(38)RS-5, SW
- Let date
- Friday, June 17, 2022
- Contract
- 66K68 · job page
- District
- District 3
- County
- Iroquois
- Highway
- Limits
- This work is located on FAS 1324 (US 45) from First South Street in Chebanse to Third Ave in Clifton in Iroquois County (+/-4.73 miles). This work consists of 3P milling and resurfacing (designed overlay) and ADA improvements.
- Classification
- 3P milling and resurfacing (designed overlay) and ADA improvements
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Iroquois Paving Corporation Low bidder | $4,264,818 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Iroquois Paving… |
|---|---|---|---|---|---|---|
| 1 | X0320050 | CONSTRUCTN LAYOUT SPL | 1 | L SUM | $20,000.00 | |
| 2 | X0326998 | FUR & INSTL HANDRAIL | 282 | FOOT | $200.00 | |
| 3 | X0327809 | LINEAR DELIN PANELS 4 | 100 | EACH | $22.00 | |
| 4 | X0800001 | SHLDR REM SPL | 7,861 | SQ YD | $14.00 | |
| 5 | X1200050 | BOX CULVERT REMOVAL | 45 | FOOT | $220.00 | |
| 6 | X4401198 | HMA SURF REM VAR DP | 6,817 | SQ YD | $6.25 | |
| 7 | X4402805 | ISLAND REMOVAL | 443 | SQ FT | $16.00 | |
| 8 | X5012502 | CONC REM SPEC | 12 | CU YD | $650.00 | |
| 9 | X6030310 | FR & LIDS ADJUST SPL | 4 | EACH | $1,000.00 | |
| 10 | X6061055 | CONCRETE ISLAND SPL | 226 | SQ FT | $160.00 | |
| 11 | Z0007126 | HANDRAIL REMOVAL | 64 | FOOT | $47.50 | |
| 12 | Z0030850 | TEMP INFO SIGNING | 42 | SQ FT | $27.50 | |
| 13 | Z0034105 | MATL TRANSFER DEVICE | 17,434 | TON | $12.00 | |
| 14 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $0.0100 | |
| 15 | Z0050100 | REM RE-ERECT EX HDRL | 17 | FOOT | $195.00 | |
| 16 | Z0076600 | TRAINEES | 1,000 | HOUR | $0.8000 | |
| 17 | Z0076604 | TRAINEES TPG | 1,000 | HOUR | $15.00 | |
| 18 | 20400800 | FURNISHED EXCAVATION | 15 | CU YD | $105.00 | |
| 19 | 20800150 | TRENCH BACKFILL | 71 | CU YD | $57.50 | |
| 20 | 21400100 | GRADING & SHAP DITCH | 1,400 | FOOT | $17.50 | |
| 21 | 25000210 | SEEDING CL 2A | 0.5 | ACRE | $4,050.00 | |
| 22 | 25000400 | NITROGEN FERT NUTR | 42 | POUND | $5.00 | |
| 23 | 25000500 | PHOSPHORUS FERT NUTR | 42 | POUND | $5.00 | |
| 24 | 25000600 | POTASSIUM FERT NUTR | 42 | POUND | $5.00 | |
| 25 | 25100630 | EROSION CONTR BLANKET | 2,266 | SQ YD | $2.35 | |
| 26 | 25200100 | SODDING | 357 | SQ YD | $25.00 | |
| 27 | 40200800 | AGG SURF CSE B | 87 | TON | $100.00 | |
| 28 | 40600290 | BIT MATLS TACK CT | 55,331 | POUND | $2.00 | |
| 29 | 40600370 | LONG JOINT SEALANT | 30,659 | FOOT | $2.75 | |
| 30 | 40600400 | MIX CR JTS FLANGEWYS | 24 | TON | $0.0100 | |
| 31 | 40600901 | HMA BC HM N70 | 36 | TON | $0.0100 | |
| 32 | 40600990 | TEMPORARY RAMP | 1,406 | SQ YD | $0.0100 | |
| 33 | 40603085 | HMA BC IL-19.0 N70 | 10,748 | TON | $98.00 | |
| 34 | 40604052 | HMA SC IL-9.5 C N70 | 6,686 | TON | $105.00 | |
| 35 | 40800050 | INCIDENTAL HMA SURF | 560 | TON | $225.00 | |
| 36 | 42400100 | PC CONC SIDEWALK 4 | 6,086 | SQ FT | $23.00 | |
| 37 | 42400800 | DETECTABLE WARNINGS | 692 | SQ FT | $50.00 | |
| 38 | 44000100 | PAVEMENT REM | 125 | SQ YD | $21.00 | |
| 39 | 44000164 | HMA SURF REM 3 3/4 | 76,344 | SQ YD | $5.25 | |
| 40 | 44000300 | CURB REM | 241 | FOOT | $37.00 | |
| 41 | 44000500 | COMB CURB GUTTER REM | 144 | FOOT | $37.00 | |
| 42 | 44000600 | SIDEWALK REM | 3,308 | SQ FT | $7.50 | |
| 43 | 44201737 | CL D PATCH T1 8 | 24 | SQ YD | $225.00 | |
| 44 | 44201741 | CL D PATCH T2 8 | 26 | SQ YD | $225.00 | |
| 45 | 44201747 | CL D PATCH T4 8 | 26 | SQ YD | $225.00 | |
| 46 | 44201789 | CL D PATCH T2 12 | 318 | SQ YD | $200.00 | |
| 47 | 44201794 | CL D PATCH T3 12 | 111 | SQ YD | $200.00 | |
| 48 | 48102100 | AGG WEDGE SHLD TYPE B | 1,773 | TON | $38.00 | |
| 49 | 48203029 | HMA SHOULDERS 8 | 3,387 | SQ YD | $52.50 | |
| 50 | 48203100 | HMA SHOULDERS | 357 | TON | $105.00 | |
| 51 | 50300225 | CONC STRUCT | 4.8 | CU YD | $5,000.00 | |
| 52 | 50800205 | REINF BARS, EPOXY CTD | 441 | POUND | $9.00 | |
| 53 | 52100510 | ANCHOR BOLTS 3/4 | 8 | EACH | $115.00 | |
| 54 | 542A8215 | P CUL CL A 2 EQRS 30 | 48 | FOOT | $250.00 | |
| 55 | 54260315 | TRVRS PIPE GRT CON ES | 9.4 | FOOT | $155.00 | |
| 56 | 54263330 | CONC ES 542011 30 1:3 | 1 | EACH | $17,000.00 | |
| 57 | 550A0050 | STORM SEW CL A 1 12 | 15 | FOOT | $315.00 | |
| 58 | 60238800 | INLETS TA | 1 | EACH | $5,000.00 | |
| 59 | 60260400 | INLETS ADJ NEW T1F CL | 1 | EACH | $3,000.00 | |
| 60 | 60600605 | CONC CURB TB | 492 | FOOT | $97.50 | |
| 61 | 60603500 | COMB CC&G TB6.06 | 21 | FOOT | $135.00 | |
| 62 | 60604400 | COMB CC&G TB6.18 | 56 | FOOT | $135.00 | |
| 63 | 60605000 | COMB CC&G TB6.24 | 69 | FOOT | $135.00 | |
| 64 | 60618300 | CONC MEDIAN SURF 4 | 121 | SQ FT | $32.00 | |
| 65 | 63301210 | REM RE-E SPBGR TY A | 75 | FOOT | $300.00 | |
| 66 | 66900200 | NON SPL WASTE DISPOSL | 50 | CU YD | $175.00 | |
| 67 | 66900530 | SOIL DISPOSAL ANALY | 2 | EACH | $1,500.00 | |
| 68 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,500.00 | |
| 69 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,500.00 | |
| 70 | 66901006 | REG SUB MON | 3 | CAL DA | $1,600.00 | |
| 71 | 67000400 | ENGR FIELD OFFICE A | 3 | CAL MO | $0.0100 | |
| 72 | 67100100 | MOBILIZATION | 1 | L SUM | $224,000.00 | |
| 73 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $100.00 | |
| 74 | 70100455 | TRAF CONT-PROT 701206 | 1 | L SUM | $100.00 | |
| 75 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $100.00 | |
| 76 | 70100500 | TRAF CONT-PROT 701326 | 1 | L SUM | $20,000.00 | |
| 77 | 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $7,500.00 | |
| 78 | 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $7,500.00 | |
| 79 | 70200100 | NIGHT WORK ZONE LIGHT | 1 | L SUM | $0.0100 | |
| 80 | 70300100 | SHORT TERM PAVT MKING | 8,313 | FOOT | $0.0100 | |
| 81 | 70300150 | SHRT TRM PAVT MK REM | 2,772 | SQ FT | $0.0100 | |
| 82 | 72400500 | RELOC SIN PAN ASSY TA | 1 | EACH | $175.00 | |
| 83 | 78000100 | THPL PVT MK LTR & SYM | 187.2 | SQ FT | $6.25 | |
| 84 | 78000200 | THPL PVT MK LINE 4 | 8,380 | FOOT | $1.10 | |
| 85 | 78000500 | THPL PVT MK LINE 8 | 206 | FOOT | $2.10 | |
| 86 | 78000600 | THPL PVT MK LINE 12 | 276 | FOOT | $3.15 | |
| 87 | 78000650 | THPL PVT MK LINE 24 | 60 | FOOT | $6.30 | |
| 88 | 78009004 | MOD URETH PM LINE 4 | 106,412 | FOOT | $0.9000 | |
| 89 | 78009006 | MOD URETH PM LINE 6 | 14,021 | FOOT | $1.20 | |
| 90 | 78011000 | GRV RCSD PM LTR & SYM | 187.2 | SQ FT | $3.25 | |
| 91 | 78011025 | GRV RCSD PVT MRKG 5 | 16,898 | FOOT | $0.5500 | |
| 92 | 78011045 | GRV RCSD PVT MRKG 9 | 206 | FOOT | $1.60 | |
| 93 | 78011065 | GRV RCSD PVT MRKG 13 | 276 | FOOT | $2.10 | |
| 94 | 78011125 | GRV RCSD PVT MRKG 25 | 60 | FOOT | $4.25 | |
| 95 | 78100100 | RAISED REFL PAVT MKR | 375 | EACH | $47.50 | |
| 96 | 78200020 | CURB REFLECTORS | 35 | EACH | $16.00 | |
| 97 | 78300200 | RAISED REF PVT MK REM | 339 | EACH | $0.0100 |