Filtered by: County: Grundy Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2018 | 66H60 | GrundyDistrict 3 | Remove Ash trees for Emerald Ash Borer control along I-80 and I-55 in Grundy County. | — | Executed | LaJobie Mosley d/b/a Lion Construction 1 LLC $107,383 · | ||
| Jan 19, 2018 | 66H84 | GrundyDistrict 3 | Washing and concrete sealing bridge SN 032-0099 carrying IL 47 over the Illinois River and the I and M canal, 1.2 mies south of US 6. | — | Executed | M & M Concrete, Inc. $53,993 · | ||
| Mar 9, 2018 | 87611 | GrundyDistrict 3 | New sidewalk construction and replacing existing sidewalks at various locations in the Village of South Wilmington. | — | Rejected | D. Construction, Inc. $284,602 · | ||
| Apr 27, 2018 | 66J18 | GrundyLivingstonDistrict 3 | 2 applications of spary mixtures, spring and summer of 2018, along various routes in Grundy and Livingston /counties. | — | Executed | Endrizzi Contracting, Inc $109,840 · | ||
| Jun 15, 2018 | 66H25 | GrundyDistrict 3 | Repair SN 032-0082 and 0083 carrying I-55 over Gooseberry Creek, 1 mile east of IL 47. | — | Executed | D. Construction, Inc. $729,600 · | ||
| Jun 15, 2018 | 66J29 | BureauGrundyLaSalleDistrict 3 | Class A and Class B pavement patching and pavement marking on I-80 from the Henry/Bureau County line to the Grundy/Will County line. | — | Executed | D. Construction, Inc. $323,732 · | ||
| Jun 15, 2018 | 66J31 | GrundyLivingstonDistrict 3 | Class A pavement patching and pavement marking from the McLean/Livingston County line to the Grundy/Will County line. | — | Executed | G. M. Sipes Construction, Inc. $722,218 · | ||
| Aug 3, 2018 | 66J33 | GrundyDistrict 3 | Class B patching on IL 47 and Class A and B patching on the entrance and exit ramps of the I-80 and IL 47 interchange. | — | Executed | D. Construction, Inc. $136,744 · | ||
| Aug 3, 2018 | 87642 | GrundyDistrict 3 | Rahabilitate the structure carrying Braceville Road over the Mazon river, 0.2 mile east of Gorman Road. | — | Executed | D. Construction, Inc. $984,309 · | ||
| Aug 3, 2018 | 87643 | GrundyDistrict 3 | Replace the bridge carrying Grand Ridge Road over Johnny Run, 0.65 mile east of Illinois Route 47. | — | Executed | Riber Construction, Inc. $793,264 · | ||
| Jan 18, 2019 | 66J67 | GrundyLivingstonDistrict 3 | Two application of spray mixtures at designated times, once in the Spring and once in the summer, along I-80, I-55 and IL 113 in Grundy County and along I-55, IL 47, and IL 23 in Livingston County. | — | Executed | Endrizzi Contracting, Inc $126,725 · | ||
| Jan 18, 2019 | 87710 | GrundyDistrict 3 | Pavement reconstruction, storm sewers, curb and gutter, sidewalk and roadway lighting, on Broadway Street from IL 113 to Park Street in Coal City. | — | Executed | D. Construction, Inc. $4,631,410 · | ||
| Mar 8, 2019 | 66J77 | GrundyDistrict 3 | Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders. | — | Executed | Van-Mack Electric Co. $49,650 · | ||
| Apr 26, 2019 | 66J66 | GrundyLaSalleDistrict 3 | Intermittent milling and resurfacing on IL 47 from Illinois Ave. to south of Jefferson Street in Morris and on IL 170 from US 6 to just south of the CSX Railroad crossing in Seneca. | — | Executed | D. Construction, Inc. $426,301 · | ||
| Jun 14, 2019 | 66K10 | GrundyLaSalleDistrict 3 | BRIDGE WASHING AT VARIOUS STRUCTURES OVER THE ILLINOIS RIVER. | — | Executed | All States Painting, Inc. $169,700 · | ||
| Jun 14, 2019 | 66K11 | GrundyDistrict 3 | 6 MILES OF CLASS A PAVEMENT PATCHING 16" ON PORTLAND CEMENT CONCRETE (PCC) PAVEMENT, PCC SHOULDER REPAIR AND INTERMITTNT PAVEMENT STRIPPING ON I-80 FROM 0.4 MILES N OF SENECA TO 0.4 MILES WOF IL 47 IN MORRIS. | — | Executed | D. Construction, Inc. $298,147 · | ||
| Aug 2, 2019 | 66K25 | GrundyDistrict 3 | 0.9 miles of milling and resurfacing on both NB and SB lanes of I-55 at MP 232.6, milling and resurfacing Reed Road interchange ramps, and building two PCC crosssovers. | — | Executed | D. Construction, Inc. $3,956,040 · | ||
| Sep 20, 2019 | 87695 | GrundyDistrict 3 | Pavement widening and reconstruction of Ridge Road from a two-lane to a four-lane with bi-directional turn lane, includes bridge rehabilitation and the construction of a new bridge span to carry the Wisconsin Central Ltd. Railway over Ridge Road. Project runs from south of McEvilly Road to Minooka Road in the village of Minooka. | — | Rejected | D. Construction, Inc. $11,963,320 · | ||
| Nov 8, 2019 | 46902 | GrundyDistrict 3 | Remove and replace three span structures SN 032-7004 and SN 032-7099 carrying Price street over the IandM Canal, seal and stripe parking lots, and other associatd work at the William G. Stratton State Park in Morris. | — | Executed | D. Construction, Inc. $896,861 · | ||
| Jan 17, 2020 | 66A51 | GrundyDistrict 3 | Milling and resurfacing shoulders and 8.5" of HMA mainline pavement, replacing cable median barrier, and structural repairs with scarification on some. The project will be staged using crossovers. It is located on I-55 from 0.39 miles S of Gardner Rd to 0.83 miles S of Reed Rd interchange. | — | Executed | D. Construction, Inc. $18,872,523 · | ||
| Jan 17, 2020 | 66K75 | GrundyIroquoisDistrict 3 | Weed spraying on various routes in Grundy and Livingston counties. | — | Executed | Endrizzi Contracting, Inc $27,192 · | ||
| Mar 6, 2020 | 66A82 | GrundyDistrict 3 | 3P milling and resurfacing on IL 113 from IL 47 to Mary Ave in Coal City. 6.73 miles. | — | Executed | D. Construction, Inc. $2,696,227 · | ||
| Apr 24, 2020 | 87736 | GrundyDistrict 3 | Sidewalk replacement and construction, and pavement martings at various locations in Mazon. | — | Executed | D. Construction, Inc. $167,522 · | ||
| Jun 12, 2020 | 66K89 | GrundyLaSalleDistrict 3 | Beam end cleaning and painting on SN 032-0099 (IL 47 in Morris) and SN 050-0219 (CH 15, Marseilles Rd in Marseilles). | — | Executed | ERA-Valdivia Contractors, Inc. $407,093 · | ||
| Jul 31, 2020 | 66L08 | GrundyDistrict 3 | Placing an aggregate wedge shoulder adjacent to existing paved shoulders on FAP 326 (IL 47) beginning at the intersection of IL 47 and Rte 113 and ending at the intersection of IL 47 and Scully Rd in Grundy County. | — | Executed | Scanlon Excavating & Concrete, Inc. $91,591 · | ||
| Jan 15, 2021 | 66E45 | GrundyDistrict 3 | The replacement of bridge deck on SN 032-0075 carrying US 6 and over CSX Transportation Railroad The work consists of the replacement of bridge deck on SN 032-0075 carrying US 6 and over CSX Transportation Railroad. Additional work includes substructure repairs, structural steel painting, tree removal, landscaping,grading ditches, and resurfacing pavement. The project length is 0.4 miles and is located 5.3 miles East of Morris in Grundy Co. | — | Executed | P. T. Ferro Construction Co. $2,077,263 · | ||
| Mar 5, 2021 | 66H15 | GrundyDistrict 3 | BRIDGE REPLACEMENT (032-0079) IL 47 OVER 1-55, AND RECONSTRUCTION OF IL 47 FROM NORTHBROOK AVE TO THE SOUTH ABUTMENT OF SN 032-0110, ALONG WITH ADJACENT LIGHTING. | — | Executed | D. Construction, Inc. $9,396,853 · | ||
| Apr 23, 2021 | 66L52 | GrundyDistrict 3 | This pollinator project is located at Three Rivers Rest Areas on I-80 west of Minooka. This work will include herbicide, seeding, planting, landscaping and maintenance. | — | Executed | Nettle Creek Nursery, Inc. $377,962 · | ||
| Apr 23, 2021 | 66L63 | GrundyDistrict 3 | The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Grundy County. | — | Executed | Outsen Electric, Incorporated $51,970 · | ||
| Jun 11, 2021 | 66L59 | GrundyDistrict 3 | Pavement Patching on IL 47 located 3.5 miles South of Minooka Road (SN 032-0123) and 0.4 miles North of Nelson Road (SN 032-0122) North of Morris. | — | Executed | G. M. Sipes Construction, Inc. $124,463 · | ||
| Jun 11, 2021 | 66L76 | GrundyLivingstonDistrict 3 | Class A pavement patching and pavement striping This work is located on FAI 55 ( I-55) beginning at M.M. 17 ( just south of IL 17) in Livingston County and ending at M.M. 221 (1.0 mi. NE of IL 47) in Grundy County. This project consists of Class A pavement patching and pavement striping. | — | Executed | G. M. Sipes Construction, Inc. $354,303 · | ||
| Jun 11, 2021 | 66L77 | GrundyDistrict 3 | Class A, Class B Pavement Patching, Subgrade removal and replacement, pavement striping and other related item This work is located on FAI Route 80 beginning at the LaSalle/Grundy County Line and ending at the Grundy/Will County Line. This project consists of Class A, Class B Pavement Patching, Subgrade removal and replacement, pavement striping and other related items to complete this work. | — | Executed | D. Construction, Inc. $703,404 · | ||
| Jun 11, 2021 | 87741 | GrundyDistrict 3 | Replace the bridge carrying Grand Ridge Road over Murry Slough, 2 miles east of Mazon. | — | Executed | D. Construction, Inc. $897,148 · | ||
| Jul 30, 2021 | 46584 | GrundyKendallDistrict 3 | Removing and replacing existing centerline striping on FAI 80 (I-80) in Grundy County, FAP 591 (US 34) and FAP 311 (US 34 and IL 71) in Kendall County. | — | Executed | Maintenance Coatings Co. $264,008 · | ||
| Nov 5, 2021 | 66L96 | GrundyDistrict 3 | Removing and replace failed wing wall stems and headwall This project is located at Structure No. 032-2525, a 12' x 8' concrete box culvert, 400' feet West of Ashley Rd. in Grundy County. This project consists of removing and replace failed wing wall stems and headwall. | — | Executed | D. Construction, Inc. $239,279 · | ||
| Nov 5, 2021 | 87782 | GrundyDistrict 3 | Resurfacing, sidewalk replacement, curb and gutter replacement and pedestrian traffic signal improvements on Minooka Road from Tables Road to Ridge Road in Minooka. | — | Executed | D. Construction, Inc. $2,146,151 · | ||
| Apr 29, 2022 | 66E51 | GrundyDistrict 3 | HMA milling and resurfacing, ADA ramps, signals, pavement marking and Raised reflectors 0.7 MI OF MCCLINDON RD IN CHANNAHON TO 0.2 MI W OF WILL CO LINE. This work consists of HMA milling and resurfacing, ADA ramps, signals, pavement marking and Raised reflectors. | — | Executed | D. Construction, Inc. $2,116,332 · | ||
| Apr 29, 2022 | 66M01 | GrundyDistrict 3 | This work is located at the intersections of IL 47 and Pine Bluff Road and at the intersection of IL 47 and Southmor Road South of Morris in Grundy County. This work consists off the removal of existing traffic signal equipment, signal heads, concrete foundations, controller cabinets, UPS and other related traffic signal equipment. | — | Executed | Van-Mack Electric Co. $359,960 · | ||
| Jun 17, 2022 | 66E48 | GrundyDistrict 3 | Milling and resurfacing 3 Project consists of milling and resurfacing 3.75" on IL 113 from Lincoln St to Will Rd in Grundy County. The project length is 1.60 miles. Additional work includes ADA improvements and traffic signal upgrades. Minor drainage repairs are also proposed. | — | Executed | D. Construction, Inc. $1,189,717 · | ||
| Jun 17, 2022 | 66J62 | GrundyDistrict 3 | Spot improvements to remove SN 032-0052 carrying Nettle Creek Road over I-80, 8.2 miles West of IL 47. | — | Executed | D. Construction, Inc. $1,320,668 · | ||
| Jun 17, 2022 | 66L48 | GrundyDistrict 3 | Rest area and renovations, I-80 Three Rivers Rest Stop. | — | Executed | D. Construction, Inc. $2,364,030 · | ||
| Jun 17, 2022 | 87756 | GrundyDistrict 3 | Replace the bridge carrying DuPont Road over Waupecan Creek. | — | Executed | Austin Tyler Construction, Inc. $1,177,778 · | ||
| Jul 15, 2022 | 66M52 | GrundyDistrict 3 | Removal and replacement of highway light poles, luminaries and breakaway couplings This work is located at the Interchange of I-80 and IL 47 in Grundy County. This work consists of removal and replacement of highway light poles, luminaries and breakaway couplings. | — | Active | Electric Conduit Construction $184,785 · | ||
| Nov 18, 2022 | 87768 | GrundyDistrict 3 | Replace superstructure carrying Brisbin Road over Collins Run Creek, 1.4 miles south of Minooka. | — | Executed | D. Construction, Inc. $787,230 · | ||
| Mar 10, 2023 | 66N04 | GrundyDistrict 3 | Bridge Painting: 032-0005 NB, 032-0006 SB over the Mazon River, 4.0 mi. south of Reed Rd.; 032-0007 NB, 032-0008 SB over the Union Pacific Railroad, 3.2 mi. south of Reed Rd. | — | Executed | ERA-Valdivia Contractors, Inc. $1,046,975 · | ||
| Jun 16, 2023 | 66M71 | GrundyDistrict 3 | Crack Filling on FAP 326 (IL 47) 0.1 MI S of Southmor Rd to 0.2 MI S of IL 113 for a total of 3.59 MI. | — | Executed | Denler, Inc. $69,016 · | ||
| Jun 16, 2023 | 66N26 | GrundyDistrict 3 | Pavement widening with resurfacing of Morey Road and Seneca Road including minor drainage improvements. | — | Executed | D. Construction, Inc. $375,288 · | ||
| Jun 16, 2023 | 66N43 | GrundyLaSalleDistrict 3 | Washing the bridge components and replacing the elastomeric (expansion) trough on SN 050-0079 and the structur This project consists of washing the bridge components and replacing the elastomeric (expansion) trough on SN 050-0079 and the structure carrying IL 47 over the Illinois River and the IandM Canal approximately 1.2 miles south of US 6 in Morris. | — | Executed | All States Painting, Inc. $349,800 · | ||
| Aug 4, 2023 | 66N51 | GrundyLivingstonDistrict 3 | Class A pavement Patching, striping and other related work This project is located on Interstate Route 55 beginning at M.M. 2.15 (Beginning of concrete section) to M.M. 218.81(Livingston/Grundy County Line) to M.M. 222 end of concrete section in Grundy County. This work consists of Class A pavement Patching, striping and other related work. | — | Executed | G. M. Sipes Construction, Inc. $378,840 · | ||
| Jan 19, 2024 | 66K67 | GrundyDistrict 3 | This project includes milling and resurfacing (design overlay), structure repairs, pavement marking and minor drainage improvements on I-55 from 1.2 miles northeast of IL 47 near Dwight to the Gardner interchange. | — | Executed | D. Construction, Inc. $12,150,715 · | ||
| Jan 19, 2024 | 66N48 | GrundyDistrict 3 | Pavement patching and related construction work This work is located on the I-80 and IL 47 Interchange Ramps in Morris. This work consists of pavement patching and related construction work. | — | Executed | D. Construction, Inc. $664,134 · | ||
| Jan 19, 2024 | 66P07 | GrundyKankakeeDistrict 3 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas hereinafter described as the areas to be cleaned in Grundy and Kankakee Counties. | — | Executed | The Final Connection, Inc. $105,464 · | ||
| Mar 8, 2024 | 87844 | GrundyDistrict 3 | Sidewalk and driveway replacement, and landscaping along IL 13 from 5th Avenue to Curtis Street in Diamond. | — | Executed | P. T. Ferro Construction Co. $507,801 · | ||
| Apr 26, 2024 | 66N50 | GrundyDistrict 3 | Raising existing concrete pavement adjacent to approach pavement IL 47 at the north abutment, southbound lanes of structure No. 032-0099; the work consists of raising existing concrete pavement adjacent to approach pavement. | — | Executed | D. Construction, Inc. $59,606 · | ||
| Apr 26, 2024 | 87791 | GrundyDistrict 3 | Rehabilitate the bridge carrying CH 34V over the Mazon Ricer, 0.7 mile north of I-55, and replace the bridge carrying FAS 272 over an Unnamed Creek 3 miles southwest of Mazon. | — | Executed | D. Construction, Inc. $1,773,338 · | ||
| Apr 26, 2024 | 87792 | GrundyDistrict 3 | Replace 3 structures on Grand Ridge Road over Hog Run, Bills Run and Waupecan Creek, located between LaSalle Road anc Verona Road. | — | Executed | Riber Construction, Inc. $1,942,958 · | ||
| Jun 14, 2024 | 66N38 | GrundyDistrict 3 | Variable depth milling and resufacing of Ashley Road and US-6 intersection in Morris city (Grundy County). | — | Executed | Gallagher Asphalt Corporation $85,098 · | ||
| Jun 14, 2024 | 66N62 | GrundyDistrict 3 | Installation of flashing beacons. | — | Executed | D. Construction, Inc. $248,311 · | ||
| Jun 14, 2024 | 66P40 | GrundyLaSalleDistrict 3 | Centerline striping on I-39 in LaSalle County and on I-80 in LaSalle and Grundy Counties. | — | Executed | Maintenance Coatings Co. $1,382,491 · | ||
| Jun 14, 2024 | 87849 | GrundyDistrict 3 | Remove and replace two precast channel beam superstructures on Gardner Road over Johnny Run and West Fork of Mazon River. Includes the salvage and reinstallation of S1 bridge rail and HMA approach pavment. | — | Executed | D. Construction, Inc. $1,144,745 · | ||
| Jun 14, 2024 | 87867 | GrundyDistrict 3 | HMA resurfacing, curb and gutter, sidewalks and pavement markings on Carbon Hill Road from IL 113 to Spring Road in Coal City. | — | Executed | P. T. Ferro Construction Co. $438,984 · | ||
| Nov 8, 2024 | 87870 | GrundyDistrict 3 | Sidewalk improvements along Mitchell, Main, and Railroad Streets in Braceville. | — | Executed | Gallagher Asphalt Corporation $248,978 · | ||
| Nov 8, 2024 | 87872 | GrundyDistrict 3 | Resurface Ashton Road from US 6 to north of Locust Road in the City of Morris. | — | Executed | D. Construction, Inc. $199,524 · | ||
| Jan 17, 2025 | 66P96 | GrundyDistrict 3 | Repair and maintain traffic signals, flashing beacons, roadway lighting, speed display signs, and other electrical services within Grundy County. | — | Active | Meade Inc. $341,893 · | ||
| Jan 17, 2025 | 87840 | GrundyDistrict 3 | Construction of a HMA multi-use path and pedestrian bridge with segmental block wall, utility adjustments, and culverts along McEvilly Road in Minooka. | — | Executed | D. Construction, Inc. $1,708,477 · | ||
| Mar 7, 2025 | 66P51 | GrundyDistrict 3 | Milling and resurfacing 1.15 miles of OR 129 from Main St. to Carbon Hill Rd. in Gardner, along with the replacement of 3 culverts within the Project Bounds. | — | Executed | D. Construction, Inc. $680,856 · | ||
| Apr 25, 2025 | 46940 | GrundyDistrict 3 | Roadway and parking lot improvements (HMA resurfacing, removal and replacement of existing parking lot, drainage improvements, ADA sidewalk, and pavement marking and other work) within the_Goose Lake Prairie State Natural Area in Grundy County. 1.4 miles gross length internal park roads. | — | Executed | D. Construction, Inc. $1,889,874 · | ||
| Apr 25, 2025 | 66P47 | GrundyDistrict 3 | 6.77 miles of crack and joint sealing on FAS 301 from IL-47_to Mary Ave in Coal City. | — | Executed | Denler, Inc. $62,830 · | ||
| Apr 25, 2025 | 66P73 | GrundyDistrict 3 | Furnishing and installing Buttertfly Dynamic Message Signs on I-80 in Grundy County at M.M. 108.5 and M.M. 119.5. 1.663 miles gross length. | — | Executed | John Burns Construction Company $1,251,719 · | ||
| Apr 25, 2025 | 66R12 | GrundyLaSalleDistrict 3 | Pavement patching along I-80 in LaSalle and Grundy counties_extending from east of Illinois 23 interchange (M.M.90) to Grundy county line (M.M.103), LaSalle County Line (M.M.103) to Seneca interchange (M.M.105), Brisbon interchange Grundy county, and Minooka interchange (Ridge Rd), 15 miles gross length. | — | Executed | D. Construction, Inc. $579,432 · | ||
| Apr 25, 2025 | 66R26 | GrundyKendallDistrict 3 | Over 70,000 feet of pavement marking in various locations in District 3. | — | Executed | Precision Pavement Markings Inc. $847,344 · | ||
| Apr 25, 2025 | 66R31 | GrundyLivingstonDistrict 3 | Milling and resurfacing (Designed Overlay), patching,_pavement marking and raised reflectors on FAS 298 from IL 47 in Dwight to IL 53 in Gardner, for a total of 8.1 miles. | — | Executed | D. Construction, Inc. $3,397,233 · | ||
| Jun 13, 2025 | 66P52 | GrundyDistrict 3 | Bridge Repairs TR 110 (SN 032-0077) over I-55 0.3 MI N of the Livingston County Line. | — | Executed | D. Construction, Inc. $952,217 · | ||
| Sep 19, 2025 | 66295 | GrundyDistrict 3 | Railroad Separation Structure Replacement at WCL Railroad over I-80 (SN 032-9906) and Bridge Repair at Wabena Rd. over I-80 (SN 032-0065 in Kendall and Grundy Counties. | — | Executed | D. Construction, Inc. $14,268,635 · | ||
| Jan 16, 2026 | 66T16 | GrundyDistrict 3 | 0.60 miles of seeding, Minooka Rd to Aux Sable Creek. | — | Executed | Central Landscaping, LP $117,275 · | ||
| Feb 27, 2026 | 66R94 | GrundyDistrict 3 | Cleaning and painting all structural steel and non-structure_steel components on Structure No. 032-0092 carrying Carbon Hill Rd. over I-55 approximately 4.8 miles south of Reed Rd in Grundy County. | — | Rejected | Civil Coatings and Construction Inc. $356,186 · | ||
| Apr 24, 2026 | 66N58 | GrundyDistrict 3 | Rehabilitation of SN 032-0025, carrying US 6 over Aux Sable Creek in Grundy County. | — | Executed | D. Construction, Inc. $1,596,194 · | ||
| Apr 24, 2026 | 87893 | GrundyDistrict 3 | Construct a three-span PPC deck beam bridge to carry Rice Road over East Fork Mazon River. Includes HMA approach, patching, guardrail and HMA Shoulders. | — | Executed | D. Construction, Inc. $2,879,699 · | ||
| Apr 24, 2026 | 87907 | GrundyDistrict 3 | Sidewalk construction along East North Street, North Jackson Street, and East Washington Street in Gardner. | — | Executed | D. Construction, Inc. $163,783 · | ||
| Jun 12, 2026 | 66C06 | GrundyDistrict 3 | Milling and resurfacing 3 3/4 inches (designed overlay), class D patching, pipe culvert end section_replacements and cleaning, detector loop replacement, pavement marking, and raised reflective pavement markers on US 6 beginning at IL 47 in Morris, and ends 0.7 miles west of Nigas Road._Approximately 6.81 miles gross length. | — | Executed | D. Construction, Inc. $4,185,244 · | ||
| Jun 12, 2026 | 66T12 | GrundyDistrict 3 | Washing all components of the structure which includes all structural steel (beams, girders, diaphragms, beari Project is located at Structure No. 032-0099 carrying F.A.P. Route 326 (IL 47) over the Illinois River and the IandM Canal approximately 1.2 miles south of US 6 (Morris) in Grundy County. This work consists of washing all components of the structure which includes all structural steel (beams, girders, diaphragms, bearings, cross framing, lateral framing), top surface of piers and abutments, deck drains (scuppers), entire deck surface, inside face of parapets, finger plate expansion joints and el | — | Executed | All States Painting, Inc. $57,414 · | ||
| Jun 12, 2026 | 66T41 | GrundyLivingstonDistrict 3 | Litter picking on interstate I-55, throughout Livingston and Grundy Counties in District 3. | — | Executed | The Final Connection, Inc. $49,729 · |
1–82 of 82
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.