Filtered by: County: Bureau Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2018 | 66H10 | BureauLaSalleDistrict 3 | "On Call" repair and maintenance of traffic signals, flashing beacons and roadway lighting throughout District 3. | — | Executed | Meade Inc. $88,323 · | ||
| Jan 19, 2018 | 66H74 | BureauDistrict 3 | Cleaning and painting bridge SN 006-0115 carrying CH 10 over I-80, 1.25 miles east of the Henry County line. | — | Executed | ERA-Valdivia Contractors, Inc. $271,374 · | ||
| Jan 19, 2018 | 66H75 | BureauDistrict 3 | Cleaning and painting bridge SN 006-0124 carrying TR 188 over I-80, 4.3 miles west of IL 26 in Bureau County. | — | Executed | ERA-Valdivia Contractors, Inc. $211,120 · | ||
| Jan 19, 2018 | 66H77 | BureauDistrict 3 | Cleaning and painting bridge SN 006-0131 carrying CH 27 over I-80, 0.5 mile west of I-180. | — | Executed | ERA-Valdivia Contractors, Inc. $212,380 · | ||
| Jan 19, 2018 | 66H78 | BureauDistrict 3 | Cleaning and painting bridge SN 006-0132 carrying East Road/CH 19 over I-80, 3 miles east of I-180. | — | Executed | ERA-Valdivia Contractors, Inc. $211,130 · | ||
| Jan 19, 2018 | 66H79 | BureauDistrict 3 | Cleaning and painting structural steel on SN 006-0097 carrying IL 92 over Green River, 1.4 miles west of IL 40. | — | Executed | ERA-Valdivia Contractors, Inc. $197,620 · | ||
| Jan 19, 2018 | 87675 | BureauDistrict 3 | Resurfacing from the Henry County line to the corporate limits of New Bedford. | — | Executed | Advanced Asphalt Company $1,194,338 · | ||
| Mar 9, 2018 | 66H82 | BureauDistrict 3 | Clean and paint bridge SN 006-0138 carrying IL 40 over BNSF Railway, 2.7 miles south of US 6/34 | — | Executed | ERA-Valdivia Contractors, Inc. $96,405 · | ||
| Mar 9, 2018 | 66H95 | BureauDistrict 3 | Centerline crack and joint sealing on I-80 from 0.7 mile east of I-180 to west of IL 89. | — | Executed | Complete Asphalt Service Co. $65,466 · | ||
| Mar 9, 2018 | 87672 | BureauDistrict 3 | Bridge replacement located 3.5 miles northwest of Sheffield over Smith Ditch. | — | Executed | Curnyn Construction Co. $231,566 · | ||
| Apr 27, 2018 | 66H70 | BureauDistrict 3 | Intall 6.1 miles of high tensin cable median barrier on I-80 from 0.42 mile west of 600 E Street to the 1200 E Street overpass. | — | Executed | Access Control Company, Inc. $700,595 · | ||
| Jun 15, 2018 | 46490 | BureauLaSalleDistrict 3 | Remove and replace Raised Reflective pavement markers and reflectors on various routes in District 3. | — | Executed | P & P Construction Co. $125,628 · | ||
| Jun 15, 2018 | 66A21 | BureauDistrict 3 | Remove structure SN 006-0106 and replace with a 70' 3-span structure to carry IL 89 over Brush Creek, 1.2 miles south of Arlington. | — | Executed | D. Construction, Inc. $1,045,173 · | ||
| Jun 15, 2018 | 66J05 | BureauDistrict 3 | Installation of 5.82 miles of high tension cable median barrier on I-80, from the 2750E Road overpass to the IL 89 overpass. | — | Executed | COLLINS & HERMANN, INC. $763,936 · | ||
| Jun 15, 2018 | 66J16 | BureauDistrict 3 | 6.16 miles of CL microsurfacing joint repair located 1.0 mile west of IL 26 to 0.6 mile east of I-80. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $374,648 · | ||
| Jun 15, 2018 | 66J22 | BureauDistrict 3 | 8,606.4 feet of milling resurfacing and paving existing shoulders on IL 40 from I-80 to US 34/US 6. | — | Executed | Advanced Asphalt Company $393,341 · | ||
| Jun 15, 2018 | 66J26 | BureauDeKalbDistrict 3 | Removal of 22 medium trees and 56 large trees, and ground restoration along I-80, IL 92, US 6, IL 72 and US 30. | — | Executed | Clean Cut Tree Service, Inc. $104,195 · | ||
| Jun 15, 2018 | 66J29 | BureauGrundyLaSalleDistrict 3 | Class A and Class B pavement patching and pavement marking on I-80 from the Henry/Bureau County line to the Grundy/Will County line. | — | Executed | D. Construction, Inc. $323,732 · | ||
| Jun 15, 2018 | 87654 | BureauDistrict 3 | Roadway reconstruction on FAU Route 5647 (Euclid Avenue) from Elm Place to Central Avenue in the city of Princeton. | — | Executed | Advanced Asphalt Company $2,350,963 · | ||
| Jun 15, 2018 | 87690 | BureauDistrict 3 | Crack filling on various routes in Bureau County. | — | Executed | Complete Asphalt Service Co. $96,600 · | ||
| Aug 3, 2018 | 66H27 | BureauDistrict 3 | Repair SN 006-0045 and 006-0046 carrying I-180 over IL 26. | — | Executed | D. Construction, Inc. $535,864 · | ||
| Aug 3, 2018 | 66J40 | BureauPutnamDistrict 3 | HMA wearing surface removal and replacement, and deck patching on the east bound lane of SN 078-001 carrying I-180 over the Illinois River. | — | Executed | D. Construction, Inc. $556,692 · | ||
| Nov 9, 2018 | 87686 | BureauDistrict 3 | Remove deteriorated wingwalls of the three-barrel box culvert and a portion of the box culvert ends and replace with permanent steel sheet pile wingwalls along with replacing the concrete on the culvert ends, located on FAS 247 (CH 31) at Crow Creek, 6.0 miles east of Bradford | — | Executed | Miller Trucking & Excavating Company $1,092,510 · | ||
| Jan 18, 2019 | 66H81 | BureauDistrict 3 | Cleaning and painting all strucutral steel of SN 006-0090 carrying IL 40 over Hennepin Canal. | — | Executed | Thomas Industrial Coatings, Inc. $99,935 · | ||
| Jan 18, 2019 | 66J37 | BureauDistrict 3 | Concrete deck, bearing, expansion joint, floor drain, guardrail/terminal section removal and replacement, and installing steel bridge railing to SN 006-0061 carrying US 6 over King Creek. | — | Executed | D. Construction, Inc. $426,461 · | ||
| Jan 18, 2019 | 66J43 | BureauDistrict 3 | Cleaning and painting all structural steel of SN 006-0039 carrying FAI 180 over FAI 80 approximately 4 miles east of Princeton. | — | Executed | ERA-Valdivia Contractors, Inc. $424,473 · | ||
| Jan 18, 2019 | 66J46 | BureauDistrict 3 | Cleaning and painting all structural steel of SN 006-0142 carrying IL 89 over a branch of Brush Creek approximately 0.8 miles south of Arlington. | — | Executed | Thomas Industrial Coatings, Inc. $101,065 · | ||
| Mar 8, 2019 | 66J76 | BureauLaSalleDistrict 3 | Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders. | — | Executed | Laser Electric, Inc. $75,883 · | ||
| Apr 26, 2019 | 87698 | BureauDistrict 3 | Replace the bridge carrying TR 281 over East Bureau Creek, 3.5 miles west of Depue. | — | Executed | Stark Excavating, Inc. $1,004,126 · | ||
| Jun 14, 2019 | 46917 | BureauDistrict 3 | 2 miles of resurfacing park roads and parking lots with A-2 Oil and Chip at Mautino State Fish and Wildlife Area. Project includes some roadway widening, culvert replacement and drainage improvements. | — | Executed | Phoenix Corporation of the Quad Cities $476,639 · | ||
| Jun 14, 2019 | 66E21 | BureauDistrict 3 | 4.34 MILES OF 3P MILLING AND RESURFACING 2.25" OF MAINLINE FROM 0.2 MILES N OF COUNTY ROAD 1500N ON US 6 TO ST MARY AND FROM US 6 TO W ILLINOIS ST. IT INCLUDES PAVEMENT MARKINGS AND REPLACING EXISTING DETECTOR LOOPS. | — | Executed | Advanced Asphalt Company $3,128,659 · | ||
| Jun 14, 2019 | 66J87 | BureauDistrict 3 | 10.5 MILES OF ROUTING AND SEALING TRANSVERSE AND PRIMARY LONGITUDINAL CRACKS GREATER THAN 0.25" WIDE AS WELL AS CLEANING AND SEALING SECONDARY CRACKS GREATER THAN 0.25" WIDE ON IL 26 FROM I-80 TO THE SOUTH OF RAILROAD AVE IN PRINCETON. MICROSURFACING THE CENTERLINE FROM 0.1 MILES N OF 2600N RD TO I-80. | — | Executed | A. C. Pavement Striping Co. $328,924 · | ||
| Jul 12, 2019 | 66H58 | BureauDistrict 3 | 9.9 miles of 3P 3.75" milling and resurfacing on IL-26 from N of IL-92 to S of red covered bridge road according to tamp designed overlay policy. Other work includes shoulder stone, pavement marking, and raised reflective pavement markers. | — | Executed | Advanced Asphalt Company $4,128,627 · | ||
| Aug 2, 2019 | 66A92 | BureauDistrict 3 | 6.03 miles of 3P milling and resurfacing on IL 40 from the Burlington Northern Santa Fe Railroad south of Buda to the Stark County line. Includes approach work on SN 006-0145, guardrail with shoulder stabilization, aggregate ditch checks, intermittent resurfacing, shoulder stone, pavement marking and raised reflectors. | — | Executed | Advanced Asphalt Company $3,084,437 · | ||
| Jan 17, 2020 | 66F08 | BureauPutnamDistrict 3 | Complete deck replacement of the I-180 bridge over the Illinois River and pavement resurfacing and replacement on the approach to the bridge. | — | Executed | Civil Constructors, Inc. $25,110,125 · | ||
| Jan 17, 2020 | 66K36 | BureauDistrict 3 | Cleaning and painting all structural steel including beams, diaphragms, bearings, drains, steel handrails when specified and all other steel components on SN's 006-0125 and 006-0126. | — | Executed | ERA-Valdivia Contractors, Inc. $416,773 · | ||
| Jan 17, 2020 | 66K74 | BureauDistrict 3 | Cleaning and painting all structural steel including beams, diaphragms, bearings, drains, steel handrails when specified and all other steel components of SN 006-0123 carrying TR 148 over I-80. | — | Executed | ERA-Valdivia Contractors, Inc. $194,041 · | ||
| Mar 6, 2020 | 87718 | BureauDistrict 3 | Resurfacing and aggregate shoulders on CH 24 from CH 8 to Tiskilwa Spur Road in Tiskilwa. | — | Executed | Advanced Asphalt Company $998,904 · | ||
| Mar 6, 2020 | 87719 | BureauDistrict 3 | Replace the bridge carrying W. Epperson Road over Epperson Run Creek at the western limits of the City of Princeton. | — | Executed | Curnyn Construction Co. $495,779 · | ||
| Mar 6, 2020 | 87734 | BureauDistrict 3 | Approximately 96.28 miles of bituminous surface treatment and crack filling on various county highways in Bureau County. | — | Executed | Pavement Maintenance Services, Inc. $2,594,660 · | ||
| Apr 24, 2020 | 66968 | BureauDistrict 3 | 3P milling and resurfacing on FAP 613 (US 34) from Henry County Line to 1200N Rd in Bureau County. | — | Executed | Advanced Asphalt Company $2,572,903 · | ||
| Apr 24, 2020 | 66K30 | BureauDistrict 3 | 5.76 miles of SMART overlay consisting of milling and resurfacing of 2" of HMA and additional ADA, guardrail, and drainage improvements from E of IL 40 to Hazelwood Dr in Wyanet. | — | Executed | Advanced Asphalt Company $1,697,790 · | ||
| Apr 24, 2020 | 66K58 | BureauDistrict 3 | Milling 3" and resurfacing 3.75" on the first mile, the rest of the project will be milled and resurfaced with 3.75" of HMA. The city of Princeton will participate with milling and resurfacing the parking lanes and ADA improvements. Minor drainage improvements are included. The project length is 1.34 miles. | — | Executed | Advanced Asphalt Company $967,303 · | ||
| Apr 24, 2020 | 66K92 | BureauDistrict 3 | Furnishing and installing stone dumped riprap to armor existing foreslope erosion on NB I-180 0.2 mile S of TR 281 (SN 006-0126). | — | Executed | D. Construction, Inc. $52,700 · | ||
| Jun 12, 2020 | 66K28 | BureauDistrict 3 | 3P milling and resurfacing (designed overlay) and ADA from US 6/34 to BSNF RR S of Buda. | — | Executed | Advanced Asphalt Company $1,374,338 · | ||
| Jun 12, 2020 | 66K59 | BureauDistrict 3 | 8.532 miles of milling and resurfacing 3-3/4" of mainline from the eastern city limit of Dover to IL 89 in Lamoille. This project includes pavement markings. | — | Executed | Advanced Asphalt Company $3,113,802 · | ||
| Jun 12, 2020 | 87720 | BureauDistrict 3 | Replace the bridge carrying Jefferson Street over Rocky run Creek in Tiskilwa. | — | Executed | D. Construction, Inc. $331,165 · | ||
| Jun 12, 2020 | 87721 | BureauDistrict 3 | Resurface Ladd Road from US 6 to Dakota Street in Spring Valley. | — | Executed | Advanced Asphalt Company $226,431 · | ||
| Jul 31, 2020 | 66L16 | BureauDistrict 3 | Scour mitigation measures (riprap) at SN 006-0114 carrying FAS 248 (Tiskilwa Spur) over Big Bureau Creek 0.3 mi N of Tiskilwa in Bureau County. | — | Executed | D. Construction, Inc. $40,542 · | ||
| Sep 18, 2020 | 66L09 | BureauDistrict 3 | Installing a 36" ERS concrete Pipe culvert adjacent to the box culvert This work is located on FAS Route 1279 (US 34) carrying US 34 adjacent to a concrete Box culvert, Structure No. 006-2569, Station 428+72 in Bureau County. This project consists of installing a 36" ERS concrete Pipe culvert adjacent to the box culvert. | — | Executed | Scanlon Excavating & Concrete, Inc. $54,859 · | ||
| Sep 18, 2020 | 66L11 | BureauDeKalbDistrict 3 | The removal and replacement of traffic signal "Controller Cabinets This work is located at various intersections on US 6 in Bureau County and IL 38 in DeKalb County. This work consists of the removal and replacement of traffic signal "Controller Cabinets." | — | Executed | H & H Electric Co. $429,688 · | ||
| Nov 6, 2020 | 87737 | BureauDistrict 3 | Replace the bridge carrying CH 8 over Maple Creek, 2 miles north of Wyanet. | — | Executed | D. Construction, Inc. $961,533 · | ||
| Jan 15, 2021 | 66K95 | BureauDistrict 3 | The removal of a quadruple (4) CMP 24" DIA culvert and replacement with a double (2) PPC 24" DIA pipe culvert This work is located on FAP 698 (IL 89) 0.3 miles north of E. Walnut St. in Ladd at station 564+45 in Bureau County. This work consists of the removal of a quadruple (4) CMP 24" DIA culvert and replacement with a double (2) PPC 24" DIA pipe culvert with guardrail removal. | — | Executed | R & R Landscaping & Irrigation $75,446 · | ||
| Jan 15, 2021 | 66L24 | BureauDistrict 3 | Bridge painting This work is located at Structure No. 006-0153, IL 92 over a stream, approximately 3.3 miles West of US 34 in Bureau County. This work consists of bridge painting. | — | Executed | Three Star Painting, Inc. $145,136 · | ||
| Jan 15, 2021 | 66L25 | BureauDistrict 3 | Bridge painting This work is located at Structure No. 006-0128, TR 333 over 1-180, approximately 3.3 miles West of US 34 in Bureau County. This work consists of bridge painting. | — | Executed | ERA-Valdivia Contractors, Inc. $208,017 · | ||
| Jan 15, 2021 | 66L26 | BureauDistrict 3 | Bridge painting This work is located at Structure No. 006-0041 (SB), 006-0042 (NB), approximately 2.54 miles North of IL 26 and Structure No. 006-0043 (NB), 006-0044 (SB), approximately 2.04 miles North of IL 26 in Bureau County. This work consists of bridge painting. | — | Executed | Three Star Painting, Inc. $651,622 · | ||
| Jan 15, 2021 | 66L44 | BureauLivingstonDistrict 3 | The work consists on performing Bridge Deck Concrete sealing at various bare concrete bridge decks in Bureau and Livingston counties. | — | Executed | All States Painting, Inc. $177,640 · | ||
| Jan 15, 2021 | 87745 | BureauDistrict 3 | Resurfacing CH 19 from Angling Road to US 6. | — | Executed | Advanced Asphalt Company $1,111,251 · | ||
| Apr 23, 2021 | 66E14 | BureauDistrict 3 | 3P mill and resurface. | — | Executed | Advanced Asphalt Company $4,496,640 · | ||
| Apr 23, 2021 | 66K60 | BureauDistrict 3 | 7.3 miles of milling and resurfacing, ADA improvements. | — | Executed | Advanced Asphalt Company $2,816,475 · | ||
| Apr 23, 2021 | 66L32 | BureauDistrict 3 | The installation of approximately 5 This project consists of the installation of approximately 5.24 miles of high tension cable median barrier from the Henry/Bureau County Line to 0.42 miles West of 600E Rd. | — | Executed | Advanced Asphalt Company $1,112,433 · | ||
| Apr 23, 2021 | 66L62 | BureauLaSalleDistrict 3 | The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Bureau and LaSalle Counties. | — | Executed | Laser Electric, Inc. $71,890 · | ||
| Apr 23, 2021 | 66L70 | BureauDistrict 3 | Weed spraying to aid in weed control This project is located along FAI 80 (I-80) in Bureau county. The work consists of weed spraying to aid in weed control. | — | Executed | Endrizzi Contracting, Inc $99,891 · | ||
| Apr 23, 2021 | 87764 | BureauDistrict 3 | Replace the bridge carrying CH 24 over a branch of Pond Creek, 2 miles south of Wyanet. | — | Executed | D. Construction, Inc. $338,614 · | ||
| Jun 11, 2021 | 66A96 | BureauDistrict 3 | 3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement on US 6 from IL 26 South in Princeton to IL 89 North in Spring Valley. | — | Executed | Advanced Asphalt Company $5,946,378 · | ||
| Jun 11, 2021 | 66L60 | BureauDistrict 3 | Class B pavement patching and pavement striping This work is location on FAI 80 ( I-80) beginning at the I -80 and I -180 Interchange and ending at the I -80 and IL 89 Interchange. This work consists of Class B pavement patching and pavement striping. | — | Executed | G. M. Sipes Construction, Inc. $294,924 · | ||
| Jun 11, 2021 | 87762 | BureauDistrict 3 | Replace the bridge carrying TR 130 over Silver Creek, 7.0 miles southeast of Buda. | — | Executed | Curnyn Construction Co. $311,681 · | ||
| Jul 30, 2021 | 87781 | BureauDistrict 3 | Repair the undermining at the abutments and install improved drainage at the bridge carrying Peru Road over Negro Creek, just south of US 6. | — | Executed | D. Construction, Inc. $198,183 · | ||
| Sep 17, 2021 | 66M08 | BureauLaSalleDistrict 3 | The installation of four changeable speed warning signs on the outer interchange ramps at I-80 and I-39 and th This project consists of the installation of four changeable speed warning signs on the outer interchange ramps at I-80 and I-39 and three changeable speed warning signs at the I-80 and I-180 interchange. | — | Executed | T.M.F. Construction Company $71,655 · | ||
| Nov 5, 2021 | 66H26 | BureauDistrict 3 | The project is a bridge replacement over the Hennepin Feeder Canal located on IL 92, 1 mile East of IL 172 in Bureau County. The profile grade will be raised approx 5'-10", therefore, additional work such as guardrail upgrades, embankment, etc is expected. Work within IDNR property is also proposed. Construction shall be achieved via Detour. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $2,548,314 · | ||
| Nov 5, 2021 | 66J01 | BureauDistrict 3 | Removal and replacement of superstructures on SN 006-0014 and 006-0015, milling and resurfacing of mainline an This project is located on FAI 80 (I-80) at the Maple Grove Creek crossing, approximately 2 miles north of Wyanet, in Bureau County. The work consists of removal and replacement of superstructures on SN 006-0014 and 006-0015, milling and resurfacing of mainline and shoulders, guardrail removal and replacement, and other work. | — | Executed | D. Construction, Inc. $2,541,583 · | ||
| Mar 11, 2022 | 66L57 | BureauDistrict 3 | Work begins in Ohio, Illinois at the intersection of IL 26 and IL 92 and goes West 9.9 miles including a 3P milling and resurfacing of IL 92, drainage improvements, and guardrail improvements. The project terminates at the junction of US 34 and IL 89 in La Moille, Illinois. | — | Executed | Advanced Asphalt Company $3,472,037 · | ||
| Mar 11, 2022 | 87784 | BureauDistrict 3 | Sidewarlk construction and replacemnt at various locations within Princeton. | — | Executed | Advanced Asphalt Company $363,355 · | ||
| Mar 11, 2022 | 87785 | BureauDistrict 3 | Sidewalk replacement at various locations in DePue. | — | Executed | Advanced Asphalt Company $248,541 · | ||
| Apr 29, 2022 | 66A79 | BureauDistrict 3 | 3P milling and resurfacing This work is located at FAS 1247 (US 6), approximately 1.0 miles East of Henry County Line to US 34 (S) in Sheffield in Bureau County (+/-5.74 miles). This work consists of 3P milling and resurfacing. | — | Executed | Advanced Asphalt Company $3,588,523 · | ||
| Apr 29, 2022 | 66F91 | BureauDistrict 3 | The project consists on the removal and replacement of six concrete box culverts on IL 29 (DePue Spur) in Bureau County. The scope of work includes milling and resurfacing the area in between culverts and guardrail upgrades. Traffic control shall be achieved by detour. The project length is 0.6 miles. | — | Executed | Gensini Excavating, Inc. $3,420,890 · | ||
| Apr 29, 2022 | 66K35 | BureauDistrict 3 | Spot improvement to remove and replace a box culvert located 0.2 mile South of IL 92 in Ohio IL. | — | Executed | Phoenix Corporation of the Quad Cities $535,704 · | ||
| Apr 29, 2022 | 66K57 | BureauDistrict 3 | Work begin at IL 92/IL 89 intersection just North of Lamoille and end 0.2 mile South of Plank Road in Cherry. The project is a 3P milling and resurfacing of IL 89 including drainage and ADA improvements. | — | Executed | Advanced Asphalt Company $5,628,157 · | ||
| Apr 29, 2022 | 66K73 | BureauDistrict 3 | Bridge Replacements SN 006-0117 and SN 006-0121 under TR 60B 4.8 miles East of Henry County Line; under TR 82C, 1.5 miles north of Sheffield. | — | Executed | D. Construction, Inc. $7,246,218 · | ||
| Apr 29, 2022 | 66L72 | BureauDistrict 3 | Work begin 0.1 mile East of Lincoln Avenue in Depue and at IL 89 in Spring Valley. The project is a SMART overlay, shoulder widening and rumble strips. | — | Executed | Advanced Asphalt Company $1,899,841 · | ||
| Jun 17, 2022 | 66M35 | BureauLaSalleDistrict 3 | Washing all structural and non-structural steel, entire bridge deck surface, parapet walls, abutment seats, to This project is located at five structures spanning the Illinois River in IDOT District 3. This work consists of washing all structural and non-structural steel, entire bridge deck surface, parapet walls, abutment seats, tops of piers, deck drains and scuppers. | — | Executed | All States Painting, Inc. $378,400 · | ||
| Jun 17, 2022 | 87778 | BureauDistrict 3 | Replace the double barrel box culvert with a 10' x 12' double barrel reinforced concrete box culvert over Hickory Creek at Backbone Road. | — | Executed | Gensini Excavating, Inc. $961,378 · | ||
| Sep 23, 2022 | 66M91 | BureauLaSalleDistrict 3 | Centerline milling and resurfacing 2 feet wide, at a depth of 2", pavement marking, and raised reflectors This project is located on FAI 80 (I-80) from 0.7 mile East of I-180 to 0.7 mile West of Il 251. The work consists of centerline milling and resurfacing 2 feet wide, at a depth of 2", pavement marking, and raised reflectors. | — | Executed | Advanced Asphalt Company $1,093,285 · | ||
| Nov 18, 2022 | 66M31 | BureauDistrict 3 | Milling and resurfacing 1 1/2" (SMART), aggregate shoulders, guardrail work, pavement marking, and raised refl This project is located on FAP 587 (US 34) beginning N. of LaMoille and ending at the LaSalle County line,_for a total of 5.85 miles. Work consists of milling and resurfacing 1 1/2" (SMART), aggregate shoulders, guardrail work, pavement marking, and raised reflectors. | — | Executed | Advanced Asphalt Company $1,765,431 · | ||
| Nov 18, 2022 | 66M74 | BureauDistrict 3 | Structure No. 006-0153, Bridge Rehabilitation, 3.3 mi. west of US 34 (Lamoille). | — | Executed | D. Construction, Inc. $546,258 · | ||
| Mar 10, 2023 | 66N01 | BureauDistrict 3 | Removal of existing light structures and construction of new light poles and electrical control unit. | — | Executed | Electric Conduit Construction $406,731 · | ||
| Mar 10, 2023 | 66N07 | BureauDistrict 3 | The work includes turf restoration, aerating, applying herbicide and soil amendments to all existing lawn areas, mulch placement in playgrounds and around existing landscape trees, tree trimming of existing landscape trees, and setup and removal of traffic control at the Great Sauk Trail Rest Area grounds on Eastbound and Westbound I-80 in Bureau County at approximately mile marker 51. | — | Rejected | |||
| Apr 28, 2023 | 66J65 | BureauDistrict 3 | 9.49 miles of designed overlay with bridge repairs from the Henry county Line to IL 40 on Interstate 80. | — | Executed | Advanced Asphalt Company $36,870,619 · | ||
| Apr 28, 2023 | 66M70 | BureauDistrict 3 | Bridge Approach removal and replacement, resurfacing, guardrail removal, and re-installation and pavement marking on IL 26 over Big Bureau Creek. | — | Executed | Stark Excavating, Inc. $653,949 · | ||
| Apr 28, 2023 | 87797 | BureauDistrict 3 | HMA overlay with aggregate shoulders on CH 8 from CH 12 to US 6. | — | Executed | Advanced Asphalt Company $2,153,163 · | ||
| Jun 16, 2023 | 87806 | BureauDistrict 3 | HMA resurfacing with ADA curb ramps, curb and gutter, sidewalks, and Pavement markings on 4th Street from Strong Avenue to Greenwood Street in Spring Valley. | — | Executed | Advanced Asphalt Company $381,331 · | ||
| Jan 19, 2024 | 64P41 | BureauWhitesideDistrict 2 | Cold Milling, Pavement Patching, and Hot-Mix Asphalt Resurfacing on IL 40 from 0.4 mile north of I-88 to IL 92. | — | Rejected | Martin & Company Excavating $6,978,085 · | ||
| Jan 19, 2024 | 66967 | BureauDistrict 3 | HMA milling and resurfacing, culvert replacement, ditch cleaning, pavement marking, and raised reflectors This job is located on FAP 587 (IL 92) from 0.1 mile east of IL 40 to WCL Walnut City, for a length of 4.36 miles. The work consists of HMA milling and resurfacing, culvert replacement, ditch cleaning, pavement marking, and raised reflectors. | — | Executed | Advanced Asphalt Company $2,548,799 · | ||
| Mar 8, 2024 | 66M88 | BureauDistrict 3 | Crack routing and sealing, and pavement marking This project is located on FAP 646 (IL 40), it begins south of the BNSF Railroad at the south city limits of Buda and ends at the Stark County line. The work consists of crack routing and sealing, and pavement marking. | — | Executed | Complete Asphalt Service Co. $42,302 · | ||
| Mar 8, 2024 | 66M96 | BureauDistrict 3 | HMA milling and resurfacing, Class B patching, drainage work, paverment marking, and raised reflective markers This project is located on FAS 248 (Tiskilwa Spur), it begins 0.7 mile north of Lovers Lane Road and ends 0.3 mile south of 1075N Road. The work consists of HMA milling and resurfacing, Class B patching, drainage work, paverment marking, and raised reflective markers. | — | Executed | Advanced Asphalt Company $3,072,639 · | ||
| Mar 8, 2024 | 87811 | BureauDistrict 3 | HMA resurfacing, curb and gutter, and traffic signals on South Main Street in Princeton. | — | Executed | Advanced Asphalt Company $845,557 · | ||
| Mar 8, 2024 | 87842 | BureauDistrict 3 | Sidewalk construction along various streets in Ladd. | — | Executed | Gensini Excavating, Inc. $282,441 · | ||
| Apr 26, 2024 | 66N53 | BureauDistrict 3 | Bridge repairs at Structure No. 006-0083 carrying FAS 1252 (IL 26/29) over Bureau Creek Overflow, 0.3 mi. northeast of IL 26 and IL 29 junction. | — | Executed | Gensini Excavating, Inc. $431,733 · | ||
| Apr 26, 2024 | 66N93 | BureauDistrict 3 | Cleaning and painting all structural steel on Structure No. 006-0083 carrying IL 29/26 over Big Bureau Creek Overflow, 0.3 mi. north of the south junction of IL 26 and Structure No. 006-0084 carrying IL 29 over over Big Bureau Creek, 0.3 mi. south of the south junction of IL 26. | — | Executed | ERA-Valdivia Contractors, Inc. $548,417 · | ||
| Apr 26, 2024 | 87815 | BureauDistrict 3 | Replace the bridge carrying TR 312 over the Tributary to Masters Creek, 4 miles west of LaMolle. | — | Executed | Curnyn Construction Co. $499,288 · |
1–100 of 141Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.