138RS-4&139RS-6
- Let date
- Friday, April 24, 2020
- Contract
- 66B75 · job page
- District
- District 3
- County
- Kankakee, Iroquois
- Highway
- Limits
- Milling and resurfacing 3.75" of HMA binder and surface on the mainline (3P Designed Overlay) with guardrail upgrades and drainage improvements. It begins from 0.2 mile S of I-57 to IL 79.
Bidders 3
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Iroquois Paving Corporation Low bidder | $7,393,021 | ||
| 2 | Kankakee Valley Construction Company, Inc. | $7,488,120 | +1.3% | |
| 3 | Gallagher Asphalt Corporation | $7,976,068 | +7.9% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Iroquois Paving… | #2 Kankakee Valley… | #3 Gallagher Aspha… |
|---|---|---|---|---|---|---|---|---|
| 1 | X0325893 | CLEAN EX END SECTION | 3 | EACH | $1,500.00 | $1,700.00 | $1,365.00 | |
| 2 | X0326394 | FLOOR DRAINS CLEANED | 16 | EACH | $375.00 | $130.00 | $365.00 | |
| 3 | X0327809 | LINEAR DELIN PANELS 4 | 18 | EACH | $175.00 | $150.00 | $181.00 | |
| 4 | X2140100 | GRAD & SHAP DITCH SPL | 740 | FOOT | $18.50 | $25.00 | $9.00 | |
| 5 | X4401198 | HMA SURF REM VAR DP | 11,216 | SQ YD | $10.85 | $11.50 | $9.00 | |
| 6 | X5430100 | INSERT CUL LIN SPL | 54 | FOOT | $575.00 | $430.00 | $125.00 | |
| 7 | Z0004556 | HMA SURFACE RM (DECK) | 716 | SQ YD | $16.50 | $11.00 | $9.00 | |
| 8 | Z0005216 | HMA STAB 6 AT SPBGR | 540 | SQ YD | $70.00 | $80.00 | $95.00 | |
| 9 | Z0015500 | DEBRIS REMOVAL | 1 | L SUM | $45,000.00 | $11,000.00 | $12,500.00 | |
| 10 | Z0018500 | DRAINAGE STR CLEANED | 2 | EACH | $12,500.00 | $9,000.00 | $12,500.00 | |
| 11 | Z0018700 | DRAINAGE STR REMOVED | 1 | EACH | $5,000.00 | $6,500.00 | $3,200.00 | |
| 12 | Z0030850 | TEMP INFO SIGNING | 42 | SQ FT | $0.0100 | $35.00 | $45.00 | |
| 13 | Z0033700 | LONG JOINT SEALANT | 76,877 | FOOT | $2.45 | $2.50 | $3.00 | |
| 14 | Z0034105 | MATL TRANSFER DEVICE | 50,587 | TON | $4.25 | $3.95 | $3.00 | |
| 15 | Z0076600 | TRAINEES | 2,000 | HOUR | $0.8000 | $0.8000 | $0.8000 | |
| 16 | Z0076604 | TRAINEES TPG | 2,000 | HOUR | $15.00 | $15.00 | $15.00 | |
| 17 | 20200100 | EARTH EXCAVATION | 90 | CU YD | $145.00 | $165.00 | $125.00 | |
| 18 | 20800150 | TRENCH BACKFILL | 6 | CU YD | $350.00 | $95.00 | $400.00 | |
| 19 | 25100630 | EROSION CONTR BLANKET | 822 | SQ YD | $2.50 | $2.22 | $6.00 | |
| 20 | 28100107 | STONE RIPRAP CL A4 | 65 | SQ YD | $125.00 | $150.00 | $185.00 | |
| 21 | 28200200 | FILTER FABRIC | 65 | SQ YD | $2.00 | $5.00 | $18.00 | |
| 22 | 40600290 | BIT MATLS TACK CT | 167,969 | POUND | $0.0100 | $0.0100 | $1.00 | |
| 23 | 40600400 | MIX CR JTS FLANGEWYS | 71.9 | TON | $0.0100 | $475.00 | $680.00 | |
| 24 | 40600990 | TEMPORARY RAMP | 2,389 | SQ YD | $0.0100 | $33.00 | $29.00 | |
| 25 | 40602985 | HMA BC IL-9.5 N70 | 26,728 | TON | $86.50 | $92.50 | $80.00 | |
| 26 | 40604062 | HMA SC IL-9.5 D N70 | 23,427 | TON | $86.50 | $92.50 | $89.60 | |
| 27 | 40800050 | INCIDENTAL HMA SURF | 1,536 | TON | $185.00 | $175.00 | $215.00 | |
| 28 | 44000100 | PAVEMENT REM | 30 | SQ YD | $45.00 | $48.00 | $220.00 | |
| 29 | 44000164 | HMA SURF REM 3 3/4 | 240,887 | SQ YD | $4.75 | $3.70 | $5.00 | |
| 30 | 44201063 | CL B PATCH T2 18 | 20 | SQ YD | $450.00 | $400.00 | $365.00 | |
| 31 | 44201299 | DOWEL BARS 1 1/2 | 40 | EACH | $25.00 | $15.00 | $12.00 | |
| 32 | 44213200 | SAW CUTS | 94 | FOOT | $7.50 | $15.00 | $12.00 | |
| 33 | 48102100 | AGG WEDGE SHLD TYPE B | 1,266 | TON | $34.50 | $27.50 | $55.00 | |
| 34 | 48203100 | HMA SHOULDERS | 472 | TON | $98.00 | $150.00 | $90.00 | |
| 35 | 542A5485 | P CUL CL A 1 EQRS 30 | 42 | FOOT | $350.00 | $440.00 | $355.00 | |
| 36 | 542C0223 | P CUL CL C 1 18 | 7 | FOOT | $350.00 | $275.00 | $325.00 | |
| 37 | 54248510 | CONCRETE COLLAR | 0.2 | CU YD | $4,500.00 | $2,000.00 | $2,500.00 | |
| 38 | 54260315 | TRVRS PIPE GRT CON ES | 10 | FOOT | $185.00 | $150.00 | $195.00 | |
| 39 | 54262718 | METAL FL END SEC 18" | 1 | EACH | $425.00 | $800.00 | $480.00 | |
| 40 | 54262724 | METAL FL END SEC 24" | 2 | EACH | $525.00 | $1,200.00 | $535.00 | |
| 41 | 54263330 | CONC ES 542011 30 1:3 | 2 | EACH | $5,500.00 | $3,000.00 | $5,500.00 | |
| 42 | 63000001 | SPBGR TY A 6FT POSTS | 162.5 | FOOT | $32.50 | $29.00 | $28.00 | |
| 43 | 63000003 | SPBGR TY A 9FT POSTS | 825 | FOOT | $36.50 | $37.50 | $39.00 | |
| 44 | 63100075 | TRAF BAR TERM T5A | 7 | EACH | $1,850.00 | $1,500.00 | $1,500.00 | |
| 45 | 63100167 | TR BAR TRM T1 SPL TAN | 9 | EACH | $3,950.00 | $2,950.00 | $3,250.00 | |
| 46 | 63200310 | GUARDRAIL REMOV | 1,313 | FOOT | $13.50 | $12.00 | $15.00 | |
| 47 | 64200108 | SHOULDER RUM STRIP 8 | 132,113 | FOOT | $0.2500 | $0.2300 | $1.50 | |
| 48 | 66700205 | PERM SURV MKRS T1 | 20 | EACH | $65.00 | $350.00 | $2,500.00 | |
| 49 | 67000400 | ENGR FIELD OFFICE A | 6 | CAL MO | $2,800.00 | $4,500.00 | $4,500.00 | |
| 50 | 67100100 | MOBILIZATION | 1 | L SUM | $350,000.00 | $353,000.00 | $456,500.00 | |
| 51 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $0.0100 | $2,500.00 | $5,000.00 | |
| 52 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $0.0100 | $2,500.00 | $5,000.00 | |
| 53 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $45,000.00 | $11,000.00 | $75,000.00 | |
| 54 | 70102625 | TR CONT & PROT 701606 | 1 | L SUM | $25,000.00 | $5,500.00 | $15,000.00 | |
| 55 | 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $0.0100 | $2,500.00 | $5,000.00 | |
| 56 | 70300100 | SHORT TERM PAVT MKING | 24,535 | FOOT | $0.0100 | $1.50 | $0.0100 | |
| 57 | 70300150 | SHRT TRM PAVT MK REM | 5,398 | SQ FT | $0.0100 | $2.75 | $0.0100 | |
| 58 | 72501000 | TERMINAL MARKER - DA | 9 | EACH | $50.00 | $35.00 | $45.00 | |
| 59 | 78000100 | THPL PVT MK LTR & SYM | 218 | SQ FT | $5.50 | $5.00 | $6.00 | |
| 60 | 78000200 | THPL PVT MK LINE 4 | 49,583 | FOOT | $1.00 | $0.7500 | $1.00 | |
| 61 | 78000400 | THPL PVT MK LINE 6 | 2,814 | FOOT | $1.50 | $1.14 | $1.40 | |
| 62 | 78000500 | THPL PVT MK LINE 8 | 1,141 | FOOT | $2.00 | $1.52 | $2.00 | |
| 63 | 78000600 | THPL PVT MK LINE 12 | 986 | FOOT | $3.00 | $2.27 | $2.75 | |
| 64 | 78000650 | THPL PVT MK LINE 24 | 414 | FOOT | $6.00 | $4.75 | $6.00 | |
| 65 | 78001110 | PAINT PVT MK LINE 4 | 218,786 | FOOT | $0.2000 | $0.1000 | $0.1500 | |
| 66 | 78001130 | PAINT PVT MK LINE 6 | 25,042 | FOOT | $0.2500 | $0.1500 | $0.2000 | |
| 67 | 78100100 | RAISED REFL PAVT MKR | 1,025 | EACH | $35.00 | $30.67 | $37.00 | |
| 68 | 78200005 | GRDRAIL REF TYPE A | 32 | EACH | $15.00 | $10.00 | $12.00 | |
| 69 | 78300200 | RAISED REF PVT MK REM | 1,025 | EACH | $0.0100 | $17.00 | $10.00 | |
| 70 | 88600100 | DET LOOP T1 | 58 | FOOT | $42.50 | $32.00 | $39.00 |