113RS-4
- Let date
- Friday, June 17, 2022
- Contract
- 66E48 · job page
- District
- District 3
- County
- Grundy
- Highway
- Limits
- Project consists of milling and resurfacing 3.75" on IL 113 from Lincoln St to Will Rd in Grundy County. The project length is 1.60 miles. Additional work includes ADA improvements and traffic signal upgrades. Minor drainage repairs are also proposed.
- Classification
- Milling and resurfacing 3
Bidders 3
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | D. Construction, Inc. Low bidder | $1,189,717 | ||
| 2 | P. T. Ferro Construction Co. | $1,316,671 | +10.7% | |
| 3 | Gallagher Asphalt Corporation | $1,617,456 | +36.0% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 D. Construction… | #2 P. T. Ferro Con… | #3 Gallagher Aspha… |
|---|---|---|---|---|---|---|---|---|
| 1 | X0320050 | CONSTRUCTN LAYOUT SPL | 1 | L SUM | $17,500.00 | $7,000.00 | $15,000.00 | |
| 2 | X1400215 | REMOTE CONTR VIDEO SY | 1 | EACH | $49,254.84 | $50,000.00 | $55,000.00 | |
| 3 | X2600012 | REM & REL SN P&P ASSY | 1 | EACH | $500.00 | $875.00 | $1,000.00 | |
| 4 | X4401198 | HMA SURF REM VAR DP | 5,680 | SQ YD | $2.55 | $2.50 | $5.00 | |
| 5 | X5619210 | WATER VALVES ADJ SPL | 3 | EACH | $600.00 | $300.00 | $725.00 | |
| 6 | X6030310 | FR & LIDS ADJUST SPL | 11 | EACH | $650.00 | $1,000.00 | $800.00 | |
| 7 | X8760200 | ACCESSIBLE PED SIGNAL | 2 | EACH | $1,760.00 | $1,100.00 | $1,200.00 | |
| 8 | X8950114 | MOD EX CONTR & CAB | 1 | EACH | $16,656.30 | $14,000.00 | $20,000.00 | |
| 9 | X8950301 | REM EX TR SIGNAL POST | 1 | EACH | $385.00 | $750.00 | $800.00 | |
| 10 | X8950307 | REM EX PED SIG HEAD | 1 | EACH | $330.00 | $500.00 | $550.00 | |
| 11 | Z0018300 | DRAINAGE STR REPAIR | 2 | EACH | $1,000.00 | $850.00 | $2,000.00 | |
| 12 | Z0030850 | TEMP INFO SIGNING | 42 | SQ FT | $25.00 | $15.00 | $15.00 | |
| 13 | Z0033072 | VIDEO VEH DET SYS | 1 | EACH | $80,054.70 | $80,000.00 | $90,000.00 | |
| 14 | Z0034105 | MATL TRANSFER DEVICE | 5,440 | TON | $2.75 | $0.0100 | $5.00 | |
| 15 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $10,000.00 | $1,000.00 | $9,000.00 | |
| 16 | Z0073509 | PERM TR SIGNAL TIMING | 1 | EACH | $2,200.00 | $2,500.00 | $2,700.00 | |
| 17 | 20200100 | EARTH EXCAVATION | 41 | CU YD | $100.00 | $60.00 | $45.00 | |
| 18 | 20400800 | FURNISHED EXCAVATION | 16 | CU YD | $100.00 | $100.00 | $150.00 | |
| 19 | 25200100 | SODDING | 332 | SQ YD | $28.00 | $100.00 | $50.00 | |
| 20 | 25200200 | SUPPLE WATERING | 2 | UNIT | $500.00 | $300.00 | $600.00 | |
| 21 | 28100101 | STONE RIPRAP CL A1 | 2 | SQ YD | $500.00 | $105.00 | $700.00 | |
| 22 | 28200200 | FILTER FABRIC | 13 | SQ YD | $10.00 | $10.00 | $15.00 | |
| 23 | 35101600 | AGG BASE CSE B 4 | 401 | SQ YD | $8.00 | $10.00 | $0.0100 | |
| 24 | 40600290 | BIT MATLS TACK CT | 20,033 | POUND | $0.0100 | $0.0100 | $0.0100 | |
| 25 | 40600370 | LONG JOINT SEALANT | 9,934 | FOOT | $2.73 | $2.75 | $2.50 | |
| 26 | 40600400 | MIX CR JTS FLANGEWYS | 7.8 | TON | $0.0100 | $600.00 | $500.00 | |
| 27 | 40600901 | HMA BC HM N70 | 13 | TON | $200.00 | $200.00 | $250.00 | |
| 28 | 40600990 | TEMPORARY RAMP | 1,629 | SQ YD | $0.0100 | $0.0100 | $0.0100 | |
| 29 | 40602985 | HMA BC IL-9.5 N70 | 2,884 | TON | $78.00 | $95.50 | $110.00 | |
| 30 | 40604162 | P HMA SC IL-9.5 D N70 | 2,556 | TON | $83.00 | $111.00 | $125.00 | |
| 31 | 40800050 | INCIDENTAL HMA SURF | 803 | TON | $88.00 | $110.00 | $150.00 | |
| 32 | 42400100 | PC CONC SIDEWALK 4 | 4,661 | SQ FT | $7.50 | $11.00 | $10.00 | |
| 33 | 42400300 | PC CONC SIDEWALK 6 | 65 | SQ FT | $10.00 | $23.00 | $25.00 | |
| 34 | 42400800 | DETECTABLE WARNINGS | 474 | SQ FT | $35.00 | $20.00 | $50.00 | |
| 35 | 44000156 | HMA SURF REM 1 3/4 | 331 | SQ YD | $2.35 | $18.00 | $10.00 | |
| 36 | 44000164 | HMA SURF REM 3 3/4 | 25,637 | SQ YD | $3.00 | $3.30 | $4.50 | |
| 37 | 44000200 | DRIVE PAVEMENT REM | 69 | SQ YD | $16.00 | $3.00 | $0.0100 | |
| 38 | 44000500 | COMB CURB GUTTER REM | 648 | FOOT | $10.00 | $15.50 | $16.00 | |
| 39 | 44000600 | SIDEWALK REM | 4,408 | SQ FT | $3.00 | $4.50 | $4.00 | |
| 40 | 56109210 | WATER VALVES ADJUST | 2 | EACH | $400.00 | $500.00 | $275.00 | |
| 41 | 60255500 | MAN ADJUST | 1 | EACH | $650.00 | $500.00 | $550.00 | |
| 42 | 60260100 | INLETS ADJUST | 8 | EACH | $650.00 | $500.00 | $425.00 | |
| 43 | 60300305 | FR & LIDS ADJUST | 1 | EACH | $650.00 | $500.00 | $550.00 | |
| 44 | 60603800 | COMB CC&G TB6.12 | 23 | FOOT | $40.00 | $60.00 | $100.00 | |
| 45 | 60604400 | COMB CC&G TB6.18 | 16 | FOOT | $35.00 | $62.00 | $100.00 | |
| 46 | 60605000 | COMB CC&G TB6.24 | 609 | FOOT | $35.00 | $52.00 | $60.00 | |
| 47 | 66700205 | PERM SURV MKRS T1 | 2 | EACH | $1,100.00 | $2,500.00 | $800.00 | |
| 48 | 66900200 | NON SPL WASTE DISPOSL | 41 | CU YD | $105.00 | $92.00 | $150.00 | |
| 49 | 66900530 | SOIL DISPOSAL ANALY | 9 | EACH | $1,650.00 | $1,075.00 | $1,800.00 | |
| 50 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,250.00 | $2,300.00 | $3,500.00 | |
| 51 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,475.00 | $2,300.00 | $600.00 | |
| 52 | 66901006 | REG SUB MON | 15 | CAL DA | $880.00 | $1,200.00 | $750.00 | |
| 53 | 67000400 | ENGR FIELD OFFICE A | 4 | CAL MO | $4,000.00 | $1.00 | $4,000.00 | |
| 54 | 67100100 | MOBILIZATION | 1 | L SUM | $36,000.00 | $70,000.00 | $97,000.00 | |
| 55 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $1.00 | $10,250.00 | $55,000.00 | |
| 56 | 70102634 | TR CONT & PROT 701611 | 1 | L SUM | $1.00 | $1.00 | $1.00 | |
| 57 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $81,675.00 | $1.00 | $1.00 | |
| 58 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $1.00 | $1,000.00 | $2,000.00 | |
| 59 | 70300100 | SHORT TERM PAVT MKING | 3,765 | FOOT | $0.0100 | $0.0100 | $2.00 | |
| 60 | 70300150 | SHRT TRM PAVT MK REM | 838 | SQ FT | $0.0100 | $0.0100 | $0.0100 | |
| 61 | 78000100 | THPL PVT MK LTR & SYM | 369 | SQ FT | $6.49 | $5.90 | $6.00 | |
| 62 | 78000200 | THPL PVT MK LINE 4 | 7,021 | FOOT | $0.9800 | $0.8900 | $1.00 | |
| 63 | 78000400 | THPL PVT MK LINE 6 | 1,680 | FOOT | $1.64 | $1.49 | $1.50 | |
| 64 | 78000500 | THPL PVT MK LINE 8 | 413 | FOOT | $2.18 | $1.98 | $2.00 | |
| 65 | 78000600 | THPL PVT MK LINE 12 | 885 | FOOT | $3.27 | $2.97 | $3.00 | |
| 66 | 78003131 | PREF PL PM TB STAN L6 | 405 | FOOT | $4.68 | $4.25 | $4.50 | |
| 67 | 78003181 | PREF PL PM TB STAN L24 | 241 | FOOT | $18.70 | $17.00 | $18.00 | |
| 68 | 78011000 | GRV RCSD PM LTR & SYM | 264 | SQ FT | $5.50 | $5.00 | $5.00 | |
| 69 | 78011025 | GRV RCSD PVT MRKG 5 | 4,750 | FOOT | $1.16 | $1.05 | $1.25 | |
| 70 | 78011035 | GRV RCSD PVT MRKG 7 | 1,962 | FOOT | $1.45 | $1.32 | $1.50 | |
| 71 | 78011045 | GRV RCSD PVT MRKG 9 | 343 | FOOT | $2.20 | $2.00 | $2.25 | |
| 72 | 78011125 | GRV RCSD PVT MRKG 25 | 228 | FOOT | $5.50 | $5.00 | $5.50 | |
| 73 | 78100100 | RAISED REFL PAVT MKR | 144 | EACH | $46.75 | $100.00 | $45.00 | |
| 74 | 78300200 | RAISED REF PVT MK REM | 144 | EACH | $7.00 | $0.0100 | $0.0100 | |
| 75 | 81028340 | UNDRGRD C PVC 1 1/2 | 2 | FOOT | $330.00 | $500.00 | $550.00 | |
| 76 | 85000200 | MAIN EX TR SIG INSTAL | 1 | EACH | $3,850.00 | $2,500.00 | $3,000.00 | |
| 77 | 87301215 | ELCBL C SIGNAL 14 2C | 201 | FOOT | $4.26 | $5.00 | $5.50 | |
| 78 | 87301804 | ELCBL C SERV 6 1C | 201 | FOOT | $5.23 | $6.00 | $6.50 | |
| 79 | 87502440 | TS POST GALVS 10 | 1 | EACH | $2,750.00 | $1,800.00 | $2,000.00 | |
| 80 | 87800100 | CONC FDN TY A | 4 | FOOT | $550.00 | $200.00 | $225.00 | |
| 81 | 87900200 | DRILL EX HANDHOLE | 1 | EACH | $550.00 | $1,500.00 | $1,600.00 | |
| 82 | 88102825 | PED SH P LED 1F BM CT | 1 | EACH | $1,075.47 | $950.00 | $1,000.00 | |
| 83 | 89502300 | REM ELCBL FR CON | 169 | FOOT | $1.65 | $3.00 | $3.00 | |
| 84 | 89502375 | REMOV EX TS EQUIP | 1 | EACH | $385.00 | $1,500.00 | $1,600.00 | |
| 85 | 89502385 | REMOV EX CONC FDN | 1 | EACH | $605.00 | $1,500.00 | $1,600.00 |