(06-3B)BR
- Let date
- Friday, November 5, 2021
- Contract
- 66J01 · job page
- District
- District 3
- County
- Bureau
- Highway
- Limits
- This project is located on FAI 80 (I-80) at the Maple Grove Creek crossing, approximately 2 miles north of Wyanet, in Bureau County. The work consists of removal and replacement of superstructures on SN 006-0014 and 006-0015, milling and resurfacing of mainline and shoulders, guardrail removal and replacement, and other work.
- Classification
- Removal and replacement of superstructures on SN 006-0014 and 006-0015, milling and resurfacing of mainline an
Bidders 4
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | D. Construction, Inc. Low bidder | $2,541,583 | ||
| 2 | ICC Group Inc. | $2,845,000 | +11.9% | |
| 3 | Civil Constructors, Inc. d/b/a/ Helm Civil | $2,936,019 | +15.5% | |
| 4 | Brandt Construction Co. | $3,979,715 | +56.6% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 D. Construction… | #2 ICC Group Inc. | #3 Civil Construct… | #4 Brandt Construc… |
|---|---|---|---|---|---|---|---|---|---|
| 1 | X0325201 | SHOULDER RUM STRIP RM | 845 | SQ YD | $25.00 | $30.00 | $30.00 | $64.50 | |
| 2 | X0326649 | LINEAR DELIN PANELS 6 | 8 | EACH | $82.50 | $75.00 | $115.00 | $85.00 | |
| 3 | X0327809 | LINEAR DELIN PANELS 4 | 14 | EACH | $121.00 | $110.00 | $105.00 | $125.00 | |
| 4 | X2700027 | PREF PL PM TD L 8 CON | 1,560 | FOOT | $9.35 | $7.90 | $12.75 | $9.00 | |
| 5 | X5030250 | BR DECK GROOVING LONG | 894 | SQ YD | $8.50 | $5.09 | $9.49 | $13.50 | |
| 6 | X7010208 | TC-PROT 701402 SPL | 2 | EACH | $24,400.00 | $30,000.00 | $9,860.00 | $38,500.00 | |
| 7 | X7030005 | TEMP PAVT MKING REMOV | 5,603 | SQ FT | $1.50 | $0.7500 | $1.00 | $0.8500 | |
| 8 | X7830070 | GRV RCSD PVT MRKG 5 | 12,264 | FOOT | $0.7200 | $0.5000 | $0.7000 | $0.7000 | |
| 9 | X7830074 | GRV RCSD PVT MRKG 7 | 1,560 | FOOT | $1.32 | $1.10 | $2.20 | $1.25 | |
| 10 | Z0004552 | APPROACH SLAB REM | 212 | SQ YD | $30.00 | $75.00 | $46.00 | $30.00 | |
| 11 | Z0005216 | HMA STAB 6 AT SPBGR | 551 | SQ YD | $44.50 | $50.00 | $50.00 | $55.00 | |
| 12 | Z0012754 | STR REP CON DP = < 5 | 30 | SQ FT | $215.00 | $120.00 | $283.00 | $285.00 | |
| 13 | Z0029090 | DIAMOND GRIND BR SEC | 1,370 | SQ YD | $14.00 | $20.00 | $15.80 | $17.50 | |
| 14 | Z0033700 | LONG JOINT SEALANT | 918 | FOOT | $7.68 | $10.00 | $8.45 | $8.75 | |
| 15 | Z0040530 | PIPE UNDERDRAIN REMOV | 160 | FOOT | $6.00 | $18.00 | $17.00 | $11.50 | |
| 16 | Z0046304 | P UNDR FOR STRUCT 4 | 262 | FOOT | $27.50 | $30.00 | $40.80 | $30.00 | |
| 17 | Z0065700 | SLOPE WALL REPAIR | 1 | SQ YD | $2,500.00 | $1,000.00 | $2,000.00 | $2,000.00 | |
| 18 | 20100110 | TREE REMOV 6-15 | 73 | UNIT | $110.00 | $45.00 | $45.00 | $65.00 | |
| 19 | 20101000 | TEMPORARY FENCE | 609 | FOOT | $4.40 | $4.00 | $3.83 | $5.00 | |
| 20 | 20101400 | NITROGEN FERT NUTR | 72 | POUND | $4.40 | $4.00 | $1.00 | $1.15 | |
| 21 | 20101500 | PHOSPHORUS FERT NUTR | 72 | POUND | $4.40 | $4.00 | $1.00 | $1.15 | |
| 22 | 20101600 | POTASSIUM FERT NUTR | 72 | POUND | $4.40 | $4.00 | $1.00 | $1.15 | |
| 23 | 20200100 | EARTH EXCAVATION | 502 | CU YD | $35.00 | $38.00 | $40.00 | $55.00 | |
| 24 | 25000210 | SEEDING CL 2A | 0.8 | ACRE | $1,650.00 | $1,500.00 | $3,000.00 | $3,600.00 | |
| 25 | 25100630 | EROSION CONTR BLANKET | 3,871 | SQ YD | $1.38 | $1.25 | $2.00 | $1.50 | |
| 26 | 28000305 | TEMP DITCH CHECKS | 452 | FOOT | $11.00 | $10.00 | $10.00 | $11.50 | |
| 27 | 28000400 | PERIMETER EROS BAR | 2,386 | FOOT | $2.20 | $2.00 | $2.25 | $3.25 | |
| 28 | 28000500 | INLET & PIPE PROTECT | 1 | EACH | $209.00 | $190.00 | $200.00 | $200.00 | |
| 29 | 28100107 | STONE RIPRAP CL A4 | 370 | SQ YD | $65.00 | $60.00 | $108.75 | $77.00 | |
| 30 | 28200200 | FILTER FABRIC | 370 | SQ YD | $5.00 | $5.00 | $2.50 | $4.25 | |
| 31 | 30300112 | AGG SUBGRADE IMPR 12 | 188 | SQ YD | $25.00 | $30.00 | $50.00 | $36.25 | |
| 32 | 31102300 | SUB GRAN MAT C 6 | 699 | SQ YD | $11.50 | $27.00 | $18.50 | $26.50 | |
| 33 | 40600290 | BIT MATLS TACK CT | 4,391 | POUND | $0.0100 | $1.30 | $1.30 | $1.55 | |
| 34 | 40603085 | HMA BC IL-19.0 N70 | 590 | TON | $85.00 | $125.00 | $125.00 | $140.00 | |
| 35 | 40603240 | P HMA BC IL19.0 N90 | 307 | TON | $95.00 | $140.00 | $140.00 | $140.00 | |
| 36 | 40604062 | HMA SC IL-9.5 D N70 | 191 | TON | $90.00 | $130.00 | $130.00 | $140.00 | |
| 37 | 40604174 | P HMA SC IL-9.5 E N90 | 205 | TON | $99.00 | $145.00 | $145.00 | $175.00 | |
| 38 | 42000080 | PVT CON PCC BR APP SL | 176 | SQ YD | $175.00 | $210.00 | $320.00 | $305.00 | |
| 39 | 44000100 | PAVEMENT REM | 212 | SQ YD | $25.00 | $50.00 | $33.00 | $35.00 | |
| 40 | 44000164 | HMA SURF REM 3 3/4 | 3,059 | SQ YD | $6.50 | $12.00 | $12.00 | $6.50 | |
| 41 | 44000173 | HMA SURF REM 6 | 1,248 | SQ YD | $8.00 | $15.00 | $15.00 | $10.50 | |
| 42 | 44004250 | PAVED SHLD REMOVAL | 624 | SQ YD | $15.00 | $18.00 | $17.00 | $30.00 | |
| 43 | 48101500 | AGGREGATE SHLDS B 6 | 302 | SQ YD | $12.00 | $33.00 | $33.00 | $21.00 | |
| 44 | 50101700 | REM EXIST SUP-STR N1 | 1 | EACH | $75,000.00 | $90,000.00 | $52,000.00 | $180,000.00 | |
| 45 | 50101800 | REM EXIST SUP-STR N2 | 1 | EACH | $75,000.00 | $90,000.00 | $52,000.00 | $180,000.00 | |
| 46 | 50102400 | CONC REM | 31 | CU YD | $1,200.00 | $750.00 | $1,460.00 | $2,700.00 | |
| 47 | 50104650 | SLOPE WALL REMOV | 70 | SQ YD | $35.00 | $100.00 | $114.00 | $25.00 | |
| 48 | 50200100 | STRUCTURE EXCAVATION | 234 | CU YD | $35.00 | $70.00 | $27.30 | $50.00 | |
| 49 | 50300225 | CONC STRUCT | 50.8 | CU YD | $700.00 | $750.00 | $618.00 | $885.00 | |
| 50 | 50300255 | CONC SUP-STR | 669.8 | CU YD | $1,000.00 | $900.00 | $1,050.00 | $1,950.00 | |
| 51 | 50300300 | PROTECTIVE COAT | 1,810 | SQ YD | $2.00 | $3.00 | $2.50 | $3.00 | |
| 52 | 50301350 | CONC SUPSTR APP SLAB | 238 | CU YD | $425.00 | $450.00 | $470.00 | $500.00 | |
| 53 | 50800205 | REINF BARS, EPOXY CTD | 329,540 | POUND | $1.80 | $2.00 | $2.00 | $1.90 | |
| 54 | 50800515 | BAR SPLICERS | 1,146 | EACH | $65.00 | $65.00 | $87.00 | $95.00 | |
| 55 | 51500100 | NAME PLATES | 2 | EACH | $600.00 | $650.00 | $780.00 | $724.55 | |
| 56 | 52200020 | TEMP SOIL RETEN SYSTM | 208 | SQ FT | $50.00 | $500.00 | $190.00 | $125.00 | |
| 57 | 58600101 | GRANULAR BACKFILL STR | 220 | CU YD | $52.50 | $65.00 | $75.00 | $105.00 | |
| 58 | 59000200 | EPOXY CRACK INJECTION | 34 | FOOT | $65.00 | $210.00 | $140.00 | $180.00 | |
| 59 | 59100100 | GEOCOMPOSITE WALL DR | 132 | SQ YD | $35.00 | $35.00 | $140.00 | $45.00 | |
| 60 | 59300100 | CONTR LOW-STRENG MATL | 2 | CU YD | $400.00 | $500.00 | $440.00 | $550.00 | |
| 61 | 60108501 | PIPE UNDERDR T 3 | 80 | FOOT | $30.00 | $20.00 | $52.70 | $20.00 | |
| 62 | 63000001 | SPBGR TY A 6FT POSTS | 962.5 | FOOT | $39.88 | $36.25 | $36.00 | $40.00 | |
| 63 | 63100045 | TRAF BAR TERM T2 | 2 | EACH | $2,183.50 | $1,985.00 | $1,750.00 | $2,250.00 | |
| 64 | 63100085 | TRAF BAR TERM T6 | 8 | EACH | $3,905.00 | $3,550.00 | $3,700.00 | $4,025.00 | |
| 65 | 63100167 | TR BAR TRM T1 SPL TAN | 6 | EACH | $3,795.00 | $3,450.00 | $2,800.00 | $3,900.00 | |
| 66 | 63200310 | GUARDRAIL REMOV | 1,347 | FOOT | $4.40 | $4.00 | $12.00 | $4.50 | |
| 67 | 63500310 | REM & REIN DELINEATOR | 11 | EACH | $59.13 | $53.75 | $110.00 | $60.00 | |
| 68 | 64200116 | SHOULDER RUM STRIP 16 | 4,577 | FOOT | $1.90 | $1.28 | $1.74 | $2.00 | |
| 69 | 67000400 | ENGR FIELD OFFICE A | 7 | CAL MO | $3,500.00 | $2,000.00 | $2,900.00 | $3,000.00 | |
| 70 | 67100100 | MOBILIZATION | 1 | L SUM | $73,000.00 | $169,292.05 | $176,161.00 | $240,000.00 | |
| 71 | 70106800 | CHANGEABLE MESSAGE SN | 1 | CAL MO | $3,000.00 | $1,500.00 | $3,500.00 | $1,700.00 | |
| 72 | 70300220 | TEMP PVT MK LINE 4 | 16,810 | FOOT | $0.5000 | $0.7500 | $1.10 | $0.9000 | |
| 73 | 70400100 | TEMP CONC BARRIER | 2,412.5 | FOOT | $30.00 | $13.50 | $34.00 | $39.00 | |
| 74 | 70400200 | REL TEMP CONC BARRIER | 1,875 | FOOT | $12.00 | $9.00 | $8.50 | $10.00 | |
| 75 | 70600250 | IMP ATTN TEMP NRD TL3 | 2 | EACH | $5,000.00 | $4,400.00 | $2,250.00 | $4,975.00 | |
| 76 | 70600350 | IMP ATTN REL NRD TL3 | 2 | EACH | $1,500.00 | $1,400.00 | $750.00 | $1,550.00 | |
| 77 | 72501000 | TERMINAL MARKER - DA | 6 | EACH | $44.00 | $40.00 | $35.00 | $45.00 | |
| 78 | 78008210 | POLYUREA PM T1 LN 4 | 12,264 | FOOT | $1.05 | $0.9500 | $0.9600 | $1.10 | |
| 79 | 78100100 | RAISED REFL PAVT MKR | 156 | EACH | $55.00 | $50.00 | $75.00 | $55.00 | |
| 80 | 78200005 | GRDRAIL REF TYPE A | 25 | EACH | $11.00 | $10.00 | $15.00 | $15.00 | |
| 81 | 78300200 | RAISED REF PVT MK REM | 156 | EACH | $10.00 | $50.00 | $16.00 | $30.00 | |
| 82 | 78300202 | PAVMT MRKG REM WTR BL | 4,702 | SQ FT | $2.48 | $1.85 | $1.65 | $2.10 |