Filtered by: County: Livingston Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2018 | 66H99 | KankakeeLivingstonDistrict 3 | Removal, replacement and rewiring of light towers, light poles and their foundations at 2 locations in Livingston County and at 1 location in Kankakee County. | — | Executed | Bodine Electric of Decatur $770,899 · | ||
| Jan 19, 2018 | 87681 | LivingstonDistrict 3 | Cleaning and repainting of the soffit, fascia, and exterior wood parts, and cleaning and tuck pointing on the historic Dwight train depot in the Village of Dwight. | — | Rejected | D. Construction, Inc. $103,093 · | ||
| Apr 27, 2018 | 66J18 | GrundyLivingstonDistrict 3 | 2 applications of spary mixtures, spring and summer of 2018, along various routes in Grundy and Livingston /counties. | — | Executed | Endrizzi Contracting, Inc $109,840 · | ||
| Jun 15, 2018 | 46501 | FordIroquoisLivingstonDistrict 3 | Remove and replace raised reflective pavement markers and reflectors on various routes in District 3 | — | Rejected | ROADSAFE TRAFFIC SYSTEMS, INC. $257,475 · | ||
| Jun 15, 2018 | 66B64 | LivingstonDistrict 3 | 6.01 miles of rubblization, pavement reconstruction and structure repairs on I-55 from 1.7 miles south of IL 116 to 0.6 mile north of IL 23 at Pontiac. | — | Executed | Kankakee Valley Construction Company, Inc. $40,969,992 · | ||
| Jun 15, 2018 | 66H28 | LivingstonDistrict 3 | Repair SN 053-0120 and 0121 carrying I-55 over Rooks Creek, 1.1 miles north of the McLean County Line. | — | Executed | Tobey's Construction & Cartage, Inc. $764,029 · | ||
| Jun 15, 2018 | 66J02 | LivingstonDistrict 3 | Various repairs to SN 053-0066 carrying IL 116 over Turdey Creek, 1.1 miles east of I-55. | — | Executed | Tobey's Construction & Cartage, Inc. $374,127 · | ||
| Jun 15, 2018 | 66J31 | GrundyLivingstonDistrict 3 | Class A pavement patching and pavement marking from the McLean/Livingston County line to the Grundy/Will County line. | — | Executed | G. M. Sipes Construction, Inc. $722,218 · | ||
| Aug 3, 2018 | 66J35 | LivingstonDistrict 3 | Class B patching on IL 17 from Waupansie Street to IL 47. | — | Executed | G. M. Sipes Construction, Inc. $94,034 · | ||
| Nov 9, 2018 | 66H31 | LivingstonDistrict 3 | Class B patching (SPECIAL) and partial depth concrete and hot mix asphalt patching of historic concrete pavement on Old Route 66 from IL 116 to the Mclean County line. | — | Executed | Kinney Contractors, Inc. $640,392 · | ||
| Nov 9, 2018 | 66H50 | LivingstonDistrict 3 | 0.318 mile of pavement reconstruction, 1.7 miles south of IL 17 to 1.4 miles south of IL 17. | — | Executed | D. Construction, Inc. $2,821,316 · | ||
| Nov 9, 2018 | 66J49 | LivingstonDistrict 3 | Remove existing paved shoulders with curbs (HMA), earth excavation, granular subbase, contructing combination concrete curb and gutter, removal and replacement of all steel plate beam guardrail including terminals, erosion repairs, and other miscellaneous work. | — | Executed | Iroquois Paving Corporation $258,840 · | ||
| Jan 18, 2019 | 66J67 | GrundyLivingstonDistrict 3 | Two application of spray mixtures at designated times, once in the Spring and once in the summer, along I-80, I-55 and IL 113 in Grundy County and along I-55, IL 47, and IL 23 in Livingston County. | — | Executed | Endrizzi Contracting, Inc $126,725 · | ||
| Mar 8, 2019 | 66J53 | LivingstonDistrict 3 | Microsurfacing full-width existing pavement on IL 116 from Pearl Street in Pontiac to IL 47. The project is 10.61 miles | — | Executed | Beniach Construction Co., Inc. $537,261 · | ||
| Mar 8, 2019 | 87622 | LivingstonDistrict 3 | Resurfacing CH 16 from Long Point Road to IL 17. | — | Executed | Kankakee Valley Construction Company, Inc. $824,223 · | ||
| Mar 8, 2019 | 87694 | LivingstonDistrict 3 | Replace the bridge carrying TR 97 over Deer Creek, 4 miles northeast of Pontiac. | — | Executed | Tobey's Construction & Cartage, Inc. $347,256 · | ||
| Mar 8, 2019 | 87707 | LivingstonDistrict 3 | Replace the bridge carrying TR 108 over a tributary of Baker Run, located 3 miles northwest of Pontiac. | — | Executed | H. J. Eppel & Co. $259,317 · | ||
| Apr 26, 2019 | 66J68 | IroquoisLivingstonDistrict 3 | Installing back up generators at 2 pump stations, and removal and replacement of all electrical, plumbing, HVAC, and mechanical equipment at the Reading pump station. | — | Active | D. Construction, Inc. $1,953,400 · | ||
| Apr 26, 2019 | 87699 | LivingstonDistrict 3 | Replace the bridge carrying TR 245A over the south fork of Vermilion River, 4 miles south of chatsworth. | — | Executed | Riber Construction, Inc. $309,930 · | ||
| Jun 14, 2019 | 66J88 | LaSalleLivingstonDistrict 3 | 12.4 miles of routing and sealing on IL 23 from just north of Oakley Avenue to Grove Street in Streator, and on IL 23 from 1 mile south of the LaSalle County Line to 9th Street in Cornell. | — | Executed | Denler, Inc. $73,110 · | ||
| Jun 14, 2019 | 66K09 | LivingstonDistrict 3 | 2.337 MILES OF 2' WIDE CENTERLINE MILLING AND RESURFACING FROM 2NS ST. IN STRAWN TO THE FORD COUNTY LINE. | — | Executed | Kankakee Valley Construction Company, Inc. $99,007 · | ||
| Jun 14, 2019 | 66K12 | LivingstonDistrict 3 | REMOVING AND REPLACING HIGH MAST LIGHT TOWERS AT THE I-55 AND IL 17 EXCHANGE. | — | Executed | Bodine Electric of Decatur $540,782 · | ||
| Jul 12, 2019 | 66D59 | KankakeeLivingstonDistrict 3 | 1.954 miles of 3P milling and resurfacing W of Reddick to 0.3 mile W of TR 48. It also includes centerline and shoulder rumble strips. | — | Executed | Kankakee Valley Construction Company, Inc. $1,002,537 · | ||
| Jul 12, 2019 | 66F25 | LivingstonDistrict 3 | 10.2 miles of 3P milling and resurfacing of 3.75" on or 66 from IL-23 to Prairie St. on Odell. Other work included is shoulder stone, pavement marking and raised reflective pavement markers. | — | Executed | Kankakee Valley Construction Company, Inc. $4,643,509 · | ||
| Jan 17, 2020 | 66E68 | LivingstonDistrict 3 | Removing SN 053-0065 and replacing it with SN 053-0192. The work also includes guardrail removal and replacement, channel excavation, rip rap placement, milling and resurfacing of adjacent pavement, pavement marking, and pavement markers. | — | Executed | Tobey's Construction & Cartage, Inc. $2,828,867 · | ||
| Jan 17, 2020 | 66K48 | LivingstonDistrict 3 | Various bridge repairs to SN's 053-0139(SB) and 053-0140(NB) carrying FAI 55 over the west fork of Mazon River 3.0 miles southwest of IL Rte 17. | — | Executed | D. Construction, Inc. $353,644 · | ||
| Mar 6, 2020 | 66K49 | LivingstonDistrict 3 | Bridge expansion joint seal removal and replacement, removal and replacement of existing bridge approach slabs on SN 053-0047 carrying IL 47 over 5 Mile Creek 0.30 mile N of IL 116. | — | Executed | Tobey's Construction & Cartage, Inc. $532,961 · | ||
| Mar 6, 2020 | 66K80 | LivingstonDistrict 3 | 13.10 miles consisting of 2" SMART cold milling and resurfacing from 0.9 miles S of IL 17 in Dwight to IL 116 in Saunemin. | — | Executed | Kankakee Valley Construction Company, Inc. $3,727,955 · | ||
| Mar 6, 2020 | 87693 | LivingstonDistrict 3 | Replace the bridge carrying TR 32 over Mole Creek, 4.0 miles southeast of Long Point. | — | Executed | Riber Construction, Inc. $378,893 · | ||
| Mar 6, 2020 | 87728 | LivingstonDistrict 3 | Cold in Place recycling and resurfacing on Campus Road from IL 17 to CH 1. | — | Executed | Kankakee Valley Construction Company, Inc. $1,897,377 · | ||
| Apr 24, 2020 | 66A87 | LivingstonDistrict 3 | 7.27 miles of 3P milling and resurfacing on IL 116 from 0.7 mile E of IL 47 in Saunemin to W of Cullom. | — | Executed | Kankakee Valley Construction Company, Inc. $3,700,015 · | ||
| Apr 24, 2020 | 66B80 | LivingstonDistrict 3 | 3P milling and resurfacing of 3.75" with guardrail replacement from E city limits of Cornell to IL 116 in Pontiac. | — | Executed | Kankakee Valley Construction Company, Inc. $6,285,284 · | ||
| Apr 24, 2020 | 66D56 | LivingstonDistrict 3 | 3P milling and resurfacing (Designed Overlay) from IL 18 to West Fork Mazon River, 1.4 miles W of I-55. | — | Executed | Kankakee Valley Construction Company, Inc. $5,416,536 · | ||
| Apr 24, 2020 | 87729 | LivingstonDistrict 3 | Replace the bridge carrying TR 41D over Mud Creek, 2.5 miles southeast of Blackstone. | — | Executed | Riber Construction, Inc. $310,925 · | ||
| Jun 12, 2020 | 66K52 | LivingstonDistrict 3 | Milling and resurfacing 2.75- HMA from the mainline as part of the 3P standard overlay. Areas on Culverts SN 053-2003 and SN 053-2029 will have additional HMA lifts so the new HMA overlay equals 2.75-. In addition, the project includes guardrail upgrades, grading and shaping ditches, and ADA improvements in Forrest. | — | Executed | Iroquois Paving Corporation $2,599,878 · | ||
| Jun 12, 2020 | 66K79 | LivingstonDistrict 3 | Bridge expansion joint removal and replacement, bridge approach shoulder removal and replacement, deck slab repairs, guardrail and terminal sections sections removal and replacement, pavement striping removal and replacement, traffic control, and other related construction items on SN 053-0158 carrying FAP 649 (IL 17) over the west fork of the Mazon River 1.33 miles west of I-55 near Dwight. | — | Executed | P. T. Ferro Construction Co. $249,319 · | ||
| Jan 15, 2021 | 66L40 | LivingstonDistrict 3 | Removing existing HMA and aggregate subbase surfaces, repair and preparation of base course and placing a poly This work is located at the Illinois Department of Transportation, District 3, Pontiac Maintenance Facility in Livingston County. This work consists of removing existing HMA and aggregate subbase surfaces, repair and preparation of base course and placing a polymer HMA binder cse (2¼" lift) and a polymer HMA surface cse (1 ¼" lift). | — | Executed | Kankakee Valley Construction Company, Inc. $427,351 · | ||
| Jan 15, 2021 | 66L44 | BureauLivingstonDistrict 3 | The work consists on performing Bridge Deck Concrete sealing at various bare concrete bridge decks in Bureau and Livingston counties. | — | Executed | All States Painting, Inc. $177,640 · | ||
| Jan 15, 2021 | 87744 | LivingstonDistrict 3 | Replace the bridge carrying TR 4B over Ditch Mole Creek, located 2.5 miles northwest of Flanagan. | — | Executed | Riber Construction, Inc. $335,279 · | ||
| Jan 15, 2021 | 87755 | LivingstonDistrict 3 | Replace the bridge carrying TR 118 over Mud Creek, 3.5 miles northeast of Cornell. | — | Executed | Riber Construction, Inc. $380,342 · | ||
| Mar 5, 2021 | 87735 | LivingstonDistrict 3 | Resurfcing CH 6/CH 1 from Chestnut Street in Fairbury (Livingston County) to north of the railroad in McLean County. | — | Executed | Kankakee Valley Construction Company, Inc. $2,589,198 · | ||
| Apr 23, 2021 | 66L56 | LaSalleLivingstonDistrict 3 | Placing aggregate wedge shoulder This work is located on FAP 786 (IL 170) beginning at the intersection of IL 170 and N 21st Rd in LaSalle County and ending at the intersection of IL 170 and IL 17 in Livingston County (+/- 12.0 miles). This work consists of placing aggregate wedge shoulder. | — | Executed | Phoenix Corporation of the Quad Cities $135,304 · | ||
| Jun 11, 2021 | 66K86 | LivingstonDistrict 3 | 3P Milling and Resurfacing (SMART Overlay) ADA improvement and minor drainage improvement, from IL 116 in Saunemin to US 24 in Forrest. | — | Executed | Kankakee Valley Construction Company, Inc. $2,744,546 · | ||
| Jun 11, 2021 | 66L76 | GrundyLivingstonDistrict 3 | Class A pavement patching and pavement striping This work is located on FAI 55 ( I-55) beginning at M.M. 17 ( just south of IL 17) in Livingston County and ending at M.M. 221 (1.0 mi. NE of IL 47) in Grundy County. This project consists of Class A pavement patching and pavement striping. | — | Executed | G. M. Sipes Construction, Inc. $354,303 · | ||
| Jun 11, 2021 | 66L85 | LivingstonDistrict 3 | Bridge Deck Overlay (SN 053-0149), bridge carrying IL 23 over Vermillion River and AT and SF RR, located 0.2 miles south of Adams street south of Streator. | — | Executed | Kankakee Valley Construction Company, Inc. $115,095 · | ||
| Jun 11, 2021 | 87751 | LivingstonDistrict 3 | PCC pavement reconstruction, storm sewers, curb and gutter, sidewalks and pavement markings on Indiana Avenue from Illini Avenue to the east corporate limits of Pontiac. | — | Executed | Opperman Construction Co. $1,268,954 · | ||
| Jul 30, 2021 | 66L81 | LivingstonDistrict 3 | Centerline repairs cleaning and filling potholes, depressions and cracks and micro surfacing This project is located at two locations on FAI 55 (I-55) in Livingston County. Location 1 begins at M.M. 205.0 and ends at M.M. 209.0 (S. of Odell), Location 2 begins at M.M. 212.0 and ends at M.M. 215.3 (N. of Odell). This project consists of centerline repairs cleaning and filling potholes, depressions and cracks and micro surfacing. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $557,717 · | ||
| Mar 11, 2022 | 66L75 | LivingstonDistrict 3 | Latex overlay, expansion joint replacement and deck repairs on the structures structures SN 053-0124 and SN 053-0125 carrying I-55 over Rooks creek, 3 miles southwest of Pontiac in Livingston County. | — | Rejected | Tobey's Construction & Cartage, Inc. $1,906,501 · | ||
| Mar 11, 2022 | 87773 | LivingstonDistrict 3 | Replace the bridge carrying TR 70 over Mud Creek, 2.5 miles southeast of Manville. | — | Executed | Tobey's Construction & Cartage, Inc. $406,355 · | ||
| Mar 11, 2022 | 87774 | LivingstonDistrict 3 | Replace the bridge carrying TR 244 over Gooseberry Creek, 2.5 miles north of Emington. | — | Executed | Riber Construction, Inc. $388,075 · | ||
| Mar 11, 2022 | 87775 | LivingstonDistrict 3 | Resurfacing Weston Road from 900N Road/McLean County Line to 1650N Road. | — | Executed | Kankakee Valley Construction Company, Inc. $2,085,137 · | ||
| Apr 29, 2022 | 66L90 | LivingstonDistrict 3 | 3P milling and resurfacing (designed overlay) This work is located at FAP 317 (US 24) 0.3 miles East of IL 47 in Forrest to Ford County Line in Livingston County (+/- 8.75 miles). This work consists of 3P milling and resurfacing (designed overlay). | — | Executed | Iroquois Paving Corporation $5,795,600 · | ||
| Apr 29, 2022 | 66M46 | LivingstonDistrict 3 | Class A pavement patching and related construction work This work is located on FAI Route 55 (I-55) beginning at the McLean County Line (Mile Marker 187.87) and ending at Wolf-s creek, Structure No. 053-2506 (Mile Marker 206.12). This work consists of Class A pavement patching and related construction work. | — | Executed | G. M. Sipes Construction, Inc. $590,810 · | ||
| Jun 17, 2022 | 66E53 | LivingstonDistrict 3 | Milling 3 Project consists of milling 3.50" and resurfacing 3.75" on IL 116, 100' East of the intersection of IL 23 in Pontiac for a total of 1.71 miles. The scope of work includes some traffic signal upgrades, pavement patching, ADA ramp improvements, and minor drainage maintenance work. | — | Executed | Kankakee Valley Construction Company, Inc. $2,680,230 · | ||
| Jun 17, 2022 | 66K76 | LivingstonDistrict 3 | Milling and resurfacing (designed overlay) with ADA sidewalk work This work is located at FAP 326 (IL 47) from US 24 in Forrest to Ford County line in Livingston County (+/-9.35 miles). This work consists of milling and resurfacing (designed overlay) with ADA sidewalk work. | — | Executed | Kankakee Valley Construction Company, Inc. $6,277,406 · | ||
| Jun 17, 2022 | 66M21 | LivingstonDistrict 3 | Cleaning all structural steel and other steel components of the structures This project is located at three structures: Structure No. 053-0123 carrying E1400N Rd. over I-55 and Mazon River, 3 miles Southwest of Pontiac; SN 053-0047 carrying IL 47 over Five Mile Creek, 0.3 miles North of IL 116; SN 053-0168 carrying IL 47 over the Vermilion River, 0.4 miles South of US 24. This project consists of cleaning all structural steel and other steel components of the structures. | — | Executed | Venus Painting Co. $710,553 · | ||
| Jun 17, 2022 | 66M59 | IroquoisLivingstonDistrict 3 | At Buckley interchange; at Limestone rest area south of Pontiac Vegetation Control - Tree Removal. | — | Executed | CSD Environmental Services, Inc. $456,330 · | ||
| Sep 23, 2022 | 66F92 | LivingstonDistrict 3 | Removal and replacement of the existing bridge (SN 053-0029) carrying IL 17 over Manville Drainage Ditch The project consists of removal and replacement of the existing bridge (SN 053-0029) carrying IL 17 over Manville Drainage Ditch. The work also includes slope/ditch grading, guardrail upgrades, and resurfacing. The temporary steel support shall be salvaged from the existing structure. A detour will be used. | — | Executed | Riber Construction, Inc. $1,025,425 · | ||
| Mar 10, 2023 | 66M37 | LivingstonDistrict 3 | 5.52 miles of shoulder widening and rumble strip installation on IL 17 from IL 170 (N 1500E Rd) to N 2100E Rd in Livingston County. | — | Executed | D. Construction, Inc. $1,244,052 · | ||
| Mar 10, 2023 | 66M64 | LivingstonDistrict 3 | 1.55 mi. Ditch grading and shaping, CMP culvert removal, concrete slope wall removal, installing Precast Concrete Box Culverts, Precast Box Culvert End Sections, earthwork, seeding. Beginning at the Intersection of IL 116 and Deerfield Rd and ending at approximately 192 feet east of SN 053-0066. | — | Executed | Tobey's Construction & Cartage, Inc. $384,412 · | ||
| Mar 10, 2023 | 66N08 | LivingstonDistrict 3 | The work includes turf restoration, aerating, applying herbicide and soil amendments to all existing lawn areas, mulch placement in playgrounds and around existing landscape trees, tree trimming of existing landscape trees, and setup and removal of traffic control at the Limestone Rest Area grounds on Northbound and Southbound I-55 in Livingston County at approximately mile marker 193/194. | — | Rejected | |||
| Mar 10, 2023 | 66N13 | LivingstonDistrict 3 | Milling, resurfacing and drainage work at the Pontiac Traffic Facility at 401 S. Ladd St. in Pontiac. | — | Executed | H. J. Eppel & Co. $203,759 · | ||
| Mar 10, 2023 | 87796 | LivingstonDistrict 3 | Replace the bridge carrying TR 268 over Gosseberry Creek, 0.9 mile south of E 2700 Road North. | — | Executed | Tobey's Construction & Cartage, Inc. $336,879 · | ||
| Mar 10, 2023 | 87803 | LivingstonDistrict 3 | Resurfacing CH 6 from CH 8 to Cherry Street and CH 8 from CH 10 to CH 6. | — | Executed | H. J. Eppel & Co. $2,004,192 · | ||
| Mar 10, 2023 | 87808 | LivingstonDistrict 3 | Replace the bridge carrying TR 129 over Broughton Creet, 0.3 mile west of North 3300. | — | Executed | Tobey's Construction & Cartage, Inc. $472,941 · | ||
| Apr 28, 2023 | 66F93 | LivingstonDistrict 3 | This project is located at the I-55 and IL 17 interchange, beginning at Sta. 32+90 and ending at Sta. 66+40, for a total of 0.63 miles, and includes the removal of SN 053-0014 and replacement with SN 053-0193. Other work includes HMA milling and resurfacing, pavement marking and raised reflective pavement markers. | — | Executed | D. Construction, Inc. $9,100,026 · | ||
| Apr 28, 2023 | 66M75 | LivingstonDistrict 3 | Bridge Repairs at SN 053-0027, 2.5 mi. east of IL 23 and SN 053-0167, 2.8 mi. east of IL 23. | — | Executed | P. T. Ferro Construction Co. $959,278 · | ||
| Jun 16, 2023 | 66B05 | LaSalleLivingstonDistrict 3 | Milling and resurfacing with a designed overlay of IL 18 including storm_sewer construction, drainage and ADA ramp improvements. From the intersection of IL 17 and IL 18 in south eastern Streator and ends at the intersection of Otter Creek Road and IL 18 in Streator. | — | Executed | Advanced Asphalt Company $4,236,173 · | ||
| Aug 4, 2023 | 66N49 | LivingstonDistrict 3 | Class B pavement patching This project is located on US 24 Beginning at the Intersection of N. 2000 E. Rd and ending at the curb and gutter just east of Tenth Street in Fairbury. This work consists of Class B pavement patching. | — | Executed | G. M. Sipes Construction, Inc. $459,272 · | ||
| Aug 4, 2023 | 66N51 | GrundyLivingstonDistrict 3 | Class A pavement Patching, striping and other related work This project is located on Interstate Route 55 beginning at M.M. 2.15 (Beginning of concrete section) to M.M. 218.81(Livingston/Grundy County Line) to M.M. 222 end of concrete section in Grundy County. This work consists of Class A pavement Patching, striping and other related work. | — | Executed | G. M. Sipes Construction, Inc. $378,840 · | ||
| Jan 19, 2024 | 66N34 | LaSalleLivingstonDistrict 3 | This project consists of 5.8 miles of shoulder widening and rumble strip installation on IL 17 from E 11th Rd in LaSalle County to IL 23 in Livingston County. | — | Executed | Kankakee Valley Construction Company, Inc. $1,328,740 · | ||
| Jan 19, 2024 | 66N91 | LivingstonDistrict 3 | Cleaning and painting all structural steel components of the bridges This project is located at 3 structures; SN 053-0119 carrying CH 26 over I-55, 0.5 miles north of Chenoa, SN's 053-0128 and 053-0129 carrying NB and SB I-55 over the Vermillion River 1.5 miles north of IL 116. This work consists of cleaning and painting all structural steel components of the bridges. | — | Executed | Venus Painting Co. $1,109,544 · | ||
| Jan 19, 2024 | 87822 | LivingstonDistrict 3 | Replace the bridge carrying TR 24 over Mole Creek, 4 miles southeast of Long Point. | — | Executed | Riber Construction, Inc. $494,605 · | ||
| Mar 8, 2024 | 66M28 | LivingstonDistrict 3 | This job is located on FAP 317 (US-24), approximately 2.8 mile west of IL 115 north at Piper city in Livingston county, (SN 053-0097). Bridge replacement. | — | Executed | Iroquois Paving Corporation $902,137 · | ||
| Mar 8, 2024 | 87821 | LivingstonDistrict 3 | Replace the bridge carrying CH 16 over Prairie Creek, 1.5 miles south of IL 17. | — | Executed | Tobey's Construction & Cartage, Inc. $511,620 · | ||
| Apr 26, 2024 | 66N40 | LivingstonDistrict 3 | Micro surfacing Joint Repair, Located on FAI 55 in Livingston County, from McLean County Line to 1.7 miles South of IL 116. | — | Executed | A. C. Pavement Striping Co. $577,571 · | ||
| Apr 26, 2024 | 87820 | LivingstonDistrict 3 | Replace existng structure with a three-span RC slab bridge with HMA approach, aggregate and HMA shoulders, and guardrail improvements on CH 3 over Broughton Creek, one mile north of Campus. | — | Executed | Tobey's Construction & Cartage, Inc. $737,652 · | ||
| Apr 26, 2024 | 87831 | LivingstonDistrict 3 | HMA Resurfacing with Cold-In-Place Recycling, aggregate base course widening, and aggregate shoulders on CH 6 rom 20000N Road to CH 8. | — | Executed | Kankakee Valley Construction Company, Inc. $2,522,672 · | ||
| Jun 14, 2024 | 66H56 | LivingstonDistrict 3 | Milling and resurfacing, culvert repairs, and latex overlays on I-55 0.8 miles north of Wolf Creek to 1.8 miles south of IL 17 and CH1 in Odell from OR 66 to 0.25 miles east of N 2000 Rd. | — | Executed | Kankakee Valley Construction Company, Inc. $39,441,550 · | ||
| Jun 14, 2024 | 66P02 | LivingstonDistrict 3 | Pavement patching_(ramps and parking areas), sidewalk (ADA), curb and gutter, driveway pavement, and striping on FAI 55 at the Northbound Limestone Rest Area, 3.52 miles south of IL 116 (Pontiac) and Southbound Limestone Rest Area, 2.52 miles south of IL 116 (Pontiac). | — | Executed | K-Five Construction Corporation $2,825,368 · | ||
| Jun 14, 2024 | 87823 | LivingstonDistrict 3 | Construct a single-span PPC deck beam bridge on spill-through abutments to carry TR 18C (400 E Road) over Scattering Point Creek, 1 mile south of Flanagan . Projects includes HMA approaches, aggregate shoulders, channel excavation, and seeding. | — | Executed | Tobey's Construction & Cartage, Inc. $432,451 · | ||
| Aug 2, 2024 | 66P43 | LivingstonDistrict 3 | HMA milling and resurfacing, pavement marking, and raised reflective markers on FAP 786 (IL 170) from south of IL 17 to the intersection of IL 23, including the northbound right turn lane of IL 23. | — | Executed | Kankakee Valley Construction Company, Inc. $3,524,732 · | ||
| Sep 20, 2024 | 66E54 | LivingstonDistrict 3 | About 2.32 miles of milling and resurfacing designed overlay of IL 116 and OR 66 with intersection improvements, drainage and ADA improvements. Along IL-116 from the west leg of Ewing Drive to Old Rt. 66 and along Old Rt. 66 from IL-116 to the south approach slab of the bridge over the Vermilion River in Pontiac. | — | Executed | Kankakee Valley Construction Company, Inc. $7,271,812 · | ||
| Sep 20, 2024 | 66P42 | LaSalleLivingstonDistrict 3 | 16.21 miles of HMA milling and resurfacing on IL 170 from 0.2 mile south of River Road in Seneca to the intersection with IL 17. | — | Executed | D. Construction, Inc. $6,376,242 · | ||
| Nov 8, 2024 | 66L79 | LivingstonDistrict 3 | Bridge replacement of SN 053-0062 on IL 116 over Scattering Point Creek east of Flanagan. 600' | — | Executed | Riber Construction, Inc. $1,865,719 · | ||
| Jan 17, 2025 | 66P81 | LivingstonDistrict 3 | Cleaning and painting structural steel on SN's 053-0116 and 053-0019. | — | Executed | ERA-Valdivia Contractors, Inc. $658,785 · | ||
| Jan 17, 2025 | 66P90 | BureauLivingstonDistrict 3 | Bridge deck sealing with the parapets/curbs on various routes at various locations throughout Bureau and Livingston Counties. | — | Executed | M & M Concrete, Inc. $159,932 · | ||
| Mar 7, 2025 | 66P83 | LivingstonDistrict 3 | Cleaning and painting all structural steel of SN 053-0160 carrying IL 17 over Prairie Creek, 1.0 mile east of IL 23. | — | Executed | ERA-Valdivia Contractors, Inc. $143,680 · | ||
| Mar 7, 2025 | 66R06 | LaSalleLivingstonDistrict 3 | Contrast pavement marking of the 8" lane lines on IL 23 at Richards Rd in LaSalle County and ending at Adams St in Livingston County and also on IL 18 beginning at Second Ave and ending at Wasson St in LaSalle County. | — | Executed | Varsity Striping & Construction Co. $268,247 · | ||
| Mar 7, 2025 | 66R09 | LivingstonDistrict 3 | Excavating and grading existing shoulders and placing aggregate shoulders on OR 66 from IL Route 116 to E. 1600 Road. | — | Executed | H. J. Eppel & Co. $88,186 · | ||
| Apr 25, 2025 | 66M99 | LivingstonDistrict 3 | Milling and resurfacing (Standard Overlay) and ADA improvement on US 24 from the Mclean Co line to 0.3 mi E of 7th St in Fairbury City, 4.32 miles gross length. | — | Executed | Iroquois Paving Corporation $2,667,505 · | ||
| Apr 25, 2025 | 66P37 | LivingstonDistrict 3 | Bridge repairs including paved shoulder replacement, expansion joint replacement, bearing replacement, PPC I-Beam Repairs, approach slab repairs, deck patching and other related construction items at dual Structures, 053-0007 EB and 053-0008 WB carrying O.R. 66 over the Vermilion River, 0.55 miles south of IL Route 23 in Pontiac. | — | Executed | Tobey's Construction & Cartage, Inc. $1,048,761 · | ||
| Apr 25, 2025 | 66P48 | LivingstonDistrict 3 | Routing and filling the cracks along the centerline, as well as any significant transverse cracks, and pavement markings along various routes in Livingston County. 45.61 miles gross length. | — | Executed | Denler, Inc. $193,871 · | ||
| Apr 25, 2025 | 66R28 | LivingstonDistrict 3 | CMP culvert entrance removal and replacement with a Precast Concrete Box Culvert on IL 116 0.61 miles east of F.A.I Route 55. At commercial entrance (Walmart Dr). | — | Executed | H. J. Eppel & Co. $257,331 · | ||
| Apr 25, 2025 | 66R31 | GrundyLivingstonDistrict 3 | Milling and resurfacing (Designed Overlay), patching,_pavement marking and raised reflectors on FAS 298 from IL 47 in Dwight to IL 53 in Gardner, for a total of 8.1 miles. | — | Executed | D. Construction, Inc. $3,397,233 · | ||
| Apr 25, 2025 | 87862 | LivingstonDistrict 3 | HMA resurfacing with aggregate shoulders on various county highways in Livingston County. | — | Executed | H. J. Eppel & Co. $1,638,174 · | ||
| Jun 13, 2025 | 87884 | LivingstonDistrict 3 | Sidewalk construction at various locations in Dwight. | — | Rejected | D. Construction, Inc. $230,453 · | ||
| Sep 19, 2025 | 66R62 | LivingstonDistrict 3 | Deck slab repairs (patching on the bridge deck and approach slabs) included in this work is structural concrete repairs to piers and debris removal on SN 053-0150 carrying IL Route 17 over the east branch of the Mazon River approximately 6.1 miles east of IL Route 47 in Livingston County. | — | Executed | Tobey's Construction & Cartage, Inc. $255,575 · | ||
| Sep 19, 2025 | 66R70 | LivingstonDistrict 3 | Scour mitigation by placing stone dumped riprap and other related construction items at SN 053-0011 carrying OR 66 over Wolf Creek approximately 5.15 miles northeast of IL Route 23 near Pontiac. | — | Executed | Tobey's Construction & Cartage, Inc. $64,451 · | ||
| Jan 16, 2026 | 66D52 | LivingstonDistrict 3 | 8.78 miles gross of HMA designed overlay and installation of four foot HMA safety shoulders along with edge line rumble strips on IL 17 in Livingston County. | — | Executed | Kankakee Valley Construction Company, Inc. $7,195,925 · |
1–100 of 108Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.