IDOT Jobs

All dates · 104 jobs · — Sign up free
★ My Jobs

Filtered by: County: Iroquois Clear all

104 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 19, 2018 66H94 IroquoisDistrict 3 Routing and crack sealing 15.94 miles on I-57 from Gilman to Ashkum. — Executed Nov 26 New Freehill Asphalt, Inc. $65,778 ·
Mar 9, 2018 66H76 IroquoisDistrict 3 Clean and paint bridge SN 038-0132 carrying CR 1100 North over I-57, 4.67 miles south of the Onarga interchange. — Executed Nov 26 New Venus Painting Co. $190,690 ·
Mar 9, 2018 66H97 IroquoisDistrict 3 Microsurfacing along centerline on northbound and southbound lanes of I-57 from 0.6 mile north of IL 116 to north of Clifton. — Executed Nov 26 New Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $224,654 ·
Apr 27, 2018 66E24 IroquoisDistrict 3 Replace bridge SN 038-0116 carrying Us 45/52 over Langan Creek Tributary, 3 miles east of Clifton. — Rejected Nov 26 New Iroquois Paving Corporation $1,085,786 ·
Jun 15, 2018 46501 FordIroquoisLivingstonDistrict 3 Remove and replace raised reflective pavement markers and reflectors on various routes in District 3 — Rejected Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $257,475 ·
Jun 15, 2018 66J32 IroquoisKankakeeDistrict 3 Class A, B and C pavement patching and pavement marking on I-57 from the Ford/Iroquois County line to the Kankakee/Will County line. — Executed Nov 26 New G. M. Sipes Construction, Inc. $1,023,232 ·
Mar 8, 2019 66J11 IroquoisDistrict 3 4.96 miles of shoulder widening and rumble strip installation on IL 49 from just north of E 4300 Rd to 200' south of Mud Creek. — Executed Nov 26 New Iroquois Paving Corporation $1,187,960 ·
Mar 8, 2019 66J79 IroquoisKankakeeDistrict 3 Repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services requested by "on-call" work orders. — Executed Nov 26 New Van-Mack Electric Co. $64,110 ·
Apr 26, 2019 66879 IroquoisDistrict 3 Replace SN 038-0165 with a double box culvert (SN 038-2023) carrying IL 1 over Gay Creek, 2.3 miles south of Wellington. — Executed Nov 26 New Iroquois Paving Corporation $768,521 ·
Apr 26, 2019 66J09 IroquoisDistrict 3 2.91 miles of shoulder widening and rumble strips on US 24 from IL 1 to 2580E Road. — Executed Nov 26 New Iroquois Paving Corporation $595,879 ·
Apr 26, 2019 66J10 IroquoisDistrict 3 3.97 miles of shoulder widening and rumble strips on IL 49 from E 2600 Rd to E 2200N Rd. — Executed Nov 26 New Iroquois Paving Corporation $996,392 ·
Apr 26, 2019 66J68 IroquoisLivingstonDistrict 3 Installing back up generators at 2 pump stations, and removal and replacement of all electrical, plumbing, HVAC, and mechanical equipment at the Reading pump station. — Active Nov 26 New D. Construction, Inc. $1,953,400 ·
Jun 14, 2019 66J81 IroquoisDistrict 3 Weed spraying and seeding for prairie grass at various areas along IL 1 near Milford. — Executed Nov 26 New F & W Lawn Care and Landscaping Company $54,611 ·
Jun 14, 2019 66K06 IroquoisDistrict 3 Class B pavement patching on IL 1 from US 52 to the Vermilion County line. — Executed Nov 26 New G. M. Sipes Construction, Inc. $471,138 ·
Jun 14, 2019 66K07 IroquoisDistrict 3 Class A and Class B patching on IL 24 from 2800E Road to the Indiana State line. — Executed Nov 26 New Iroquois Paving Corporation $337,214 ·
Jun 14, 2019 66K24 IroquoisDistrict 3 4.5 MILES OF INTERMITTENT MILLING AND RESURFACING 2" AT VARIOUS LOCATIONS FROM MILE POST 265 TO MILE POST 280. THE PROJECT ALSO INCLUDES PAVEMENT MARKING, SHOULDER REPAIRS (2" WIDE, 6" DEEP RESURFACING), AND SETTING UP TRAFFIC CONTROL. — Executed Nov 26 New Iroquois Paving Corporation $888,875 ·
Jun 14, 2019 87691 IroquoisDistrict 3 Replace the bridge carrying TR74 over Spring Creek, 1.5 miles southeast of Onarga. — Executed Nov 26 New Iroquois Paving Corporation $735,366 ·
Jul 12, 2019 66A84 IroquoisDistrict 3 8.09 miles of 3.75 milling and resurfacing from US 24 to US 45/52. — Executed Nov 26 New Iroquois Paving Corporation $3,777,848 ·
Jul 12, 2019 66F86 IroquoisDistrict 3 8.948 miles of 3P milling and resurfacing on IL-1 in Watseka to the Indiana St line. — Executed Nov 26 New Iroquois Paving Corporation $5,596,979 ·
Sep 20, 2019 66K34 IroquoisDistrict 3 DRAINAGE REPAIRS 0.27 MI N OF CR 700 N ROAD. — Executed Nov 26 New Iroquois Paving Corporation $208,524 ·
Nov 8, 2019 66F70 IroquoisDistrict 3 Removal and replacement of SN 038-0039, reconstruction of adjacent pavement, and associated earthwork and traffic control of US 45 over Prairie Creek. — Executed Nov 26 New Iroquois Paving Corporation $1,710,724 ·
Nov 8, 2019 87548 IroquoisDistrict 3 Replace the deck on a three span, non-continuous composite steel wide flange bridge carrying CH 40 over Sugar Creek, located 2.7 miles east of IL 1. — Rejected Nov 26 New Rausch Infrastructure, LLC $1,885,543 ·
Jan 17, 2020 66K75 GrundyIroquoisDistrict 3 Weed spraying on various routes in Grundy and Livingston counties. — Executed Nov 26 New Endrizzi Contracting, Inc $27,192 ·
Apr 24, 2020 66B75 IroquoisKankakeeDistrict 3 Milling and resurfacing 3.75" of HMA binder and surface on the mainline (3P Designed Overlay) with guardrail upgrades and drainage improvements. It begins from 0.2 mile S of I-57 to IL 79. — Executed Nov 26 New Iroquois Paving Corporation $7,393,021 ·
Apr 24, 2020 66E15 FordIroquoisDistrict 3 7.18 miles of milling and resurfacing 2.5" of HMA on IL 54 from IL 115 in Roberts to Spring Creek and updating guardrail at 2 structures. — Executed Nov 26 New Iroquois Paving Corporation $2,417,273 ·
Jun 12, 2020 66K08 IroquoisDistrict 3 Class B pavement patching from N 2950 East Rd to US 24. — Executed Nov 26 New G. M. Sipes Construction, Inc. $145,923 ·
Jun 12, 2020 66K90 IroquoisDistrict 3 Class A pavement patching and pavement marking on I-57 from the Ford/Iroquois county line to the Iroquois/Kankakee county line. — Executed Nov 26 New G. M. Sipes Construction, Inc. $396,436 ·
Jun 12, 2020 87716 IroquoisDistrict 3 Resurfacing CH 23 from CH 4 to IL 116. — Executed Nov 26 New Iroquois Paving Corporation $1,295,043 ·
Jun 12, 2020 87758 IroquoisDistrict 3 Remove existing guardrail and terminals, install new guardrail and terminals, pipe culverts and shaping ditches at various locations in Iroquois County. — Executed Nov 26 New Lovewell Fencing, Inc. $1,490,938 ·
Sep 18, 2020 66K51 IroquoisDistrict 3 3P milling and resurfacing from IL 54 in Onarga to North St in Buckley according to TAMP designed overlay policy. Other work includes culvert work, grading and shaping ditches, stabilization, shoulder stone, pavement marking, and raised reflectors. — Executed Nov 26 New Iroquois Paving Corporation $4,263,411 ·
Nov 6, 2020 66959 IroquoisDistrict 3 The removal and replacement of the existing structure, guardrail and terminal removal and replacement, HMA mil This project is located on FAP 332 (IL 1) 0.15 mile north of US 52 in lroquois County. The work consists of the removal and replacement of the existing structure, guardrail and terminal removal and replacement, HMA milling and resurfacing, pavement marking, and reflectors. — Executed Nov 26 New Iroquois Paving Corporation $1,546,600 ·
Nov 6, 2020 66K54 IroquoisDistrict 3 3P Milling and Resurfancing (Designed overlay) and ADA improvements on FAP 332 (IL 1) from 0.1 miles North of US 52 to US 24 in Watseka for a total length of 8.2 miles. — Executed Nov 26 New Iroquois Paving Corporation $5,298,767 ·
Mar 5, 2021 66K56 IroquoisDistrict 3 6 miles of milling, resurfacing, and ADA improvements on US 45 from North Street in Buckley to Jefferson Street in Loda. 1 foot saftey shoulders will be added to the rural section between Buckley and Loda. — Executed Nov 26 New Iroquois Paving Corporation $3,034,581 ·
Apr 23, 2021 66L22 IroquoisDistrict 3 Bridge painting This work is located at Structure No. 038-0130, TR 95 over 1-57, approximately 3.48 miles South of IL 116 and Structure No. 038-0131 carrying TR 109 over 1-57, approximately 5.59 miles South of IL 116 in Iroquois. This work consists of bridge painting. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $384,278 ·
Apr 23, 2021 66L30 IroquoisKankakeeDistrict 3 This project consists of 3.85 miles of shoulder widening and rumble strip installation on IL 1 from 150 feet west of W Circle Dr in St Anne in Kankakee County to E 3100N Rd in Iroquois County. — Executed Nov 26 New Iroquois Paving Corporation $1,088,767 ·
Apr 23, 2021 66L41 IroquoisDistrict 3 Removing existing HMA and aggregate subbase surfaces, repair and preparation of base course, and placing a pol This work is located at the Illinois Department of Transpiration, District 3, Buckley Maintenance Facility in Iroquois County. This work consists of removing existing HMA and aggregate subbase surfaces, repair and preparation of base course, and placing a polymer HMA asphalt binder cse. (2¼" lift) and a polymer HMA surface *See Remarks*. — Executed Nov 26 New Iroquois Paving Corporation $333,002 ·
Apr 23, 2021 66L65 IroquoisKankakeeDistrict 3 The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Kankakee and Iroquois Counties. — Executed Nov 26 New Outsen Electric, Incorporated $65,170 ·
Jun 11, 2021 66K40 IroquoisDistrict 3 3P MILLING AND RESURFACING (DESIGNED OVERLAY) EXTENDING 6.41 MILES FROM THE FORD CO LINE TO 0.2 MI E OF I-57 IN GILMAN. — Executed Nov 26 New Iroquois Paving Corporation $3,355,377 ·
Jun 11, 2021 66L68 IroquoisKankakeeDistrict 3 Tree Removal at Chabanse interchange as describe in the plans and special provisions. — Executed Nov 26 New CSD Environmental Services, Inc. $83,632 ·
Jun 11, 2021 87725 IroquoisDistrict 3 Replace the bridge carrying CH 4 over Pike Creek, 3.3 miles west of IL Rt 1. — Rejected Nov 26 New Iroquois Paving Corporation $1,016,600 ·
Jun 11, 2021 87747 IroquoisDistrict 3 Resurfacing CH 4 from the Ford County line to 500 E Road. — Executed Nov 26 New Iroquois Paving Corporation $2,188,307 ·
Jul 30, 2021 66L83 IroquoisDistrict 3 Class A pavement patching, pavement striping, and other related construction items This project is located on FAI 57 (I-57) beginning at the Ford County Line and ending at IL Route 116 (Ashkum). This work consists of Class A pavement patching, pavement striping, and other related construction items. — Executed Nov 26 New G. M. Sipes Construction, Inc. $448,168 ·
Jul 30, 2021 66L91 FordIroquoisDistrict 3 The project consists of 7.15 miles of crack routing and crack sealing on FAP 71 (IL 54) from IL 115 in Roberts to Structure 038-0213 in Ford and Iroquois Counties. — Executed Nov 26 New Freehill Asphalt, Inc. $62,711 ·
Sep 17, 2021 66D53 IroquoisDistrict 3 US 52 - 3P milling and resurfacing, shoulder widening and ADA in Iroquois from East of IL 1 to South of Donovan in Iroquois county. — Executed Nov 26 New Iroquois Paving Corporation $5,186,160 ·
Sep 17, 2021 66L97 IroquoisDistrict 3 Removal and replacement of existing 48" and 12" storm sewer, catch basin, manhole, pavement patching and other This project is located at failed 48- diameter pipe culvert at Sta. 391+00 carrying IL 49 over Shavetail Creek approximately 8 miles South of US 24 (Cresent City). This project consists of removal and replacement of existing 48" and 12" storm sewer, catch basin, manhole, pavement patching and other related construction items. — Executed Nov 26 New Dirtworks Trucking & Excavating $69,245 ·
Nov 5, 2021 66F01 IroquoisDistrict 3 The project length is 700 feet. It is located along IL 1 and includes the replacement of the exisiting SN 038-0028 over Gay Creek approximately 0.2 miles South of Wellington, Il. — Executed Nov 26 New Iroquois Paving Corporation $1,138,320 ·
Jan 21, 2022 66932 IroquoisDistrict 3 Bridge Replacement (SN 038-0023) at Coon Creek, 5.4 miles South of US 24. — Executed Nov 26 New Iroquois Paving Corporation $2,285,001 ·
Jan 21, 2022 66M11 IroquoisDistrict 3 Cleaning and painting all structural steel and other steel components of the structures This project is located at two structures on I-57, SN 038-0123 carrying I-57 over IL 116 (Ashkum Interchange) and SN 038-0125 carrying TR 89 over I-57, 2.5 mi. south of IL 116 and one structure on US 52, SN 038-0182 carrying US 52 over the Iroquois River near the village of Iroquois. This project consists of cleaning and painting all structural steel and other steel components of the structures. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $549,318 ·
Mar 11, 2022 66H63 IroquoisDistrict 3 Project consists on milling and resurfacing I-57 interstate and Buckley interchange ramps in Iroquois County. The project length is 6.9 miles. The work also includes structural upgrades, underdrain removal / replacement, guardrail upgrades and grading/shaping ditches. Resurfacing on Buckley Interchange ramps shall be accomplished at night. — Executed Nov 26 New Iroquois Paving Corporation $20,672,340 ·
Mar 11, 2022 66K31 IroquoisDistrict 3 Work begins East of Sugar Creek on US 24 and goes East 3.08 miles including a 3P milling and resurfacing of US 24 including drainage and ADA improvements. The project terminates at East end of Watseka city limit. — Executed Nov 26 New Iroquois Paving Corporation $3,586,035 ·
Mar 11, 2022 66K77 IroquoisDistrict 3 HMA milling and resurfacing, shoulder work, ADA ramps, pavement marking, and raised reflective markers This project is located on FAP 71/FAS 323 (IL 54) from 0.4 mile west of I-57 to US 45/52 in Onarga. The work consists of HMA milling and resurfacing, shoulder work, ADA ramps, pavement marking, and raised reflective markers. — Rejected Nov 26 New Iroquois Paving Corporation $1,584,326 ·
Mar 11, 2022 87760 IroquoisDistrict 3 Roadway reconstruction, Curb and gutter, storm sewers, landscaping, streetscape, lighting, and pavement markings on North Central Street, from Crescent St. to East 3rd. Street, and on East 2nd Street from the IC Railroad to North Central Street, and on East Front Street from North Central St. to North Main Street in Gilman. — Executed Nov 26 New Iroquois Paving Corporation $3,193,594 ·
Apr 29, 2022 66D60 IroquoisDistrict 3 7.71 miles,Milling and Resurfacing (Designed Overlay) and ADA Work begins 0.15 miles South of South St in Donovan and ends at US 24 in Sheldon. — Executed Nov 26 New Iroquois Paving Corporation $4,931,854 ·
Apr 29, 2022 66M10 DeKalbIroquoisDistrict 3 This project includes traffic signal improvements and railroad interconnect system upgrades at five intersections on US 24/IL 1 from Second St TO Eighth St in Watseka. This project also includes the aforementioned improvements at the intersection of US 30 and Elm St in Waterman. — Executed Nov 26 New Outsen Electric, Incorporated $238,185 ·
Apr 29, 2022 66M42 IroquoisDistrict 3 Class B pavement patching and related construction work This work is located on FAP Route 840 (IL 49) beginning at the intersection of IL 49 and IL 24 (L.M. 0.00) and ending at the Vermilion County Line (L.M. 21.50) This work consists of Class B pavement patching and related construction work. — Rejected Nov 26 New Ramirez Diversified Services, LLC $324,616 ·
Apr 29, 2022 66M43 IroquoisDistrict 3 Class B pavement patching and related construction work This work is located on FAP Route 317 (US 24) beginning at the intersection of US 45/24 (L.M. 0.00) in Gilman and ending at the intersection of US 24 and IL 1 (L.M. 12.34) in Watseka. This work consists of Class B pavement patching and related construction work. — Rejected Nov 26 New G. M. Sipes Construction, Inc. $155,429 ·
Apr 29, 2022 66M49 IroquoisDistrict 3 Intermittent milling 2" and resurfacing, pavement striping, raised reflective pavement marker removal and repl This project is located on F.A.I. Route 57 (I-57) beginning at the Ford County Line and ending approximately 4.5 miles North of US 24 (Gilman). This work consists of intermittent milling 2" and resurfacing, pavement striping, raised reflective pavement marker removal and replacement. — Rejected Nov 26 New Iroquois Paving Corporation $509,531 ·
Jun 17, 2022 66K68 IroquoisDistrict 3 3P milling and resurfacing (designed overlay) and ADA improvements This work is located on FAS 1324 (US 45) from First South Street in Chebanse to Third Ave in Clifton in Iroquois County (+/-4.73 miles). This work consists of 3P milling and resurfacing (designed overlay) and ADA improvements. — Executed Nov 26 New Iroquois Paving Corporation $4,264,818 ·
Jun 17, 2022 66K78 IroquoisDistrict 3 Milling and resurfacing (designed overlay), ADA ramps, pavement marking, and raised reflectors This project is located on FAS 317 (US 45), beginning at North St in Danforth to US 24, for a total of 4.09 miles. The work consists of milling and resurfacing (designed overlay), ADA ramps, pavement marking, and raised reflectors. — Executed Nov 26 New Iroquois Paving Corporation $2,398,343 ·
Jun 17, 2022 66M05 IroquoisDistrict 3 Replacing the high mast light towers This project is located at the Mainline Rest Areas in Buckley on I-57. The work consists of replacing the high mast light towers. — Executed Nov 26 New Van-Mack Electric Co. $785,218 ·
Jun 17, 2022 66M18 IroquoisDistrict 3 This project consists of 2.9 miles of shoulder widening and rumble strip installation on IL 54 from N 200E Rd to 0.22 mi west of N 500E Rd in Iroquois County. — Executed Nov 26 New Iroquois Paving Corporation $1,212,384 ·
Jun 17, 2022 66M59 IroquoisLivingstonDistrict 3 At Buckley interchange; at Limestone rest area south of Pontiac Vegetation Control - Tree Removal. — Executed Nov 26 New CSD Environmental Services, Inc. $456,330 ·
Jun 17, 2022 66M61 IroquoisDistrict 3 This project includes a small native planting project at the Ashkum Maintenance Yard using wildflower seeding. — Rejected Nov 26 New
Jun 17, 2022 87769 IroquoisDistrict 3 Replace the bridge carrying 1000 East Road over a tributary to Little Mud Creek , 3 miles northwest of Cissna. — Rejected Nov 25 New Iroquois Paving Corporation $785,132 ·
Nov 18, 2022 66M38 IroquoisDistrict 3 This project consists of 5.3 miles of shoulder widening and rumble strip installation on IL 1 from 0.02 mi South of E 2500N Rd to 0.22 mi North of E 1950N Rd in Iroquois County. — Executed Nov 26 New Iroquois Paving Corporation $2,063,122 ·
Jan 20, 2023 66N02 IroquoisDistrict 3 Bridge Painting at SN 038-0082, 2.62 miles South of IL 54 (Onarga). — Executed Nov 26 New Three Star Painting, Inc. $261,241 ·
Jan 20, 2023 66N03 IroquoisDistrict 3 Bridge Painting at SN 038-0032, 2.1 mi. East of US 45 and SN 038-0033, 3.1 mi. East of US 45. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $248,590 ·
Mar 10, 2023 66N09 IroquoisDistrict 3 This project is located at the Main Line Station Rest Area grounds on NB and SB I-57 in Iroquois County at approximately mile marker 269. The work includes turf restoration, aerating, applying herbicide and soil amendments to all existing lawn areas, mulch placement in playgrounds and around existing landscape trees, tree trimming of existing landscape trees, and setup and removal of traffic control. — Rejected Nov 26 New
Apr 28, 2023 66M19 IroquoisDistrict 3 This project consists of 8.0 miles of shoulder widening and rumble strip installation on IL 49 from 725 ft south of E 1200N Rd to just south of E 2000N Rd in Iroquois County. — Executed Nov 26 New Iroquois Paving Corporation $2,590,845 ·
Apr 28, 2023 87793 IroquoisDistrict 3 Remove existing structure and replace with a single span PPC deck beam bridge with aggregate approach on 1100 E Road over Branch of Prairie Creek, 2.9 miles southeast of Ashkum. — Executed Nov 26 New Iroquois Paving Corporation $455,093 ·
Apr 28, 2023 87814 IroquoisDistrict 3 Resurfacing CH 10 from the Ford County line to US 45. — Executed Nov 26 New Iroquois Paving Corporation $1,002,116 ·
Jun 16, 2023 87809 IroquoisDistrict 3 Resurfacing various routes within the City of Watseka. — Executed Nov 26 New Iroquois Paving Corporation $537,824 ·
Aug 4, 2023 66M89 IroquoisDistrict 3 HMA milling and resurfacing, culvert replacement, ditch cleaning, pavement marking, and raised reflectors This job is located on FAP 317 (US 24) from 0.1 mile east of IL 45 to IL 49 in Crescent City, for a length of 5.87 miles. The work consists of HMA milling and resurfacing, culvert replacement, ditch cleaning, pavement marking, and raised reflectors. — Executed Nov 26 New Iroquois Paving Corporation $2,370,974 ·
Aug 4, 2023 66N27 IroquoisKankakeeDistrict 3 The installation of a flashing red beacon at each of the stop controlled approaches to the intersection of US This project consists of the installation of a flashing red beacon at each of the stop controlled approaches to the intersection of US 45/52 and W 8000S Rd. It also includes the installation of a flashing yellow beacon at each of the advanced intersection warning signs adjacent to US 45/52. — Executed Nov 26 New Outsen Electric, Incorporated $148,037 ·
Aug 4, 2023 87828 IroquoisDistrict 3 Resurfacing CH 47 from Ford County line to IL 54. — Executed Nov 26 New Iroquois Paving Corporation $495,258 ·
Jan 19, 2024 66E40 IroquoisDistrict 3 Replacing the bridge deck on SN 038-0076, HMA milling and resurfacing, interchange lighting replacement, pavem This project is located on FAI 57 (I-57) at SN 038-0076 (Onarga Interchange). The work consists of replacing the bridge deck on SN 038-0076, HMA milling and resurfacing, interchange lighting replacement, pavement marking, and raised reflective markers. — Executed Nov 26 New Iroquois Paving Corporation $4,148,759 ·
Mar 8, 2024 66H62 IroquoisDistrict 3 Milling and resurfacing I-57 interstate including IL-54 and US-24 interchange ramps in Iroquois County. — Executed Nov 26 New Iroquois Paving Corporation $27,992,940 ·
Apr 26, 2024 66C45 IroquoisDistrict 3 Work beings at the Iroquois/Ford county line on IL 116 extending 8.22 miles, ending at the interchange limits of IL 116 and I 57. The project is a milling and resurfacing designed overlay of IL 116 including drainage improvements. — Executed Nov 26 New Iroquois Paving Corporation $5,775,587 ·
Apr 26, 2024 66M98 IroquoisKankakeeDistrict 3 Work beings at 0.1 Mi N of Ambrose St in St Anne to 1.8 Mi S of Papineau Rd. 6.22 Miles of smart overlay with ADA and drainage repairs. — Executed Nov 26 New Iroquois Paving Corporation $2,586,271 ·
Apr 26, 2024 66N44 IroquoisDistrict 3 Milling and resurfacing the Illinois Department of Transportation Ashkum Maintenance facility. — Executed Nov 26 New H. J. Eppel & Co. $781,331 ·
Apr 26, 2024 66N54 IroquoisDistrict 3 Remove concrete slope wall, install stone riprap, filter fabric, stone bedding, replace expansion joint seal, and structural repair of concrete (pier) on SN 038-0174. — Executed Nov 26 New Iroquois Paving Corporation $313,415 ·
Apr 26, 2024 66N97 IroquoisDistrict 3 Traffic Signal Mast Arm Replacement. This project is located in Iroquois County, at the west intersection of US-24 and IL-1 in Watseka. — Executed Nov 26 New Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC $299,323 ·
Apr 26, 2024 87794 IroquoisDistrict 3 Replace the bridge carrying CH 40 over a tributary to Possum Trot Ditch, 3.5 miles south of Sheldon. — Executed Nov 26 New Iroquois Paving Corporation $1,057,026 ·
Jun 14, 2024 66P14 IroquoisDistrict 3 Class A pavement patching on FAI 57 beginning at MM 285.5, 2.5 miles north of US 24 (Gilman Interchange) and ending at MM 293.5, 0.64 mile north of IL 116 (Ashkum Interchange). — Executed Nov 26 New G. M. Sipes Construction, Inc. $511,011 ·
Jun 14, 2024 66P29 IroquoisDistrict 3 8.09 miles, Crack and joint sealing, US 24 to US 45/52. — Executed Nov 26 New Freehill Asphalt, Inc. $83,979 ·
Nov 8, 2024 66P32 IroquoisDistrict 3 Bridge repairs to SN 038-0187 carrying US 24 over a tributary of Prairie Creek 3.74 miles west of I-57. — Executed Nov 26 New Iroquois Paving Corporation $354,306 ·
Jan 17, 2025 66K94 IroquoisDistrict 3 0.2 mile bridge replacement at Little Beaver Creek. 1.2 miles north of Papineau Road. — Executed Nov 25 New Iroquois Paving Corporation $2,649,190 ·
Mar 7, 2025 66R34 IroquoisDistrict 3 HMA milling and resurfacing 2" (SMART) of the mainline, shoulder work, pavement marking, and raised reflectors on FAI 57 from 0.5 mile north of IL 116 to 1.6 miles north of CH4. 4.88 miles gross. — Executed Nov 25 New Iroquois Paving Corporation $9,823,667 ·
Mar 7, 2025 87850 IroquoisDistrict 3 Removal of the existing sub-structure, and construction of a new concrete stub abutments, bearing and joint replacement, and reconstruction of the approaches to the bridge carrying CH 31 over the Iroquois River, one mile north of Watseka. — Executed Nov 25 New Iroquois Paving Corporation $1,179,351 ·
Apr 25, 2025 66R17 IroquoisDistrict 3 Class B pavement patching and other related construction items on US Route 24 beginning at the east ramps of I-57 Interchange and ends at the US 24/45 intersection. — Executed Nov 25 New SNC Construction, Inc. $306,453 ·
Jun 13, 2025 66F94 IroquoisDistrict 3 Bridge Deck Replacement for SN 038-0048 carrying IL 54 over I 57 at the interchange in Onarga. — Executed Nov 25 New Iroquois Paving Corporation $5,007,493 ·
Jun 13, 2025 66H59 IroquoisDistrict 3 7.7 gross miles of HMA milling and resurfacing, pavement patching, structure repairs, rest area repairs including: ADA ramps, curb and gutter repairs, pavement joint repairs, pavement marking, and raised reflectors on I-57 from the Buckley Interchange to the Ford County Line. — Executed Nov 25 New Iroquois Paving Corporation $30,611,903 ·
Jun 13, 2025 66M23 IroquoisDistrict 3 Bridge replacements of SN 038-0151 and SN 038-0152 on FAI 57(I-57) over Louis Creek, 0.7 miles north of Buckley interchange. — Executed Nov 25 New Iroquois Paving Corporation $5,792,936 ·
Jun 13, 2025 66R52 IroquoisDistrict 3 Class B pavement patching and other related construction work on Il Route 1 at the intersection of IL Route 1 and US Route 24 near Watseka and ending at the Vermilion County Line. — Executed Nov 25 New G. M. Sipes Construction, Inc. $680,867 ·
Jun 13, 2025 87858 IroquoisDistrict 3 HMA Resurfacing with aggregate shoulders on CH 4 from the west village limits of Clifton to CH 24. — Executed Nov 25 New Iroquois Paving Corporation $1,783,862 ·
Feb 27, 2026 66T02 IroquoisDistrict 3 Cleaning and painting all structural steel and_non-structural steel components of Structure No. 038-0198 carrying IL Route 49 over Little Mud Creek approximately 2.6 mi. north of Cissna Park in Iroquois County. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $133,444 ·
Apr 24, 2026 66P68 IroquoisDistrict 3 A SMART resurfacing along with an experimental mix design of the eastbound lane 6.04 mi of 1.5" milling and hot-mix asphalt surface course pavement rehabilitation and minor drainage repairs including culvert work on Old Route 24 and ADA sidewalk ramp improvements. Project consists of a SMART resurfacing along with an experimental mix design of the eastbound lane. — Executed Nov 25 New Iroquois Paving Corporation $2,884,241 ·
Apr 24, 2026 66R50 IroquoisDistrict 3 Milling and resurfacing (designed overlay) with new shoulders and rumble strip. Additional work includes patching, ditch cleaning, drainage improvements, pavement marking, and rest area milling and resurfacing on US-52 from approximately 200' east of US-45 and IL-49 to approximately 1 mile west of IL-1 in Iroquois County. 5.98 miles gross length. — Executed Nov 25 New Iroquois Paving Corporation $6,694,992 ·
Apr 24, 2026 66R61 IroquoisDistrict 3 Scour repair, Deck/Approach, patching, Joint replacement, Slope wall repair and extending deck drains at structure No. 038-0037 carrying US Route 24 over Raymond Creek 2.65 miles east of IL 1 in Iroquois County. — Executed Nov 25 New Iroquois Paving Corporation $434,116 ·
Jun 12, 2026 66T09 IroquoisDistrict 3 Various sizes of Class B pavement patching pavement striping and aggregate wedge shoulders at the Sheldon Weight Station approximately 1.9 miles east of US Route 52 (N) in Sheldon, Iroquois County. — Executed Nov 25 New Iroquois Paving Corporation $388,737 ·
1–100 of 104Next ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.