth HMA paving, drainage improvements, detention pond grading, culverts, multi-use path and sidewalks. | — | Executed | D. Construction, Inc. $10,727,441 · | ||
| Jan 16, 2026 | 66R89 | KendallDistrict 3 | Cleaning and painting steel bridge, pavement striping, and traffic control at SN 047-0052 carrying US Route 52 over Roods Creek in Kendall County. | — | Executed | ERA-Valdivia Contractors, Inc. $118,285 · | ||
| Feb 27, 2026 | 66N22 | KendallDistrict 3 | Plug and abandon existing culvert (SN 047-2514) carrying IL 71 over a stream located 0.1 miles SW of Fennel Rd in Newark, IL and replace nearby side road culvert, culvert lining, and ditch re-grading. | — | Executed | D. Construction, Inc. $199,416 · | ||
| Apr 24, 2026 | 87899 | KendallDistrict 3 | Reconstruction of Ridge Road to an HMA four-lane from Holt Road to Black Road. Includes; curb and gutter, raised median, driveways, drainage improvements, traffic signals, and a shared-use path. | — | Executed | Austin Tyler Construction, Inc. $32,828,299 · | ||
| Jun 12, 2026 | 62M71 | KaneKendallDistrict 1 | Earth excavation, embankment, structure removal, portland cement concrete (PCC) pavement, hot-mix asphalt pave (3.59-Mile) Roadway Reconstruction project on a new shifted alignment consists of earth excavation, embankment, structure removal, portland cement concrete (PCC) pavement, hot-mix asphalt pavement, hot-mix asphalt binder and surface courses, pavement removal, PCC shoulder, hot-mix asphalt shoulder, combination concrete curb and gutter, concrete median, PCC sidewalk, drainage improvements, sheet pile retaining wall, cast in place box culverts, traffic signal installation, water main relocation, l | — | Executed | D. Construction, Inc. $52,733,996 · |
1–50 of 50
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.