(102)CR
- Let date
- Friday, January 15, 2021
- Contract
- 66K95 · job page
- District
- District 3
- County
- Bureau
- Highway
- Limits
- This work is located on FAP 698 (IL 89) 0.3 miles north of E. Walnut St. in Ladd at station 564+45 in Bureau County. This work consists of the removal of a quadruple (4) CMP 24" DIA culvert and replacement with a double (2) PPC 24" DIA pipe culvert with guardrail removal.
- Classification
- The removal of a quadruple (4) CMP 24" DIA culvert and replacement with a double (2) PPC 24" DIA pipe culvert
Bidders 5
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | R & R Landscaping & Irrigation Low bidder | $75,446 | ||
| 2 | Herbig Blacktop Construction | $76,136 | +0.9% | |
| 3 | CSD Environmental Services, Inc. | $76,193 | +1.0% | |
| 4 | Scanlon Excavating & Concrete, Inc. | $79,275 | +5.1% | |
| 5 | G. M. Sipes Construction, Inc. | $87,480 | +16.0% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 R & R Landscapi… | #2 Herbig Blacktop… | #3 CSD Environment… | #4 Scanlon Excavat… | #5 G. M. Sipes Con… |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Z0030850 | TEMP INFO SIGNING | 42 | SQ FT | $40.00 | $38.00 | $72.50 | $22.00 | $50.00 | |
| 2 | 20800150 | TRENCH BACKFILL | 50 | CU YD | $128.00 | $75.00 | $57.78 | $80.00 | $50.00 | |
| 3 | 44201819 | CL D PATCH T3 14 | 38 | SQ YD | $610.00 | $400.00 | $175.00 | $600.00 | $500.00 | |
| 4 | 48101200 | AGGREGATE SHLDS B | 10 | TON | $135.00 | $100.00 | $230.00 | $150.00 | $150.00 | |
| 5 | 50102400 | CONC REM | 8 | CU YD | $550.00 | $550.00 | $409.12 | $250.00 | $200.00 | |
| 6 | 50105220 | PIPE CULVERT REMOV | 168 | FOOT | $57.00 | $50.00 | $5.00 | $45.00 | $10.00 | |
| 7 | 542A0229 | P CUL CL A 1 24 | 96 | FOOT | $110.00 | $200.00 | $378.49 | $200.00 | $375.00 | |
| 8 | 54213669 | PRC FLAR END SEC 24 | 2 | EACH | $700.00 | $1,100.00 | $3,500.00 | $1,800.00 | $3,900.00 | |
| 9 | 63200310 | GUARDRAIL REMOV | 260 | FOOT | $15.00 | $18.00 | $10.00 | $6.50 | $5.00 | |
| 10 | 67100100 | MOBILIZATION | 1 | L SUM | $7,000.00 | $3,960.00 | $5,261.02 | $4,000.00 | $4,000.00 | |
| 11 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $3,500.00 | $11,250.00 | $3,000.00 | $12,000.00 | $10,000.00 | |
| 12 | 70100455 | TRAF CONT-PROT 701206 | 1 | L SUM | $2,500.00 | $500.00 | $3,000.00 | $1.00 | $0.0100 |